Loading...
HomeMy WebLinkAbout20191700 Ver 3_Fenton 404-401 Ltr +Att 2023-12-01_Optimized_20231201ArNatural Resource Consultants December 1, 2023 U.S. Army Corps of Engineers NC Division of Water Resources Charlotte Regulatory Field Office 401 & Buffer Permitting Branch via online PCN Submittal via online PCN Submittal RE: Nationwide Permit 13/Water Quality Certification 4245 Fenton — Stream Stabilization USACE Project No. SAW-2012-01499 DWR Project No. 201917000 V3 Cary, Wake County, North Carolina NRC Project #: 23039 To Whom It May Concern: On behalf of USEF HCG Fenton, LLC, HCG Fenton Phase D, LLC, and the State of North Carolina, we are applying for a Nationwide Permit 13 from the US Army Corps of Engineers (USACE) and Water Quality Certification 4245 from the NC Division of Water Resources (DWR) for proposed impacts to jurisdictional waters associated with the project known as Fenton — Stream Stabilization. The purpose of the proposed project is to stabilize a section of eroding streambank on Walnut Creek associated with a previously permitted greenway pedestrian bridge and to obtain after -the -fact approval for the stabilization of a streamside scour hole. Site access is located off Quinard Road in Cary, Wake County, North Carolina. A Nationwide Permit 39 and 14 (SAW-2012-01499) were originally issued by the USACE for the Fenton project on April 29, 2020, and later modified on September 2, 2020, and a corresponding 401 Water Quality Certification (DWR# 19-17000, V2) was issued by DWR on September 1, 2020. During Phase 2 of the project, a greenway network was constructed on the northeast side of Walnut Creek (Class C, NSW), which utilized permitted pedestrian bridge/boardwalk crossings to avoid and/or minimize impacts to Walnut Creek and associated floodplain wetlands. During post -construction site visits and inspections of the greenway, the Town of Cary observed streambank erosion and an adjacent scour hole at the pedestrian bridge crossing of Walnut Creek. The enclosed PCN requests authorization for proposed streambank stabilization on Walnut Creek and after -the -fact approval related to scour stabilization within the stream buffer. A list of the attachments to the online Pre -Construction Notification Application and those attachments follow this letter. Your review of this project is greatly appreciated. If you have any questions or require additional information, please contact me at (919) 422-3605 or burdette@nrconsultnc.com. Sincerely, Natural Resource Consultants Jennifer Surdette, PWS Sr. Environmental Consultant 308 W Millbrook Road, Ste D #200, Raleigh, NC 27609 919.422.3605 USACE/DW R NRC Project #: 23039 December 1, 2023 Page 2 of 2 Attachments cc: Bill Derks, McAdams (derks@mcadamsco.com) Kurt Hartman, Hines (kurt.hartman@hines.com) Scott Grigg, Hines (scott.grigg@hines.com) Hunter Morris, Clancy & Theys (huntermorris@clancytheys.com) AriNatural Resource Consultants Fenton — Stream Stabilization List of Attachments DWR Prefiling Acknowledgement Agent Authorization Forms Figure 1. US Geological Survey 7.5-minute Quadrangle Topographic Map Figure 2. Wake County Soil Survey Map PJD & Buffer Determination NWP & 401 Certification w/Mitigation Forms Impact Maps & Construction Details USFWS Letter Cultural Resources Supporting Photographs DWR Prefiling Acknowledgement Kaylie Yankura From: 401 Pre File <401 Pre File@deq.nc.gov> Sent: Monday, October 30, 2023 10:14 AM To: Kaylie Yankura Subject: Automatic reply: [External] Pre -Filing Meeting Request, Fenton (DWR #20191700), Cary, Wake County This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and submit this documentation as part of your 401 application (PCN Application) as required by federal law. DWR will not be able to accept your application without this federally required documentation. 401 applications received without documentation that a pre -filing meeting request was submitted at least 30 days prior will be returned as incomplete. Responses to this email are not monitored. If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact Iist(s). For Non -Transportation Central Staff: https://deg.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting/401- buffer-permitting-contacts For Non -Transportation Regional Staff: https://edocs.deg.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2162034&cr=1 For all Transportation Projects Including NCDOT Projects: https://deg.nc.gov/a bout/divisions/water-resources/water-resources-permits/transportation- pe rm itt i ng/staff-contacts Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Agent Authorization Forms PLEASE OMPLET` �� MCA DA M 5 AGENT AUTHORIZATION FORM All Blanks To Be Filled In By Current Property Owner PIN: 0773198437 Name: USEF HCG Fenton, LLC Address: 5 Ravinia Drive, Atlanta, GA 30346 Phone/Email: ']V 3 +� +vim i`t 1M17L$ a Cam Project Name: Fenton Project Number: HIN-19000 Project Manager: Bills Derks/lennifer Burdette U5 Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom It May Concern: NC Division of Water Resources 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 I hereby designate and authorize The John R. McAdams Company, Inc. to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc, from this day forward. i, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and NC Division of Water Resources to enter upon the property herein described for the purpose of conducting on -site investigation and issuing a determination associated with Water of the U_5. subject to Federal jurisdiction under Section 404 of the Clean Water Act/Section 10 of the Rivers and Harbors Act of 1899 and/or Waters of State and/or Riparian Buffer Rules. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Company, Inc. staff. Ktiz Print Property Owner Signature Date creating experiences through experience 2905 Meridian Parkway, Durham, NC 1919. 361. 5000 PLEASE .OMPLETF 91 M C A DA M S AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Property Owner PIN: 0773183321 & 0773288960 Name: HCG Fenton Phase D, LLC Address: 5 Ravinia Drive, Atlanta, GA 30346 Phone/Email: 70 - Ziax! - 533.3 �+(uRl . AKM14v--:, e— K i"6-s . L on Project Name: Fenton Project Number: HIN-19000 Project Manager: Bills perks/Jennifer Burdette US Army Corps of Engineers Raleigh Regulatory field Office 3331 Heritage Trade Drive, Suite 105 Waite Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom It May Concern: NC Division of Water Resources 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 I hereby designate and authorize The Jahn R. McAdams Company, Inc. to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc. from this day forward. i, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and NC Division of Water Resources to enter upon the property herein described for the purpose of conducting on -site investigation and issuing a determination associated with Water of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act/Section 10 of the Rivers and Harbors Act of 1899 and/or Waters of State and/or Riparian Buffer Rules. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Compa , Inc. staff. Print Property Owner Signat e creaUng experiences through experience \�;( -"A19 Date 29135 Meridian Parkway, Durham, NC 1919. 361. 5000 M M(-A 1)•a N1`' AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Property Owner PIN: 0774218071 Name: State of North Carolina, State Property Office Address: 116 W Jones Street, Raleigh, NC 2603-1300 Phone/Email: 9 9 fi rr. I cT/7�o�� a' o •. ne. Project Name: Fenton Project Number: HIN-19000 Project Manager: Bills ❑erks/Jennifer Hurdette US Army Carps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom it May Concern: NC Division of Water Resources 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 hereby designate and authorize The John R. McAdams Company, Inc. to act on my behalf as my agent in the processing of permit applications and obtaining verification of wetland delineations for the project listed above. I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and NC Division of Water Resources to enter upon the property herein described for the purpose of conducting on -site investigation and issuing a determination associated with Water of the U.S. subject to Federai jurisdiction under Section 404 of the Clean Water Act/Section 10 of the Rivers and Harbors Act of 1899 and/or Waters of state and/or Riparian Buffer Rules. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Company, Inc. staff. Tr tA LJA L--T-o PJ Print Property Owner Signature Date A -G creating experiences through experience 2905 Meridian Parkway, ❑urtiam, NC 1919 361 5000 Figure 1. US Geological Survey 7.5-minute Quadrangle Topographic Map F-UIMLIVU 1 Figure 2. Wake County Soil Survey Map +• ! Tyr` "�' :�� ` 1 WIN AAl- Y + file ,� s •ti ti c!4i, s` 1• :r �� C1C3 AhC2 02 �' 4 AuJr .: r.. c■ f r� hp[ 2 I �ir / F� n yn ». F AOC7 C'm I AF.I0(' Vc lr_i'.ItiC1�+, K `0 i Ce82 — .... � rg2 EA PRUJEC AR�L— -� `� CgB2 Aes2 c �i t. 1� AAA C¢C2 - APS ' Awn ApfJ2 S9ey A�{q 82 ApC2 Go" •� A • ApL: •�' I � 4yf,'rC�� C682 w.'A02 � Cn Av82 ��� O f 4`� Ceti i Wwi' 1 CSC2 CgB. ti+ �ti i Rls; J I� eC •Crn'I AC k 2 l3l Rn$2 yvy • / "" - " J �- Au C B1 � y 1_� � ' J f APU rr�r� f=8�? Ag82 7 Gel A�2 1 qC Cf.f3J r { C l 4� Asr3 T WmE J AsC2 t G2 A�C2 �`�� ' CI133Ce j C.a. AaCnf32 ' C . � � Cos^ CG. ' ApB2 K 1 ** Crf? CAW C r� :e Ce ` n� .•..lam n Wrrr ' . ,� �i I[ Ma �� • � � t.. r. YYY APD � yet y 7 . ADC r n { ApoVIC Lfi I I b¢ Ag e , �c CRC- Cn. Apc ApC n 9. ApC �m mP Illy C Legend i Aii '`� �, " CeB2 CeC GW 'AP82 ..� ARC i gC i� Y�' , C AE Project area NOTES: 1. NRCS: SOIL SURVEY SHEETS 47ANID 57, WAKE COUNTY, NC (1970) 0 660 1,320 FIGURE 2B. BUFFER SUBJECTIVITY SOIL SURVEY Feet FENTON MIXED -USE DEVELOPMENT 1 inch = 1,320 feet CARY, WAKE COUNTY, NC VERSION: 1 DATE: i 1/6/2019 MCADAMC JOB NO: HIN-19000 DRAWN BY: pierzge x:lProjeots\HfMHIN-1900m4-ProductionkNatural Resource s%GISIHIN19000Fenton Fig 2B Huffer Suhj SS,mxd, 1116/2019 3:22:03 PM, plercga PJD & Buffer Determination U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-01488 County: Wake County U.S.G.S. Quad: Cary NOTIFICATION OF JURISDICTIONAL DETERARNATION Property Owner/Applicant: North Carolina State Property Office Attn: Joy Wayman Address: Room 4055, Administration Building 116 West Janes Street Raleigh, NC 27603 Telephone Number: 919-807-4650 Size (acres) 95 Nearest Town Cary Nearest Waterway Walnut Creek River Basin Neuse USGS HUC 03020201 Coordinates Latitude: 35.7776 Longitude:-78.759 Location description: The property is approximately 95 acres located adjacent to and north of Cary Towne Blvd., near the town of Cary, Wake County, north Carolina. and is identified by PIN 0774311292. Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RIFIA) (33 USG § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S, This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RIIA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWAIRHA jurisdiction overall of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW-2012-0 IJ88 _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed. five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA), You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact .fames Lastinger at (919) 554-4884 or Ja mes.C. LastinLyerQusace.army. m il. C. Basis For Determination: NIA. An Approved JD has not been completed. D. Remarks: E. Attention USDA Program Participants This delineation/deterrnination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above) If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form, If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. A / Corps Regulatory Officia Date: May 31, 2019 SANV 2012-01488 The Wilmington Distfict is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located on] ine at httl2:HcgMsniapu.usace.army.mil/em a exlf?=136:4:0, Copy Furnished: McAdams Attn: Jennifer Burdette 2905 Meridian Parkway Durham, NC 27713 mil' _� Iy;�-y., ie{f.•vi.l YJc1LANU M 4VE1-LRWn G ' - - _ - - - _ _ _ „•i. 1 11µ'�Y1 a' • P. 1-0-1125 At .1-aiu Aa •�. �" - f .- , ,1 rlttC 71�.4 :1. i START STRE P2,1 FEA7LIRE D . (35.705059--i6.7$84?9I •'rl'" ;i>C le1TEf{h111-PENT e1-134F 1. 076P AC. -' t - _ - SUBJECT PROPERTY - - - - - - - STREAM FE Al UREA PERENNIAL LF _WE FLAP,. UfL M rLAND E . t START S IRE AM F EAT UNE E - l IN1Ef:lAlflf�rvi • - - . LF :-0.831 AC. i gA1'DAC . 'START STREAM - - - - - F�ATURE C - [CONT-FROM OFF•PROPE{ETY•j - - WETLAND C' 1- 0.011 AG. wolNnti S TR EAh4 FF ATUR E Cl- INTERAIITTF.NT - - - - - - - - -1- 811 LF .. END STREAWEATURE C . •=--._•ENO7 5 RFA rt4 (4,770400�-IfZ 799102) - - - .. _ 1=TCLjlVFA -_ - ATCIllVFRr'- - - WETLAND L. STARTURF.A41 FFAT6RE. Cz Tply�l�pLN9. - I'` r fNTFRA9ITTFNF 7i8797} 4r.53CF LEGEND H l rU.STRFAM F FATPW 42 DATA POIN T .05.7773a7.,7US8.197j _ - .-_ INTERMITTENT STREAM rEATURE _._:•' .. - ENf) 0TREA' ,r1 .. - - .. - - - -- — PERENN IAL STR EAM FEATURE --.-. - - AT CO RER _ . C EXISTING WETLAND . AT kILVER7 _ - - - 3TREAd.1 FEATLiRE e 6a-FTNEUSEBUPFERS _ _ _�.'� - • . 100-YR FLOOOPLAIN -"IARI N I REAM--. - --_--__-_.-.-•_--- _PRQJECTARFA e ALO 2-FTCON TOURS NmES •Ej Jurlsdlctiand onw&w Wanda w the Us w a.anwroodby Tasha AlexandR el the OSACEon MUM (DBAIDA 1) Neuv. Rfver Bash - HUG 0302020111OI Walnul reek mwrshed. SAW utM4501. An eLyel JudsdEOonel dmin e[era4on kas tler hnot been ncfNed W M6 We, 21 IXJYR sermm Indes NOmber27�i{1k Walnut Cre nk; Claerlroa n C; NSW. el Neu- dparren burfAm wm Confirmed by Jieep Robinecn e} NO DM m 1OMM17, An olFdd boa O) 100-Year medbraln lop led wiUm eludy are. lkCFI RAM Mop Numbers 3720077400J and 37200TF30OJ; Reeked determlmollon Iettlf has mat been mcel-d al this lime. vmooSI, 7) Jurkdiotlonal fratum haVe hot 6eeh Add wweyed by 9-M41ea eUe and t lmensrmd Ilmll. of eO sbea . d e) Reld wwk complal>!d OUR WRO17. wW onds ra egwalmele, a 125 250 J FIGURE 3. PRELIMINARY JURISDICTIONAL DETERMINATION MAP 111111110=1111101=1 Feet STATE-OWNED PROPERTY 1 Inch=25afeel CARY, NORTH CAROLINA DATE: af.5201El JQB NO: GD51-15000 MCADAMS DRAWN Sy: NurdoOa m .nrrr-rr_ cry, a� maa . .mxd. s�sr�nly e.or.auJ. eurdelte =a Water Resources ENVIRONMENTAL QUALITY October 17, 20t7 State of North Carolina c/o Department of Administration 116 W Jones St.. Raleigh, NC 27603-1300 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Buffer Determination Letter NBRRO #17-340 Wake County Determination Type: Buffer Intermittent/Perennial ❑ Neuse (15A NCAC 213 .0233) ❑ Tar -Pamlico (15A NCAC 2B .0259) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name Address/Location: Stream(s): Cary Towne Boulevard — State-owned Property 950 E. Chatham St., Cary, NC 27511 Walnut Creek & UTs Determination Date: 1/2017 Staff: Jason Robinson Stream E/UP* Not Subject Subject Start a; StopC Soil USGS Survey Topo A P X X X B P X X X C I X Offsite DWR Flag X —35.7784004 -78.7591019 C (cont) I X DWR Flag DWR Flag X —35,7775002 —35.7773018 -78.7587967 -78.7587967 D I X DWR Flag Stream A X X 35.7850990 -78.7584991 Division of Water Res tirces, Ralei-h Itegri«naf Office, Wmcr Quality Operatioils Scction IutpJ'port��Lncdenr.org!��chiwd%aps t628 MIA Service Center, Raleigh, NC 27699-1628 Plione: (9t9) 791-4200 Locatiori: 3800 Barrett Drive, Raleigh, NC 27609 F "Ix: (919) 788-7159 Cary Towne Boulevard — State-owned Property Wake County October 17, 2017 Page 2 of 2 Stream E/I/P* Not Subject Subject Start(i L StopC Soil Survev USGS To o E I X DWR Flag 35.7820015 -78.7546005 Stream A X F E X X G E X X H E X X I E X X *EIVP = Ephemeral/Intermittent/Perennial Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. IJ'sending via US Postal Service: c/o Karen Higgins; DtVR — 401 & Baffer Permitting Unit; 1617 Nlail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DJVR — 401 & Buffer Permitting Unit; 512 N. Salisbury Street, Raleigh, NC 27604. This determination is unai and binding uniess, as detaiied above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Jason Robinson at (919) 791-4200 or Jason.'I'.Rol>irrso�.r�%l:ncd, �rrr�ri.-�' Sincere y, I S Danny Smith ! Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Kelly Roth of McAdams Company: 2905 Meridian Parkway, Durham, NC 27713 17-340 Cary Towne Boulevard - State -Owned Property �SfAr�4 Map provided by NCDEQ Legend: "p Division of Water Re- sources -Approximate Site<s_' boundary: Locations are approxi- mate and are provided for -Approximate Start/Stop x ,��s _ �' reference only :: 17-340 Cary Towne Boulevard - State -Owned Property Stream D: Subject Starts @ DWR Le sr h �� "" "'' Map provided by NCDEQ Division Water Re g end: �� F � ��� y, of sources -Approximate Site�f boundary:�; Locations are approxi- -Approximate Start/Stop mate and are provided for reference only NWP & 401 Certification w/Mitigation Forms U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2012-01499 County: Wake U.S.G.S. Quad: NC -Cary GENERAL PERNHT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: USEF HCG Fenton, LLC Kurt Hartman Address: 8 Ravinia Drive Atlanta, GA 30346 Telephone Number. 770-206-5333 E-mail: kurt.hartman(a' ines.com Size (acres) 92 Nearest Town Cary Nearest Waterway Walnut Creek River Basin Neu -se USGS HUC 03020201 Coordinates Latitude: 35.7809 Longitude:-78.7573 Location description: The project site is approximately 92 acres bordered to the south by Cary Town Blvd. anti to the east by Walnut Creek in the town of Cary, Wake County, North Carolina. Description of projects area and activity: This permit verification aItows for 0.423 acre of ►Nretiand impacts (0.I99 acre temporary anti 0.234 acre permanent] and 291 linear feet of stream channel impacts 046 if temporary and 145 if nermanen#1 associated with the construction of the Fenton mixed use dmelonment. mitigation is required Tor #his irroposal. Applicable Law(s): ❑X Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 39. Commercial and Institutional Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 412712020, and the enclosed plans entitled "Fenton impact exhibits" (11 sheets) dated 4122/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed n6thin twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the pennittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James Lastinger at 919-554-4884 ext 32or James.C.Lastinp-er(alusace.armv.mil. Corps Regulatory Official: _Date: 04/29/2020 Expiration Date of Verification: 03/18/2022 o- � The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.amiy.miUcm_apexif?p=135:4:D Copy furnished: Agent: McAdams Comnany Jennifer Burdette Address: 2905 Meridian Parkway Durham, NC 27713 Telephone Number: 919-361-504111 E-mail: hurdette(u)meadamscoxom SAW-2012-01499 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this fonn, are hereby incorporated as special conditions of this permit authorization. SAW-2012-01499 Compensatory Mitigation Responsibility Transfer Form Permittee: USEF HCG Fenton, LLC, Kurt Hartman Action ID: SAW-2012-01499 Project Name: Fenton Mixed -use development County: Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.234 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.47 Mitigation Site Debited: Falling Creek Stream and wetland mitigation bank -Falling Creek/Grantham Branch sites (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. wildlands Holdings III, LLC Mitigation Sponsor Name: Na Authorized Representative; Robert W. Bugg 6/10/2020 re o1 Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from Wildlands Holdings III, LLC, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 4/24/2020 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: James.C.Lastinger@usace.army.mil USACE Project Manager Signature 04/29/2020 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil Compensatory Mitigation Responsibility Transfer Form Permittee: USEF HCG Fenton, LLC, Kurt Hartman Project Name: Fenton mixed use development Action ID: SAW-2012-01499 County: Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.157 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.157 Mitigation Site Debited: Falling Creek stream and wetland mitigation bank: Falling Creek and Grantham Branch sites (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. wildlands Holdings III, LLC Mitigation Sponsor Name: Na ,Mpp§ yr's Authorized Representative: Robert W. Bugg AligbTf onsor's Authorized Representative 11/5/2020 Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from Wildlands Holdings III. LLC, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 7/28/2020 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC 27587 (email. toddAugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: James.C.Lastinger@usace.army.mil cr�o .ram USACE Project Manager Signature 09/02/2020 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director USEF HCG Fenton, LLC Attn: Kurt Hartman 5 Ravinia Drive Atlanta, GA 30346 NORTH CAROLINA Environmental Quality September 1, 2020 DWR #19-1700 v2 Wake County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES [1SA NCAC 02B .0714j WITH ADDITIONAL CONDITIONS Fenton OTO. ►III111111111:. iFTGif iiii You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on July 30, 2020 and with payment received on August 1, 2020. These impacts are covered by the attached Water Quality General Certification Number 4135 and 4139 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 14 and 39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited toy Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This 401 Water Quality Certification and Authorization Certificate for OWR #19- 1700 v2 replaces the 401 Water Quality Certification and Authorization Certificate for #19- 1700 revised on April 30, 2020. This approval requires you to follow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B .0611] North Carolina De part men[ of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh. North Carolina 27609 KF "ill U nL INA tll� 919.791.4200 Fenton DWR #19-1700 v2 401 AND BUFFER APPROVAL Page 2 of 5 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Wetland W1a-Sanitary Sewer -Excavation 0 (acres) 0.201(acres) W1b-Sanitary Sewer -Excavation 0 (acres) 0.157 (acres) W2- Sanitary Sewer -Excavation 0 (acres) 0.005 (acres) W3: Road Crossing 1 0.148 (acres) 0 (acres) W4: Road Crossing 2 0.037 (acres) 0 (acres) W5: Road Widening 0.049 (acres) 0 (acres) Stream S1-Sanitary Sewer Connection 0 (linear feet) 146 (linear feet) S2: Road Widening 65 (linear feet) 0 (linear feet) 53: Road Crossing 2 80 (linear feet) 0 (linear feet) Buffers — Zone 1 61: Sediment & Erosion Control 0 (square feet) 1,585 (square feet) 132: Sanitary Sewer Crossing 1,121 (square feet) 0 (square feet) 133: Stormwater Outlet 724 (square feet) 0 (square feet) 64: Greenway Trail 3,852 (square feet) 0 (square feet) 135: Greenway Trail 1,420 (square feet) 0 (square feet) 66: Greenway Trail 449 (square feet) 0 (square feet) 137: Greenway Trail 1,309 (square feet) 0 (square feet) B8: Greenway Trail Construction Access 0 (square feet) 660 (square feet) 139: Greenway Trail 823 (square feet) 0 (square feet) 1310: Road Widening 5,841 (square feet) 0 (square feet) 611: Road Crossing 2 5,741 (square feet) 0 (square feet) B12: Sanitary Sewer Replacement 2,580 (square feet) 0 (square feet) Buffers — Zone 2 61: Sediment & Erosion Control 0 (square feet) 390 (square feet) 132: Sanitary Sewer Crossing 710 (square feet) 0 (square feet) 133: Stormwater Outlet 400 (square feet) 0 (square feet) 134: Greenway Trail 7,251 (square feet) 0 (square feet) 135: Greenway Trail 1,605 (square feet) 0 (square feet) B& Greenway Trail 4,286 (square feet) 0 (square feet) B7: Greenway Trail 953 (square feet) 0 (square feet) 138: Greenway Trail Construction Access 0 (square feet) 455 (square feet) 139: Greenway Trail 2,132 (square feet) 0 (square feet) 1310: Road Widening 5,319 (square feet) 0 (square feet) B11: Road Crossing 2 3,603 (square feet) 0 (square feet) B12: Sanitary Sewer Replacement 1,878 (square feet) 0 (square feet) Fenton DWR #19-1700 v2 401 AND BUFFER APPROVAL Page 3 of 5 2. Stormwater Manaeement Plan (SMP) Aooroval from Local Communitv Reauired The stormwater management plan (SMP) must be approved by Town of Cary and meet the requirements of this Certification. The SMP may not be modified without prior written authorization from the Town of Cary. [15A NCAC 02H .0505(b)(3)] 3. Compensatory Mitigation Using a Private Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received a Statement of Availability letter from EBX-Neuse 1, LLC Neuse Riparian Buffer Umbrella Mitigation Bank (EBX-Neuse 1), RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank (RES), RES Poplar Creek Buffer & Nutrient Offset Umbrella Mitigation Bank or EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank (EBX) to meet this mitigation requirement. The specific bank site to be debited will be Arrington Bridge I, Buffalo Branch, Selma Mill, Cedar Grove, Hatley, Ezell, Polecat, Hannah Bridge, Meadow Spring, Uzzle, Poplar Creek and Stone Creek all located in HUC 03020201. Until EBX-Neuse 1, RES or EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX-Neuse 1, RES, or EBX to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation Bank Sponsor River & Sub -basin Required Number Buffer- 11,556 (square feet) EBX-Neuse I, LLC or EBX Neuse: 03020201-Not in Zone 1 Falls Lake Watershed Buffer- 10,877 [square feet] EBX-Neuse I, LLC, or EBX Neuse: 03020201-Not in Zone 2 Falls Lake Watershed Total: 22,433 (square feet) 4. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .02001 including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. Fenton DWR #19-1700 v2 401 AND BUFFER APPROVAL Page 4 of 5 5. Protective Fencin The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H ,0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 6. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 This Certification and Buffer Authorization can be contested as provided in General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http:Z/www.ncoah.comZ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 Fenton DWR #19-1700 v2 401 AND BUFFER APPROVAL Page 5 of 5 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Paul Wojoski NC DWR - 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Paul Wojoski NC DWR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns. Sincerely, DocuSigned by: E � e*�i 0A4At- 6COA9�82504A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Enclosure: GC 4135 GC 4139 cc: James Lastinger, USACE Raleigh Regulatory Field Office (via email) DWR RR❑ 401/Riparian Buffer file DWR 401 & Buffer Permitting Unit via Laserfiche Jennifer Burdette, McAdams Company, (via email) ire: Mitigation Credit Transfer Certificate Prepared by EBX-NEUSE1, LLC November 9, 2020 USEF HCG Fenton, LLC 5 Ravinia Drive Atlanta, GA 30346 Uzzle Bank Parcel ID: DWR Project # 2016-0981 v2 Riparian Buffer Credits Purchased: 22,433.00 (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Fenton, DWR Project 919-1700 v2 You have elected to fulfill your permitted buffer mitigation requirements for the Fenton project by paying into the Neuse Riparian Buffer and Nutrient Bank (Uzzle Site). This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project 919-1700 v2 and is 22,433.00 W. You must also comply with any other state, federal or local government permits, or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact me at 919-209-1075 or cparker@res.us. Sincerely, Caitlan B. Parker Credit Sales Coordinator Resource Environmental Solutions, LLC cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator DWR — Stephanie Goss McAdams — Jennifer Burdette Resource Environmental Solutions, LLC . 302 Jefferson Street, Suite 110 . Raleigh, NC 27605 Impact Map & Construction Details U7 = izscz vNnoav� Hiaon'Aav� € ❑'dVATnOU 3NMOi Aatl3 SSS m SAGIHX313VdM E2jS a AMA TTsanncv-j HivDwmj� 3 GlIVAT nOU 3NMOi AIJVD SSS SAGIHX3 J.3VdVV NOIN3=1 Pox MATCAT LTNE SEE TnTS STIERT - Al 7y1 - — F4 17.1 "4 4 w " IJAIS SUILL XIS - ANrl UJLLVM OZOz'0Z'LO 31Va VNI]O VJ HIHON'AHVJ w0aoa�wepeaw,�Mn, SWVCIS-rDW V �lY1L oAAVI 3lvDs GdVA3inou INMOIAl I D SS8 L8T-�seze MVl A9 NMVNO 9eas2e xe�sNa�l MVl A803)IJ3HJ L-3 —13SN I i:)Vd W I 000s3se s3e_o T3-0006TNIH 3AVN31IJ Fir, 0006T-NIH ON 103f0bd �t//z�N-wey.�a N011b' MOMI NVId NO1N33 M 1Cd Ne1PI aW S06Z '�ul'�uedwo�swepyeW'il uyof ayl W _ E Z/VZT' MP 50006TNIH\s ulrvs,0,ua.rr�\z elry 1 an5\ ul�aaul u3\u -l� Poid-b0\00 T NIH\NIH\s,1ao,d\'X \ L3ti eHa < N/ \\\\ \ \ \\ \l Lw W W �Z00 oa \\\ o U GI •p, \ \ \ �i I �\ \ `\ \ zoo (D \ \ oze —\ W Z Y / _ Z Q < (J O H �\ \ - A > > \ d��- u) Q o->�) �-oo z o LE "off\\enwawo �wnarn O O o o Q rWW¢�I \\\ \ m \ wo 0 o _ \\ N ZY \ram \ \ \ \ wwYW �WZZzz Z� \ / / Y ,m"NNm" LL c w m'' O= Ln : U e'wo uvo °E a s w F 4-1 o° m _ cn -o m -'. E L ao Zor g_=SE V n O w N W Y E x N - -ra `u 1— o c z LA U N y v � LULU � a o U mxE°�°39 C o rc � O O X C 0E� r Y O r y N O C0 0 `O r r rr 9 L 1 I J � W4������ ■ d i is W"a.EWU I G �2 VI ' C l~ 1 � y z Y -O N N i �o o O C�a iW d N m u w>�� o a3 aa�i ma 70 O� O >i O N {I m _ ,-> O N N C C O .O (6 -O cm::E E. a U N O 7 X O au)l d7 < N O s= N O > CL .� a N EQ act fr Xw r 5 y L i' U O moo i U \ Q t2'ME x W La w E z �WI ly = J (10 • m (10 LLJ .' ! �. \ .. / . !\.0 0 0 00 °VO° " V \ � LL ° O L O 000 �_ 000 F- o ° — ° y _ 000 0 �_ 0/ 0 n LL LOm 11 I' I i A £ZOZ '£Z '90 31V0 OT=..l 31VD5 TLSLZ 'VNIl021VD H1NON 'Ailt1D w°a °asu,eveaw �„Mn. SWVCIVDW MVl A9NMVN0 aura 3NMOiA2WD sss 692Z'i9£'6i6 xe) MVl A80DJ3HJ i101HX3 dVldN kVMN33b9 °°°s 19E 61fia°°q° T3-0006T-NIH 3AVN31IJ sos¢�m'q�!a!°a Fir, 0006T-NIH 'ON 103f0bd NOlN33 °°s ao!ns a�154�n°�°9sIIW LZ9 NOliVVYUO3N1 NVId 'A_wo _P,,. au r... ,wao�EEEEz°V"J",.aT3--06TNIH\•.wooszx i � d u 5S u 'o J %tzi'_ o - ¢;v�- w _ w _ cc Viz".•.' J J = z o u OQ m o �N W fY o � w I U w v I w o 1 a H a I ;¢ aw �N Q Z o� X < W o \ <o - 0 ¢w� \ ,z \ / \ II -- 1 USFWS Letter United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh CS Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 September 21, 2017 Kelly Roth The John R. McAdams Company Inc. 2905 Meridian Parkway Durham, NC 27713 Re: State -Owned Property - Cary Towne Boulevard — Wake County, NC Dear Mrs. Roth.: This letter is to inform you that the Service has established an on-line project planning and consultation process which assists developers and consultants in determining whether a federally -listed species or designated critical habitat may be affected by a proposed project. For future projects, please visit the Raleigh Field Office's project planning website at https://www.t'ws.gov/ralcigh/pp.html. If you are only searching for a list of species that may be present in the project's Action Area, then you may use the Service's Information, Planning, and Consultation System (IPaC) website to determine if any listed, proposed, or candidate species may be present in the Action Area and generate a species list. The IPaC website may be viewed at htt s:ttccos.fws. govli pact. The IPaC web site contains a complete and frequently updated list of all endangered and threatened species protected by the provisions of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.)(Act), a list of federal species of concern that are known to occur in each county in North Carolina, and other resources. Section 7 of the Act requires that all federal agencies (or their designated non-federal representative), in consultation with the Service, insure that any action federally authorized, funded, or carried out by such agencies is not likely to jeopardize the continued existence of any federally -listed endangered or threatened species. A biological assessment or evaluation may be prepared to fulfill that requirement and in determining whether additional consultation with the Service is necessary. In addition to the federally -protected species list, information on the species' life histories and habitats and information on completing a biological assessment or evaluation and can be found on our web page at http:tlwww.fws.gov/raleigh. Please check the web site often for updated information or changes. 1 The term "federal species of concern" refers to those species which the Service believes might be in need of concentrated conservation actions. Federal species of concern receive no legal protection and their designation does not necessarily imply that the species will eventually be proposed for listing as a federally endangered or threatened 'species. However, we recommend that all practicable measures he taken to avoid or minimize adverse impacts to federal species of concern. If your project contains suitable habitat for any of the federal]y-listed species known to be present within the county where your project occurs, the proposed action has the potential to adversely affect those species. As such, we recommend that surveys be conducted to determine the species' presence or absence within the project area. The use of North Carolina Natural Heritage program data should not be substituted for actual field surveys. If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely to adversely affect) a federally -protected species, you should notify this office with your determination, the results of your surveys, survey methodologies, and an analysis of the effects of the action on listed species, including consideration of direct, indirect, and cumulative effects, before conducting any activities that might affect the species. If you determine that the proposed action will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on federally listed species, then you are not required to contact our office for concurrence (unless an Environmental Impact Statement is prepared). However, you should maintain a complete record of the assessment, including steps leading to your determination of effect, the qualified personnel conducting the assessment, habitat conditions, site photographs, and any other related articles. With regard to the above -referenced project, we offer the following remarks. Our comments are submitted pursuant to, and in accordance with, provisions of the Endangered Species Act. Based on the information provided and other information available, it appears that the proposed action is not likely to adversely affect any federally -listed endangered or threatened species, their formally designated critical habitat, or species currently proposed for listing under the Act at these sites. We believe that the requirements of section 7(a)(2) of the Act have been satisfied for your project. Please remember that obligations under section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; or, (3) a new species is listed or critical habitat determined that may be affected by the identified action. However, the Service is concerned about the potential impacts the proposed action might have on aquatic species. Aquatic resources are highly susceptible to sedimentation. Therefore, we recommend. that all practicable measures be taken to avoid adverse impacts to aquatic species, including implementing directional boring methods and stringent sediment and erosion control measures. An erosion and sedimentation control plan should be submitted to and approved by the North Carolina Division of Land Resources, Land Quality Section prior to construction. Erosion and sedimentation controls should be installed and maintained between the construction site and any nearby down -gradient surface waters. In addition, we recommend maintaining natural, vegetated buffers on all streams and creeks adjacent to the project site. The North Carolina Wildlife Resources Commission has developed a Guidance Memorandum (a copy can be found on our website at (http:llwww.fws.gov/raleigh) to address and mitigate secondary and cumulative impacts to aquatic and terrestrial wildlife resources and water quality. We recommend that you consider this document in the development of your projects and in completing an initiation package for consultation (if necessary). We hope you find our web page useful and informative and that following the process described above will reduce the time required, and eliminate the need, for general correspondence for species' lists. If you have any questions or comments, please contact John Ellis of this office at (919) 856-4520 ext. 26. Sin" ly, ^ c ete Benjamin Field Supervisor 3 Cultural Resources rpiG,3 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona Al. Bartos, Administrator C:ovcrnor Roy Conpc_r &Mtory SUSS H. 1lamilton September 28, 2017 Kelly Roth McAdams 2905 Meridian Parkway Durham, NC 27713 rath c,,meadamsco.com Re: State-owned property, Cary Towne Boulevard, Wake County, GS 17-1635 Dear Ms. Roth: Thank you for your letter of August 25, 2017, concerning the above project. C7ilice ❑f Archives and 1 Gstory Deputy Secretory Kevin C:hrrrs We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or renee.gledhill-earley@ncder.gov, In all future communication concerning this project, please cite the above -referenced tracking number. Sincerely, 2L.,., lk". -&4 Tt mona M. Bartos Lacotioo- 1CI9 Last Joncs Surct, Ralcylt NC; 27GU1 Mailing Address: 4617 Al:d1 Scn ice (sntcr, Raleigh NC 27699-4617 Telephone/Fax: {)19)867.4579/807-G599 Supporting Photographs Natural Resource Consultants Supporting Photographs Photo 1. Eroded streambanks below the pedestrian bridge over Walnut Creek. Photo 2. Scour hole located within the stream buffer of Walnut Creek before repair. 308 W Millbrook Road, Ste D #200, Raleigh, NC 27609 1 of 2 Natural Resource Consultants Photo 3. Stabilized scour hole located within the stream buffer of Walnut Creek. 308 W Millbrook Road, Ste D #200, Raleigh, NC 27609 2 of 2