HomeMy WebLinkAboutNCC191511_NOT Closeout Documents_20231212 Permit Number: 2019-1533
.� ,,"1- TOWN of
., —
ENGINEERING
-% WAKE FOREST
ENGINEERING
Certificate of Completion
Erosion and Sediment Control
Town of Wake Forest Engineering Department
301 South Brooks Street
Wake Forest,NC 27587
Phone: (919)435-9443
Subdivision/Site Name: Plan Approval Date: Date of Final Inspection/walk thru:
Purvear Lot 1 10/15/2020 11/17/2021
Location: Financial Responsible Party: Contactor Phone Number:
5229 Unicon Dr. Andy Pun-ear 919-427-1269
Plan Specifications Local Ordinance Met: Temporary Controls Removed: Permanent Controls Installed and
Met: Operational:
Yes yes yes yes
Additional Comments:
N/A
The undersigned(inspector)hereby accepts the installation of permanent and removal of temporary erosion and
sediment control devices (per plan and specification) on behalf of the Town of Wake Forest.The owner is responsible
for maintai}fig tlsc;e�devices,and in no way holds the Town responsible for deanout or repair.
Inspector: N chae orner Contractor:Moffat Pipe Owner:Andy Purvear