HomeMy WebLinkAboutNCC233604_Site Plan or Location Map (4)_20231207 I
SpygCr 3
w(k�NOpgry
I
•
I
I
I COMPETITION LAKE
I
I ELEVATION CROSS ELEVATION CROSS
SECTION A SECTION B
I
0
•
S�ORELFNE \ I z
cn I s§
o �01 y •
SHORELINE/E&SC PERMIT BOUNDARY I
------- ------ _ QO
r►�HHHHH►-� --- UNDISTURBED WOODED : ir
I H H H H H H;y \ 50-FT BUFFER I N PERM BD o '
I / / ~~i�� UNDISTURBED WOODED ROCK DAM�7
T / $y •
I - 50-FT BUFFER IN DITCH '
1
/ / •
tiff_ —__ ---------------------- ---1 cn
I / / /�- tiHHi7p NH HL-J L'�FJMHFiHHHHHHHHHHHMMM HHHHH►-.•`H _—_
GRAVEL I H HHHHF" .-1.--.._,,,,,,-;;_____ oRE1.INE��IEFEE�-- •
—
ASPHALT I 20-FT-WIDE —I---Id81NTENANCE — ——— -- -- ".N H,,H. . . HHHH►� I
/y -- HHHHH
DWY I ' MAINTENANCE �'- � CORRIDOR- ---�� tyHHHHH BERM I •
I CORRIDOR i I
EQUIPMENT I / - - ----- 2'TALL x OLIATE BERM j •
FOLIATED BERM I
STORAGE m Iw I _ —————_ _ OTHER j
/ / i O IZ I / ------------ --- - CONCRETE MATERIAL I •• •
ILL - / I " STOCKPILE STOCKPILE I I
/ / A It (- / / - 24_ - TYPICAL I
TRANSFER r
/ N � -- EXION/ I //ENTRANCE / .— _ MAINTENANCE/ 23— CORRIDOR
I ____
FLAT NI
STORAGE GRAJEL- -.-- EXCAVATED \ T
•
GRAVEL T CON T JC7ION --- _ I -._ -- -- ------------ - AREA SOIL STOCKPILE 1
L -_ I ENTRANCE MAINTENANCE
-- -
_ MAINTENANCE : ELEV. I
� T ---- -CCORRIDOR-- _______ --- ±1a FTA.s.L. �/ j
--�� 1^� EQUIPMENT ACCESS HAUL RD TO WORKING AREA I
SITE ENTRANCE _ 1 - I
�-,__ ___..LL• BERM
I — —ASPHALTC-W��TAFL�K�INFGPATki---- - -- —I ---- -- — --_ -- _ I I
HH1-a1=fl--Ft .�..—..—� -- ------ -- -- — F --l�l -- ---TC —H-H-HH�HHHHHHHHHHHHHHHHHHHHHS ••�•I�
RR ., .- - .w /
\ \_ROCK DAM E&SC PERMIT BOUNDARY
foit"4- 4--
\ DRAINAGE DITCH IN DITCH I
LANDFILL TO STORMWATER POND DRAINAGE DITCH - �_DRAINAGE DITCH
it/ACCESS a TO STORMWATER POND TO WETLANDS
ROAD wI FORMER CONSTRUCTION&DEMOLITION LANDFILL -
2
N FOLIATED
/ DEAD END
HEADDEAD END
OF DITCH HEAD OF DITCH
220' J 55'
EROSION&SEDIMENT CONTROL MEASURES SITEMAP THIS MAP IS NOT A CERTIFIED
OPERATOR: LCID FACILITY EXCAVATION&RENOVATION SURVEY AND HAS NOT BEEN REVIEWED
PASQUOTANK COUNTY PASQUOTANK COUNTY LANDFILL BYA LOCAL GOVERNMENT AGENCY FOR
SOLID WASTE&RECYCLING DEPT. 983 SIMPSON DITCH ROAD COMPLIANCE WITH ANY APPLICABLE
BRAD GARDNER,DIRECTOR ELIZABETH CITY,NC 27909 LAND DEVELOPMENT REGULATIONS.
317 PRITCHARD STREET 252-338-7621
ELIZABETH CITY,NC 27909 MAP BY ELLIOTT CONSULTING
252-335-4105 OCTOBER 17,2023
-SILT FENCE INSTALLED AROUND ENTIRE PROPOSED ACTIVE AREA GRAPHIC SCALE
CONTRACTOR: -LANDFILL MOUND EXCAVATION STARTS AT NORTH END OF SITE so o to SO 160 MAP SCALE:1 IN=80 FT
STEVENSON SAND,INC. -LAND EXCAVATED TO+10 FT ABOVE SEA LEVEL(ASL)
672 BLOUNT ROAD -EXCAVATED MATERIALS SEPARATED INTO STOCKPILES
ELIZABETH CITY,NC 27909 ' i"DEFT
-EROSION CONTROL BERM CONSTRUCTED INSIDE SILT FENCE AS EXCAVATION PROCEEDS
252-338-3004 -EXCAVATION OF LANDFILL MOUND PROCEEDS SOUTHWARD ACROSS SITE 1 INCH -SO FT.
MAP 3 OF 5