Loading...
HomeMy WebLinkAboutNCC192855_Annual Fee Paid Email_20231213Holloman, Tevye L From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Wednesday, December 13, 2023 8:46 AM To: john.nichols@brunswickcountync.gov Cc: Holloman, Tevye L; Georgoulias, Bethany; bob.tweedy@brunswickcountync.gov Subject: [External] Construction SW General Permit Annual Fee Resolved - NCC192855 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear Construction General Permit Permittee: This email is to notify you that the 2022 annual fee for Certificate of Coverage (COC) no. NCC192855 has been resolved. If the permit remains active, it has been successfully renewed (as long as all other annual fees have been paid). If the permit is no longer active, no future fees will be required. This COC is for Northeast Brunswick Regional Wastewater Treatment Plant Expansion in Brunswick County, issued to Brunswick County Public Utilities. This communication is in reference to Invoice no. NCC192855-2022. If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.