HomeMy WebLinkAboutSW6170202_Cover Letter & Permit_20170210 ROY COOPER
Governor
t,a
MICHAEL S. REGAN
Secretary
Energy,Mineral& TRACY DAVIS
Director
Land Resources
ENVIRONMENTAL OLIALITY February 10, 2017
Mr. Ralph Huff,Member/Manager
H&M Bedford,LLC
2919 Breezewood Ave.
Fayetteville,North Carolina 28303
Subject: Stormwater Permit No. SW6170202
Bedford Commercial,Hoke County
Dear Mr. Huff.
The Division of Energy,Mineral, and Land Resources(DELMR),received a complete Stormwater
Management Permit Application for the subject project on February 3, 2017. Staff review of the plans
and specifications has determined that the project,as proposed,will comply with the Stormwater
Regulations set forth in Title 15A Section NCAC 2H.1000. We are forwarding Permit No. SW6170202,
dated February 10, 2017, for the construction, operation and maintenance of the subject project and the
stormwater system. This permit shall be effective from the date of issuance until February 9, 2025, or
until rescinded and shall be subject to the conditions and limitations as specified therein, and does not
supersede any other agency permit that may be required.
If any parts,requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per
NCGS 143-215(e)the petition must be filed with the OAH within thirty(30) days of receipt of this
permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required)
and/or the details of the filing process at 6714 Mail Service Center,Raleigh,NC 27699-6714, or via
telephone at 919-431-3000, or visit their website at www.NCOAH.com.Unless such demands are made
this permit shall be final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need
additional information concerning this matter,please contact Mike Randall at(919) 807-6374; or
mike.randall@ncdenr.gov.
Sincerely,
�Q
E D 1 7 2017
for Tracy E. Davis, PE, CPM,Director
cc: SW6170202 File,Fayetteville Regional Office
ec: Fayetteville Regional Office
55`-'Nothing Compares_
SState of North Carolina I Environmental Quality I Energy,Mineral and Land Resources
512 N.Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612
919 707 9200
State Stormwater Permit
Permit No. SW6170202
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT QUALITY
STATE STORMWATER MANAGEMENT PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
H & M Bedford, LLC
Bedford Commercial Development in
Hoke County
FOR THE
construction, operation and maintenance of each Stormwater Control Measures (SCM) in
compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the
"stormwater rules') and the approved stormwater management plans, specifications and
other supporting data as on file with and approved by the State and considered a part of
this permit.
This permit shall be effective from the date of issuance until February 9, 2025, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. Each SCM is approved for the management of stormwater runoff as described in the
application documents and as shown on the approved plans.
3. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be
recorded showing all such required easements, in accordance with the approved
plans.
4. The runoff from all built-upon area within the permitted drainage area of this project
must be directed into the SCMs.
5. The built-upon areas associated with this project shall be located at least 30 feet
landward of all perennial and intermittent surface waters.
6. If sediment accumulates in the forebay in a manner that reduces its depth to less
than 75 percent of its design depth, then the forebay shall be cleaned out and
returned to its design state.
7. The dam structure, including front and back embankment slopes, of the pond shall
be vegetated with non-clumping turf grass; trees and woody shrubs shall not be
allowed.
8. The vegetated shelf shall be planted with a minimum of three diverse species of
herbaceous, native vegetation at a minimum density of 50 plants per 200 square
feet of shelf area.
Page 1 of 4
State Stormwater Permit
Permit No. SW6170202
construction.
10. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in
the notice, the permittee shall submit a written time schedule to the Director for
modifying the site to meet minimum requirements. The permittee shall provide
copies of revised plans and certification in writing to the Director that the changes
have been made.
11. SCMs that allow stormwater to infiltrate shall not be located on or in areas with
contaminated soils.
12. Plats for residential lots that contain SCMs shall include: the specific location of the
SCM on the lot; a typical detail for SCM to be used; and a note that the SCM on the
property has been required to meet stormwater regulations and that the property
owner may be subject to enforcement procedures as set forth in G.S. 143, Article 21
if the SCM is removed, relocated, or altered without prior approval.
13. The O&M Agreement shall be referenced on the final plat and shall be recorded with
the county Register of Deeds upon final plat approval. If no subdivision plat is
recorded for the site, then the O&M Agreement shall be recorded with the county
Register of Deeds so as to appear in the chain of title of all subsequent purchasers.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director. In
the event of a change of ownership, or a name change, the permittee must submit a
completed Name/Ownership Change form signed by both parties, to the State,
accompanied by the supporting documentation. The approval of this request will be
considered on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such time
as the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the State, in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or
replacement stormwater management systems.
6. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated. The
permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and re-issuance or termination does
not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Page 3 of 4
State Stormwater Permit
Permit No. SW6170202
H & M Bedford, LLC
Bedford Commercial Development in
Hoke County
Designer's Certification
as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/weekly/
full time) the construction of the project,
(Project Name)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Number
Date
cc: NCDEQ-DEMLR Regional Office
Page 1 of 1