Loading...
HomeMy WebLinkAboutC204570 Site 7_ 3In Mn . ys Eta•` -. a R_ C'-^.' _..- l _� f�'{s�Y7E�l`i^s... i �i - q.. f ,SS a� „ _ _ _ - _ _ _ . • ; •,' / I :4 � 41 ... '�:! -' '� +rat ��� � .t-- - W.1 .�� "'. � q/� �'% � ,x `iv. ' ,. } •,,..• � ice, - .iv;,�.. 41 F J•' _ _ l- � _ Y ��MA Nr < r�`}� �, M,• �V' � .;.._.Ai. .',S �.ti�.1 • S- ,I-- ° IFs -� � /'. 7tr�.� LW - �E .. r "; � t . �I _ f � ., .. i. � •��+"�I �� Va b R�" 5 - - _ .. -, � _ - i ��'s f .'� ter � "3 7P� � �• � � _ — � - F'. - a 71 t. • v y as � i M •y- 1 s f W�� r � r�r 4, r'' r� `".. e ale ' y • ` y!1� � h ,� � 4r 1 + 3 l �. '�'� �'Y�-+- �L fa� - /� �1 t. '�.��.9�V6r1!�t - aN, s! S n 1:.. �•!p``,. DETAI STANDABD BASE DITCH (NOla 9061 0 'C weMxM wm 0. 3,5 R. K—d- 3-5 Fl, 0- CO Fl. TYp,el flow- Cku I $TA. 12+00 - : LT — DENOTES FILL IN WETLAND DENOTES MECHANIZED dF aF CLEARING ® DEN INESWETLAANADTION 15" PERMIT DRAWING SHEET 35 OF 69 25, —T IV, DITCH —T— — HW rr�S C WOODSCG9�1S SPECIAL LATERAL4-FT / IE R. HEATH BASEDITCHEE DETAIL 22, PSH 2D-1 Cif f f f RAP F < i 45 1 SITS 7 IIE R. HEATH SPECIAL LATERAL2-FT / BAS CH SEE DETAIL 1, PSH C7 R G MECHANIZED CLEARING / EXCAVATION WOODS IOEMOT Cow�r� 1 UiILE65 �� AU ALL •WFIATUllf1 EOM INSET 7D —, `i 'E 6 �Y-A , r J rr T 1 REMOV� �7% TwCLASS IPSEE D8 LL IN ®50 FT; GRADDS EST. DDE o 62 CY 'h'— SEE n. / rA PECIAL L C --QVE C DI iF S I RIP RAP MECHANIZED R y� G � S AIL 10, PSH 213-1 CLEARING �F ?V C SS I RIP RAP DOWN EXISTING SjK E QV� FROM END OF DITCH, 1.5 FT T EST 110�TS EST 15d F iL M 1F SPECIAL LATERAL 'V' DITC SITE 1F 1M w evE SEE DETAIL 5, PSH 2D-1 '1TJ'U- JL. JlO, fC--PVU.VU l 1 11 I RPD- S I` I +7 JI JIMMIE R. HEATH f� , WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND I SURFACE WATER IMPA7- Hand Existing Existing T Channel Ph— I N Site Station Permanent Temp. Excavation Mechanized Clearing Permanent emp. a aturaf No. Structure (From/To) Fill In Fill In in Clearing g in SW SW Impacts Impacts Stream Size /Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design 5 37+71 - 37+82 -Y- RT Hand Clearing (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) in TDE 0.008 5 5 39+12 - 40+79 -Y- RT Roadway Fill 0.080 40+90 - 41+10 -Y- RT 15" Pipe/Rip Rap at Outlet 0.007 6 28+43 - 28+74 -Y- LT Roadway Fill/Channel Change 0.012 6 27+01 - 28+70 -Y- RT Roadway Fill 6 22+65 - 22+75 -RPD- LT Rip Rap Channel Stabilization 6 22+65 - 22+84 -RPD- LT DWwatering for Pie install 7 17+53 -17+76 -RPD- RT Dftch Construction s 11+65 -12+24 -RPD- RT Dltoh w/RIp Rap Construction 0,034 +>6 -12+19 -RPD- RT RI Rapdown existingslop(, 0.028 U+96.70+96 -L- LT Ro!g&aX FIII 0,231 iu+38.71+62 -L- LT Bank Stabllization u /030.71+30 -L- LT Permanent Channel Stabipzetia+I 89+83.00+73 -L- LT Brld a Bent In Stream 70+80.71+04 -L- LT Brld a Bent In Stream 70+26.70+40 -L- LT Stream Access for Stabilization 70+89.71+04 -L- LT Stream Access for Stablllzstlon Sill I I TOTAL : 0,393 %minded totals are sum of actual Impaots NoES Shoot 2 of 4 Project Totals rhown on Sheet 4 (60) "'otsis shown above are for this sheet only 1 1 1 -- / NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 2/25/2021 Columbus R-2561CA 34466,4.5 SHEET 67 OF 69