HomeMy WebLinkAboutNCC192029_NOT Closeout Documents (15)_20231207 <Jason.Browning@littleonline.com>
Cc:Johnson, Ray<Ray.Johnson@greensboro-nc.gov>; Phlegar, David <David.Phlegar@greensboro-
nc.gov>; Hill,Johnnie<Johnnie.Hill@greensboro-nc.gov>; Lattimore, Devin
<Devin.Lattimore@greensboro-nc.gov>
Subject: BB&T Leadership Institute-Parking Lot Addition SCM Inspection (D1816)
This email originated from outside of our organization,so don't click links or open attachments from any unknown
sources.
All,
Please refer to the attached Site Inspection Report for the status of the Stormwater Control Measure(s)
at BB&T Leadership Institute—Parking Lot Addition.Address all maintenance/repair items listed within
the report. All documentation has been received. Will re-evaluated vegetation on slopes in 2 weeks to
see if SCM is in approvable condition.
Thank you,
Kenneth Taylor
Stormwater Environmental Compliance Specialist
Water Resources Department
Phone: 336.373.4633
www.greensboro-nc.gov
Kenneth.Taylor@Greensboro-NC.gov