Loading...
HomeMy WebLinkAboutSW6230807_Plansheet - Grading/Drainage Plan_20231205 (3) wr BMP MAINTENANCE NOTES ° CONSTRUCTION SEQUENCE ALL MEASURES STATED ON THESE PLANS AND IN THE SWPPP SHALL BE MAINTAINED 1. CONDUCT PRE-CONSTRUCTION MEETING WITH THE CITY TO DISCUSS EROSION AND SEDIMENT :UA IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR COMPLETED s� CONTROLS AND CONSTRUCTION PHASING. PHASE OF WORK OF FINAL STABILIZATION OF THE SITE. \�� 2. INSTALL STABILIZED CONSTRUCTION EXIT AND POST SWPPP AND SITE COMPLIANCE SIGNAGE ARCHITECTS PUBLICLY VISIBLE. ENGINEERS FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT THE PROJECT G F �1 $ 3. INSTALL CONSTRUCTION FENCES AND TEMPORARY TRAFFIC AND PEDESTRIAN CONTROL DEVELOPMENT. WHEN CHANGES IN CONSTRUCTION ACTIVITIES ARE NEEDED, AMEND �\\ �'� O fp0 69°46 20, °� DEVICES. THE SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL. \G � E 4. PREPARE TEMPORARY PARKING AND STORAGE AREAS. \G � � � ` 71•� 5. INSTALL SILT FENCE ON THE SITE AS SHOWN WITHIN THE CONSTRUCTION LIMITS. HARRISON FRENCH SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON ++ R 6. DEMO EXISTING STRUCTURES, PAVEMENT, AND SPECIFIED UTILITIES. IN ACCORDANCE WITH THE CONSTRUCTION GENERAL PERMIT, AND REPAIRED IN GJ 7. UNDERCUT EXISTING POOR SOILS AS INDICATED IN THE GEOTECHNICAL REPORT. & ASSOCIATES , LTD Q ,�� ACCORDANCE WITH THE FOLLOWING: Q \�� ,\()'� ��.1 ♦` �C>� / 8. BEGIN GRADING THE SITE. 1705 S. Walton Blvd., Suite 3 \ �p ® v 9. BEGIN CONSTRUCTION OF UTILITIES. `� 10. BEGIN SUBGRADE PREPARATION AND CONSTRUCTION OF STRUCTURES. Bentonville, Arkansas 72712 1. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED \� "o. / \ t 479.273.7780 IF THEY SHOW SIGNS OF DETERIORATION. \v ,�D� 11. BEGIN INSTALLATION OF CURB, GUTTER, AND PAVING. 12. COMPLETE PERMANENT STABILIZATION ON AREAS WHERE CONSTRUCTION HAS COMPLETED. f 888.520.9685 2. ALL SEEDED/SODDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A , i m <9 242 v� s� 13. COMPLETE FINAL GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS. www.hfa-ae.com GOOD STAND IS MAINTAINED. AREAS SHALL BE FERTILIZED, WATERED AND 14. OBTAIN CONCURRENCE FROM THE OWNER AND THE CITY THAT THE SITE HAS BEEN FULLY 40 30 20 10 0 20 40 60 80 REPAIRED AS NEEDED. S �' \ °�� ems, STABILIZED. ♦® °- 15. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES. w z} oQ=Jow�Q 3. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. - J�� �� 16. STABILIZE ALL AREAS DISTURBED BY BMP REMOVAL. SCALE: finch = 40 ft. w w~X U z w Q W SEDIMENT SHALL BE REMOVED FROM THE SILT FENCE WHEN IT REACHES w w w w o o ONE-HALF THE HEIGHT OF THE FENCE. CONTRACTOR MAY COMPLETE CONSTRUCTION RELATED ACTIVITIES CONCURRENTLY ONLY IF ALL o Q G O--LL¢0 T W O p PRECEDING BMPS HAVE BEEN COMPLETELY INSTALLED. o z w¢w Z= 4. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL \•' \ \ �O. PROPOSEDLL \ THE ACTUAL SCHEDULE FOR IMPLEMENTING POLLUTANT CONTROL MEASURES WILL BE DETERMINED z PREVENT TRACKING OR FLOW OF SEDIMENT FROM THE SITE. THIS MAY REQUIRE p a¢ o o o (n w Z U w F w w H J PERIODIC TOP DRESSING OF THE EXIT AS CONDITIONS DEMAND. ® \ O , BY THE PROJECT CONSTRUCTION PROGRESS AND RECORDED BY THE GENERAL CONTRACTOR ON o z w / •N �' ` zLL�oaQ�U000 THESE PLANS� . PROPERTY LINE 5. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN A GOOD w� o w w c'w w w o= LIMITS OF DISTURBANCE -w= w PLEASE SEE THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR W s z r ~�=a�z CONDITION. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE AREA AS /� C� U, cn o o s o¢a w CONDITIONS DEMAND. °� o egg FURTHER DETAILS ON BMP DESIGN CRITERIA, MAINTENANCE, CONSTRUCTION SPECS AND SF SILT FENCE ? INSTALLATION. 6. PRIOR TO LEAVING THE SITE, ALL VEHICLES SHALL BE CLEANED OF DEBRIS. ANY / ��� o 4it ------------ 10' WIDE MAINTENANCE ACCESS DEBRIS AND/OR SEDIMENT LEAVING THE SITE SHALL BE CLEANED IMMEDIATELY. v 7. ALL INLETS AND STORM DRAINS SHALL BE KEPT CLEAN OF DEBRIS AND SEDIMENT. ANY DEBRIS AND/OR SEDIMENT THAT ENTERS ANY INLET OR STORM i DISTURBED DRAINAGE AREA rn Q N DRAIN SHALL BE CLEANED IMMEDIATELY. FLUSHING SHALL NOT BE USED TO J / ° DRAINING TO SKIMMER BASIN \ oy 2 It c� CLEAN DEBRIS AND/OR SEDIMENT FROM STORM DRAINS. / / �Zm \ G� U M o NOTES w N W / z4 ♦ m 1 N. SWPPP SIGN � U � \ ° o N ♦ 2N. CONCRETE WASHOUT AREA y MAINTENANCE ACCESS TO O Z Z PUBLIC ROW 3N. EQUIPMENT STORAGE AREA F_ 4D \ = z W LOVE'S ® �43 DETAILS co a P �4 TRAVEL CENTER O�� 1 D. CONSTRUCTION EXIT, SEE DETAIL 1/SHEET C9.0 % \ 2D. SEDIMENT/SILT FENCE WITH WIRE SUPPORT, SEE DETAIL 2/SHEET C9.0 �A ��� w %% \ 3D. EROSION EELS SEDIMENT BARRIER, SEE DETAIL 3/SHEET C9.0 P� O \\ 4D. CONCRETE WASHOUT, SEE DETAIL 4/SHEET C9.0 �� 5D \ \\ 5D. DANDY CURB BAG INLET PROTECTION, SEE DETAIL 5/SHEET C9.0 ®� �Q 6D. BLOCK&AGGREGATE FLUME PROTECTION, SEE DETAIL 6/SHEET C9.0 ( QIj / ® / 4 \\Q �� \ \ 7D. ROCK CHECK DAM, SEE DETAIL 9/SHEET C9.0 QO ' / am / �/�� \ ti 8D. BLOCK&AGGREGATE AREA INLET SEDIMENT DEVICE, SEE DETAIL 8/SHEET C9.0 C^ . •° ` co J/ 9D. NOT USED 10D. RIP RAP GROUTED IN PLACE, SEE DETAIL 10/SHEET C9.0 Cp `� 0 11 D. DIVERSION DITCH, SEE DETAIL 11 /SHEET C9.0 t,z �p 244 �® ° \\a •cr C�, \� 12D. SILT FENCE OUTLET PROTECTION, SEE DETAIL SHEET C9.1 � / a o ° \ O,, \� _z'j \, / ° C/ NO WETLANDS WERE OBSERVED ON THIS SITE PER WETLAND 7D INVESTIGATION BY WETLAND SOLUTIONS, LLC MEMO DATED c/) / / s 5tiz \ ` J U LY 7 2022 (ADAM CASTER) BASED ON THE NORTH CAROLINA SURFACE WATER PROPERTY LINE CLASSIFICATIONS AS WELL AS THE WEEKLY WATERBODY �����•,,....,,,.o���,� oTtiv �SF�N Q s REPORTS THERE ARE NO SURFACE WATERS WITHIN THE AREA ,oFEss/p •, 2 % OF DISTURBANCE FOR THIS PROJECT. = A U) 5 12 42'' �\/ 246 \ \ O STA4 STM / { C 0 0_ c� MAINTENANCE ACCESS TO i r PUBLIC ROW HARRISON FRENCH &ASSOCIATES, PLLC / �. / / // y / / / • / 0 0 �G c� O COA#P0402 -57 v m10D O INSTALL SKIMMER BASIN �� A �� LL / 40BAFFLES. SEE SHE G ET\4.3. M � � \� INV 1 ' �_ \�g2 \\ 246 5D MAINTENANCE ACCESS TO DISTURBED DRAINAGE AREA \ PUBLIC ROW co ISSUE BLOCK z ♦ O�� qG pT R // \ x� i� \\ \ DRAINING TO SKIMMER BASIN �. \ ` C� O OTP 02 AUG 2022 cD `l cFSs ,, FR x y \ \ Z F�SFMF l `` S \ \ 4= G o CCD9 01 DEC 2023 co t 683•p0 \ Nam,. \\ \ ° • g3° 3'o� 5 __ \� 9, o STORE NO. 412 rn \ _ cn --s 1 ` DOCUMENT DATE: 08/02/2022 rn m \ 1 CHECKED BY: WFM C� 1 rn rna o rn z I o� �� DRAWN BY: DAG R BV D ILp \ s Zo / N G�gAC - - _ rn w G PROTO CYCLE: o 4,33 --2 3 - 1 ci 10D „ 33• 6 243 , s (R) __ _ -Co / � o Q , _ _ _ EROSION CONTROL ,. _ ^ n _ PLAN PHASE II Cn / O 10D �� ° 3 " �g 899 CMS \ Coo o 0 0 0 g3-4 A4, 02" w 22� s 6o o � g°2 ° o N 5 7 SHEET: N � O C4 . 2