Heys Guys,
Busy day in division 6. Please see email below regarding sediment loss on the outer loop U-2519BA BB.
Chris H. McGinness, PWS
Division 6 Environmental Specialist I
North Carolina Department of Transportation
910 364 0837 office
515 720 0758 Mobile
chmcginness@ncdot.gov
431 Transportation Drive
Fayetteville, NC 28302
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Walker, Matt <Matt.Walker@rsandh.com>
Sent: Monday, December 18, 2023 3:37 PM
To: zackery.jacobs@bra nchciviLcom; Thomas Murphy<Thomas.murphy@bra nchcivil.com>; Steven Fox
<Steven.fox@bra nchcivi1.com>; McGinness, Christopher H <chmcginness@ncdot.gov>; CruzAlicea, Hector
<Hector.CruzAlicea@rsandh.com>; cwsmith@rkk.com
Cc: Bullard, Jason M <jmbullardl@ncdot.gov>; Terry Whitson<terry.whitson@branchcivil.com>; Peterson, Benjamin
<benjamin.peterson@rsandh.com>; Roy.Conoly@rsandh.c
Subject: [External] Inclement Weather 12/17/2023
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
The following will be considered part of the erosion control NPDES of the week starting 12/17/2023. Items that
are considered URGENT will be noted as such at the beginning of the description. URGENT items are those that
pose an increased chance for loss of material from the work site, such as non-functional erosion control
devices. URGENT indicates a need for corrective action within 24 hours of notice given to the contractor. All
erosion control issues not marked as URGENT are to be considered ROUTINE and are to be completed within 5
working days of notification to the contractor. Failure to do so will be noted in the NPDES report, indicated by
a date of completion outside the final workday of the week. All items reported in this list must be included in
the weekly NPDES, regardless of whether the work was completed or not during the week.
4 3/4 of rain was recorded on 12/18/2023 at the Lay down
Yard off of -Y13- after the rain event on 12/17/2023.
The following list is not to be considered all-inclusive and additional items may be added throughout the week
as they are identified. Inspection of the site, maintenance of erosion control devices, and maintaining
compliance regarding permits and regulations are the responsibility of the primary contractor, including all
subcontractors and those working on behalf of the primary contractor.
Branch Civil are working on this list today! The URGENTS are ruffly estimated the total will be added when they
are completed.
Matt Walker
Transportation Technician
2110 Fort Bragg Rd, Suite 108, Fayetteville, NC 28303
910-366-9975
Matt.Walker@rsandh.com
rsandh.com I Facebook I Twitter I Linkedln I Blog
Stay up-to-date with our latest news and insights.
RS&H
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.