Loading...
HomeMy WebLinkAboutNC0003760_Inspection_20231206ROY COOPER Ca errtor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Shelby Arellano Covation Biomaterials LLC 4693 Hwy 11 N Grifton, NC 28530 � 1.a SfATF q, � awM ✓�` NORTH CAROLINA Environmental Quality December 06, 2023 SUBJECT: Compliance Inspection Report Covation Biomaterials Kinston Site NPDES WW Permit No. NC0003760 Lenoir County Dear Permittel The North Carolina Division of Water Resources conducted an inspection of the Covation Biomaterials Kinston Site on 12/05/2023. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0003760. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". If you should have any questions, please do not hesitate to contact Robbie Bullock with the Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email at robert.e.bullock@deq.nc.gov. ATTACHMENTS Cc: Laserfiche Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ mlora„D �� North Carocna Department afElrvlrammental Qaallty I DWAon ofwaterP sources Washington VNg mlOFt3ce 1943Washinglon3gvarc Mall I Washington, North Carolina 27M 252.9464481 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0003760 I11 121 23/12/05 I17 18LC I 19 Ls_] 2012 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I n,J I I I 71 I 74 79 I I I I I I I80 701� I 711 L LJ L Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:OOAM 23/12/05 17/04/01 Covation Biomaterials Kinston Site 4693 Hwy 11 N Exit Time/Date Permit Expiration Date Grifton NC 28530 11:45AM 23/12/05 22/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data David Lawton Suggs/ORC/252-643-7002/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Shelby Arellano,4693 Hwy 11 N Grifton NC 28530//252-643-7124/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Robert E Bullock DWR/WARO WQ/252-948-3843/ 12/6/2023 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Plow TR..y DWR/WQROS 252-948-3921 12/11/2023 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NC0003760 I11 12I 23/12/05 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The review period for this inspection was January 2022 through September 2023. Over the review period the facility was issued the following Notices: A Notice of Deficiency was issued for Ph violations at Outfall 002 in October 2022 A Notice of Violation was issued for Zinc violations at Outfall 003 in November 2022 A Notice of Violation was issued for Copper violations at Outfall 003 in January 2023 The current permit was set to expire on March 31, 2022. A renewal application has been submitted therefore the existing permit will remain effective until a new permit is issued. David Suggs is the ORC with Randall Harrell and Amanda Grenier as the backup ORC's. The facility was judged to be Compliant with NPDES permit NC0003760. Page# Permit: NC0003760 Inspection Date: 12/05/2023 Owner -Facility: Covation Biomaterials Kinston Site Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ El El El ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: David Suggs is the ORC with Randall Harrell and Amanda Grenier as the backup ORC's. The September 2023 DMR was soot checked for accuracv with no discreDancies found. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Page# 3 Permit: NC0003760 Owner -Facility: Inspection Date: 12/05/2023 Inspection Type: Covation Biomaterials Kinston Site Compliance Evaluation Permit Yes No NA NE Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The current permit was set to expire on March 31, 2022. A renewal application has been submitted therefore the existing permit will remain effective until a new permit is :--. .-A Equalization Basins Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Yes No NA NE ❑ ■ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ Comment: Equalization basins are used when there is a high influent flow or if there is an upset in the production area. There is an overflow pipe in the Equalization basin that discharges into the Aeration Basin to prevent the Equalization Basins from overflowing_ A Sump pump is used to transfer the wastewater from the Equalization basin to the Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/1) Comment: Yes No NA NE Surface ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 4 Permit: NC0003760 Inspection Date: 12/05/2023 Owner -Facility: Covation Biomaterials Kinston Site Inspection Type: Compliance Evaluation Pumps-RAS-WAS Yes No NA NE Are pumps in place? 0 ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ■ ❑ ❑ ❑ Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ■ ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ■ ❑ ❑ ❑ Is scum removal adequate? ❑ ❑ 0 ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? ■ ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Drying Beds Yes No NA NE Is there adequate drying bed space? 0 ❑ ❑ ❑ Is the sludge distribution on drying beds appropriate? 0 ❑ ❑ ❑ Are the drying beds free of vegetation? 0 ❑ ❑ ❑ # Is the site free of dry sludge remaining in beds? ❑ 0 ❑ ❑ Is the site free of stockpiled sludge? 0 ❑ ❑ ❑ Is the filtrate from sludge drying beds returned to the front of the plant? 0 ❑ ❑ ❑ # Is the sludge disposed of through county landfill? ■ ❑ ❑ ❑ # Is the sludge land applied? ❑ 0 ❑ ❑ (Vacuum filters) Is polymer mixing adequate? ❑ ❑ 0 ❑ Comment: On the day of inspection sludge was drying on the drying beds. Sludge is taken to the landfill for disposal. Flow Measurement - Effluent # Is flow meter used for reporting? Yes No NA NE ■ ❑ ❑ ❑ Page# 5 Permit: NC0003760 Owner -Facility: Covation Biomaterials Kinston Site Inspection Date: 12/05/2023 Inspection Type: Compliance Evaluation Flow Measurement - Effluent Yes No NA NE Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ Comment: ClearWater calibrated the effluent flow meter for Outfall 001 on August 14, 2023. Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: Outfall 001 sampler is flow proportional and the sampler temperature was three degrees on the day of inspection. Outfall 002 sampler is on constant time and constant volume. The sampler is iced when samples are collected. Outfall 003 sampler is on constant time and constant volume. Outfalls 004, 005 and 006 are Stormwater outfalls. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ■ ❑ Comment: On the day of inspection no adverse conditions were observed. Page# 6