Loading...
HomeMy WebLinkAboutNCC232345_Modification Confirmation Email_20231207 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Thursday, December 7, 2023 1:57 PM To: nuwan.wijesuriya@duke-energy.com Cc: Georgoulias, Bethany; nuwan.wijesuriya@duke-energy.com; edulkis@dewberry.com Subject: [External] Modification Confirmation CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. This e-mail is to notify you that the modification information for COC No. NCC232345 for the project Weatherspoon- Libbey Owens Ford 115kV-Reconductor that you submitted on 12/6/2023 has been added to the permit file records as of 12/7/2023. Modification Reason: Other Revision(s)to E&SC Plan Additional Details(if provided): Plans have been modified for several reasons, including the addition of a temporary culvert based on NCDOT permitting comments, updated quantities for gravel (no change in plans). the addition of temporary overhead utility line and clearing, and the addition of details.This resulted in the limits of disturbance to jump from 102.7 acres to 102.9 acres. You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at(919) 707-3640. Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future e-mails about this application from going into Spam filters. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. i