Loading...
HomeMy WebLinkAboutSW6231201_Stormwater Report_20231214 DUKE ENERGY CAROLINAS ERWIN-FAYETTEVILLE EAST 115KV OLD BLUFF CHURCH ROAD LAYDOWN YARD CUMBERLAND COUNTY, NORTH CAROLINA DATE: DECEMBER 1ST, 2023 N CAR /I'' SS`/ e°°e { ti a O ee CI. SEAL e = 035619 e = e e IIjI�� ````� S D/yy/������ally sly e�ir�?Nicholas Parks N I C ► DN:"c-l�i�H►lss Parks,c-l1S, Parks"'" " rrkss@mcadamsco.com Date:2023.12.01 13:56:29-05'00' DUKE ENERGY CAROLINAS ERWIN-FAYETTEVILLE EAST 115KV OLD BLUFF CHURCH ROAD LAYDOWN YARD CUMBERLAND COUNTY, NORTH CAROLINA EROSION CONTROL NARRATIVE PROJECT NUMBER: DKE-22043 ANALYZED BY: SHANE PIERCE CHECKED BY: NICK PARKS, PE DATE: DECEMBER 1ST, 2023 1 1 MCADAMS / • °0 r�Ss •°°,� • �+ THE JOHN R. MCADAMS COMPANY, INC. ° 2� SEAL 621 HILLSBOROUGH STREET It 035619 e ° SUITE 500 ��•f` RALEIGH, NORTH CAROLINA 27603 N0147i0 s 04. rks°ca USarks NC Llc. # C-0293, C-187 Parks r'" 202312 01 1356 48-OS'00' �� Mx CADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Table of Contents 1.0 Introduction 2 1.1 Project Location and Description 2 2.0 Erosion and Sediment Control Measures 2 2.1 Temporary Gravel Construction Entrance/Exit 2 2.2 Silt Fence 2 3.0 Vegetative Stabilization 2 4.0 Maintenance 3 4.1 Temporary Gravel Construction Entrance/Exit 3 4.2 Silt Fence/Silt Fence Outlets 3 5.0 Erosion Control Methodology 3 5.1 Staging 3 5.2 Silt Fence 3 5.3 Swale Lining Calculations 3 5.4 Riprap Dissipator Pad Calculations 4 6.0 Appendix 5 Appendix A Project Exhibits 6 Appendix B NOAA Rainfall Intensity, Duration, and Frequency Data 7 Appendix C Drainage Area Maps 8 Appendix D Erosion Control Channel and Outlet Protection Design 9 Appendix E Property Deed 10 creating experiences through experience 621 Hillsborough Street,Suite 500,Raleigh,NC.27603/919.361.5000 �J MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT 1.0 Introduction 1.1 Project Location and Description The proposed Erwin-Fayetteville East 115kV — Old Bluff Church Road Laydown Yard project is located in Cumberland County, North Carolina. The project is along an existing transmission corridor and will require Duke Energy to obtain a leased parcel within Cumberland County. The prior use of the existing parcels effected varies, however the project will not change the existing land use. Prior to construction, a Duke Energy construction contractor will install erosion control measures to encompass the anticipated construction limits. Predevelopment conditions will be restored, and the area will be stabilized prior to completion of construction. An avoidance and minimization of disturbance approach has been incorporated into the design of the erosion control measures by utilizing existing access points and stabilized right-of-way access routes, whenever possible. Erosion control measures are indicated herein for permitting use only by NCDEQ.The initial project duration is anticipated to start in September 2024 and be completed in June 2025. The storm drainage from this project drains to the Cape Fear River, "WS-C". The site is within the Cape Fear River Basin. The entire site disturbance area is approximately 7.28 acres. This report pertains solely to the Erwin-Fayetteville East 115kV—Old Bluff Church Road Laydown Yard project. 2.0 Erosion and Sediment Control Measures All vegetative practices and erosion and sediment control features shall be designed, constructed,and maintained to control runoff resulting from the 2-and 10-year frequency storms. 2.1 Temporary Gravel Construction Entrance/Exit A construction entrance will be needed to clean the tires of vehicles and equipment during wet conditions. There is a low potential for tracking mud and sediment onto adjacent local streets, however a construction entrance will be proposed to minimize impacts offsite. 2.2 Silt Fence Silt fences will be provided down gradient of the proposed site impacts at the locations shown on the drawings. The sediment fences will act as a filter for sediment laden runoff flowing from nearby construction areas.Silt fence outlets will be placed at any low points along the silt fence to allow collected runoff to pass through without overwhelming the fencing. A double row silt fence design will be utilized at temporary stockpile areas. 3.0 Vegetative Stabilization Vegetative cover shall be re-established within 14 calendar days or less as per NPDES Stabilization Requirements after completion of the activity. See the table on Sheet 2 of the Land Disturbance plans for more information on stabilization timelines.Temporary and permanent seeding specifications area included on Sheet 2. creating experiences through experience 2 of 10 �J MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT 4.0 Maintenance 4.1 Temporary Gravel Construction Entrance/Exit Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic top dressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out, as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto any roadway. 4.2 Silt Fence/Silt Fence Outlets Silt fence and silt fence outlets shall be inspected at least once a week and after each rainfall (1-inch or greater). Should the fabric of a silt fence collapse, tear, decompose, or become ineffective, replace it promptly. Remove accumulated sediment as necessary when one-third of the storage capacity is reached to provide adequate storage volume for the next rain and to reduce pressure on the fence.Take care to avoid undermining the fence during cleanout. Remove all materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. At the outlets remove sediment contaminated stone and replace, as necessary. 5.0 Erosion Control Methodology 5.1 Staging The erosion control plan addresses the complete construction activities for this temporary laydown yard. The plans include an Erosion Control Plan Stage 1 that places erosion control measures for the initial site installation activities. Stage 2 shows the temporary site installations being removed with erosion control measures in place. 5.2 Silt Fence The existing drainage patterns of the site exist in such a way that less than an acre of land contributes runoff to an existing drainage structure. The proposed layout creates the same scenario of less than an acre of land contributing runoff to any drainage structure. 5.3 Swale Lining Calculations Swale lining calculations were performed using calculated velocities and shear stress values based on static flow equations and interpolating Manning's n value per Chapter 8 of the NCDEMLR Erosion and Sediment Control Planning and Design Manual. Permanent lining calculations are based on the 10-year storm while the temporary lining calculations are based on the 2-year storm. A temporary lining has been specified for all swales based on a velocity of 2 ft/s or greater. The existing drainage patterns of the site exist in such a way that less than an acre of land contributes runoff to an existing drainage structure. The proposed layout creates the same scenario of less than an acre of land contributing runoff to any drainage structure. These calculations are included in the Erosion Control Channel Design spreadsheet in Appendix D. creating experiences through experience 3 of 10 �� MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT 5.4 Riprap Dissipator Pad Calculations Riprap velocity dissipater calculations were performed per NY DOT method and sizing based on Figure 8.06.b.1 of the NCDEMLR Erosion and Sediment Control Planning and Design Manual. These calculations are included in the Riprap Outlet Protection spreadsheet in Appendix D. creating experiences through experience 4 of 10 MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT 6.0 Appendix Appendix A—Project Exhibits Figure 1 - USGS Topo Map Figure 2 - NRCS Soil Survey Figure 3 -Aerial Map Appendix B—NOAA Rainfall Intensity, Duration, and Frequency Data Appendix C—Drainage Area Maps Appendix D—Erosion Control Channel and Outlet Protection Design Appendix E—Property Deed creating experiences through experience 5 of 10 �� MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Appendix A Project Exhibits creating experiences through experience 6 of 10 • 9� N /� /J44 ' . Westmmister . __ Cem ^ • 1f1 /06 . -.‘,2 . , , 4 '' ' V cir4f1314 7 i i" fir o rs / - \ I, / ..../.." rj ,. 01_ tf � i / In /it ..;....____1....__________. ...:.;;;77.L .7::::::::„. ......:_. 1� 4((..../:::: Y9B ��t ' n / Q y ` —T— �1\ - f z (, 1,< r, ` :K2 \�w • �v� /\\),.. ---"-- ---"'" Mt(milt I 'IC 1 ,/" �/- �, giro,\ e� .........N...._. • / w f,0P. If • :mmanuel O 43 (,l' •'_'• i;Wade •i; : ••=1. .,W._ • % ' Bl� 147) •Y• r ,' _ Fire Sta. rsz .> / -- ... .:. . .8 ._....,- —LI ( , Li Legend • r" ,• /' - • - •' ;�. Cop olh,o®` ;ot13.National Geographic(Society,i-cubed •Ki!6 Q PROJE LIMITS ,1 .'i _/ �•• N .s ERWIN-FAYETTEVILLE EAST 115kV al OLD BLUFF CHURCH ROAD LAYDOWN YARD USGS TOPOGRAPHIC MAP PROJECT#: DKE22043 Lu 0.15 0.3 0.45 0.6 Miles CUMBERLAND COUNTY,NORTH CAROLINA MCADAMS 1.1.:"."..erj--7j_., .... UV 1 ov Yl • r■` -r F N VA ... F r .. / IIII\ .. } ' I r' J '•y I - I r • i '41151 ' w �} 0- 11 1�- . .i s ■ 11 ir 11 r -{ ,r .h.i / litiri iii:'r . . ! . I • t - r 04. 31;11 9-2 ii �� i illr NI WIreikili AmoVell licippithill-NI A ti } __• '• rat i L 46.1 Iral ff. ' 1-I 1.9\........ . 4 I I1 ■ + Ifih .* _ ill y f ■ II r r ' / I l r•1 1� re' ..r jr . . .friter _ . L .. • I e , + ili r -,-,.:14..\..........).........,%..t...., . IL / . , Legend �,x -... t11:411r: ` PROJECT LIMITS d t' ,`4 ' Fer 1. ERWIN-FAYETTEVILLE EAST 115kV 'I OLD BLUFF CHURCH ROAD LAYDOWN YARD SOILS MAP PROJECT#: DKE22043 O 0.1 0.2 0.3 0'4 CUMBERLAND COUNTY, NORTH CAROLINA MCADAMS Miles 1 N • •T �' lei *• ' 1 K .� .. -.p,. toy,. § . .. ♦ / - / t/. .f�. '�''• fit r, ,k4 .' ^ 4.. fie/ ,' �, t �`f �� .1Q4df, ,, '''Ail. ,_ . chgr --- .(.- . O. vs:,!,.. .. -.., v - ci + 06* , Ail > .f dr. �e/`,, IteiL. 1.4,cy, 064,04 Ike I _, /.‘ ..." . 4'• ,_ 4 G • __,......8;c4)41/44v, 4 , 4 eA' 1' Y ,a' lpir V ' r/ , .` -1.. Faet' I r k.0 , - , ' / •t� 41 v.II 41 Ze , 4 - • i . , • ._ {' jdG, ,axs Esc Common [MapControbmaoua,Co, ,-. ,,umberland, '! Legend : 3, SState if oa41h Caro�0�a Dar, C o S ` i�,�w�8teetnMliapo pnlo5Erus‘A %.ri, HERE, ' GronitriatelGrnpfh, r©oTec�bni 000aa Ilnc,HETIN°SA,MSS(: , EPA, NPS, US I .ti C t. , e,nsus Bureau, USDA — PROJECT LIMITS ' ,,.: 'I�'_ a . 4 i, ERWIN-FAYETTEVILLE EAST 115kV 'I OLD BLUFF CHURCH ROAD LAYDOWN YARD SITE MAP PROJECT#: DKE22043 0 0.07 0.14 0.21 0.28 Miles CUMBERLAND COUNTY,NORTH CAROLINA MCADAMS �� MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Appendix B NOAA Rainfall Intensity, Duration, and Frequency Data creating experiences through experience 7 of 10 6/1/23, 10:29 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 �* Location name: Godwin,North Carolina,USA* ''� '`° V Latitude:35.1825°,Longitude:-78.7227° . none `i• `'' Elevation: 149 ft** i 2�� *source:ESRI Maps "s '4 %nod **source:USGS �""""'`'� POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90%confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 5.22 6.16 7.14 7.93 8.86 9.56 10.2 10.9 11.6 12.3 (4.75-5.77) (5.60-6.79) (6.49-7.87) (7.20-8.74) (8.02-9.74) (8.62-10.5) (9.17-11.2) (9.68-11.9) (10.3-12.8) (10.8-13.5) 10-min 4.17 4.92 5.71 6.34 7.06 7.61 8.13 8.61 9.21 9.68 (3.80-4.61) (4.48-5.43) (5.20-6.31) (5.76-6.98) (6.38-7.76) (6.86-8.35) (7.28-8.90) (7.68-9.43) (8.14-10.1) (8.49-10.6) 15-min 3.48 4.12 4.82 5.35 5.97 6.43 6.85 7.24 7.73 8.10 (3.17-3.84) (3.76-4.55) (4.38-5.32) (4.86-5.89) (5.40-6.56) (5.79-7.05) _(6.14-7.50) (6.46-7.94) (6.83-8.47) (7.10-8.88) 30-min 2.38 2.85 3.42 3.87 4.42 4.84 5.25 5.64 I 6.15 6.56 (2.17-2.63) (2.59-3.14) (3.12-3.78) (3.52-4.27) (4.00-4.86) (4.36-5.31) (4.70-5.75) (5.03-6.18) (5.44-6.74) (5.75-7.19) 60-min 1.49 I 1.79 2.19 2.52 2.94 3.28 3.61 3.95 4.41 4.78 (1.35-1.64) i (1.63-1.97) (2.00-2.42) (2.29-2.78) (2.66-3.23) (2.96-3.60) (3.24-3.96) (3.53-4.33) (3.90-4.83) (4.20-5.25) 2-hr 0.868 1.05 1.32 1.53 1.82 2.06 2.30 2.54 2.88 3.17 (0.779-0.982) (0.944-1.18) (1.18-1.48) (1.37-1.73) (1.62-2.05) (1.82-2.31) (2.02-2.58) (2.22-2.86) (2.50-3.24) (2.72-3.56) 3-hr 0.614 0.742 0.934 1.10 1.32 1.50 1.70 1.90 2.20 2.44 (0.552-0.697) (0.667-0.842) (0.837-1.06) (0.981-1.24) (1.17-1.49) (1.33-1.70) (1.49-1.91) (1.66-2.14) (1.89-2.47) (2.08-2.75) 6-hr 0.367 0.444 0.559 0.658 0.793 0.908 r 1.03 1.16 1.34 1.50 (0.331-0.412) (0.401-0.498) (0.504-0.626) (0.591-0.735) (0.707-0.884) (0.804-1.01) (0.903-1.14) (1.01-1.29) (1.15-1.49) (1.27-1.66) - 12-hr 0.215 0.260 0.329 0.389 0.472 0.544 0.620 0.703 0.822 0.925 (0.193-0.241) (0.234-0.291) (0.296-0.369) (0.348-0.436) (0.419-0.527) (0.479-0.605) (0.540-0.689) (0.606-0.780) (0.698-0.913) (0.775-1.02) 24-hr 0.127 0.154 0.198 0.233 0.282 0.323 0.367 0.413 0.479 I 0.534 (0.117-0.139) (0.142-0.169) (0.181-0.217) (0.212-0.255) (0.257-0.309) (0.292-0.354) (0.330-0.402) (0.370-0.453) (0.426-0.527) (0.471-0.588) 2-day 0.074 0.089 0.113 0.133 0.160 0.183 0.207 0.232 0.268 0.298 (0.068-0.080) (0.082-0.097) (0.104-0.123) (0.122-0.144) (0.146-0.174) (0.166-0.199) (0.187-0.225) (0.208-0.253) (0.239-0.293)1(0.263-0.327) 3-day 0.052 0.063 0.079 0.093 0.112 0.127 0.143 0.160 0.184 0.204 (0.048-0.056) (0.058-0.068) (0.073-0.086) (0.085-0.100) (0.102-0.121) (0.116-0.137) (0.130-0.155) (0.144-0.174) (0.165-0.201) (0.181-0.223) 4-day 0.041 0.050 0.063 0.073 0.087 0.099 0.111 0.124 0.142 0.157 (0.038-0.045) (0.046-0.054) (0.058-0.068) (0.067-0.079) (0.080-0.094) (0.090-0.107) (0.101-0.120) (0.112-0.134) 10.127-0.154) (0.140-0.171) 7-day 0.027 0.033 0.041 0.047 0.056 0.063 0.070 0.078 0.089 0.097 (0.025-0.029) (0.030-0.035) (0.037-0.044) (0.043-0.051) (0.051-0.060) (0.057-0.068) (0.064-0.076) (0.070-0.085)1(0.080-0.097) (0.087-0.106) 10-day 0.022 0.026 0.032 0.036 0.042 0.047 0.053 0.058 0.065 0.071 (0.020-0.023) (0.024-0.028) (0.029-0.034) (0.034-0.039) (0.039-0.046) (0.044-0.051) (0.048-0.056) (0.053-0.062) (0.059-0.070) (0.064-0.077) 20-day 0.014 0.017 0.021 0.023 0.027 0.030 0.033 0.036 0.041 0.044 (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.025) (0.025-0.029) (0.028-0.033) (0.031-0.036) (0.033-0.039) (0.037-0.044) (0.040-0.048) 30-day 0.012 0.014 0.017 0.019 0.021 0.024 0.026 0.028 0.031 0.033 (0.011-0.013) (0.013-0.015) (0.016-0.018) (0.017-0.020) (0.020-0.023) (0.022-0.025) (0.024-0.028) (0.026-0.030) (0.028-0.033) (0.030-0.035) 45-day 0.010 0.012 0.014 0.015 0.017 0.019 0.020 0.022 0.024 0.025 (0.009-0.011) (0.011-0.013) (0.013-0.015) (0.014-0.016) (0.016-0.018) (0.018-0.020) (0.019-0.022) (0.020-0.023) (0.022-0.026) (0.023-0.027) 60-day 0.009 0.011 0.012 0.013 0.015 0.016 0.018 i 0.019 0.020 0.021 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.019)1(0.017-0.020) (0.019-0.022) (0.020-0.023)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.1825&Ion=-78.7227&data=intensity&units=english&series=pds 1/4 6/1/23, 10:29AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.1825`, Longitude: -78.7227' Average recurrence .....-.--....,---‹ -1 101 -. — interval I (years) L 2 . 'in 0 _. \ 10 — 5 — 10 c — 25 o — 50 m▪ 10-1 _ \ — 100 U \- — 200 \ ...-aJ < 500 — 1000 10-Z - r 1 1 1 t 1 I 1 1 1 I 1 1 1 1 E E E E E A A 6 N v , ,, v a ,, a„ 'n O L4 O $ Duration N N r6 V r O O O V 0 101 - 1 -" - i - 11111111111111111.1 C ___.. ......m.111110111111111111.11.11. 1.11.i.iiiMMENN - MIMNMEI Duration in10° -� — 5-min — 2-day 10{nin — 3-day c 15 mrn — 4-day — 30-man — 7-day +., 10-1 --- a — 60-mm — 10-day .� — 2-hr — 20-day Q. .11 — 3-hr — 30-day — 6-tlr — 45-day 10-2 — —• —• — — 12-hr — 60-day ' I I 1 2 5 10 25 50 100 200 500 1000 — 24-hr Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu Jun 1 14:29:56 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.1825&Ion=-78.7227&data=intensity&units=english&series=pds 2/4 6/1/23, 10:29 AM Precipitation Frequency Data Server ;r f 11111111ali /IV ;A. Op\ Fsla l J •d Lar a scale terrain stun-Sal ern • • �Durham Rocky Mount � Greensboro • Raleigh • :TH C ARO L INA Greenville •Charlotte Fayetteville• I 1a_k .r I • �r AROtINA Wilmington OnsI 100km • Bd) r nit 61Omi Large scale map IMMO Inston em Greensboro Durham Rocky Mount .ileigh North Greenville Carolina Motile etteville Jack Wilmington 100krr i 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lot=35.1825&Ion=-78.7227&data=intensity&units=english&series=pds 3/4 6/1/23, 10:29 AM Precipitation Frequency Data Server Winston-Salem • • Greensboro Durham • Rocky Mount • Raleigh Greenville North • Carolina Charlotte Fayetteville • Jacksonville • II Ahlmingon III 7lum 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questionsa@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.1825&Ion=-78.7227&data=intensity&units=english&series=pds 4/4 �� Mx CADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Appendix C Drainage Area Maps creating experiences through experience 8 of 10 %� ,i///// --^ '/.7 / // r' ---� \�' '/ / 47' iIV I I I � , I /il iII 1 II N. I \ \� ��—so--/ /I I I / \ N.... /r \ \/ 1. I / /\ /' --, I I F0STING90' \ Y� / SITE ACCESS -\_ / \ T ANSMISSION / / I /7/11 \ EASEMENT / F • \ i / - /� ter/ .. \ // / / ,d'; ,,� \ max/ , ..- /. ... `-- - ,,.,i- ) 0/, ..... / � /-/' //h�' / ,' // , / / \��\ / \ C.) I I 1 1 il/7/ ,---'\. --'''',i-/-4. ----''',,,,,,...ger-- ,,./ -1-49- ' -'`C,--0 +8-' _‘/H ----, / / /EwsnNc / // / / Zoe' � .i / / /// POND ice .�' / \ -��"�6` / "�"�� zM'1'G \\ - g' / '1'i F \ >,....\\,,,\___:, V ' -/ _..„ ,,'i' � /I I '/ -i,I pp, /� �4 � ---- / / Et , , ---- ---17 --- ------,,,,,,,__)( \ / � / / /. _/':1-0 61 � / �\ / I - o j /�,' 04111 �/ .�— / / i g/ � _ �11 /•' GRADING LEGEND //,/ q3/ //' LEASE LINE Q / .. // - -\- -/// i \\�` --_ / -- PROPERTY LINE 0 e / / // ,1 \ 141--' / 1\ PROPERTY SETBACK B/ ✓ IIIIIII I \` / ,' / --- �/ ADJACENT PROPERTY LINE _ Et a I / �, a a OVERHEAD ELECTRICAL (, a � /' \ IIIIII \\`r/' 140 / /' / ��' // ------- DISTRIBUTION EASEMENTEt $ . .�/� \ r/ II -fi ` / /� / / // i \\ 500-YR FLOODPLAIN \ II i /} LD LD LIMITS OF DISTURBANCE �' /'\\ 11111. - / //� ' x\ \\ —x—x—x—x— CHAIN LINK FENCE /� 7 \ 11II \� %' \ III _—_"--� -a \ \ \ �,��� ABC STONE J 1. I _ �3gq\ \ \--- \ CO f� //I / \ / Illllkr ��'// 0/..----- ' -- -�--- \ \ 250 MAJOR CONTOUR CO 1 / / // �\ fillil/N1l \ ��' !WOO \ \� GRAPHIC SCALE 252 MINOR CONTOUR J // / \ III' — — 0I,I, // \ \ 11 EXISTING MAJOR CONTOUR 0 / I EXISTING I 1 I STREAM II \\ l I -.Oil / / l inch=100 ft. ----�--- EXISTING MINOR CONTOUR \ Al, '��I'IIIIIII 1/ ,I111... III III II / I / `�Iliii�Illilb --��_ I -\ \\ ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT DUKE HQ —�_ — / ENERGY PROGRESS,CUMBERLAND COUNTY,NCDOT ENGINEERING DESIGN LU I AND CONSTRUCTION STANDARDS / I / .1 I I / I / _ 1\ /' ANY CHANGES TO THE PLAN&DETAILS SPECIFIED HEREIN MUST BE APPROVED J I / °( 1 I BY THE DUKE ENERGY PERMITTING SPECIALIST PRIOR TO IMPLEMENTATION. W S .,�,Nr CARD •., ME r =o�oFEss" 121 he John R.McAdams Company,inc. DUKE DUKE ENERGY PROGRESS EAST Q Q 621 Hillsborough Street ERWIN-FAYETTEVILLE EAST 115kV Suite 500 71 Raleigh,NC 27603 CP OLD BLUFF CHURCH ROAD LAYDOWN YARD z a ,NEC.V phone 919.361.5000 ENERGY. CUMBERLAND COUNTY,NORTH CAROLINA FiA.P PRE P,, fax 919.361.2269 O license number:C-0293,C-187 PRE DRAINAGE AREA MAP Ct U .,...rr.at° MCADAMS 411 FAEI Ht.NLLE STREET in o PRELIMINARY DRAWING NOT RELEASED FOR CONSTRUCTION mcaaamsco.�om RALEINO N.C.27601 NNE NOEX OIIAM►10 41EET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(919)546-2090 ###### E22008401 DA1 :::::::::::::::::_v);;;11,,::://,)//'//////'///////B//)11 1/'-- \\ 1 / 1 I/ / /7 / / ---- / / V / f l l ( �• I 1 /�Ill 1 v 'l I /iI / 1 OFFSITE /P — IMPERVIOUS OFFSITE V A V I 'DRAINAGE // / \ I / /AREA T \ \ \ / / / /v A, V / I, V V / I X / \ N 4 A // / / IST G9 \� v / / SITE ACCESS —V / '\ \ TAN ISS i / � ) \ —/ / j / /\ / S , � ' -10 /) , / — Q. 4.,,, ,, , -- : __ / , ..// ' / / / i / y /'� P,,..,, / \ —— ii � � / s.71AC.I - i �j , max^ ,/ -•- -- ,- , ,,b, ..- _----"- . .„.--- , / /' / i NN. — /N' ——— � ,.I I , / � i _--I� O _---/- ti,�, C m,— �1' - ' ;ra/ / /EXISTING ' / / si , 0 .,pr v/ / �/ / POND f ��,o � 1� � i Y / a� \/ / / i // / iiIlIIii \ 'p _// 7 r '///�/'/,' /� /i, it �� 1 . �/ /' illl IIP / ilIP,4„5-/ , / _71-7A 0 1. (--, ': 1--',// � — iA \ .,,,,,,,,N -.....„:„- „.„/ ////;/, ,',7z/,;//,',/1011 40, A / -,/), t-x>-'-'(,. ...-;- - - 1, / N _ 4>1 7,//,'/%, --0.46 AC.III � l p1� t// o • T --z , / /�TAk. LIMITS OF I ,/ /i' /1 _J 1 1 1 , DISTURBANCE � �� O• " LAYDOW N YARD/ _/�i,! � i o +, iti z! i1 O/ % ems "2 /- °1 / ✓// pr n1 f /' . / _.-----_ I ��p , O' �I O `� A V GRADING LEGEND / � / I 1 i/ /' 7 / )/ \ `� — — — — LEASE LINE Q CI / d/ 2.07 AC.'/���` \� UI{� `\ E /-/_.4/', / /—�'—�� �/l \ _ -- PROPERTY LINE 0 s ! \ II II \�\`\ -��� -/�'ei h¢ --' / / \ ' \ PROPERTY SETBACK Ct j. / I 1111 I \,,g� , 111-i % / , / / �'/ I \ • W W ADJACENT PROPERTY LINE ' `I. �, / / // // \ \ OVERHEAD ELECTRICAL `�)7 I // ) (iiiiiil \��`(Q —✓ /i / / \ \ \ DISTRIBUTION EASEMENT 1 / \ ,1 500-YR FLOODPLAIN / +4' . - \� iiii C, C' _ _ / / _ 'ram \ \ \ LD LD LIMITS OF DISTURBANCE U �/ A611 CHAIN LINK FENCE E - / t.,TEMPORARY . .0.55 AC. i'� •''a V �¢\ _ —7- -n \ \ \ —— ABC STONE �i' STOCKPILE ' Qc �' v v 0 B/ I / \N. \1/ IIIIl� ` / i7 /�_— /— — co --\--_\ \ \ \ \ 250 MAJOR CONTOURa 1 / / )A ���'1I A / — V A A A AV GRAPHIC SCALE 252 MINOR CONTOUR —1 0 / I / ( \ 1 i Al \ _— /� \� \ \ \ \ \ 1 EXISTING MAJOR CONTOUR 0 14 I I \ I i \ ��/— _ �'/` \ \ \ \ \ EXISTING MINOR CONTOUR / EXISTING I I' / ) /. STREAM y\\ / �liil G. e /®1�1���� .11" ii_ill,�� \\\ \\ \\ linch=100 ft. --- Y/ / / H : - • // -'N�liiiiij -1 ur�ii�_____ I v vvIvv A _ -vvv I II I ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT DUKE_ ENERGY PROGRESS,CUMBERLAND COUNTY,NCDOT ENGINEERING DESIGN( \ ) �! ; AND CONSTRUCTION STANDARDSI I IL-IL-II \ '\ I ANY CHANGES TO THE PLAN&DETAILS SPECIFIED HEREIN MUST BE APPROVED BY THE DUKE ENERGY PERMITTING SPECIALIST PRIOR TO IMPLEMENTATION. W $ .`P.�N'CARD/�,' r °� Ess, -." DUKE >- of �" The JohnR.McAdamsCompanY,Inc. DUKE ENERGY PROGRESS EAST Q Q� T� 621 Hillsborough Street SEAL = '_ '� Suite50o ERWIN-FAYETTEVILLEEAST115kV ti03561 s Raleigh,NC 27603 OLD BLUFF CHURCH ROAD LAYDOWN YARD Fti� E�� phone 919.361.5000 E N E RGY CUMBERLAND COUNTY,NORTH CAROLINA z .•;/CA"A....?. PR,emsa. ,,,, license numfax b9.361.2269 er:C-0293,C-187 2 11/20/23 RESPONSE TO NCDEQ COMMENTS • SP NAP NAPDRAINAGE AREA MAP-POST Ct 1 - 11/10/23 RESPONSE TO NCDEQ COMMENTS SP NAP NAP n „ MCADAMS 411 FAVLI ILN1LLE STREET W PRELIMINARY DRAWING NOT RELEASED FOR CONSTRUCTION mcadamsco.com RALEIGH N.C.27601 UNE!NM: OMMMO SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED ww TELEPHONE NO.(919)546-2090 ###### E22008401 DA2 �� MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Appendix D Erosion Control Channel and Outlet Protection Design creating experiences through experience 9 of 10 Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Thursday,Jun 1 2023 CLEAN WATER BYPASS Hydrograph type = Rational Peak discharge (cfs) = 30.98 Storm frequency (yrs) = 2 Time interval (min) = 1 Drainage area (ac) = 8.390 Runoff coeff. (C) = 0.6 Rainfall Inten (in/hr) = 6.153 Tc by User (min) = 5 IDF Curve = DKE22043-LAYDOWN YARD.IDFRec limb factor = 1.00 Hydrograph Volume=9,293(cuft);0.213(acft) Runoff Hydrograph Q (cfs) 2-yr frequency Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 5 10 Time (min) Runoff Hyd -Qp = 30.98 (cfs) Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Thursday,Jun 1 2023 CLEAN WATER BYPASS Hydrograph type = Rational Peak discharge (cfs) = 39.90 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 8.390 Runoff coeff. (C) = 0.6 Rainfall Inten (in/hr) = 7.927 Tc by User (min) = 5 IDF Curve = DKE22043-LAYDOWN YARD.IDFRec limb factor = 1.00 Hydrograph Volume=11,971 (cuft);0.275(acft) Runoff Hydrograph Q (cfs) 10-yr frequency Q (cfs) 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 5 10 Time (min) Runoff Hyd -Qp = 39.90 (cfs) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Thursday,Jun 1 2023 CLEAN WATER BYPASS Trapezoidal Highlighted Bottom Width (ft) = 3.00 Depth (ft) = 1.22 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 39.90 Total Depth (ft) = 2.50 Area (sqft) = 8.13 Invert Elev (ft) = 139.50 Velocity (ft/s) = 4.91 Slope (%) = 1.00 Wetted Perim (ft) = 10.72 N-Value = 0.025 Crit Depth, Yc (ft) = 1.21 Top Width (ft) = 10.32 Calculations EGL (ft) = 1.59 Compute by: Known Q Known Q (cfs) = 39.90 Elev (ft) Section Depth (ft) 143.00 I 3.50 142.00 - 2.50 • 141.00 • 1.50 • 140.00 • 0.50 • • 139.00 • -0.50 • 138.00 -1.50 0 2 4 6 8 10 12 14 16 18 20 22 Reach (ft) '� MCADAMS EROSION CONTROL CHANNEL DESIGN Project Name: ERWIN FAYETTEVILLE 115KV-OLD BLUFF CHURCH ROAD LAYDOWN YARD Date: 6/1/2023 Project Number DKE22043 Calculated By: SMP Channel Number:BYPASS I. FLOW CALCULATIONS Drainage Area= . 8.71 acres SCS CN= 70 For newly graded areas,HSG'A'soils Rational C= 0.40 C=0.020 x CN-1.0 Tc= 5.00 min Conservative assumption 12= 6.16 in/hr 110= 7.93 in/hr Q2= 21.46 cfs Q10= 27.63 cfs II. SWALE CALCULATIONS Proposed Channel Section Longitudinal Slope= 1.00% Left Sideslope= 3.00 H:V Right Sideslope= 3.00 H:V Maximum Vel.= 4.50 ft/s 1For established grass lined channel Bottom Width= 3.00 ft 10-Year Storm Calculations(for Permanent Liner) Match Manning's"n"to Calculated"n"and adjust Depth until Capacity matches Flow(Q10). Wetted Hydraulic Liner Description/ Manning's"n" Depth Flow Area Perimeter Radius Velocity VR Flow(Q10) Capacity Shear Stress Selection Calculated [ft] [ft2] [ft] [ft] [ft/sec] [ft2/sec] [cfs] [cfs] [Ib/ft^2] 0.046 1.3636 9.67 11.62 0.83 2.86 2.38 27.63 27.63 0.85 Tall Fescue 0.046 0.028 1.0767 6.71 9.81 0.68 4.12 n/a 27.63 27.63 0.67 ERONET P300 0.029 >NO PERMANENT LINER REQUIRED >VELOCITY IS OKAY >SHEAR STRESS IS OKAY 2-Year Storm Calculations(for Temporary Liner) Depth Flow Area Wetted Perimeter Hydraulic Rad. Velocity VR Flow(Q2) Capacity Shear Stress Calculated Manning's"n" [ft] [ft2] [ft] [ft] [ft/sec] [ft/sec] [cfs] [cfs] [Ib/ft^2] Description 0.022 0.8447 4.67 8.34 0.56 4.59 n/a 21.46 21.46 0.53 Bare Earth 0.037 1.0904 6.84 9.90 0.69 3.14 n/a 21.46 21.46 0.68 ERONET SC150 0.037 >CHANNEL UNSTABLE-TEMPORARY LINER REQUIRED >VELOCITY IS OKAY >SHEAR STRESS IS OKAY Liner Longevity->24 Months Permanent Liner Specifications- NO LINER REQUIRED Allowabe Partially Vegetated Allowable Partially Vegetated Matrix Netting Velocity(f/s) Shear Stress[Ib/ft^2] #N/A MA #N/A #N/A T=Top;B=Bottom;M=Middle Temporary Liner Specifications- ERONET SC150 Matrix Netting Allowabe Unvegetated Allowable Partially Vegetated Velocity(f/s) Shear Stress[lb/ft^2] 70%Straw Fiber-0.351b/sy T:Heavyweight photodegradable w/UV additives- 30%Coconut Fiber-0.151b/sy 31b/I000sf B:Lightweight 8.0 2.00 T=Top;B=Bottom;M=Middle 2 MCADAMS DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project: ERWIN FAYETTEVILLE 115KV-OLD BLUFF CHUF Date: 6/1/2023 Project Number: DKE22043 Calculated By: SMP Outlet Number: 1 Outlet flowrate= 39.9 cfs Pipe diameter= 36 inches Number of pipes= 1 Pipe separation= 0 feet Outlet Velocity= 4.91 ft/sec Figure 8.06.b.1 25 ,I.------ —ppm Zo •7 ------- 20 ------------- — ---"-- Ice, ����� ��=-====i_ P \ZZZC������ — Elinniiiii==== 10 MM5E=W��----- ` =1 5 ---\mmil '�w� l�==i�■!! zuni... Zonel.■■■------ --i 70,EM 0 ------ 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Outlet pipe diameter 36 in. Length= 18.0 ft. Outlet flowrate 39.9 cfs Width= 10.2 ft. Outlet velocity 4.9 ft/sec Stone diameter= 6 in. Material= Class B Thickness= 18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4 x D(o) 3 x D(o) 2 Class B 6 18 6xD(o) 3xD(o) 3 Class 1 13 24 8 x D(o) 3 x D(o) 4 Class 1 13 24 8 x D(o) 3 x D(o) 5 Class 11 23 36 10 x D(o) 3 x D(o) 6 Class 11 23 36 10 x D(o) 3 x D(o) 7 Special study required _ 1.Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2.Outlet velocity based on full flow velocity �� MCADAMS OLD BLUFF CHURCH ROAD LAYDOWN YARD > EROSION CONTROL REPORT Appendix E Property Deed creating experiences through experience 10 of 10 7218 BK3218PG510 0510 -t RE::C:E:EVEl) 0 1 985 ! 4-2+3..2006 P11 12.,46w23 J. LEE WARREN jR,. REGISTER OF DEEDS (N.P. SEAL) C iIYIi3c RL...i ND co. , N.C. l � NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $0.01) Parcel Identifier No. Verified by County on the day of ,20_ By: Mail/Box to: Talmage S.Baggett.Jr..P.O. Drawer 1148.Fayetteville.NC 28302 This instrument was prepared by:Talmage S. Baggett. Jr..P,O. Drawer 1148.Fayetteville,NC 28302 Brief description for the Index: THIS DEED made this 27th day of April ,20 06,by and between GRANTOR GRANTEE Mar♦-Lou Lockamy,Widow Vickey Ray Lockainy 5716 Sisk Culbreth Road 5640 Sisk Culbreth Road Godwin.NC 28344 Godwin,NC 28344 The designation Grantor and Grantee as used herein shall include said parties,their heirs,successors,and assigns,and shall include singular,plural,masculine,feminine or neuter as required by context. WITNESSETH,that the Grantor,for a valuable consideration paid by the Grantee,the receipt of which is hereby acknowledged,has and by these presents does grant,bargain,sell and convey unto the Grantee in fee simple,all that certain lot or parcel of land situated in the City of , Black River Township, Cu iuberlarid County,North Carolina and more particularly described as follows: BEING 3 tracts of land in Black River Township consisting of 90.45 acres and more particularly described as follows: Lot 1: consisting of 13,10 acres as shown in a Nat Book 82.Page 147. Lot 2: consisting of 30.92 acres as shown in a Plat Book 82. Page 147 and Lot 3: consisting of 46.43 acres as shown in a Plat Book 82.Page 148. The property hereinabove described was acquired by Grantor by instnnment recorded in Book 4462 page : 694 A map showing the above described property is recorded in Plat Book page NC Bar Association Form No.L-3 ® 1976,Revised C 1977,2002 Printed by Agreement with the NC Bar Association— 1981 SoftPro Corporation,333 E.Six Forks Rd.,Raleigh,NC 27609 7218 BK7218PG51I 0511 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. T And the Grantor covenants with the Grantee,that Grantor is seized of the premises in fee simple,has the right to convey the same in fee simple,that title is marketable and free and clear of all encumbrances,and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever,other than the following exceptions: IN WITNESS WHEREOF,the Grantor has duly executed the foregoing as of the day and year first above written_ o�tS (SEAL) (Entity Name) Y OU LOCKAMY By: (SEAL) Title: By: (SEAL) Title: By: (SEAL) Title: State of North Carolina-County of Cumberland I,the undersigned Notary Public of the County and State aforesaid,certify that Many Lou Loclann personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this 2711i 'day of April ,20 06 My Commission Expires: June 10. 2006 IVN ©.� Notary Public Connie McDoi• d State of North Carolina-County of I,the undersigned Notary Public of the County and State aforesaid,certify that personally earn before me this day and acknowledged that_he is the of , a North Carolina or corporation/limited liability company/general partnership/limited partnership(strike through the inapplicable),and that by authority duly given and as the act of such entity,_he signed the foregoing instrument in its name on its behalf as its act and deed. Witness my hand and Notarial stamp or seal,this day of , 20_. My Commission Expires: Notary Public State of North Carolina-County of I,the undersigned Notary Public of the County and State aforesaid,certify that Witness my hand and Notarial stamp or seal,this day of ,20_. My Commission Expires: Notary Public The foregoing Certificate(s)of is/are certified to be correct This instrument and this certificate are duly registered at the date and time and in the Book and Page shown on the first page hereof. Register of Deeds for County By: Deputy/Assistant-Register of Deeds NC Bar Association Form No.L-3 0 1976,Revised® 1977,2002 Printed by Agreement with the NC Bar Association—1981 SoftPro Corporation,333 E.Six Forks Rd,Raleigh,NC 27609