Loading...
HomeMy WebLinkAboutNCC191511_NOT Closeout Documents_20231212 Permit Number: 2019-1533 .� ,,"1- TOWN of ., — ENGINEERING -% WAKE FOREST ENGINEERING Certificate of Completion Erosion and Sediment Control Town of Wake Forest Engineering Department 301 South Brooks Street Wake Forest,NC 27587 Phone: (919)435-9443 Subdivision/Site Name: Plan Approval Date: Date of Final Inspection/walk thru: Purvear Lot 1 10/15/2020 11/17/2021 Location: Financial Responsible Party: Contactor Phone Number: 5229 Unicon Dr. Andy Pun-ear 919-427-1269 Plan Specifications Local Ordinance Met: Temporary Controls Removed: Permanent Controls Installed and Met: Operational: Yes yes yes yes Additional Comments: N/A The undersigned(inspector)hereby accepts the installation of permanent and removal of temporary erosion and sediment control devices (per plan and specification) on behalf of the Town of Wake Forest.The owner is responsible for maintai}fig tlsc;e�devices,and in no way holds the Town responsible for deanout or repair. Inspector: N chae orner Contractor:Moffat Pipe Owner:Andy Purvear