Loading...
HomeMy WebLinkAboutNCC230476_NOT Closeout Documents_20231201 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 FB-Pope Airfield 24 Inch Water Main County: Cumberland Project: Replacement Project-ON-0 River basin: Cape Fear Person financially responsible:American States Utility Services,Inc.-Timothy A Project#: CUMBE-2021-117 Loughman,Utility Manager NCC230476 Address: P.O.Box 73316,Fort Bragg,NC 28307 1. Project Location: Manchester/Reilly Rd.,Fort Bragg Pictures: No 2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Jeremy George Title: ASUS Inspection report: Sent Report Date given/sent: November 15,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Lee Ward Date of inspection: November 08,2023 Time arriving on site: 12:34 PM Time leaving site: 12:41 PM cc: