HomeMy WebLinkAboutNCC192649_NOT Closeout Documents_20231207 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200
County: Durham Project: Dry Creek Mitigation Site River basin: Neuse
Person financially responsible:Wildlands Engineering,Inc.-John Hutton,Vice Project#: DURHA-2019-013
President
Address: 312 W.Millbrook Road,Suite 225,Raleigh,NC 27609
1. Project Location: Hall&Hampton Roads,Butner
Pictures: No
2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): no one on site Title:
Inspection report: Sent Report Date given/sent: November 12,2020
9. Corrective action needed:
10. Comments: Project is complete and site is substantially in compliance. Close file. Please note there are
a couple spots that should be revegetated for long term success.
Reported by: Kimberly Summers Others present:
Date of inspection: November 10,2020 Time arriving on site: 9:00 AM Time leaving site: 9:40 AM
CC: