Loading...
HomeMy WebLinkAboutNCC233604_Site Plan or Location Map (4)_20231207 I SpygCr 3 w(k�NOpgry I • I I I COMPETITION LAKE I I ELEVATION CROSS ELEVATION CROSS SECTION A SECTION B I 0 • S�ORELFNE \ I z cn I s§ o �01 y • SHORELINE/E&SC PERMIT BOUNDARY I ------- ------ _ QO r►�HHHHH►-� --- UNDISTURBED WOODED : ir I H H H H H H;y \ 50-FT BUFFER I N PERM BD o ' I / / ~~i�� UNDISTURBED WOODED ROCK DAM�7 T / $y • I - 50-FT BUFFER IN DITCH ' 1 / / • tiff_ —__ ---------------------- ---1 cn I / / /�- tiHHi7p NH HL-J L'�FJMHFiHHHHHHHHHHHMMM HHHHH►-.•`H _—_ GRAVEL I H HHHHF" .-1.--.._,,,,,,-;;_____ oRE1.INE��IEFEE�-- • — ASPHALT I 20-FT-WIDE —I---Id81NTENANCE — ——— -- -- ".N H,,H. . . HHHH►� I /y -- HHHHH DWY I ' MAINTENANCE �'- � CORRIDOR- ---�� tyHHHHH BERM I • I CORRIDOR i I EQUIPMENT I / - - ----- 2'TALL x OLIATE BERM j • FOLIATED BERM I STORAGE m Iw I _ —————_ _ OTHER j / / i O IZ I / ------------ --- - CONCRETE MATERIAL I •• • ILL - / I " STOCKPILE STOCKPILE I I / / A It (- / / - 24_ - TYPICAL I TRANSFER r / N � -- EXION/ I //ENTRANCE / .— _ MAINTENANCE/ 23— CORRIDOR I ____ FLAT NI STORAGE GRAJEL- -.-- EXCAVATED \ T • GRAVEL T CON T JC7ION --- _ I -._ -- -- ------------ - AREA SOIL STOCKPILE 1 L -_ I ENTRANCE MAINTENANCE -- - _ MAINTENANCE : ELEV. I � T ---- -CCORRIDOR-- _______ --- ±1a FTA.s.L. �/ j --�� 1^� EQUIPMENT ACCESS HAUL RD TO WORKING AREA I SITE ENTRANCE _ 1 - I �-,__ ___..LL• BERM I — —ASPHALTC-W��TAFL�K�INFGPATki---- - -- —I ---- -- — --_ -- _ I I HH1-a1=fl--Ft .�..—..—� -- ------ -- -- — F --l�l -- ---TC —H-H-HH�HHHHHHHHHHHHHHHHHHHHHS ••�•I� RR ., .- - .w / \ \_ROCK DAM E&SC PERMIT BOUNDARY foit"4- 4-- \ DRAINAGE DITCH IN DITCH I LANDFILL TO STORMWATER POND DRAINAGE DITCH - �_DRAINAGE DITCH it/ACCESS a TO STORMWATER POND TO WETLANDS ROAD wI FORMER CONSTRUCTION&DEMOLITION LANDFILL - 2 N FOLIATED / DEAD END HEADDEAD END OF DITCH HEAD OF DITCH 220' J 55' EROSION&SEDIMENT CONTROL MEASURES SITEMAP THIS MAP IS NOT A CERTIFIED OPERATOR: LCID FACILITY EXCAVATION&RENOVATION SURVEY AND HAS NOT BEEN REVIEWED PASQUOTANK COUNTY PASQUOTANK COUNTY LANDFILL BYA LOCAL GOVERNMENT AGENCY FOR SOLID WASTE&RECYCLING DEPT. 983 SIMPSON DITCH ROAD COMPLIANCE WITH ANY APPLICABLE BRAD GARDNER,DIRECTOR ELIZABETH CITY,NC 27909 LAND DEVELOPMENT REGULATIONS. 317 PRITCHARD STREET 252-338-7621 ELIZABETH CITY,NC 27909 MAP BY ELLIOTT CONSULTING 252-335-4105 OCTOBER 17,2023 -SILT FENCE INSTALLED AROUND ENTIRE PROPOSED ACTIVE AREA GRAPHIC SCALE CONTRACTOR: -LANDFILL MOUND EXCAVATION STARTS AT NORTH END OF SITE so o to SO 160 MAP SCALE:1 IN=80 FT STEVENSON SAND,INC. -LAND EXCAVATED TO+10 FT ABOVE SEA LEVEL(ASL) 672 BLOUNT ROAD -EXCAVATED MATERIALS SEPARATED INTO STOCKPILES ELIZABETH CITY,NC 27909 ' i"DEFT -EROSION CONTROL BERM CONSTRUCTED INSIDE SILT FENCE AS EXCAVATION PROCEEDS 252-338-3004 -EXCAVATION OF LANDFILL MOUND PROCEEDS SOUTHWARD ACROSS SITE 1 INCH -SO FT. MAP 3 OF 5