Loading...
HomeMy WebLinkAboutNCC192649_NOT Closeout Documents_20231207 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Durham Project: Dry Creek Mitigation Site River basin: Neuse Person financially responsible:Wildlands Engineering,Inc.-John Hutton,Vice Project#: DURHA-2019-013 President Address: 312 W.Millbrook Road,Suite 225,Raleigh,NC 27609 1. Project Location: Hall&Hampton Roads,Butner Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one on site Title: Inspection report: Sent Report Date given/sent: November 12,2020 9. Corrective action needed: 10. Comments: Project is complete and site is substantially in compliance. Close file. Please note there are a couple spots that should be revegetated for long term success. Reported by: Kimberly Summers Others present: Date of inspection: November 10,2020 Time arriving on site: 9:00 AM Time leaving site: 9:40 AM CC: