HomeMy WebLinkAboutRE_ [External] RE_ RE_ C204570 _ R-2561CA Site 12From:Sprinkle, Hannah H
To:"Alsmeyer, Eric C CIV USARMY CESAW (USA)"; Underwood, Chris
Subject:RE: [External] RE: RE: C204570 / R-2561CA Site 12
Date:Thursday, December 7, 2023 1:45:00 PM
Attachments:image001.png
Chris,
I agree with Eric these are different impact types and should be permitted as such in the future.
However, in this case, and based off our previous conversation, I do not have an objection to running
the water line in the MC area, and no permit modification from our end will be needed.
Thank you,
Hannah
Hannah Sprinkle
Environmental Specialist II
401 and Buffer Transportation Permitting Branch
Department of Environmental Quality
(910) 308-4021 (mobile)
910) 796-7379 (office)
hannah.sprinkle@deq.nc.gov ***please note my email address has changed ***
From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>
Sent: Wednesday, December 6, 2023 11:50 AM
To: Underwood, Chris <csunderwood@ncdot.gov>; Sprinkle, Hannah H
<hannah.sprinkle@deq.nc.gov>
Subject: [External] RE: RE: C204570 / R-2561CA Site 12
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Chris U: As we discussed yesterday in person, mechanized clearing and temporary impact to
wetlands for utility crossing are two different impact types and should be shown that way on
permit drawings and in impact summaries. However, since the practical impact of these two
types are similar, I do not have an objection to putting the water line in the MC area, and no
permit modification will be required. I will put the information and drawings you provided in
the administrative record to show the change.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public.
To help us ensure we continue to do so, please complete the Customer Satisfaction Survey
located at https://regulatory.ops.usace.army.mil/customer-service-survey/.
Eric
Eric Alsmeyer
Project Manager
Work Cell: 919.817.1570
Regulatory - WRDA / NCDOT BRANCH
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Regulatory
Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx
From: Underwood, Chris <csunderwood@ncdot.gov>
Sent: Friday, December 1, 2023 11:27 AM
To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Sprinkle,
Hannah H <hannah.sprinkle@deq.nc.gov>
Subject: [Non-DoD Source] RE: C204570 / R-2561CA Site 12
Good morning,
The utility contractor is working on this project at NC 11/87, and the resident engineer has a
contacted me with a question about the water line shown in the attached UC drawing. It appears
that it goes through our MC area. I checked our permit for this and didn’t see any mention of utilities
being permitted with this.
Can we run the line through the MC area since we’ve already impacted it. They will backfill when
complete.
Thanks!
Chris Underwood
Environmental Specialist II
Division 6 Environmental Unit
North Carolina Department of Transportation
919 820 1207 mobile
Transportation Drive
Fayetteville, NC