Loading...
HomeMy WebLinkAboutNCC192029_NOT Closeout Documents (9)_20231207 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then,mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N. Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)[40 CFR 122.22) General Permit Certificate of Coverage (COONo.: NCCI92029 Name of Project: BB&T Leadership Institute Parking Lot Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record,report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief, such information is true,complete,and accurate. Legally Responsible Organizational Entity(must match eNOT): Branch Bank & Trust *Legally Responsible Person (must match eNOT): Daniel O'Hara *Title of Legally Responsible Person: Senior Manager Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: *Signature: Date: * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements, see Part IV, Section B, Item(6)of the NCG010000 permit. O L Q �,