HomeMy WebLinkAboutSW6230805_Design Calculations_20231218 Storm water Management Report December 12, 2023 ,,,,,,,,,,, •orssio . • SEAL t Turnberry South - Phase 1 • a5,5� s RoyalBirkda e Drive �••EQ ••••••- •„ , - *— Raeford , Hoke County, NC Prepared for: D&L Engineering , PLLC 150 S. Page Street Southern Pines, \C 28387 910-684-8646 Prepared by: Bowman North Carolina , Ltd . 4006 Barrett Drive, Suite 104 Raleigh , NC 27609 (919) 553-6570 Firm#F- 1445 Bowman TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY-WET POND SCM 1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY-BIORETENTION POND SCM 2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION-VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the residential project Turnberry South Phase 1 on Royal Birkdale Drive in Raeford, Hoke County. The project site is currently undeveloped, wooded area. The proposed site consists of 18.926 acres. The proposed site is located in Flood Zone 'X' as shown on FEMA FIRM Panel 3710945500J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are surface waters and wetland features on the proposed property. There are two proposed storm water management facilities (one wet pond and one bioretention pond) outlined in this report and they have been designed for post—development peak attenuation to treat the impervious areas of the development. The Wet Pond SCM 1 is designed to capture a drainage area of 9.27 ac with an impervious area of 4.78 ac. The BioRetention Pond SCM 2 is designed to capture a drainage area of 14.15 ac with an impervious area of 6.12 ac. The BioRetention Pond SCM 2 includes a drainage area of 6.61 ac with an impervious area of 3.35 ac for future phases. The balance of the site is open and thinly wooded space and will by—pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. Impervious Area Summary—Wet Pond SCM 1 Roadway 71,013 sf 1.63 ac Sidewalk _ 17,159 sf 0.39 ac Roof(30 lots @ 4,000 sf/lot) 120,000 sf 2.76 ac Total IA to Pond 208,172 sf 4.78 ac Impervious Area Summary— BioRetention Pond SCM 2 Roadway 19,241 sf 0.44 ac Sidewalk 1 5,356 sf 1 0.12 ac Roof(24 lots @ 4,000 sf/lot)_ 96,000 sf _ 2.20 ac Total IA to Pond 120,597 sf 2.77 ac Impervious Area Summary—Total Roadway 90,254 sf 1 2.07 ac Sidewalk 22,515 sf 0.52 ac Roof(54 lots @ 4,000 sf/lot) 216,000 sf 4.96 ac Total IA to Pond 328,769 sf 7.55 ac Soils The County Soils Survey indicates that Norfolk loamy sand, Wagram loamy sand, Goldsboro loamy sand, and Blaney loamy sand soils are present on the site. FIGURES Hydrologic Soil Group—Hoke County, North Carolinato o v 667200 667500 667800 668100 668400 668700 66910 35°0'41"N 2 �. 1 35°0'41"N 0 9 ' i / , ' . - 0 rb-____. --„ . . ,. . .. , - . , , tit 1 M C- 4 _„,* --. 4.... '' A\ \\ .AO BaD ---_ 1 t ji ' � i fir\ °." 'i,' y,\ WaB �'�n t\ r- ./ NoB "WaB3 °: a "_,.---- 1 #°* • ' NoB BaD•, =4 filii‘----- : BaD tVED JT . • GoA '` JT `yi ,,, , `1.. ` .. h., L 4 - . 'WaB BaD S VI- { I WED _ — - , \ 'V. 10 �CCIIo 0 BaB f= g kw A \ - t f BaD Bab,.r �• ,- T BaD ` ,.,, •, , 'r 8 .. •' :‘,W 140. .'.(11144 •, ...; .;A: a.: -,,,, ,. ,,, _. ,,,, 1.. irk. i .+ - ;" �3 i :� 34°59'8"N • ,., t-f'`7[-r._ 3 _..�.,.�° f. i 34°59'8„N 667200 667500 667800 668100 668400 668700 669000 669300 3 3 to a Map Scale:1:14,000 if printed on A portrait(8.5"x 11")sheet v N Meters it 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/31/2023 di id Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Hoke County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. O C/D Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons • D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service n A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) B Maps from the Web Soil Survey are based on the Web Mercator Transportation 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the n •.i Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required.C/D US Routes This product is generated from the USDA-NRCS certified data as 0 D Major Roads of the version date(s)listed below. n Not rated or not available Local Roads Soil Survey Area: Hoke County, North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Sep 8,2022 A 1111 Aerial Photography Soil map units are labeled(as space allows)for map scales • A/D 1:50,000 or larger. .v B Date(s)aerial images were photographed: Apr 17,2022—May 20,2022 •y B/D The orthophoto or other base map on which the soil lines were • • C compiled and digitized probably differs from the background • • C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. • • D • • Not rated or not available Soil Rating Points O A O ND ▪ B • B/D USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand,2 to C 44.6 5.8% 8 percent slopes BaD Blaney loamy sand,8 to C 156.1 20.3% 15 percent slopes CaB Candor sand, 1 to 8 A 6.5 0.8% percent slopes GoA Goldsboro loamy sand, B 21.5 2.8% 0 to 2 percent slopes, Southern Coastal Plain JT Johnston loam A/D 70.0 9.1% Ly Lynchburg sandy loam, B/D 3.6 0.5% 0 to 2 percent slopes Mc McColl loam D 6.2 0.8% NoB Norfolk loamy sand,2 to A 135.5 17.6% 6 percent slopes W Water 0.2 0.0% WaB Wagram loamy sand,0 A 324.6 42.2% to 6 percent slopes Totals for Area of Interest 768.6 100.0% USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Hoke County,North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 r p11114 .._, . 1 -.?), r i 1--- • i 1111 .. ti Vii.- .5 lk. ' ►&1 • Aso .,A I�] _ 4 �� a / S�� Ng. AMERICANA DR J ����N L A� i . ��44 ' ) 1 ,f_j , 1--- '' . _ 1\ 40 I, i- ill)p1ii`11.- I , c\- � ds __ - JOHNSON iMILL�RD/ o ;81P t- - ir . _ 4 41.1 'Fs : 49 All* ...(1.00-\' ,.. \* ir r ° t tih Ik . T_* c rn gUC(EYE.DR �ti • . NIIL • "ft;\. a- 4 • Bus z c � ."_ 64*' MAE ip 401 cl;'3 1' '4- ,...., lie III I PROJECT SITE National Flood Hazard Layer FlRMette . FEMA Legend 79°10'2"W 35°0'43"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT I vw•- v , ; Without Base Flood Elevation(BFE) 2063421 FEET ♦ Ali • iligR ZoneA.V A99 SPECIAL FLOOD With BFE or Depth Zone AE.AO.AH.VE.AR 206 FEET — HAZARD AREAS Regulatory Floodway e 0.2%Annual Chance Flood Hazard.Areas of 1%annual chance flood with average yr l r depth less than one foot or with drainage areas of less than one square mile ' 41.114 • i Future Conditions 1%Annual ♦•.• . f nib - Chance Flood Hazard zone.e itio • �.• �• "4" • dr % A Area with Reduced Flood Risk due to • �"' 205 FEET _ • •• I Levee.See Notes. a0 _ OTHER AREAS OF -+.' FLOOD HAZARD '/J Area with Flood Risk due to Levee ec y..� , • NO SCREEN Area of Minimal Flood Hazard \ f'^ , Pt'r Effective LOMRs (� 14 zip c t OTHER AREAS Area of Undetermined Flood Hazard 4 • �� C _+'Alt �' A1240:ati46%6 9•%.*144, GENERAL — - Channel.Culvert.or Storm Sewer ��3 Q9 f �' 1 , , C r STRUCTURES milli Levee,Dike,or Floodwall (�` \ -1 ` •• T Z • • O 20.2 Cross Sections with 1%Annual Chance ir • AREA OF MINIMA__F,LOOD HAZA ��5 Water Surface Elevation EE €OUNT �� zon X111 "' Coastal Transect PI ` 440 � . . 4 _ i � M Base Flood Elevation Line(BFE) - '370397 w • <p` ' Limit of Study Zone AE , JP •. Jurisdiction Boundary 4 - .. � f # " A --— --— Coastal Transect Baseline • TS'J1i • 3710�' {,t� a y• OTHER - Profile Baseline A ) 4, FEATURES Hydrographic Feature • ''� .. eff. 10/17/2006 �•t r 1Digital Data AvailableN 200 FEETIdie %i _ • ZILI,10:41 . ' t4 ....,0 • S No Digital Data Available + y ' `� • MAP PANELS Unmapped 0 1„p�E /'r �� ficiii- ,-,•A The pin displayed on the map is an approximate P .,,,,, � ' •. point selected by the user and does not represent jei -� ,. �� an authoritative property location. • t 1 ,� ' ` t This map complies with FEMA's standards for the use of . ,, 4t,4, ��� A40 • •S ,� digital flood maps if it is not void as described below. r rIM. v,thqi _ - 1a = �� • The basemap shown complies with FEMA's basemap • • ,9 � ' �` ` • ` •S accuracy standards do t .� 19� 1 ��1 la) M' • w 41°• The flood hazard information is derived directly from the I. ‘ ,, 1�� . .,.,, , authoritative NFHL web services provided by FEMA.This map 1 41s • ,0 was exported on 5/23/2023 at 2:27 PM and does not c_ reflect changes or amendments subsequent to this date and .." . tot" CI 411 - ', ,44 % 4 •i • time.The NFHL and effective information may change or K f - I ,••• ' become superseded by new data over time. • (A. e 1°�g5 9 FE . This map image is void if the one or more of the following map . ;, , _ , �,t 1 elements do not appear: basemap imagery.flood zone labels. • • ♦ '" `La legend,scale bar, map creation date.community identifiers, . - - — FIRM panel number.and FIRM effective date. Map images for Feet 79°9'25'W 35°0'13"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 1 :6'00� regulatory purposes. Basemap: USGS National Map: Orthoimagery: Data refreshed October. 2020 rDQom. NC Surface Water Classifications NC Classifications Website Report an Issue a A Amn�knrv� , *c Search X Q Stream Dote Is C _ege^d X Layers X • t P., o Surface Water Classifications: v ED X o, 4944 Fayetteville Rd. X oo ) 00 00 r7i Stream Index: 18.31-19-5 - - v Stream Name: Beaver Creek Surface Water Classifications: Description: From sourcem Puppy Creek - c�F Gtw1'a'-',,, e Stream Index: 18-31-19-5 Classification: c U' v Date of Class.: June30,1973 e JoIen nM" Stream Name: Beaver Creek What does this Class.mean? veo, Description: From source to Puppy Creek e`x',,,,veno g J River Basin: Cape Fear Classification: C CI,zoom to Date of Class.: June 30,1973 y 1 :anon Heath Dr ., cG :wit—fe 4 'BdO o F What does this Class.mean? View River Basin: Cape Fear 159 0 > n e " n ch Dl Jockey Dr 3 °e 4} 'fay ette+110.12d a' v n �•� ' `- me" nfJr 259 ft o t1ao1,D1 J CC LaWre H,,,. ',ek° PROJECT SITE . d apt Uo0w1n $�a N°+ -79.191 34.998 Degrees 0 v q '�M�ooe i_, _ _ _ _,yr°r 259 are�9y1 4 rq Or Club Fo,9c In r, \ _� �encana Or \ o •..l .. �� II\ il'ald en Green Of - �% .,,\ log _ mac"C3cz-,---- PROJECT SITE / y :40, Li //,‘ _ —.11/4 -\\\ --. ' - ' 1 4111 (iorz) • IP x — i si (t4`IP..— •-• -Digit HUC(Subwatershed) • i 12•igit Name: Lower Puppy Creek .1� 12-Di .Code. 030300040606 1.\� _ '• \\\ 10.D1g1 Name: Rockfish Creek f• I\• . 1 -- 10.Digit Code: 0303000406 _ ' • ;7 1111 a 8-Digit Code: 03030004 t ') River Basin: Cape Fear 1+1 1.11 • r O '$� ep 12-Digit Area(ac): 31.636.32 1 >/ $r � r nJ \, Zoom to / I� L^ o i : Cent`Qe6e s ' • — - 0t,; R ? • 0. o m+f 1171 Pprhsst I =(II hr� a o` r ,o` Co( I0'sd.C;I \.1 5/23/23,2:21 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 Location name: Raeford, North Carolina, USA* °�✓ '°° V lt. Latitude: 35.0076°,Longitude:-79.1669° V nunElevation:247 ft**1`� *source:ESRI Maps**source:USGS ""`" `' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.436 0.514 0.600 0.664 0.741 0.797 0.850 0.899 I 0.961 1.01 (0.396-0.482) (0.468-0.569) (0.545-0.664) (0.602-0.733) (0.669-0.816) (0.717-0.876) (0.761-0.933) (0.801-0.987) (0.848-1.06) (0.884-1.11) 10-min 0.696 0.823 0.960 1.06 1.18 1.27 1.35 1.42 1.52 I 1.59 (0.633-0.770) (0.749-0.911) (0.873-1.06) (0.963-1.17) (1.07-1.30) (1.14-1.40) (1.21-1.48) (1.27-1.56) l (1.34-1.67) (1.39-1.74) 15-min 0.870 1.03 1.22 1.34 1.50 1.61 1.71 1.80 1.91 1.99 (0.791-0.963) (0.941-1.14) (1.10-1.34) (1.22-1.48) (1.35-1.65) (1.45-1.77) (1.53-1.88) (1.60-1.98) (1.69-2.10) (1.75-2.19) 30-min 1.19 1.43 1.73 1.95 2.22 I 2.42 2.61 2.80 3.04 3.23 (1.08-1.32) (1.30-1.58) (1.57-1.91) (1.76-2.15) (2.00-2.44) (2.18-2.66) (2.34-2.87) (2.49-3.07) (2.69-3.34) (2.83-3.55) 60-min 1.49 1.79 2.21 2.54 2.95 3.28 3.60 3.93 4.37 4.71 (1.35-1.65) (1.63-1.98) (2.01-2.45) (2.30-2.80) (2.66-3.25) (2.95-3.60) (3.22-3.96) (3.50-4.31) (3.86-4.80) (4.13-5.18) 2-hr 1.73 I 2.10 2.64 3.06 3.61 4.06 4.50 4.96 5.59 6.08 (1.56-1.95) (1.90-2.36) (2.38-2.96) (2.74-3.42) (3.23-4.04) (3.61-4.54) (3.98-5.04) (4.36-5.54) (4.86-6.23)I (5.25-6.79) 3-hr 1.84 2.22 2.81 3.27 3.92 4.44 4.99 5.57 I 6.38 7.03 (1.66-2.07) (2.00-2.50) (2.53-3.16) (2.94-3.68) (3.49-4.39) (3.94-4.98) (4.39-5.58) (4.86-6.22) (5.50-7.12) (6.00-7.85) 6-hr 2.19 2.65 3.35 3.91 4.70 5.35 6.03 6.74 7.76 I 8.59 (1.98-2.44) (2.40-2.96) (3.03-3.72) (3.53-4.35) (4.20-5.21) (4.75-5.91) (5.31-6.66) (5.89-7.43) (6.69-8.55) (7.32-9.45) 12-hr 2.58 3.13 3.97 4.66 5.64 6.45 7.31 8.24 9.57 10.7 (2.33-2.88) (2.83-3.49) (3.58-4.42) (4.19-5.19) (5.02-6.25) (5.70-7.13) (6.40-8.07) (7.14-9.09) I (8.17-10.6) (8.99-11.7) 24-hr 3.04 3.68 4.66 5.44 6.52 7.39 8.28 9.21 I 10.5 11.5 (2.82-3.28)i (3.41-3.98) (4.32-5.04) (5.03-5.88) (6.00-7.04) (6.78-7.97) (7.58-8.93) (8.40-9.93) (9.52-11.3) (10.4-12.4) 2-day 3.53 I 4.26 5.35 6.22 7.42 8.38 9.38 10.4 11.8 12.9 (3.29-3.79) (3.97-4.58) (4.98-5.76) (5.77-6.69) (6.86-7.97) (7.72-9.00) (8.61-10.1) (9.51-11.2) (10.7-12.7) (11.7-13.9) 3-day 3.75 4.51 5.64 6.54 7.78 8.76 9.78 10.8 12.3 13.4 (3.50-4.02) (4.22-4.84) (5.26-6.04) (6.09-7.00) (7.21-8.32) (8.10-9.37) (9.01-10.5) (9.94-11.6) (11.2-13.2)I (12.2-14.4) 4-day 3.97 4.77 5.93 6.86 8.13 9.14 10.2 11.3 12.7 I 13.9 (3.72-4.24) (4.47-5.10) (5.55-6.33) (6.40-7.31) (7.56-8.66) (8.47-9.74) (9.41-10.9) (10.4-12.0) (11.7-13.6) (12.7-14.9) 7-day 4.61 5.52 6.78 - 7.78 9.14 10.2 11.4 12.5 14.1 15.4 (4.31-4.93) (5.16-5.89) (6.33-7.25) (7.25-8.31) (8.50-9.77) (9.50-10.9) (10.5-12.2) 1 (11.5-13.4) (12.9-15.1) (14.0-16.5) 10-day 5.28 6.30 7.62 8.65 10.0 11.1 I 12.3 13.4 14.9 16.1 (4.97-5.61) I (5.93-6.70) (7.16-8.09) (8.12-9.18) (9.40-10.7) (10.4-11.8) (11.4-13.0) (12.4-14.2) I (13.8-15.9) (14.8-17.2) 20-day 7.12 I 8.43 10.0 11.3 13.0 14.3 15.6 17.0 18.8 20.3 (6.72-7.56) 1 (7.96-8.95) (9.46-10.6) (10.6-12.0) (12.2-13.8) i (13.4-15.2) i (14.6-16.6) 1 (15.8-18.1) (17.5-20.0)I (18.7-21.6) 30-day 8.85 10.4 12.2 13.6 15.4 16.8 18.1 19.5 21.4 22.8 (8.38-9.37) (9.88-11.0) (11.5-12.9) (12.8-14.4) (14.5-16.3) (15.8-17.8) (17.0-19.2) (18.3-20.7) (19.9-22.7) (21.1-24.2) 45-day 11.2 13.1 15.1 16.6 18.6 20.1 I 21.5 23.0 24.9 26.3 (10.6-11.8) (12.5-13.9) (14.3-16.0) (15.7-17.6) (17.6-19.6) (19.0-21.2) (20.3-22.8) (21.6-24.3) (23.3-26.3) (24.6-27.9) 60-day 13.4 15.7 17.9 19.6 21.7 23.3 24.9 26.4 28.4 29.9 (12.7-14.1) (14.9-16.5) (17.0-18.8) (18.6-20.6) (20.6-22.8) (22.1-24.5) i (23.5-26.2) 1 (24.9-27.8) (26.7-30.0) (28.0-31.6) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 1/4 5/23/23,2:21 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.0076°, Longitude: -79.1669° 30 - --==—, —Average recurrence interva2 l 1 (years) 25 - c / — 1 a 20 - 5 a) -o — 10 0 15 - �� — 25 y — 50 •O. 10 - — 100 1. 200 m �� a 5 — /' �'C1/iii1111 500 0- 1 I I - I I I I I —__ C_ C C C C ' " '- im >. >.>. >. T >. >. 9.>. E ro E E E N A kb N v v v-o v 7 7 7 7-9 `^ o U1 m 6 Duration N N "I ^ o R R v$ 30 - - 25 - �- Duration 20 - - O. — 5-min — 2-day v 0 15 _ — 10 ruin — 3-day r iiiiIIIIIIIIIII15-min — 4-day '= — 30-min — 7-day v10 - _� — 60-min — 10-day a` g — 2-hr — 20-day 5 — 3-hr — 30-day — 6-hr — 45-day__ — 12-hr — 60-day — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Tue May 23 18:21:33 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 2/4 5/23/23,2:21 PM Precipitation Frequency Data Server FORT BRASS MILITARY RESERVATION 41'K AJRPARK Raeford — 3km I 2mi Large scale terrain Winston-Sal em • • •Durham Rocky Mount Greensboro • Raleigh NORTH CAROLINA Green •Charlotte FayettJille. Jacksol • T H CAROLIA N A Wilmington la 100km • Y C 60mi Large scale map Winston-Salem Greensboro ' 0 Darham Rocky Mount Raleigh North Greenvi Carolina • arlotte I Fayetteville Io ackson Wilmini 100km r CCI % IMI 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?Iat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 3/4 5/23/23,2:21 PM Precipitation Frequency Data Server Winston-Salem Greensboro Durham . Rocky Mount • Raleigh • Green North • Carolina Charlotte —�� Fayetteville • Jackson Wilmin 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questionsnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 4/4 Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 D&L Engineering,PLLC March 28,2023 Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines,NC 28387 Re: Seasonal High-Water Table Identification and Soil Infiltration Rates: Turnberry, Hoke County NC parcel 494560301008 Soil conditions and infiltration rates were evaluated and measured on the above-referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C-1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table(SHWT). SATURATED HYDRAULIC CONDUCTIVITY(Ksat) Soils evaluated on this property are typical of those within Blaney Loamy Sand Soil series. These soils are well drained to moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of stormwater infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium is reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported in the table below. BMP Device Site#1 Test Location SHWT Munsell Color Ksat#1 Ksat#2 (feet below Notation ground surface) Not observed 0-5' 7-15' Elevation 232' within 15'of N/A Sandy Clay Sandy Clay surface Loam/Sandy Loam(sap) (Elevation 217') Clay Not 2.5"/hour Measured Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 BMP Device Site#2 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) Observed 0-2' 2-10' 10-13" Elevation 218' within 13'bgs 2.5Y 7/1 Sandy Clay Sandy Clay Clay (Elevation 205') Loam Loam/Sandy Expansive 5"/hour Clay Not 2.5"/hour Measured CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates;however,methods used to measure these rates can influence the results. Side walls of the bore hole are"smeared"by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on-site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, n 5ait so Scott Cole 1":0 J► North Carolina Licensed Soil Scientist ""� �,�i' .al rr'';Aiy� et 0,14 Avg ct` 12g3 r iS" F "IQR-CY co N W .P O o O 'A al cNs A to N 0 BMP Site#1(Elevation 232') SHWT: Not Observed SHWT Elevation: NA Ksat 0-5'SCL/SC: 2.5"/hour Ksat 7-15'SCL(sap): Not Measured *10 II'Ps 111 aill Ili* IF 4 is sag is ■ •♦ ... ft ail* ali / a� N lia left i 2N2 9,q8 411 eit 494560301008 6111661 ON #100 o. Nod' N 27 *IA #A10 # ¢ sOIL ►i.�'vERs.NX(/a, ( � NN # 0 tire" VP0 10 N� NN N 7,4 0 / ## 0 \\ 114 �rve N NsAPIP'r n R BMP Site#2(Elevation 218') ` '� SHWT: 13'bgs SHWT Elevation: 205' Ksat 0-2'SCL: 5"/hour Ksat 2-10'SCLISC: 2.5"/hour Ksat 10-13'C(exp): Not Measured ilk \.13'heavy wetness/free water: SHWT WIP- • N•r. • ■ ■ NI c„, •• ... F__ 1 226 __ _1_ — nr_ n .C_ _i� 2a� WATER QUALITY/QUANTITY WET POND SCM 1 9I11/90 it/ j'1111`s<\ I I l S UI /(I I IIr11ly/ C( )' /%/!/1,_✓� ll(\ l )L✓ Ic\ i\w\`vl\I I�/�i/Ilj v, ,,,,./ . / I a �II 111 Ill �� rl �` l <�(� N U1111111j11 III (z�_ I I )1 ,' �/ar 41 ��11 III�I117II1J 1\�� / V AVA �11111 {( I >Il /) Jl \ I �� to z 1 ti L )/� 91 III I111\VAI£�1V\11�Al�t V��A \VA \ I� �)� c I n VA AVA�IIAl IIII ll�l��`y�^1° ��-��^V1AAi (( \A�(%/ (�� � �� i /_ ----� -1_-.„'' 1 •-%_d `y v 1 t r V\� VAAV��� ��v�VA V AV 1l ,. AA �� o lA�\VAV1QI��l\��� ��/�I ) I ) l l r�i� � ., f A \ ( I v 11 C �VAAIt i /( I �� I-r.,��� ' t l / J s ` \ V 1� �l V`\�V \ AAA � I 4 3' �J AV I (II II��V\(� ��\� .�-i% l� l V11 IIII / /.> v —� �. l A 1 I c ( �� e I ��� ,� 1 a ) , l y�11 vv\ y �� vv\� ' A 9�`,t /�/%1 1I I / �(i/� -)9 ��— I.9�' vzv / `ll 5 � , � 1Tr i- _� (CI ` � ���Av� 1�\ --"-', ���i � AA\ I I / A\ i � II(� � �� IIL- I I \ � ��A-�� 11 � Lro � 7 `� SV�>,.---��--,\ � �r-�` '' �< <y S ! // 1 I�l V AA ��-// -7 1 1 I 1AA�` `.\ 1 5 `� � ✓ 1� I"' VA�A�� 1\l \ ''N�� � Ai/ / j J0 �1 \� �t1��VA�111%%%��Ilt�/ (�I11 IIII 1\V1�121 � �;�a��VA�c/A�VI� /1� �� 1 < �c \ �� ����� VAS AV\v\V AA VA�V � hVA�V A (!/ �/ ( II_,�-„A//I = j,lI _// II '' !✓1 �sl ��y,�„ ,, �,r ,A\ ( 9A 11 z z z �9, � �. j v1 \ /�\�\1 1 I 1 I9 \ /VAAV)1�111111111�! lI j 111�1f11I)(I IIVI V III}I( 11 1 1. r 1Ill,llll ) V HP -,\�\11�111(l,l '—"\y-, „.-- -:—,2/�� ,�,•✓JI(r1�11 �)- ,. -������� \ ) ��e J rt�;x-ei, �", v �� ' 7 /1�� HIIi)yW, `0 ,1 �0 111111i11,, (^AVA; AI//� � �j�/i/�%7,t_ - �)// )( r,,"` 911.1 9',/ ',s," �fll C' IrO \ 1✓� A���.��� ���� �: cear iik ( f�1�r � i� �l ���� 1� - 11 -✓////�,��tiin a _ i--- �r� z% ��l 1A��AV� IA ��A� / ✓ 711E OFCONCEN7RA710N �; ho o ��: I�v /j/ 1VAA- � > 1 �� ll ///552-��� ����� �.�`�� / a// \ I VI 1 / VA 1 h v �V / ,,/'-- t :�z/1 -'.. lip < �1 / �rl / / v� � _ Ft01Y PATH d 5v� A' � v�� ���v�` ���•�� �' V �i` 1 / Y�� �� 11✓� r`'/1 �1111�,>>1v � / I /f1r ,,\_. w lir���A�� �� �// r z?d . �� A, L I o III AAVAA �1��✓ sa�> Ji< ,.(�A , \V�\VAA ( , � z�' I � �� I 1Ij,l' `� 11 �` t v e /< `�, (• > ,l \ v F, // i `� - -L e �11� ' > > 1 ✓ f fl !I C AV � � --� � f e , r ( / t i I � � e ( >e 1 � � I � CCI - i� N�11111VA \ \1 l��\/C1 ����VAti �AA\ A��yl� �� _ I \\ �/< )1Al Ile 11 II7�11 1 l of ( / U l / 1A\ Oslo �A �VJ- >1V�\vA�V ` \�°` V ,*z � {� v _ l N / A�- s�A 1 1-v �`'h l �A 1 �V �� / / )(CC� VA �� °- )l `.� �-- J III V - � ',.\ J r \ /r' — 1 ((//�I 11 1 l (1 v A V v I I l w l A\ �lAr IG� r V1A1�1/III Illl1�11\ A 1 1 Z°(� VV(lQ� ��� �1\V �_� ,, _,,,,„_,--\, '�111\Vl - 1� 1 Il �`AVA V 1A \Z ,?"��It, l l �� /,z ��� j / 1}�Ii�Ic 11W vVvvvvVA1 )vvv v> / )(a. „1V w�h AvAlA V Al c�1 v 1 1VV / 1 I I ( ) 1 \ 1A ,\1 , 1 �1 A )v ! °1�_ - VAIN 1111\))VAAt��l,lA��,� _ �yfpt t, �\, 1zEV A �_I vzr/ , I ���,/ v�0w� r 1 Q o� � � 1 � � 1II )/ F . I /l1)/ // /i //of 1\\�'', • ', -` \1v1(\III ow � 1 ) 1 POST-DEVELOPED J �,Jf, / =; r, . DRAINAGE AREA �,,/< 1 v ,, �° o a 11`I`Ill V ✓�JIIl11 II\IIII( _�' sTV1/v II CI\) \\ l \�111 II /ice / l// ( / Uf /��� I t i(i�i oo,e„eA ( \ A ( e a E 1 p ll I 1 /�r)�/� f _ � �` >a V A j �'° 1 1 1 ) A l / 1 3 d E \ 11A t _-' -/ / 1 --�/��/l///il/ / S V A51 ,- > 1(1 1 )I( , I\ sl 1 v t m m l 1A��� r C // ( ✓ / J 41 1 \ _ I l A 1 l c .• WAN (lVc !✓ 1 ✓ i -�,ry( /v I II AN l I 1 1I14)I f r.7 B %)/(4 //I d i 11/� 1 v \\\ \ V ./ri< rl✓ / / ` � ` �. \,c_11,\\\ /}/7- _y2/r-> 2.,_//,./s)////> AV AA �� j e �n I V , S Q z I iiir ) )\) )J))) 7/ / V IC: w 57t, \N / z 2 k, 4 WL,k \ G9 269 PC MB / 1I 1 1 1 1 l > 1-\\_,?_,, 1 iv.oas,slat'?'°''s,''''':'�wM. °Pti a ¢ [� o 0. (( \ (_\ I\ __ _ 4Nk.„,... a. "„ear bi _�:(1(,. --\ 1, 23.--2'. c ' 0 Lit \\ \ �t9 A G i I Gc uJ 1 I -- \ \\\\\ 2)-')11111k‘ ,,, '''-- of)/ ))/ 1 \.,,, \ ) _ r,,)6 yl.'Z''';'?;1„,07„,,,,,..1‘ ,g,.. \I N\ 5, __,_2 ) 1'lt.\\\ 111,10,1 I L „.,),>;1\ * ',)::: .,),,),‘,,,.,,,s ,),.0:), ,.4)101(4;A>):.104t,, , ,4 1:: ik 1,--..a...7.. / !.... ,g..,: g. . - CC �iLc ���'� e • miv_ v .t M �o Re• S ti , i � f'a�cSsia..4. \\ c'''\''‘\1's,‘,1.t.s.,:\ts.\\.\\S:: �� o�Mac".9 _ ►s/� -_' ��� r✓ -`�I �I "I 16 /, n55,,, :' t‘-\\_vp.,>,7: r \ 11 / � / I � l ��\ \. �/ , u of . � >s �r�. ,,-\\7 „)ji /( //i/;-:__,---:,. r . . 1 b., ,4„,.. oic,-,,,17~.:\x , „ ,„ \.\,, ,,,,_.es ,‘, „„,1 ,, , \\VN li \b -\\\)\-w))6)!II POST-DEVELOPED DRAINAGE AREA f s., rw/ .`--5 s25F T N \ ei , li . n,,,// � � �� 'DIE OF CONCEN7RA11011�. � - �� -t � ��, 1 SCM#2 7.55 AC (ON SITE) ` °`' FlOW PATM - 'Ir PLAN STATUS �� ' c, r `� °P»>Ss�c��' � w�\` 07/13/23 INITIAL SUBMISSION 4 ��� III... r\\\\\\irl\I4ilii�':7�, '�.I`/;ii= /�� ` ., As. case..` .,�...01 a� �0�os\ •�' cs`q,�l ` `"��N-, of os , �,'.` , POST DEVELOPED DRAINAGE AREA U Pri -, --- „ ......-.-,...1.1,,..... �� � I SCM#2 14.15 AC OVERALL) __ � ,5o � �� ` r�a,.. i, DATE OESGRIPTION ✓� '� )1 (INCLUDING FUTURE PHASE) 1 , ' ‘1.°- , 1( \� (� �� c III Igo �,v��; _ cB Ce cEP / v��'�� // v'°� __, � - 1r e v v se v N_� �" '�Saq DESIGN DRANM CHKD _ I, s' � ,n�z v L �,o / „%_1` a SCALE H: I e 1 4. �s3' GRAPHIC SCALE Joe No. 220164-01-007 �1111 � aasss Ity �i. �`.4 — a // I I I l 1 )) �/ �� `VA., ' �e- I�� �_ �_ ,.‘� c,� e��s '�� ��e� �eN o°Nj ," o Aso �� .';,',Z----, --;--a.::4 i 1. � � ° %� .'�,, Na`�,,��s�� � DATE JULY 13, 2023 ..‘ ) )//t1;<7 h ., I\ ,, ;--,„.,,s\ „ 1 )))7//»fd/ /- ,,/�� I�' ° es 1� �� �� J •;/h �n( N eeEz) ni _ 1 t lil �� r nKig,,,gillitip\-.11'1'.. ( e �y�,.�'/�../Alb, '`� ) / : 1inch— 30 1t, �_ _ �, � SHEET �U, Cad fie none:\G r 64-Stanegate\220164-0I-007(ENG)-Tumberry South-Raeford NC\Engineerng\Engineerng Plans\Construction Drawings\220164-01-067-O(P_CPAeg SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Turnberry South Phase 1 2 Project Area(ac) 18.926 3 Coastal Wetland Area(ac) - 4 :Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) _ 7 'Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes _ 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 'Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 'Infiltration System I 0 12 Bioretention Cell 1 _ 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 I StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \\�� . � ......... 0 A Royy''% Q�F E S Ip4/4*-. - SEAL — Signature of Designer 051571 •�••FNciNC-F--•oo //������1�I IEsemo\\\\ Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Wet Pond BioRetention 5 Total drainage area(sq ft) 819110 sf 403800 328663 6 Onsite drainage area(sq ft) 819110 sf 403800 328663 7 Offsite drainage area(sq ft) _ 8 Total BUA in project(sq ft) 328769 sf 208172 sf 120597 sf New BUA on subdivided lots(subject to permitting). 9 (sq ft) $ 216000 sf 120000 sf 96000 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 112769 sf 88172 sf 24597 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sgft) 22515 sf 17159 sf 5356 sf -Roof(sq ft) -Roadway_(sq ft) 90254 sf 71013 sf 19241 sf -Future(sq ft) I -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) _ New infiltrating permeable pavement not on 14 subdivided lots sq ft) Existing BUA that will remain(not subject to 15 I,permitting)(sq ft) 16 •Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 40.14% 51.6% 36.7% 19 jDesign storm(inches) 1.0 in 1.0 in • 20 Design volume of SCM(cu ft) 19332 cf 26625 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): There is 7,454 sf(0.171 ac)of surface water area.The bioretention pond has been designed for an area of 616,411 sf with an impervious area of 266,449sf.This future phase includes an additional 287,748 sf.of drainage area with an additional impervious area of 145,848 sf. WET POND 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 17295 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side sloes? IllAre the inlets,outlets.and receiving stream protected from erosion Yes 10- ear storm)? Is there an overflow or bypass for inflow volume in excess of the 1NB Yes desi•n volume? 9 What is the method for dewatering the SCM for maintenance? i Pump(preferred 10 If a..licable,will the SCM be cleaned out after construction? Yes 1 Does the maintenance access comply with General MDC(8)? Yes ®Does the drainage easement comply with General MDC(9)? Yes a If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed rofessional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? _ Yes _ 20 Elevation of the excavated main pool depth(bottom of sediment 220.00 removal)Sfmsl)21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 221.00 22Elevation of the bottom of the vegetated shelf(fmsl) 226.50 ®Elevation of the permanent pool(fmsl) 227.00 24 Elevation of the top of the vegetated shelf(fmsl) 227.50 25 Elevation of the temporary pool(fmsl) 228.30 ' _r_ 26 Surface area of the main permanent pool(square feet) 9630 27 Volume of the main permanent pool(cubic feet) 41228 cf 28jAverage depth of the main pool(feet) 4.67 ft 29'Average depth equation used _ Equation 3 30 If using equation 3,main pool perimeter(feet) 446.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 7830 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 12 in 35 Design volume of SCM(cu ft) 19332 cf _ 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) I 2.00 in I 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.55 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 30 in 44 Depth of forebay at exit(inches) 24 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes ,permanent pool? Does the pond minimize impacts to the receiving channel from the 1- 49 Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 551wet pond(s): Wet Pond 1 4:45 PM 12/12/2023 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Wet Pond #1) Drainage Area(acres): 9.27 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 5.17 56% C BaD Blaney Loamy Sand 4.10 44% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded -Good Stand A 5.17 50 27.9 Wooded -Good Stand C 4.10 73 32.3 Cumulative Curve#= 60.2 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond #1) Drainage Area(acres): 9.27 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 5.17 56% C BaD Blaney Loamy Sand 4.10 44% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A 0.00 55 0.0 Open Space-Good Condition C 2.22 77 18.4 Impervious Area 4.78 98 50.5 Cumulative Curve#= 69.0 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/6/2023 Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 9.27 Acres 403,800 sf Impervious Area (IA) = 4.78 Acres 208,172 sf Percent Impervious (I) = 51.55 % Required Surface Area Permament Pool Depth: 4.67 ft SA/DA= 1.408 Min Req'd Surface Area = 5,686 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.514 in/in Storage Volume Required = 17,295 cf(above Permanent Pool) Elevations Top of Pond Elevation = 231.00 ft Temporary Pool Elevation = 228.30 ft Permanent Pool Elevation = 227.00 ft Shelf Begining Elevation = 227.50 ft Forebay Weir= 226.00 ft Shelf Ending Elevation = 226.50 ft Bottom Elevation = 221.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 9,630 sf Volume of Temporary Storage = 19,332 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 9630 > 5686 ) sf Volume of Storage for Design Storm = 19,332 Yes ( 19332 > 17295 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Checked by: CB Date: 12/12/2023 Water Quality Orifice *Incremental Determination of Water Quality Volume Drawdown Time A Zone 3 Q3=0.0437 CD*D2(Z-D/24-Ei)"(1/2) V • Zone 2 Q2=0.372 CD*D*(Z-Ei)^(3/2) ♦ Zone 1 Q1 =0 • Orifice Diameter(D)= 2 in Cd= 0.6 Ei= 227 Orifice Inv. Zone 1 Range= 0.00 to 227 Zone 2 Range= 227 to 227.1 Zone 3 Range= 227.1 to 228 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 227.00 _ 13,600 0 0.00 _ 2.00 0.000 -- 227.50 _ 14,740 7,085 0.50 _ 3.00 0.068 1,744 228.00 _ 15,450 7,548 1.00 _ 3.00 0.100 1,253 228.30 15,880 4,700 2.00 3.00 0.116 677 Total -- 19,333 -- -- -- 3,674 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 19,333 cf Total Time= 3,674 min Total Time= 2.55 days 12/12/2023 Prop Wet Pond#1-new design(Montrose).xls 1 of 1 Project: Pond #4 Date: 12/12/2023 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 227 9,630 4,598 41,228 A2 (Perm_Pool) 226.5 8,760 4,310 36,630 Al (Bottom_Shelf) 226 8,480 8,045 32,320 225 7,610 7,210 24,275 224 6,810 6,430 17,065 223 6,050 5,680 10,635 222 5,310 4,955 4,955 221 4,600 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 227 3,760 3,760 1,835 7,830 226.5 3,580 3,580 1,748 5,995 226 3,410 3,410 3,155 4,248 225 2,900 2,900 1,093 1,093 224.5 1,470 1,470 0 0 Forebay Volume 19.0% *Between 15% &20% Average Depth (Option 1) 4.18 *At least 3'average depth Average Depth Calculation (Option 2) Vpp 41,228 permeter of shelf 446 width of shelf 3 Al (Bottom_Shelf): 8,760 Average Depth = 4.67 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 9.27 Acres Impervious Area (IA) = 4.78 Acres Percent Impervious (I) = 51.55 % (Drainage Area) Orifice Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 2.55 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 lbs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 85.5 cf (4'x4' riser x 3' =48sf, 5'x5'footing x 1.5' =37.5cf) I I / \ STORMWATER : : i tii,...( � � i�1 � � �a,I .. \\\,, / \ \ — / \\\ �— �34 1 I \ \\ i-D � l _ ...„, __, „\\ RIP RAP DISSIPATER PAD - N----.. ,---10e7: :::mi.., ' lit \-- WIDTH=7.5' \ ILENGTH=6.0 __ ' I THICKNESS=12" _ I 7RI�AP CLASS=A \\ \\ \\ / 1I I\ ' FES INV=226.7 ,�'��� � 4. \\ \ left�g p /--- \ • SEEPAGE COLLAR\\/ lip,IN' \ \ =\ I I./ I � 'IftII:�J.) ,) \ , 7 7 :„ \____,_ ______, ._. \r 18" OUTLET PIPE \ �p ' / / /,A REFER TO DETAILS \ \ ` _/ j ' i //\ ON THISSHEET I l N (1H.,.../ Q7_, , { / / \ \ 1 \\ \ ) ' I / /// (/ I \ 1 1 i / • ) 1 ' I II 1 � �' / / I I I I / / / r_________,) \ OUTLET CONTROL 1 1 I ' \ STRUCTURE REFER 1 ' I \ I I 1/,,,,,, I TO DETAILS ON 1 • I ►� I / i / I/THIS SHEET \ \ I / / / / I I / / MAIN POND AREA I • [I ) / �Y G' SOD AREAS ABOVE \J N / � 1/1 1 1 it / / l I / VEGETATIVE SHELF I h' I / 1'� 111 44 / ' ELEVATION E 227.5 ' 1 I / / / 1 e"'�O ar�lli ( / / I / J / / I 1I 7 I / / I �Ip s�I��=- CLASS B RIP-RAP / I / / // 1 / / / J /I{i,.. AT FOREBAY WEIR ---' TOP OF / ////� //� 7-_I/ L I\ ///// /// r1/ - —— EMBANKMENT • i / i _ // / / \ I'Ij ;lfrmte! � J, l / i liNalifil i i ( 1 I / • i ft(_ kgt,w■„�1_, , INLET PIPE WITH /\�/ ./ /\ O �� L 111j���I%.lph1i,��1(J/RIP--REAP APRON LITORAL SHELF // �� �i', -�Il,I �.�1,•�1 ( / // (, AREA=1,730 SF U -�' . .0 i / REFER TO DETAIL I / \ �—��'m-� '' RIP RAP DISSIPATER PAD FOR PLANTINGS �� 2 � //1 1 ��IN,1 WIDTH=18.0' J , \\ 7;Imf.t, HI =2 —J STTER,�MANT • bZEASEMENT / REA / �;�� __�__�,��I I l GRAPHIC SCALE 30 0 15 30 60 120 PLAN VIEW ( IN FEET ) 1 inch = 30 ft. \ J STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 227.0 13,600 0 0 0.5 227.5 14,740 7,085 7,085 1.0 228.0 15,450 7,548 14,633 1.3 228.3 15,880 4,700 19,332 (WQV) 2.0 229.0 16,890 11,470 30,802 3.0 230.0 18,310 17,600 48,402 4.0 231.0 19,610 18,960 67,362 tSTORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 0303000406 PROJECT COORDINATES: 35.009339°N, -79.160924°W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 9.27 ACRES SITE IMPERVIOUS AREA TO POND: 4.78 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 4.78 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 9.27 AC 9.27 AC CURVE NUMBER: 60.2 69.0 TIME OF CONCENTRATION: 21.8 MIN 5 MIN 1.0" STORM EVENT: 0.026 CFS 0.000 CFS 1-YEAR STORM EVENT: 1.982 CFS 10.51 CFS 0.109 CFS 2-YEAR STORM EVENT: 4.496 CFS 16.63 CFS 0.572 CFS 10-YEAR STORM EVENT: 14.44 CFS 35.92 CFS 5.850 CFS \100-YEAR STORM EVENT: 34.76 CFS 71.38 CFS 14.66 CFS J r SHALLOW LAND ZONE HERBACEOUS PLANTS 1 SHALLOW WATER ZONE i o HERBACEOUS PLANTS 9 9 V POND (NORMAL POOL) 1 I_ 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER SPACING PLANTING SEASON TYPE Jancus effesus Soft Rush SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tabernaemontani Soft Stem Bulrush SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriadelphus maculates Spotted Trumpetweed SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriadelphus fistulosus Joe-Pye Weed SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER Rhynchospora colorata Starrush Whitetop SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER TYPICAL LITTORAL SHELF PLANTING SCHEDULE ! @m § ; 2! ° § g2 : g2 / , # 7 !! ; mr § :® ` § ` 2mk P., , P k72§ 20 /§§ ° ® § hh ll ; II ;,,a 2 - ` - II //\ d w 8A «®2 . )TRIG 11 ;! 1 .40 i ` � = m \ At ,limp Mg 4 ' 'i p41T .t' 88m,;\/(§ _ - ° hi 014W MOP -' m§§ I 2 �° !m, -- Eln �• � I ;k:\;�(&, � '\\ - ; 2 q . o !Q: ; 2k 11 - (k/k ' M OM *\|k 1 \)§6 \j 2 4 4,�` I - ?� ¢g e r § `V; II - f ; ; \ ■ � � � \ } \ \ § § R 1 @m$ k ) \ ) l E. k 1 ) M2! ° WsI ° ° ° — m i j}�\\ R \Km` m7— \ - F< = \ 28' l`O ° 2!$! ;_'- 5R ° 'i n. ` ■42 m3§) §\�2 11 ,12 ` ` ®2 2 II 2=:#m ;;i /( N 111 111 01 HJ O , O 1 < m z o rn Ci M r$i 0 COrn j z 0 m M rn I. 23 2 N -0m o d • U f T 1 A n m? 2 m mm m M I,A m cr, M 11 O<pa IIo m O o A D MI All . Z n 1 N< m Z O I I O mm Iv A ti N m ., cox O n.<r m m —1m m o mm m 1 I m x -co os O C) O < p M 2 N m 2 D m o Om 23 0~ M z <O m m CO 0 0 m II m o N\m < n D= NJ A X 2 1 1 II m <3> 0 ti ti N y y ?O O m x 0, cn m m ▪m � 1 0 o 27 2ti m rn o rn mr�, D C m m c ti Z D M O 0< n II xi Ps O 1 1 vnm n omn m z -1 ?J x D m 0 � o D c mfl�N+l ro mo m m m c 0,v) <no mmc�>m Iv 1 1• �M < o <po cn• m''+ o �Ao zN z Ps D n o m pa z z r, z D rn z m2 0� ino n N, m y o o m Ps \l niiiik \ 2 ti a 4 a Na u .O Na O ti C ti M O LIWV --I 33 N C z z m Ao C 2� M o0 co ca I— ilf xm M A Z D O z In 2 0 1 O A n n A ti K A A F A O Z v 71 II N V O N 0 M N A., Z rras Z Z n N A Z n D A O A = C_) ND Z y N as IT1 13 A m n as ➢ m z Z m ra n ten n c x M c m z UI C-o O A 2 0 _ f m z z n V) 0 O y II v O X.X. N<A.r ,"F oc) z-P. ➢N O A 0 O D D�1 n ~2 I-9 n O 1 n A m f SPILLWAY FLOW LONG H B W SS CHANNEL LINING TOP OF EMBANKMENT SPILLWAY ELEVATION Q(100) SLOPE(%) ELEVATION GRASS STRAW WITH NET NAG 14.66 CFS 33.3% 0.5' 10.0' 13.0' 3:1 231.0 230.5 SPILLWAY SHOREMAX W/ P300 w EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT 231.0 SS H CHANNEL LINING S SPILLWAY ELEVATION-230.5 MATTING SHALL BE AS NOTED OR APPROVED EQUAL. B ►{ GRASS SPILLWAY DETAILI GRASS SOD ON SPILLWAY AND SIDE SLOPES 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Peak Flow Period Post Through Pond 12.37 - 12.03 = 0.34 - 1 hour Hydrograph type = Reservoir Peak discharge = 14.66 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 143,104 cuft Inflow hyd. No. = 2 - BMP Post-DevelorRdservoir name = BMP Pond Max. Elevation = 230.73 ft Max. Storage = 62,310 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.77 23.63 228.36 0.753 0.104 0.647 0.752 11.80 29.25 228.54 2.126 0.099 2.019 2.118 11.83 37.64 228.76 4.344 0.085 4.247 4.332 11.87 48.50 229.04 6.593 0.063 6.129 0.401 6.593 11.90 61.25 229.36 9.934 0.031 5.250 4.651 9.931 11.93 71.38 « 229.73 11.80 0.018 4.742 7.027 11.79 11.97 70.53 230.12 13.07 0.012 4.569 8.478 13.06 12.00 56.22 230.44 13.93 0.010 4.535 9.367 13.91 12.03 35.75 230.64 14.45 0.008 4.351 9.449 0.595 14.40 12.07 19.84 230.72 14.66 0.007 4.261 9.421 0.950 14.64 12.10 12.39 230.73 « 14.68 0.007 4.249 9.413 0.986 14.66 12.13 10.22 230.71 14.63 0.008 4.275 9.432 0.903 14.62 12.17 9.807 230.68 14.56 0.008 4.308 9.445 0.783 14.54 12.20 9.414 230.65 14.48 0.008 4.339 9.448 0.649 14.44 12.23 9.019 230.62 14.40 0.008 4.372 9.451 0.507 14.34 12.27 8.620 230.59 14.31 0.008 4.412 9.462 0.359 14.24 12.30 8.215 230.55 14.21 0.009 4.462 9.483 0.205 14.16 12.33 7.809 230.51 14.11 0.009 4.515 9.505 0.042 14.07 12.37 7.399 230.47 14.01 0.009 4.532 9.439 13.98 12.40 6.986 230.43 13.90 0.010 4.536 9.339 13.88 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.43 6.570 230.38 13.78 0.010 4.537 9.222 13.77 12.47 6.150 230.34 13.65 0.010 4.533 9.083 13.63 12.50 5.729 230.29 13.52 0.011 4.532 8.941 13.48 12.53 5.340 230.24 13.39 0.011 4.538 8.800 13.35 12.57 5.049 230.19 13.25 0.011 4.548 8.656 13.22 12.60 4.867 230.13 13.10 0.012 4.565 8.511 13.09 12.63 4.752 230.08 12.95 0.012 4.582 8.357 12.95 12.67 4.659 230.03 12.80 0.013 4.597 8.188 12.80 12.70 4.566 229.98 12.65 0.014 4.616 8.009 12.64 12.73 4.472 229.92 12.49 0.014 4.639 7.815 12.47 12.77 4.378 229.87 12.31 0.015 4.666 7.610 12.29 12.80 4.283 229.82 12.13 0.016 4.694 7.396 12.11 12.83 4.188 229.76 11.92 0.017 4.725 7.161 11.90 12.87 4.093 229.71 11.70 0.018 4.756 6.920 11.69 12.90 3.997 229.66 11.48 0.019 4.796 6.656 11.47 12.93 3.901 229.61 11.25 0.020 4.837 6.391 11.25 12.97 3.805 229.56 11.02 0.022 4.894 6.101 11.02 13.00 3.708 229.51 10.79 0.023 4.953 5.811 10.79 13.03 3.616 229.46 10.54 0.025 5.030 5.484 10.54 13.07 3.537 229.42 10.30 0.027 5.110 5.154 10.29 13.10 3.474 229.37 10.03 0.030 5.212 4.781 10.02 13.13 3.419 229.33 9.753 0.032 5.323 4.395 9.751 13.17 3.368 229.28 9.456 0.035 5.451 3.968 9.455 13.20 3.316 229.24 9.122 0.039 5.607 3.474 9.120 13.23 3.265 229.20 8.803 0.043 5.755 3.003 8.801 13.27 3.213 229.17 8.342 0.048 5.941 2.352 8.341 13.30 3.161 229.13 7.895 0.052 6.120 1.721 7.893 13.33 3.109 229.10 7.481 0.057 6.285 1.139 7.480 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.37 3.057 229.08 7.097 0.060 6.234 0.802 7.096 13.40 3.004 229.05 6.742 0.062 6.160 0.519 6.741 13.43 2.952 229.02 6.412 0.064 6.091 0.257 6.412 13.47 2.900 229.00 6.107 0.066 6.027 0.014 6.107 13.50 2.847 228.98 5.906 0.066 5.839 5.905 13.53 2.795 228.96 5.718 0.066 5.651 5.718 13.57 2.749 228.94 5.539 0.066 5.472 5.539 13.60 2.707 228.92 5.427 0.068 5.355 5.423 13.63 2.669 228.90 5.340 0.070 5.262 5.332 13.67 2.631 228.88 5.254 0.072 5.171 5.243 13.70 2.594 228.86 5.162 0.074 5.073 5.147 13.73 2.556 228.84 5.017 0.076 4.925 5.002 13.77 2.518 228.82 4.878 0.078 4.784 4.862 13.80 2.480 228.80 4.745 0.080 4.648 4.729 13.83 2.443 228.79 4.613 0.082 4.514 4.596 13.87 2.405 228.77 4.441 0.084 4.343 4.427 13.90 2.367 228.76 4.279 0.085 4.183 4.268 13.93 2.329 228.75 4.127 0.087 4.032 4.119 13.97 2.290 228.73 3.983 0.088 3.889 3.978 14.00 2.252 228.72 3.848 0.089 3.755 3.845 14.03 2.217 228.71 3.733 0.090 3.636 3.726 14.07 2.188 228.70 3.625 0.091 3.524 3.615 14.10 2.169 228.69 3.523 0.092 3.418 3.510 14.13 2.154 228.68 3.428 0.092 3.319 3.411 14.17 2.142 228.67 3.338 0.093 3.226 3.319 14.20 2.129 228.66 3.255 0.093 3.139 3.232 14.23 2.116 228.65 3.176 0.094 3.057 3.151 14.27 2.103 228.65 3.103 0.094 2.983 3.077 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.30 2.090 228.64 3.034 0.095 2.916 3.011 14.33 2.077 228.63 2.969 0.095 2.853 2.948 14.37 2.064 228.63 2.907 0.095 2.793 2.888 14.40 2.051 228.62 2.849 0.096 2.736 2.832 14.43 2.038 228.62 2.793 0.096 2.682 2.778 14.47 2.025 228.61 2.741 0.096 2.631 2.728 14.50 2.012 228.61 2.691 0.096 2.583 2.679 14.53 1.999 228.60 2.644 0.097 2.537 2.634 14.57 1.986 228.60 2.599 0.097 2.493 2.590 14.60 1.973 228.59 2.556 0.097 2.452 2.549 14.63 1.960 228.59 2.515 0.097 2.412 2.509 14.67 1.947 228.58 2.476 0.098 2.374 2.471 14.70 1.934 228.58 2.439 0.098 2.338 2.435 14.73 1.920 228.58 2.408 0.098 2.306 2.404 14.77 1.907 228.57 2.378 0.098 2.275 2.373 14.80 1.894 228.57 2.349 0.098 2.246 2.344 14.83 1.881 228.57 2.321 0.098 2.217 2.315 14.87 1.868 228.56 2.294 0.098 2.190 2.288 14.90 1.854 228.56 2.268 0.098 2.163 2.261 14.93 1.841 228.56 2.243 0.098 2.137 2.236 14.97 1.828 228.55 2.218 0.098 2.112 2.211 15.00 1.815 228.55 2.194 0.099 2.088 2.186 15.03 1.801 228.55 2.171 0.099 2.064 2.163 15.07 1.788 228.55 2.148 0.099 2.041 2.140 15.10 1.775 228.54 2.126 0.099 2.019 2.118 15.13 1.761 228.54 2.105 0.099 1.997 2.096 15.17 1.748 228.54 2.084 0.099 1.976 2.075 15.20 1.735 228.54 2.064 0.099 1.955 2.054 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.23 1.721 228.53 2.044 0.099 1.935 2.034 15.27 1.708 228.53 2.024 0.099 1.915 2.014 15.30 1.694 228.53 2.005 0.099 1.895 1.994 15.33 1.681 228.53 1.986 0.099 1.876 1.975 15.37 1.667 228.53 1.968 0.099 1.857 1.956 15.40 1.654 228.52 1.949 0.099 1.839 1.938 15.43 1.641 228.52 1.932 0.099 1.821 1.920 15.47 1.627 228.52 1.914 0.099 1.803 1.902 15.50 1.613 228.52 1.897 0.099 1.785 1.885 15.53 1.600 228.51 1.880 0.100 1.768 1.867 15.57 1.586 228.51 1.863 0.100 1.751 1.850 15.60 1.573 228.51 1.846 0.100 1.734 1.833 15.63 1.559 228.51 1.831 0.100 1.718 1.818 15.67 1.546 228.51 1.817 0.100 1.703 1.803 15.70 1.532 228.51 1.803 0.100 1.688 1.788 15.73 1.519 228.50 1.789 0.100 1.674 1.773 15.77 1.505 228.50 1.775 0.100 1.659 1.759 15.80 1.491 228.50 1.761 0.100 1.644 1.744 15.83 1.478 228.50 1.747 0.100 1.630 1.730 15.87 1.464 228.50 1.733 0.100 1.615 1.715 15.90 1.450 228.49 1.720 0.100 1.601 1.701 15.93 1.437 228.49 1.706 0.100 1.587 1.687 15.97 1.423 228.49 1.692 0.100 1.572 1.672 16.00 1.409 228.49 1.679 0.100 1.558 1.658 16.03 1.397 228.49 1.665 0.100 1.544 1.644 16.07 1.387 228.49 1.651 0.100 1.530 1.630 16.10 1.379 228.48 1.638 0.100 1.516 1.616 16.13 1.374 228.48 1.625 0.100 1.502 1.603 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.17 1.369 228.48 1.613 0.100 1.489 1.590 16.20 1.365 228.48 1.601 0.100 1.477 1.577 16.23 1.360 228.48 1.590 0.101 1.465 1.565 16.27 1.355 228.48 1.579 0.101 1.453 1.554 16.30 1.351 228.47 1.568 0.101 1.442 1.543 16.33 1.346 228.47 1.558 0.101 1.431 1.532 16.37 1.341 228.47 1.548 0.101 1.421 1.521 16.40 1.337 228.47 1.538 0.101 1.411 1.511 16.43 1.332 228.47 1.528 0.101 1.401 1.501 16.47 1.327 228.47 1.519 0.101 1.391 1.492 16.50 1.322 228.47 1.510 0.101 1.382 1.482 16.53 1.318 228.47 1.502 0.101 1.373 1.473 16.57 1.313 228.46 1.493 0.101 1.364 1.465 16.60 1.308 228.46 1.485 0.101 1.355 1.456 16.63 1.303 228.46 1.477 0.101 1.347 1.448 16.67 1.298 228.46 1.469 0.101 1.339 1.439 16.70 1.294 228.46 1.462 0.101 1.331 1.431 16.73 1.289 228.46 1.454 0.101 1.323 1.424 16.77 1.284 228.46 1.447 0.101 1.315 1.416 16.80 1.279 228.46 1.440 0.101 1.308 1.409 16.83 1.275 228.46 1.433 0.101 1.300 1.401 16.87 1.270 228.46 1.426 0.101 1.293 1.394 16.90 1.265 228.45 1.419 0.101 1.286 1.387 16.93 1.260 228.45 1.413 0.101 1.279 1.380 16.97 1.256 228.45 1.406 0.101 1.272 1.373 17.00 1.251 228.45 1.400 0.101 1.265 1.367 17.03 1.246 228.45 1.393 0.101 1.259 1.360 17.07 1.241 228.45 1.387 0.101 1.252 1.354 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.10 1.236 228.45 1.381 0.101 1.246 1.347 17.13 1.232 228.45 1.375 0.101 1.240 1.341 17.17 1.227 228.45 1.369 0.101 1.233 1.335 17.20 1.222 228.45 1.363 0.101 1.227 1.328 17.23 1.217 228.45 1.357 0.101 1.221 1.322 17.27 1.212 228.45 1.352 0.101 1.215 1.316 17.30 1.208 228.44 1.346 0.101 1.209 1.310 17.33 1.203 228.44 1.340 0.101 1.203 1.305 17.37 1.198 228.44 1.335 0.101 1.197 1.299 17.40 1.193 228.44 1.329 0.101 1.192 1.293 17.43 1.188 228.44 1.324 0.101 1.186 1.287 17.47 1.183 228.44 1.318 0.101 1.180 1.282 17.50 1.179 228.44 1.313 0.101 1.175 1.276 17.53 1.174 228.44 1.308 0.101 1.170 1.271 17.57 1.169 228.44 1.303 0.101 1.165 1.266 17.60 1.164 228.44 1.297 0.102 1.160 1.262 17.63 1.159 228.44 1.292 0.102 1.155 1.257 17.67 1.154 228.44 1.287 0.102 1.150 1.252 17.70 1.149 228.44 1.282 0.102 1.146 1.247 17.73 1.145 228.43 1.277 0.102 1.141 1.242 17.77 1.140 228.43 1.271 0.102 1.136 1.237 17.80 1.135 228.43 1.266 0.102 1.131 1.233 17.83 1.130 228.43 1.261 0.102 1.126 1.228 17.87 1.125 228.43 1.256 0.102 1.121 1.223 17.90 1.120 228.43 1.251 0.102 1.116 1.218 17.93 1.115 228.43 1.245 0.102 1.112 1.213 17.97 1.111 228.43 1.240 0.102 1.107 1.208 18.00 1.106 228.43 1.235 0.102 1.102 1.204 Continues on next page... 17 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.03 1.101 228.43 1.230 0.102 1.097 1.199 18.07 1.096 228.43 1.225 0.102 1.092 1.194 18.10 1.091 228.43 1.219 0.102 1.087 1.189 18.13 1.086 228.43 1.214 0.102 1.082 1.184 18.17 1.081 228.43 1.209 0.102 1.077 1.179 18.20 1.076 228.42 1.204 0.102 1.073 1.175 18.23 1.071 228.42 1.198 0.102 1.068 1.170 18.27 1.066 228.42 1.193 0.102 1.063 1.165 18.30 1.062 228.42 1.188 0.102 1.058 1.160 18.33 1.057 228.42 1.183 0.102 1.053 1.155 18.37 1.052 228.42 1.177 0.102 1.048 1.150 18.40 1.047 228.42 1.172 0.102 1.043 1.145 18.43 1.042 228.42 1.167 0.102 1.038 1.141 18.47 1.037 228.42 1.162 0.102 1.033 1.136 18.50 1.032 228.42 1.156 0.102 1.029 1.131 18.53 1.027 228.42 1.151 0.102 1.024 1.126 18.57 1.022 228.42 1.146 0.102 1.019 1.121 18.60 1.017 228.42 1.141 0.102 1.014 1.116 18.63 1.012 228.42 1.135 0.102 1.009 1.111 18.67 1.007 228.41 1.130 0.102 1.004 1.106 18.70 1.002 228.41 1.125 0.102 0.999 1.101 18.73 0.997 228.41 1.119 0.102 0.994 1.097 18.77 0.992 228.41 1.114 0.102 0.989 1.092 18.80 0.988 228.41 1.109 0.102 0.984 1.087 18.83 0.983 228.41 1.104 0.102 0.979 1.082 18.87 0.978 228.41 1.098 0.102 0.975 1.077 18.90 0.973 228.41 1.093 0.102 0.970 1.072 18.93 0.968 228.41 1.088 0.103 0.965 1.067 Continues on next page... 18 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.97 0.963 228.41 1.082 0.103 0.960 1.062 19.00 0.958 228.41 1.077 0.103 0.955 1.057 19.03 0.953 228.41 1.072 0.103 0.950 1.052 19.07 0.948 228.41 1.067 0.103 0.945 1.047 19.10 0.943 228.41 1.061 0.103 0.940 1.043 19.13 0.938 228.40 1.056 0.103 0.935 1.038 19.17 0.933 228.40 1.051 0.103 0.930 1.033 19.20 0.928 228.40 1.045 0.103 0.925 1.028 19.23 0.923 228.40 1.040 0.103 0.920 1.023 19.27 0.918 228.40 1.035 0.103 0.915 1.018 19.30 0.913 228.40 1.029 0.103 0.910 1.013 19.33 0.908 228.40 1.024 0.103 0.905 1.008 19.37 0.903 228.40 1.019 0.103 0.900 1.003 19.40 0.898 228.40 1.013 0.103 0.895 0.998 19.43 0.893 228.40 1.008 0.103 0.890 0.993 19.47 0.888 228.40 1.003 0.103 0.885 0.988 19.50 0.883 228.40 0.997 0.103 0.880 0.983 19.53 0.878 228.40 0.992 0.103 0.875 0.978 19.57 0.873 228.40 0.987 0.103 0.870 0.973 19.60 0.868 228.39 0.981 0.103 0.865 0.968 19.63 0.863 228.39 0.976 0.103 0.860 0.964 19.67 0.858 228.39 0.971 0.103 0.856 0.959 19.70 0.853 228.39 0.965 0.103 0.850 0.954 19.73 0.848 228.39 0.960 0.103 0.845 0.949 19.77 0.843 228.39 0.955 0.103 0.841 0.944 19.80 0.838 228.39 0.949 0.103 0.836 0.939 19.83 0.833 228.39 0.944 0.103 0.831 0.934 19.87 0.828 228.39 0.939 0.103 0.826 0.929 Continues on next page... 19 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.90 0.823 228.39 0.933 0.103 0.821 0.924 19.93 0.818 228.39 0.928 0.103 0.816 0.919 19.97 0.813 228.39 0.922 0.103 0.811 0.914 20.00 0.808 228.39 0.917 0.103 0.805 0.909 20.03 0.803 228.38 0.912 0.103 0.801 0.904 20.07 0.800 228.38 0.906 0.103 0.796 0.899 20.10 0.798 228.38 0.901 0.103 0.791 0.894 20.13 0.797 228.38 0.896 0.103 0.786 0.889 20.17 0.796 228.38 0.891 0.103 0.781 0.885 20.20 0.795 228.38 0.887 0.103 0.777 0.881 20.23 0.794 228.38 0.882 0.103 0.773 0.876 20.27 0.793 228.38 0.878 0.104 0.769 0.872 20.30 0.792 228.38 0.874 0.104 0.765 0.869 20.33 0.791 228.38 0.870 0.104 0.761 0.865 20.37 0.790 228.38 0.866 0.104 0.758 0.861 20.40 0.789 228.38 0.862 0.104 0.754 0.858 20.43 0.788 228.38 0.859 0.104 0.751 0.855 20.47 0.787 228.38 0.855 0.104 0.748 0.851 20.50 0.786 228.38 0.852 0.104 0.745 0.848 20.53 0.785 228.38 0.848 0.104 0.742 0.845 20.57 0.784 228.38 0.845 0.104 0.739 0.842 20.60 0.783 228.38 0.842 0.104 0.736 0.839 20.63 0.783 228.37 0.839 0.104 0.733 0.837 20.67 0.782 228.37 0.836 0.104 0.730 0.834 20.70 0.781 228.37 0.834 0.104 0.728 0.832 20.73 0.780 228.37 0.831 0.104 0.725 0.829 20.77 0.779 228.37 0.828 0.104 0.723 0.827 20.80 0.778 228.37 0.826 0.104 0.721 0.824 Continues on next page... 20 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.83 0.777 228.37 0.824 0.104 0.718 0.822 20.87 0.776 228.37 0.821 0.104 0.716 0.820 20.90 0.775 228.37 0.819 0.104 0.714 0.818 20.93 0.774 228.37 0.817 0.104 0.712 0.816 20.97 0.773 228.37 0.814 0.104 0.710 0.814 21.00 0.772 228.37 0.812 0.104 0.708 0.812 21.03 0.771 228.37 0.810 0.104 0.706 0.810 21.07 0.770 228.37 0.808 0.104 0.704 0.808 21.10 0.769 228.37 0.806 0.104 0.702 0.806 21.13 0.768 228.37 0.804 0.104 0.700 0.804 21.17 0.768 228.37 0.803 0.104 0.699 0.803 21.20 0.767 228.37 0.801 0.104 0.698 0.801 21.23 0.766 228.37 0.800 0.104 0.696 0.800 21.27 0.765 228.37 0.799 0.104 0.695 0.799 21.30 0.764 228.37 0.798 0.104 0.693 0.797 21.33 0.763 228.37 0.796 0.104 0.692 0.796 21.37 0.762 228.37 0.795 0.104 0.691 0.795 21.40 0.761 228.37 0.794 0.104 0.689 0.793 21.43 0.760 228.37 0.792 0.104 0.688 0.792 21.47 0.759 228.37 0.791 0.104 0.687 0.791 21.50 0.758 228.37 0.790 0.104 0.686 0.790 21.53 0.757 228.37 0.789 0.104 0.684 0.788 21.57 0.756 228.37 0.788 0.104 0.683 0.787 21.60 0.755 228.37 0.786 0.104 0.682 0.786 21.63 0.754 228.37 0.785 0.104 0.681 0.785 21.67 0.753 228.37 0.784 0.104 0.679 0.783 21.70 0.752 228.37 0.783 0.104 0.678 0.782 21.73 0.751 228.37 0.782 0.104 0.677 0.781 Continues on next page... 21 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.77 0.750 228.37 0.781 0.104 0.676 0.780 21.80 0.749 228.37 0.779 0.104 0.675 0.779 21.83 0.748 228.37 0.778 0.104 0.673 0.777 21.87 0.748 228.36 0.777 0.104 0.672 0.776 21.90 0.747 228.36 0.776 0.104 0.671 0.775 21.93 0.746 228.36 0.775 0.104 0.670 0.774 21.97 0.745 228.36 0.774 0.104 0.669 0.773 22.00 0.744 228.36 0.773 0.104 0.668 0.772 22.03 0.743 228.36 0.772 0.104 0.667 0.771 22.07 0.742 228.36 0.771 0.104 0.665 0.770 22.10 0.741 228.36 0.769 0.104 0.664 0.768 22.13 0.740 228.36 0.768 0.104 0.663 0.767 22.17 0.739 228.36 0.767 0.104 0.662 0.766 22.20 0.738 228.36 0.766 0.104 0.661 0.765 22.23 0.737 228.36 0.765 0.104 0.660 0.764 22.27 0.736 228.36 0.764 0.104 0.659 0.763 22.30 0.735 228.36 0.763 0.104 0.658 0.762 22.33 0.734 228.36 0.762 0.104 0.657 0.761 22.37 0.733 228.36 0.761 0.104 0.656 0.760 22.40 0.732 228.36 0.760 0.104 0.655 0.759 22.43 0.731 228.36 0.759 0.104 0.654 0.758 22.47 0.730 228.36 0.758 0.104 0.652 0.757 22.50 0.729 228.36 0.757 0.104 0.651 0.756 22.53 0.728 228.36 0.756 0.104 0.650 0.754 22.57 0.727 228.36 0.755 0.104 0.649 0.753 22.60 0.726 228.36 0.754 0.104 0.648 0.752 22.63 0.725 228.36 0.753 0.104 0.647 0.751 22.67 0.725 228.36 0.752 0.104 0.646 0.750 Continues on next page... 22 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.70 0.724 228.36 0.751 0.104 0.645 0.749 22.73 0.723 228.36 0.750 0.104 0.644 0.748 22.77 0.722 228.36 0.749 0.104 0.643 0.747 22.80 0.721 228.36 0.748 0.104 0.642 0.746 22.83 0.720 228.36 0.747 0.104 0.641 0.745 22.87 0.719 228.36 0.746 0.104 0.640 0.744 22.90 0.718 228.36 0.745 0.104 0.639 0.743 22.93 0.717 228.36 0.744 0.104 0.638 0.742 22.97 0.716 228.36 0.743 0.104 0.637 0.741 23.00 0.715 228.36 0.742 0.104 0.636 0.740 23.03 0.714 228.36 0.741 0.104 0.635 0.739 23.07 0.713 228.36 0.740 0.104 0.634 0.738 23.10 0.712 228.36 0.739 0.104 0.633 0.737 23.13 0.711 228.36 0.738 0.104 0.632 0.736 23.17 0.710 228.36 0.737 0.104 0.631 0.735 23.20 0.709 228.36 0.736 0.104 0.630 0.734 23.23 0.708 228.36 0.735 0.104 0.629 0.733 23.27 0.707 228.36 0.734 0.104 0.628 0.732 23.30 0.706 228.36 0.733 0.104 0.627 0.731 23.33 0.705 228.36 0.732 0.104 0.626 0.730 23.37 0.704 228.36 0.731 0.104 0.625 0.729 23.40 0.703 228.36 0.730 0.104 0.624 0.728 23.43 0.702 228.36 0.729 0.104 0.623 0.727 23.47 0.701 228.36 0.728 0.104 0.622 0.726 23.50 0.700 228.36 0.727 0.104 0.621 0.725 23.53 0.699 228.36 0.726 0.104 0.620 0.724 23.57 0.698 228.36 0.726 0.104 0.619 0.723 23.60 0.697 228.35 0.725 0.104 0.618 0.722 Continues on next page... 23 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.63 0.696 228.35 0.724 0.104 0.617 0.721 23.67 0.695 228.35 0.723 0.104 0.616 0.720 23.70 0.694 228.35 0.722 0.104 0.615 0.719 23.73 0.693 228.35 0.721 0.104 0.614 0.718 23.77 0.692 228.35 0.720 0.104 0.613 0.717 23.80 0.692 228.35 0.719 0.104 0.612 0.716 23.83 0.691 228.35 0.718 0.104 0.611 0.715 23.87 0.690 228.35 0.717 0.104 0.610 0.714 23.90 0.689 228.35 0.716 0.104 0.609 0.713 23.93 0.688 228.35 0.715 0.104 0.608 0.712 23.97 0.687 228.35 0.714 0.104 0.607 0.711 24.00 0.686 228.35 0.713 0.104 0.606 0.710 24.03 0.548 228.35 0.710 0.104 0.602 0.707 24.07 0.274 228.35 0.698 0.104 0.591 0.695 24.10 0.091 228.35 0.679 0.105 0.570 0.675 24.13 0.000 228.34 0.655 0.105 0.546 0.650 24.17 0.000 228.34 0.630 0.105 0.520 0.625 24.20 0.000 228.33 0.606 0.105 0.495 0.600 24.23 0.000 228.33 0.584 0.105 0.472 0.577 24.27 0.000 228.32 0.562 0.105 0.449 0.554 24.30 0.000 228.32 0.541 0.105 0.427 0.532 24.33 0.000 228.32 0.520 0.106 0.406 0.512 24.37 0.000 228.31 0.501 0.106 0.386 0.492 24.40 0.000 228.31 0.482 0.106 0.367 0.472 24.43 0.000 228.31 0.464 0.106 0.348 0.454 24.47 0.000 228.30 0.447 0.106 0.330 0.436 24.50 0.000 228.30 0.431 0.106 0.313 0.419 24.53 0.000 228.30 0.416 0.106 0.300 0.406 Continues on next page... 24 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.57 0.000 228.29 0.401 0.106 0.286 0.392 24.60 0.000 228.29 0.387 0.106 0.273 0.380 24.63 0.000 228.29 0.374 0.106 0.261 0.367 24.67 0.000 228.28 0.361 0.107 0.249 0.355 24.70 0.000 228.28 0.348 0.107 0.237 0.344 24.73 0.000 228.28 0.336 0.107 0.226 0.333 24.77 0.000 228.28 0.324 0.107 0.215 0.322 24.80 0.000 228.27 0.313 0.107 0.204 0.311 24.83 0.000 228.27 0.302 0.107 0.194 0.301 24.87 0.000 228.27 0.291 0.107 0.184 0.291 24.90 0.000 228.27 0.284 0.107 0.177 0.284 24.93 0.000 228.27 0.276 0.107 0.169 0.276 24.97 0.000 228.26 0.269 0.107 0.162 0.269 25.00 0.000 228.26 0.262 0.107 0.155 0.262 25.03 0.000 228.26 0.255 0.107 0.148 0.255 25.07 0.000 228.26 0.248 0.107 0.141 0.248 25.10 0.000 228.26 0.242 0.107 0.134 0.242 25.13 0.000 228.25 0.235 0.107 0.128 0.235 25.17 0.000 228.25 0.229 0.107 0.122 0.229 25.20 0.000 228.25 0.223 0.108 0.116 0.223 25.23 0.000 228.25 0.217 0.108 0.110 0.217 25.27 0.000 228.25 0.212 0.108 0.104 0.212 25.30 0.000 228.25 0.206 0.108 0.098 0.206 25.33 0.000 228.24 0.201 0.108 0.093 0.201 25.37 0.000 228.24 0.195 0.108 0.088 0.195 25.40 0.000 228.24 0.190 0.108 0.082 0.190 25.43 0.000 228.24 0.186 0.108 0.078 0.186 25.47 0.000 228.24 0.183 0.108 0.075 0.183 Continues on next page... 25 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.50 0.000 228.24 0.180 0.108 0.072 0.180 25.53 0.000 228.24 0.177 0.108 0.069 0.176 25.57 0.000 228.23 0.173 0.108 0.065 0.173 25.60 0.000 228.23 0.170 0.108 0.062 0.170 25.63 0.000 228.23 0.167 0.108 0.059 0.167 25.67 0.000 228.23 0.165 0.108 0.056 0.164 25.70 0.000 228.23 0.162 0.108 0.053 0.162 25.73 0.000 228.23 0.159 0.108 0.051 0.159 25.77 0.000 228.23 0.156 0.108 0.048 0.156 25.80 0.000 228.23 0.153 0.108 0.045 0.153 25.83 0.000 228.22 0.151 0.108 0.042 0.150 25.87 0.000 228.22 0.148 0.108 0.040 0.148 ...End NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway_ Name Grass Spillway Discharge 14.66 Peak Flow Period 1 Channel Slope 0.33 Channel Bottom Width 10 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Underlying Straight 14.66 cfs 8.69 ft/s 0.17 ft 0.029 8.5 lbs/ft2 3.31 lbs/ft2 2.57 STABLE F Substrate Shoremax w/ Straight 14.66 cfs 8.69 ft/s 0.17 ft 0.029 14 lbs/ft2 3.41 lbs/ft2 4.11 STABLE F P300 Reinforced Vegetation Underlying Straight 14.66 cfs 9.27 ft/s 0.15 ft 0.026 5.68 Ibs/ft2 3.1 lbs/ft2 1.83 STABLE F Substrate Shoremax w/ Straight 14.66 cfs 9.27 ft/s 0.15 ft 0.026 8.5 lbs/ft2 3.19 lbs/ft2 2.67 STABLE F P300 Unvegetated 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.982 2 730 12,133 BMP Pre-Developed 2 SCS Runoff 10.51 2 718 21,806 BMP Post-Developed 3 Reservoir 0.109 2 1442 20,352 2 228.18 17,509 Post Through Pond 5 SCS Runoff 0.026 2 360 71 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 70.7 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 1 Year Tuesday, 12/ 12/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.982 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 12,133 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 10.51 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 21,806 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - 1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.109 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 20,352 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 228.18 ft Reservoir name = BMP Pond Max. Storage = 17,509 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 17,509 cuft 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.026 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 71 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 71 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 71 cuft 7 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.496 2 730 21,227 BMP Pre-Developed 2 SCS Runoff 16.63 2 718 33,552 BMP Post-Developed 3 Reservoir 0.572 2 884 31,971 2 228.33 19,782 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 2 Year Tuesday, 12/ 12/2023 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 4.496 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 21,227 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 16.63 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 33,552 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 • 9.00 6.00 6.00 3.00 3.00 0.00 — L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.572 cfs Storm frequency = 2 yrs Time to peak = 884 min Time interval = 2 min Hyd. volume = 31,971 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 228.33 ft Reservoir name = BMP Pond Max. Storage = 19,782 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 — — : _ ti...„3.00 3.00 0.00 -. 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 I I Total storage used = 19,782 cuft 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.44 2 728 54,129 BMP Pre-Developed 2 SCS Runoff 35.92 2 718 72,021 BMP Post-Developed 3 Reservoir 5.850 2 728 70,399 2 228.97 30,343 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 10 Year Tuesday, 12/ 12/2023 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 14.44 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 54,129 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 15.00 15.00 12.00 — • 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 \— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 35.92 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 72,021 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 , 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 5.850 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 70,399 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 228.97 ft Reservoir name = BMP Pond Max. Storage = 30,343 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - , - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 3 — Hyd No. 2 1111111 I Total storage used = 30,343 cuft 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 19 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 34.76 2 728 122,197 BMP Pre-Developed 2 SCS Runoff 71.38 2 716 144,756 BMP Post-Developed 3 Reservoir 14.66 2 726 143,104 2 230.73 62,310 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 100 Year Tuesday, 12/ 12/2023 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 34.76 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 122,197 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 • 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 71.38 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 144,756 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 14.66 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 143,104 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 230.73 ft Reservoir name = BMP Pond Max. Storage = 62,310 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 • 60.00 60.00 50.00 — — 50.00 40.00 J� 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 -omm• - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 62,310 cuft 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60 V V=1.49R°S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Te, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 Troruv Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s rrT n (min) (10 min) 0.6'Tc(hrs) 1 100 256.1 255.2 0.009 3.68 0.24 18.31 670 255.2 228 0.04060 Unpaved 3.20 3.49 21.80 21.80 0.22 1 WM20231:31 PM GM-PTRO\pmjeMPTIMECONC Tumberry.xls WATER QUALITY/QUANTITY BIORETENTION POND SCM 2 9I11/90 it/ j'1111`s<\ I I l S UI /(I I IIr11ly/ C( )' /%/!/1,_✓� ll(\ l )L✓ Ic\ i\w\`vl\I I�/�i/Ilj v, ,,,,./ . / I a �II 111 Ill �� rl �` l <�(� N U1111111j11 III (z�_ I I )1 ,' �/ar 41 ��11 III�I117II1J 1\�� / V AVA �11111 {( I >Il /) Jl \ I �� to z 1 ti L )/� 91 III I111\VAI£�1V\11�Al�t V��A \VA \ I� �)� c I n VA AVA�IIAl IIII ll�l��`y�^1° ��-��^V1AAi (( \A�(%/ (�� � �� i /_ ----� -1_-.„'' 1 •-%_d `y v 1 t r V\� VAAV��� ��v�VA V AV 1l ,. AA �� o lA�\VAV1QI��l\��� ��/�I ) I ) l l r�i� � ., f A \ ( I v 11 C �VAAIt i /( I �� I-r.,��� ' t l / J s ` \ V 1� �l V`\�V \ AAA � I 4 3' �J AV I (II II��V\(� ��\� .�-i% l� l V11 IIII / /.> v —� �. l A 1 I c ( �� e I ��� ,� 1 a ) , l y�11 vv\ y �� vv\� ' A 9�`,t /�/%1 1I I / �(i/� -)9 ��— I.9�' vzv / `ll 5 � , � 1Tr i- _� (CI ` � ���Av� 1�\ --"-', ���i � AA\ I I / A\ i � II(� � �� IIL- I I \ � ��A-�� 11 � Lro � 7 `� SV�>,.---��--,\ � �r-�` '' �< <y S ! // 1 I�l V AA ��-// -7 1 1 I 1AA�` `.\ 1 5 `� � ✓ 1� I"' VA�A�� 1\l \ ''N�� � Ai/ / j J0 �1 \� �t1��VA�111%%%��Ilt�/ (�I11 IIII 1\V1�121 � �;�a��VA�c/A�VI� /1� �� 1 < �c \ �� ����� VAS AV\v\V AA VA�V � hVA�V A (!/ �/ ( II_,�-„A//I = j,lI _// II '' !✓1 �sl ��y,�„ ,, �,r ,A\ ( 9A 11 z z z �9, � �. j v1 \ /�\�\1 1 I 1 I9 \ /VAAV)1�111111111�! lI j 111�1f11I)(I IIVI V III}I( 11 1 1. r 1Ill,llll ) V HP -,\�\11�111(l,l '—"\y-, „.-- -:—,2/�� ,�,•✓JI(r1�11 �)- ,. -������� \ ) ��e J rt�;x-ei, �", v �� ' 7 /1�� HIIi)yW, `0 ,1 �0 111111i11,, (^AVA; AI//� � �j�/i/�%7,t_ - �)// )( r,,"` 911.1 9',/ ',s," �fll C' IrO \ 1✓� A���.��� ���� �: cear iik ( f�1�r � i� �l ���� 1� - 11 -✓////�,��tiin a _ i--- �r� z% ��l 1A��AV� IA ��A� / ✓ 711E OFCONCEN7RA710N �; ho o ��: I�v /j/ 1VAA- � > 1 �� ll ///552-��� ����� �.�`�� / a// \ I VI 1 / VA 1 h v �V / ,,/'-- t :�z/1 -'.. lip < �1 / �rl / / v� � _ Ft01Y PATH d 5v� A' � v�� ���v�` ���•�� �' V �i` 1 / Y�� �� 11✓� r`'/1 �1111�,>>1v � / I /f1r ,,\_. w lir���A�� �� �// r z?d . �� A, L I o III AAVAA �1��✓ sa�> Ji< ,.(�A , \V�\VAA ( , � z�' I � �� I 1Ij,l' `� 11 �` t v e /< `�, (• > ,l \ v F, // i `� - -L e �11� ' > > 1 ✓ f fl !I C AV � � --� � f e , r ( / t i I � � e ( >e 1 � � I � CCI - i� N�11111VA \ \1 l��\/C1 ����VAti �AA\ A��yl� �� _ I \\ �/< )1Al Ile 11 II7�11 1 l of ( / U l / 1A\ Oslo �A �VJ- >1V�\vA�V ` \�°` V ,*z � {� v _ l N / A�- s�A 1 1-v �`'h l �A 1 �V �� / / )(CC� VA �� °- )l `.� �-- J III V - � ',.\ J r \ /r' — 1 ((//�I 11 1 l (1 v A V v I I l w l A\ �lAr IG� r V1A1�1/III Illl1�11\ A 1 1 Z°(� VV(lQ� ��� �1\V �_� ,, _,,,,„_,--\, '�111\Vl - 1� 1 Il �`AVA V 1A \Z ,?"��It, l l �� /,z ��� j / 1}�Ii�Ic 11W vVvvvvVA1 )vvv v> / )(a. „1V w�h AvAlA V Al c�1 v 1 1VV / 1 I I ( ) 1 \ 1A ,\1 , 1 �1 A )v ! °1�_ - VAIN 1111\))VAAt��l,lA��,� _ �yfpt t, �\, 1zEV A �_I vzr/ , I ���,/ v�0w� r 1 Q o� � � 1 � � 1II )/ F . I /l1)/ // /i //of 1\\�'', • ', -` \1v1(\III ow � 1 ) 1 POST-DEVELOPED J �,Jf, / =; r, . DRAINAGE AREA �,,/< 1 v ,, o a 11`I`Ill V ✓�JIIl11 II\IIII( _�' sTV1/v II CI\) \\ l \�111 II /ice / l// ( / Uf /��� I t i(i�i oo,e„eA ( \ A ( e a E 1 p ll I 1 /�r)�/� f _ � �` >a V A j �'° 1 1 1 ) A l / 1 3 d E \ 11A t _-' -/ / 1 --�/��/l///il/ / S V A51 ,- > 1(1 1 )I( , I\ sl 1 v t m m l 1A��� r C // ( ✓ / J 41 1 \ _ I l A 1 l c .• WAN (lVc !✓ 1 ✓ i -�,ry( /v I II AN l I 1 1I14)I f r.7 B %)/(4 //I d i 11/� 1 v \\\ \ V ./ri< rl✓ / / ` � ` �. \,c_11,\\\ /}/7- _y2/r-> 2.,_//,./s)////> AV AA �� j e �n I V , S Q z I iiir ) )\) )J))) 7/ / V IC: w 57t, \N / z 2 k, 4 WL,k \ G9 269 PC MB / 1I 1 1 1 1 l > 1-\\_,?_,, 1 iv.oas,slat'?'°''s,''''':'�wM. °Pti a ¢ [� o 0. (( \ (_\ I\ __ _ 4Nk.„,... a. "„ear bi _�:(1(,. --\ 1, 23.--2'. c ' 0 Lit \\ \ �t9 A G i I Gc uJ 1 I -- \ \\\\\ 2)-')11111k‘ ,,, '''-- of)/ ))/ 1 \.,,, \ ) _ r,,)6 yl.'Z''';'?;1„,07„,,,,,..1‘ ,g,.. \I N\ 5, __,_2 ) 1'lt.\\\ 111,10,1 I L „.,),>;1\ * ',)::: .,),,),‘,,,.,,,s ,),.0:), ,.4)101(4;A>):.104t,, , ,4 1:: ik 1,--..a...7.. / !.... ,g..,: g. . - CC �iLc ���'� e • miv_ v .t M �o Re• S ti , i � f'a�cSsia..4. \\ c'''\''‘\1's,‘,1.t.s.,:\ts.\\.\\S:: �� o�Mac".9 _ ►s/� -_' ��� r✓ -`�I �I "I 16 /, n55,,, :' t‘-\\_vp.,>,7: r \ 11 / � / I � l ��\ \. �/ , u of . � >s �r�. ,,-\\7 „)ji /( //i/;-:__,---:,. r . . 1 b., ,4„,.. oic,-,,,17~.:\x , „ ,„ \.\,, ,,,,_.es ,‘, „„,1 ,, , \\VN li \b -\\\)\-w))6)!II POST-DEVELOPED DRAINAGE AREA f s., rw/ .`--5 s25F T N \ ei , li . n,,,// � � �� 'DIE OF CONCEN7RA11011�. � - �� -t � ��, 1 SCM#2 7.55 AC (ON SITE) ` °`' FlOW PATM - 'Ir PLAN STATUS �� ' c, r `� °P»>Ss�c��' � w�\` 07/13/23 INITIAL SUBMISSION 4 ��� III... r\\\\\\irl\I4ilii�':7�, '�.I`/;ii= /�� ` ., As. case..` .,�...01 a� �0�os\ •�' cs`q,�l ` `"��N-, of os , �,'.` , POST DEVELOPED DRAINAGE AREA U Pri -, --- „ ......-.-,...1.1,,..... �� � I SCM#2 14.15 AC OVERALL) __ � ,5o � �� ` r�a,.. i, DATE OESGRIPTION ✓� '� )1 (INCLUDING FUTURE PHASE) 1 , ' ‘1.°- , 1( \� (� �� c III Igo �,v��; _ cB Ce cEP / v��'�� // v'°� __, � - 1r e v v se v N_� �" '�Saq DESIGN DRANM CHKD _ I, s' � ,n�z v L �,o / „%_1` a SCALE H: I e 1 4. �s3' GRAPHIC SCALE Joe No. 220164-01-007 �1111 � aasss Ity �i. �`.4 — a // I I I l 1 )) �/ �� `VA., ' �e- I�� �_ �_ ,.‘� c,� e��s '�� ��e� �eN o°Nj ," o Aso �� .';,',Z----, --;--a.::4 i 1. � � ° %� .'�,, Na`�,,��s�� � DATE JULY 13, 2023 ..‘ ) )//t1;<7 h ., I\ ,, ;--,„.,,s\ „ 1 )))7//»fd/ /- ,,/�� I�' ° es 1� �� �� J •;/h �n( N eeEz) ni _ 1 t lil �� r nKig,,,gillitip\-.11'1'.. ( e �y�,.�'/�../Alb, '`� ) / : 1inch— 30 1t, �_ _ �, � SHEET �U, Cad fie none:\G r 64-Stanegate\220164-0I-007(ENG)-Tumberry South-Raeford NC\Engineerng\Engineerng Plans\Construction Drawings\220164-01-067-O(P_CPAeg SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Turnberry South Phase 1 2 Project Area(ac) 18.926 3 Coastal Wetland Area(ac) - 4 :Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) _ 7 'Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes _ 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 'Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 'Infiltration System I 0 12 Bioretention Cell 1 _ 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 I StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \\�� . � ......... 0 A Royy''% Q�F E S Ip4/4*-. - SEAL — Signature of Designer 051571 •�••FNciNC-F--•oo //������1�I IEsemo\\\\ Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Wet Pond BioRetention 5 Total drainage area(sq ft) 819110 sf 403800 328663 6 Onsite drainage area(sq ft) 819110 sf 403800 328663 7 Offsite drainage area(sq ft) _ 8 Total BUA in project(sq ft) 328769 sf 208172 sf 120597 sf New BUA on subdivided lots(subject to permitting). 9 (sq ft) $ 216000 sf 120000 sf 96000 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 112769 sf 88172 sf 24597 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sgft) 22515 sf 17159 sf 5356 sf -Roof(sq ft) -Roadway_(sq ft) 90254 sf 71013 sf 19241 sf -Future(sq ft) I -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) _ New infiltrating permeable pavement not on 14 subdivided lots sq ft) Existing BUA that will remain(not subject to 15 I,permitting)(sq ft) 16 •Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 40.14% 51.6% 36.7% 19 jDesign storm(inches) 1.0 in 1.0 in • 20 Design volume of SCM(cu ft) 19332 cf 26625 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): There is 7,454 sf(0.171 ac)of surface water area.The bioretention pond has been designed for an area of 616,411 sf with an impervious area of 266,449sf.This future phase includes an additional 287,748 sf.of drainage area with an additional impervious area of 145,848 sf. BIORETENTION CELL 1 Drainage area number 2 2 Minimum required treatment volume(cu ft) 10414 cf .,.......1 GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? ' Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the 8 .design volume? Yes 9 :What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes _.17 Was the SCM designed by an NC licensed professional? Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 205.00 19 Bottom of the bioretention cell(fmsl) 220.00 20 Ponding depth of the design storm(inches) , 7 in 21 Surface area of the bioretention cell(square feet) 43600 sf 22 Design volume of SCM(Cu ft) 26625 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 17.04 in j 25 Height of peak attenuation outlet above the planting surface(in) 17.04 in F 26 Infiltration rate of the in situ soil(inch/hour) 2 in/hr 27 j Diameter of the underdrain pipes(if applicable) 4 in 28 Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 218.5 30 Elevation of the planting surface(fmsl) 220.00 ;What type of vegetation will be planted? (grass,trees/shrubs, 31 !other)? Grass 32 Media depth(inches) _ _ 30 in 33 Percentage of medium to coarse washed sand by volume ( 75-85% 34 Percentage of fines(silt and clay)by volume 8-10% 35 Percentage of organic matter by volume _ 5-10% 36 Type of organic material + Pine Bark Fines 37 Phosphorus Index(P-Index)of media(unitless) 30 _ 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch, if applicable(inches) 41 Type of mulch,if applicable 42 How many clean out pipes are being installed? 47 r 43 Type of pretreatment that will be used: Rip-Rap ADDITIONAL INFORMATION 44 Please use this space to provide any additional information about the fbioretention cell(s): Bioretention 1 4:45 PM 12/12/2023 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Bio-Retention Pond #2) Drainage Area(acres): 14.15 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 9.83 69% B GoA Goldsboro Loamy Sand 2.03 14% C BaD Blaney Loamy Sand 2.29 16% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded -Good Stand A 9.83 50 34.7 Wooded -Good Stand B 2.03 63 9.0 Wooded -Good Stand C 2.29 73 11.8 Cumulative Curve#= 55.6 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions(Bio-Retention Pond #2) Drainage Area(acres): 14.15 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 9.83 69% B GoA Goldsboro Loamy Sand 2.03 14% C BaD Blaney Loamy Sand 2.29 16% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A 4.91 55 19.1 Open Space-Good Condition B 0.93 68 4.5 Open Space-Good Condition C 2.20 77 12.0 Impervious Area 6.12 98 42.4 Cumulative Curve#= 77.9 Bio-Retention Design Site Information Sub Area Location: Drainage To Bio-Retention Area#2 Drainage Area(DA)= 14.15 Acres 616411 sf Impervious Area(IA)= 6.12 Acres 266449 sf Percent Impervious(I)= 43.23 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.44 in/in Water Quality Volume= 0.518 ac-ft Water Quality Volume= 22,552 cf Water Quality Volume= 0.439 inches of runoff NOAA 1-year,24-hour event= 3.04 inches Discharge for Ponded Area Maximum Ponding Depth= 12 in Filter Bed Surface Area Used= 43,600 sf Top of Filter Media Elevation= 220.0 Media Infiltration Rate= 2.00 in/hr Media Infiltration Time= 6.0 hr Discharge for Bioretention Filter Media Filter Bed Depth= 3 ft Maximum Ponding Depth= 12 in Filter Bed Surface Area Used= 43600 sf Top of Filter Media Elevation= 220.0 Media Infiltration Rate= 2.00 in/hr Media Infiltration Time= 18.0 hr Size Underdrain System Water Quality Volume= 0.518 ac-ft Water Quality Volume= 26,625 cf Drawdown= 0.154 cfs Underdrain Pipe Size= 4 in Number of Pipe Rows= 10 10ft on center(typ) Avg.Length of Pipe Row= 111 If Number of Perforations= 8,800 50%of Perforations= 4,400 Capacity of one perforation= 0.0069 cfs Total Capacity= 30.40 Is Total Capacity>Drawdown? Yes Underdrain pipe capacity Slope= 0.5 % Underdrain Area= 0.0873 sf Underdrain Perimeter= 1.0470 If Capacity of pipe= 1.34 cfs Capacity of pipe(50%clogged)= 0.67 cfs Is Total Capacity>Drawdown? Yes Ii i \ \/ \ '--N / /r I i I ' ( ) / // /\�_- , I/1I/ I \ // D/ I ��\�. I 23 N m -72 m /� o I \ CD m I —I / / II z7-1" \\ m \ S� m (n ,, mm / Prc7; g ' Pi / / / J / / Pt- `iD �W \ _. M = � � � /• NCNn = _ / / cn/ / DN—_ Cz � \ \=crnm � m � -o0 , INN iv • D I- � �n \\N � \ mOmp —1cnm � W : � O 0 // / / D D / D �zzm \—I 2D1140, 0 %i�i /J mm � * -- ...-....--voritt.:•.0"-- /11 ' It\ s /\r . -- 1 //* _ _ ,,,,,,A, , *V V v.- 1 // dji SA I � 40y, „of, , Lc:,,,, - „, _........., ,„ , , /. ,N„,,-„ 7- , ‘,„ ,,,, / , , . , \\* , .. ...... „....,,,,..,;___ . 0- i , „ ,,,,,„, ,,,, ,i,, z ----- -. -, - , A , . Attti, . __ -- - \ VS#Pn/".41411 _... , ....--.- -- 0Wit -i--_/-\ \ .-, I \ \ it' Y a. 41111 ,, a r 1— ,- 0;, \ c ' \ '\v, t%V ._,•;: 1111) --.....% \ Fi, \\ \ V I '"'' \ \?s), I..l..4ift41,a11liN/V4AA..0o0IN1g,e \ D v V .�'" 0 i/ vv Z 0 m vvv z v s mT. D m F4 C \ T / /u) ,-) <,...„ op i,- - \ m ,, \ - z /\ I f o4P.. / zzm \ � 2 \\ `718 j ti cn t � r z z \ \ \ \ O H m 2 Z E m 1 7 1\ .� \\ \ 1 m .(1 \ \-- C> /J lS/ \ ` �/ .Z7 T� c S .Z7 \ \ z II / T> , , c:).. - ((..7)) 2,, * r \ I�i--I � II m `/ AO 0 "STORM WATER MANAGEMENT DESIGN BI RETENTI N POND:RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C H U C: 0303000406 PROJECT COORDINATES: 35.009339°N, -79.160924°W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 14.15 ACRES SITE IMPERVIOUS AREA TO POND: 6.12 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 6.12 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 14.15 AC 14.15 AC CURVE NUMBER: 55.6 77.9 TIME OF CONCENTRATION: 29.6 MIN 5 MIN 1.0" STORN EVENT: 0.236 CFS 0.000 CFS 1-YEAR STORM EVENT: 0.992 CFS 27.72 CFS 0.000 CFS 2-YEAR STORM EVENT: 3.085 CFS 39.02 CFS 1.495 CFS 10-YEAR STORM EVENT: 13.45 CFS 73.03 CFS 12.44 CFS 100-YEAR STORM EVENT: 37.55 CFS 130.69 CFS 37.03 CFS STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 220.0 43,600 0 0 0.6 220.6 45,150 26,625 26,625 (WQV) 1.0 221.0 46,190 18,268 44,893 2.0 222.0 48,840 47,515 92,408 3.0 223.0 51,54 50,190 142,598 r . 'f Z N 0 2 m O O 0m 400 s A A O mx A OAM nrpn r>-0 P1zKApD O 0 Om - -I K O rn AA— yOO m r b�c m m ,m m __Arnx < mCA 0 = pD o o z rmz p ,,,rn *II 2r7i D1,D< =m II III A O N Z DN nr� . & II O<O 8 �N .00 r — U N OZO I =Z<ZO ti 0 C >A O O N Z I I I I m m m O AUO p i rZN m A V� O A f I N O Wy NA -0 * N A Na DO O N AWm • Z' II N y A v< rn �. 00 T O AA OCS oDa Z m _o O, GJ ti !n ti g A y C -0 Z /'f'Y�_ D m 11 -,I` • 'c, A Z A '' V n f m ,i}a, `5 VI y A P O 1. Z zAz Ai. A JR t vA �� W ,,' n ' ��1.°P�°°o 0 R o0000000.4% "' in n v � * o4°0o00°°8°0°°0°000�o '"0oe0oe 1 m z S*4 eI uo 000°00000a�yd'°000000°°O°°° N O G �, I.Il;°8°°°o0000 Avoi8v0000'°000° // cn m 'J���Ji�,44 s{ �o�%W 0.oeoo^.%tV%.. . 1-9 ^:0°00000000000000000o.w.0. 2 Lr'l • �,i. o°°oo°°<o«oo>0000000oeooe000<o =<oo^.ooa00000<800800Bo8o 0 *-0 eooeoo• 00 woo:00 ooe00000000 .w 000 00 000a00000000000>0 ,y1� 'e Z x Q' '. G\go 000 00o z W 9 :: ' ° 444k • 42 = e V o ti ti ti N, rn o n o� c, mz Dm N C Oy C- r../IM il i,.., m So O . 0 Z O mffF O S- O ITA1 O vk y D Z D Z D O m A r. i rnoA� A D Vip 2 f�*1 Z A F co G y A O m Z yC f)ti C O O OZ A /mJr ~ c 2 z ^i m m D p z O O � C A D N V l T 2,0 g p A I y II WO g -0 O DOJ m m <O y m0 - IIz m Is J zrnO�yy U m O A e � 11: © :27c/01 J // % \£7 )v) j » __ \ > / mm \ ; 0 K % \ /» m 5 o \14 k 1 )\ j jm )® §2 H 9 0®® : 4,k2 : • } § j • 3 \ cci @ \©: : . ,,, rn ri II ){£{ =22� R SPILLWAY FLOW LONG H B W SS CHANNEL LINING TOP OF EMBANKMENT SPILLWAY ELEVATION Q(100) SLOPE(%) ELEVATION GRASS STRAW WITH NET NAG 35.63 CFS 33.3% 0.8' 20.0' 24.8' 3:1 222.2 223.0 SPILLWAY SHOREMAX W/ P300 w EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=223.0 SS H /CHANNEL LINING S SPILLWAY ELEVATION=222.2 MATTING SHALL BE AS NOTED OR APPROVED EQUAL. 1- B GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Peak Flow Period Post Through Pond 738-720 = 18 min. - 1 hour Hydrograph type = Reservoir Peak discharge = 37.03 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 154,311 cuft Inflow hyd. No. = 2 - Post Developed tovoir name = Bio-Retention Max. Elevation = 222.43 ft Max. Storage = 114,020 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 702 33.50 220.75 18.52 0.963 2.108 0.963 704 40.37 220.84 18.52 1.920 2.119 1.920 706 47.85 220.94 18.52 3.308 2.131 3.308 708 58.09 221.06 18.52 5.220 2.146 5.219 710 73.24 221.20 18.52 7.820 2.163 7.820 712 92.40 221.38 18.52 11.55 2.185 11.55 714 114.30 221.60 18.59 16.70 0.936 2.212 17.63 716 130.69 << 221.85 25.13 19.11 6.011 2.243 25.12 718 127.17 222.10 27.73 17.32 10.41 2.274 27.73 720 100.24 222.30 28.88 16.68 12.19 2.013 2.298 30.89 722 63.19 222.41 29.43 16.44 12.99 6.248 2.312 35.67 724 34.85 222.43 << 29.55 16.39 13.15 7.482 2.315 37.03 726 21.66 222.41 29.43 16.44 12.99 6.242 2.312 35.67 728 17.83 222.36 29.23 16.53 12.70 4.584 2.307 33.81 730 17.08 222.32 29.02 16.62 12.39 2.952 2.301 31.96 732 16.38 222.28 28.81 16.72 12.08 1.722 2.296 30.52 734 15.67 222.24 28.59 16.83 11.76 0.902 2.291 29.49 736 14.96 222.20 28.38 16.94 11.44 0.098 2.287 28.48 738 14.24 222.17 28.15 17.08 11.07 2.282 28.15 740 13.52 222.13 27.90 17.22 10.68 2.277 27.90 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 742 12.79 222.09 27.63 17.38 10.25 2.272 27.63 744 12.07 222.05 27.32 17.58 9.746 2.267 27.32 746 11.34 222.00 27.00 17.78 9.225 2.261 27.00 748 10.61 221.96 26.53 18.17 8.361 2.256 26.53 750 9.874 221.91 26.04 18.57 7.460 2.250 26.03 752 9.197 221.86 25.34 18.99 6.347 2.245 25.34 754 8.689 221.82 24.59 19.41 5.177 2.239 24.59 756 8.372 221.77 23.62 19.48 4.138 2.233 23.62 758 8.169 221.73 22.54 19.32 3.217 2.228 22.54 760 8.005 221.69 21.45 18.96 2.395 2.223 21.35 762 7.840 221.65 20.23 18.00 1.775 2.218 19.77 764 7.675 221.62 19.12 17.12 1.210 2.214 18.33 766 7.509 221.59 18.52 16.34 0.790 2.210 17.13 768 7.343 221.56 18.52 15.64 0.528 2.207 16.17 770 7.177 221.53 18.52 14.98 0.285 2.204 15.27 772 7.010 221.51 18.52 14.37 0.057 2.201 14.43 774 6.843 221.48 18.52 13.82 2.198 13.82 776 6.675 221.46 18.52 13.29 2.195 13.29 778 6.508 221.44 18.52 12.79 2.192 12.79 780 6.339 221.42 18.52 12.31 2.190 12.31 782 6.179 221.40 18.52 11.85 2.187 11.85 784 6.043 221.38 18.52 11.42 2.185 11.42 786 5.932 221.36 18.52 11.02 2.182 11.02 788 5.837 221.34 18.52 10.63 2.180 10.63 790 5.748 221.32 18.52 10.26 2.178 10.26 792 5.657 221.31 18.52 9.900 2.176 9.900 794 5.567 221.29 18.52 9.569 2.174 9.569 796 5.477 221.28 18.52 9.261 2.172 9.261 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 798 5.386 221.26 18.52 8.963 2.170 8.963 800 5.296 221.25 18.52 8.676 2.169 8.676 802 5.205 221.23 18.52 8.399 2.167 8.399 804 5.115 221.22 18.52 8.131 2.165 8.131 806 5.024 221.21 18.52 7.872 2.164 7.872 808 4.933 221.19 18.52 7.630 2.162 7.630 810 4.842 221.18 18.52 7.406 2.161 7.406 812 4.753 221.17 18.52 7.188 2.159 7.188 814 4.673 221.16 18.52 6.977 2.158 6.977 816 4.601 221.15 18.52 6.771 2.157 6.771 818 4.534 221.14 18.52 6.572 2.155 6.572 820 4.469 221.13 18.52 6.379 2.154 6.379 822 4.404 221.12 18.52 6.192 2.153 6.192 824 4.339 221.11 18.52 6.010 2.152 6.010 826 4.274 221.10 18.52 5.839 2.150 5.839 828 4.209 221.09 18.52 5.684 2.149 5.684 830 4.144 221.08 18.52 5.533 2.148 5.533 832 4.078 221.07 18.52 5.385 2.147 5.385 834 4.013 221.06 18.52 5.240 2.146 5.240 836 3.948 221.05 18.52 5.099 2.145 5.099 838 3.882 221.04 18.52 4.961 2.144 4.961 840 3.816 221.04 18.52 4.827 2.143 4.827 842 3.755 221.03 18.52 4.695 2.142 4.695 844 3.707 221.02 18.52 4.566 2.141 4.566 846 3.673 221.01 18.52 4.441 2.140 4.441 848 3.647 221.01 18.52 4.320 2.139 4.320 850 3.625 221.00 18.52 4.204 2.138 4.204 852 3.602 220.99 18.52 4.095 2.138 4.095 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 854 3.580 220.99 18.52 3.990 2.137 3.990 856 3.558 220.98 18.52 3.889 2.136 3.889 858 3.535 220.97 18.52 3.790 2.135 3.790 860 3.513 220.97 18.52 3.695 2.134 3.695 862 3.490 220.96 18.52 3.602 2.134 3.602 864 3.467 220.95 18.52 3.517 2.133 3.517 866 3.445 220.95 18.52 3.435 2.132 3.435 868 3.422 220.94 18.52 3.355 2.132 3.355 870 3.400 220.94 18.52 3.278 2.131 3.277 872 3.377 220.93 18.52 3.202 2.130 3.202 874 3.354 220.93 18.52 3.128 2.130 3.128 876 3.331 220.92 18.52 3.057 2.129 3.056 878 3.309 220.92 18.52 2.988 2.129 2.988 880 3.286 220.91 18.52 2.924 2.128 2.924 882 3.263 220.91 18.52 2.861 2.127 2.861 884 3.240 220.90 18.52 2.800 2.127 2.800 886 3.218 220.90 18.52 2.740 2.126 2.740 888 3.195 220.90 18.52 2.681 2.126 2.681 890 3.172 220.89 18.52 2.624 2.125 2.624 892 3.149 220.89 18.52 2.568 2.125 2.568 894 3.127 220.88 18.52 2.513 2.124 2.513 896 3.103 220.88 18.52 2.460 2.124 2.460 898 3.081 220.88 18.52 2.411 2.123 2.411 900 3.058 220.87 18.52 2.363 2.123 2.363 902 3.035 220.87 18.52 2.315 2.123 2.315 904 3.012 220.86 18.52 2.269 2.122 2.269 906 2.989 220.86 18.52 2.223 2.122 2.223 908 2.966 220.86 18.52 2.178 2.121 2.178 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 910 2.943 220.85 18.52 2.134 2.121 2.134 912 2.920 220.85 18.52 2.090 2.120 2.090 914 2.897 220.85 18.52 2.047 2.120 2.047 916 2.874 220.84 18.52 2.005 2.120 2.005 918 2.851 220.84 18.52 1.964 2.119 1.964 920 2.828 220.84 18.52 1.926 2.119 1.926 922 2.805 220.83 18.52 1.888 2.118 1.888 924 2.782 220.83 18.52 1.852 2.118 1.852 926 2.759 220.83 18.52 1.815 2.118 1.815 928 2.736 220.82 18.52 1.779 2.117 1.779 930 2.713 220.82 18.52 1.744 2.117 1.744 932 2.690 220.82 18.52 1.709 2.117 1.709 934 2.667 220.82 18.52 1.674 2.116 1.674 936 2.644 220.81 18.52 1.640 2.116 1.640 938 2.621 220.81 18.52 1.606 2.116 1.606 940 2.597 220.81 18.52 1.572 2.115 1.572 942 2.574 220.80 18.52 1.539 2.115 1.539 944 2.551 220.80 18.52 1.506 2.115 1.506 946 2.528 220.80 18.52 1.474 2.114 1.474 948 2.505 220.80 18.52 1.445 2.114 1.445 950 2.482 220.79 18.52 1.416 2.114 1.416 952 2.458 220.79 18.52 1.387 2.113 1.387 954 2.435 220.79 18.52 1.358 2.113 1.358 956 2.412 220.78 18.52 1.329 2.113 1.329 958 2.389 220.78 18.52 1.300 2.112 1.300 960 2.365 220.78 18.52 1.272 2.112 1.272 962 2.344 220.78 18.52 1.244 2.112 1.244 964 2.327 220.77 18.52 1.216 2.111 1.216 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 966 2.314 220.77 18.52 1.188 2.111 1.188 968 2.305 220.77 18.52 1.161 2.111 1.161 970 2.297 220.77 18.52 1.134 2.110 1.134 972 2.289 220.76 18.52 1.108 2.110 1.108 974 2.281 220.76 18.52 1.083 2.110 1.083 976 2.273 220.76 18.52 1.058 2.109 1.058 978 2.265 220.76 18.52 1.037 2.109 1.037 980 2.256 220.75 18.52 1.015 2.109 1.015 982 2.248 220.75 18.52 0.994 2.109 0.994 984 2.240 220.75 18.52 0.973 2.108 0.973 986 2.232 220.75 18.52 0.953 2.108 0.953 988 2.224 220.75 18.52 0.933 2.108 0.933 990 2.216 220.74 18.52 0.913 2.108 0.913 992 2.207 220.74 18.52 0.893 2.107 0.893 994 2.199 220.74 18.52 0.874 2.107 0.874 996 2.191 220.74 18.52 0.855 2.107 0.855 998 2.183 220.74 18.52 0.836 2.107 0.836 1000 2.175 220.73 18.52 0.817 2.106 0.818 1002 2.167 220.73 18.52 0.799 2.106 0.799 1004 2.158 220.73 18.52 0.781 2.106 0.781 1006 2.150 220.73 18.52 0.763 2.106 0.764 1008 2.142 220.73 18.52 0.746 2.105 0.746 1010 2.134 220.72 18.52 0.729 2.105 0.729 1012 2.126 220.72 18.52 0.712 2.105 0.712 1014 2.117 220.72 18.52 0.695 2.105 0.695 1016 2.109 220.72 18.52 0.680 2.105 0.680 1018 2.101 220.72 18.52 0.666 2.104 0.666 1020 2.093 220.71 18.52 0.653 2.104 0.653 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1022 2.085 220.71 18.52 0.639 2.104 0.639 1024 2.076 220.71 18.52 0.625 2.104 0.625 1026 2.068 220.71 18.52 0.612 2.103 0.612 1028 2.060 220.71 18.52 0.598 2.103 0.598 1030 2.052 220.71 18.52 0.585 2.103 0.585 1032 2.043 220.70 18.52 0.572 2.103 0.572 1034 2.035 220.70 18.52 0.559 2.103 0.559 1036 2.027 220.70 18.52 0.546 2.102 0.546 1038 2.019 220.70 18.52 0.533 2.102 0.533 1040 2.010 220.70 18.52 0.521 2.102 0.521 1042 2.002 220.70 18.52 0.508 2.102 0.508 1044 1.994 220.70 18.52 0.495 2.102 0.495 1046 1.986 220.69 18.52 0.483 2.102 0.483 1048 1.977 220.69 18.52 0.470 2.101 0.471 1050 1.969 220.69 18.52 0.458 2.101 0.458 1052 1.961 220.69 18.52 0.446 2.101 0.446 1054 1.953 220.69 18.52 0.434 2.101 0.434 1056 1.944 220.69 18.52 0.422 2.101 0.422 1058 1.936 220.68 18.52 0.410 2.100 0.410 1060 1.928 220.68 18.52 0.398 2.100 0.398 1062 1.920 220.68 18.52 0.386 2.100 0.386 1064 1.911 220.68 18.52 0.375 2.100 0.375 ...End NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>> Bioretention Pond Spillway Name Bioretention Pond Spillway Discharge 37.03 Peak Flow Period 1 Channel Slope 0.33 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 37.03 cfs 10.36 ft/s 0.18 ft 0.026 8.5 lbs/ft2 3.65 lbs/ft2 2.33 STABLE F P300 Unvegetated Underlying Straight 37.03 cfs 10.36 ft/s 0.18 ft 0.026 5.68 Ibs/ft2 3.59 lbs/ft2 1.58 STABLE F Substrate Shoremax w/ Straight 37.03 cfs 9.9 ft/s 0.18 ft 0.028 14 lbs/ft2 3.8 lbs/ft2 3.68 STABLE F P300 Reinforced Vegetation Underlying Straight 37.03 cfs 9.9 ft/s 0.18 ft 0.028 8.5 Ibs/ft2 3.74 Ibs/ft2 2.27 STABLE F Substrate 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.992 2 744 11,335 Pre-Developed-Overall Site 2 SCS Runoff 27.72 2 718 55,448 Post Developed to Pond 3 Reservoir 0.000 2 n/a 0 2 220.57 25,106 Post Through Pond 5 SCS Runoff 0.236 2 246 2,756 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.04 1,764 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 1 Year Tuesday, 12/ 12/2023 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 0.992 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 11,335 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 im Im 0.60 I I 0.60 I— I� 0.50 I 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 27.72 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 55,448 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 28.00 , 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - A - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 220.57 ft Reservoir name = Bio-Retention Max. Storage = 25,106 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 25,106 cuft 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.236 cfs Storm frequency = 1 yrs Time to peak = 246 min Time interval = 2 min Hyd. volume = 2,756 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 1 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - I , 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pond/lax. Elevation = 220.04 ft Reservoir name = Bio-Retention Max. Storage = 1,764 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 • •• • 0.05 0.00 - ' - 0.00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 1,764 cuft 7 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.085 2 736 22,131 Pre-Developed-Overall Site 2 SCS Runoff 39.02 2 718 78,415 Post Developed to Pond 3 Reservoir 1.495 2 748 7,803 2 220.80 35,781 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 2 Year Tuesday, 12/ 12/2023 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 3.085 cfs Storm frequency = 2 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 22,131 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 4.00 - 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 39.02 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,415 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 40.00 , 40.00 30.00 30.00 1- 20.00 20.00 10.00 10.00 0.00 I s 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 1 .495 cfs Storm frequency = 2 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 7,803 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 220.80 ft Reservoir name = Bio-Retention Max. Storage = 35,781 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 40.00 - 40.00 _ _ _ / 30.00 30.00 20.00 20.00 10.00 10.00 )111L s 0.00 — : : : s 0.00 0 120 240 360 480 600 720 840 960 Time (min) — Hyd No. 3 Hyd No. 2 1111111 I Total storage used = 35,781 cuft 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 12 Hydrograph Report Hydraflow Hydrographs E tension for Autodesk®civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0inPost Throug 7 Pond Hydrograph type = ResE rvoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 mir Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.) Post-Developed to Pond/lax. Elevation = 220.00 ft Reservoir name = Bio-F,etention Max. Storage = 0 cuft Storage Indication methoi used. Exfiltration extrac$ed from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 1 _ 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 13.45 2 732 64,127 Pre-Developed-Overall Site 2 SCS Runoff 73.03 2 716 148,295 Post Developed to Pond 3 Reservoir 12.44 2 726 56,495 2 221.42 64,993 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 10 Year Tuesday, 12/ 12/2023 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 13.45 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 64,127 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 � 6.00 4.00 — 4.00 2.00 - 2.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 73.03 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 148,295 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 N44.4.4." 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 12.44 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 56,495 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 221.42 ft Reservoir name = Bio-Retention Max. Storage = 64,993 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 — 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 64,993 cuft 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 18 Hydrogra 1 h Report Hydraflow Hydrographs xtension for Autodesk®C it 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0inPost Throu h Pond Hydrograph typ = Reservoir Peak discharge = 0.000 cfs Storm frequenc = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pond/lax. Elevation = 220.00 ft Reservoir name = Bio-Retention Max. Storage = 0 cuft Storage Indication metfr d used. Exfiltration extract from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 — 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 I 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft 19 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.55 2 732 156,388 Pre-Developed-Overall Site 2 SCS Runoff 130.69 2 716 271,520 Post Developed to Pond 3 Reservoir 37.03 2 724 154,311 2 222.43 114,020 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 100 Year Tuesday, 12/ 12/2023 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 37.55 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 156,388 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 I 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 130.69 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 271,520 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 37.03 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 154,311 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 222.43 ft Reservoir name = Bio-Retention Max. Storage = 114,020 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 � ' 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 114,020 cuft 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 24 Hydrograph Report Hydraflow Hydrograp is Extension for Autodesk®Civi 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequercy = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. Nc. = 5 - 1.0 ' ost-Developed to Pond/lax. Elevation = 220.00 ft Reservoir nave = Bio-Retention Max. Storage = 0 cuft Storage Indication m thod used. Exfiltration extracted om Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 0 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60 V V=1.49R'r'S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Te, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 Troruc Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s ran (min) (10 min) 0.6'Tc(hrs) 1 100 240.5 240.1 0.004 3.68 0.24 25.33 785 240.1 211 0.03707 Unpaved 3.10 4.22 29.55 29.55 0.30 1 WM20231:65 PM GM-PTRO\pmjeMPTIMECONC Tumberry.xls EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Turnberry South-Phase 1 Project#: Designed by: CP Date: 7/13/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Rip-Rap Apron SCM-1 Pipe Diameter d= 18 Pipe Slope s= 0.8 % Manning's number n= 0.013 Flow Q= 5.46 cfs Velocity V= 5.54 ft/s Dissipator Dimensions* Zone= 1 Stone Filling Class= A Entry Width(2 X Do)= 3.0 ft Length(4 X Do)= 6.0 ft Width(La+Do)= 7.5 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches 1 6.0 *All units are in feet **Dissipator pad designed for full flow of pipe 3.0 7.5 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 12/12/2023 Page 1 of 2 Rip-Rap Apron SCM-2 Pipe Diameter d= 24 Pipe Slope s= 4.76 % Manning's number n= 0.013 Flow Q= 12.44 cfs Velocity V= 13.08 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(3 X Do)= 6.0 ft Length(6 X Do)= 12.0 ft Width(La+Do)= 14.0 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches 12.0 1 1 6.0 14.0 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 12/12/2023 Page 2 of 2 Project Name Riprap Dissipator#1 Date Turnberry South Phase 1 Dec. 2023 DD Project No. Location D&L Engineering, PLLC 1)L2225 Hoke County, North Carolina 150 S. Page Street Calculated By Southern Pines, NC 28387 JLH (910)684-8646 Checked By .1LH STORM DESIGN: 10 Year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o= 24 in. Pipe diameter in inches D-o= 2.00 ft. Pipe diameter in feet Q-25= 28.38 cfs Pipe outlet (from drainage calculations) d-50= 0.6 ft. from Figure 8.06 a L-a = 16 ft. from Figure 8.06 a Step 3. 3"D-o = 6.00 ft. 3 times the outlet pipe diameter W= 18.00 ft. Pipe diameter+Apron length Step 4. d-max 0.90 ft. Maximum Stone Diameter(1.5*d-50) in inches d-max 11 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 1.35 ft. Min. Apron Thickness With Filter Fabric(1.5*d-max) in feet Thickness= 16 in. Min. Apron Thickness With Filter Fabric(1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 16 18 6 36in. 2 TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. &ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max= Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness= Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Project Name Riprap Dissipator#2 Date Turnberry South Phase 1 Dec. 2023 DD Project No. Location D&L Engineering, PLLC DL2225 Hoke County, Forth Carolina 150 S. Page Street Calculated By Southern Pines. NC 28387 JLH (910)684-8646 Checked By .ILH STORM DESIGN: 10 Year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 18 in. Pipe diameter in inches D-o = 1.50 ft. Pipe diameter in feet Q-25= 4.29 cfs Pipe outlet(from drainage calculations) d-50= 0.4 ft. from Figure 8.06 a L-a = 9 ft. from Figure 8.06 a Step 3. 3*D-o= 4.50 ft. 3 times the outlet pipe diameter W= 10.50 ft. Pipe diameter+Apron length Step 4. d-max 0.60 ft. Maximum Stone Diameter(1.5*d-50) in inches d-max 7 in. Maximum Stone Diameter(1.5*d-50) in feet Step 5. Thickness= 0.90 ft. Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet Thickness= 11 in. Min.Apron Thickness With Filter Fabric (1.5*d-max) in inches DESIGN DIMENSIONS: Apron Dimensions Riprap Length Width 3*D-o Thick Class 9 11 5 24in. 1 TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. &ft.) d-50= Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.)