Loading...
HomeMy WebLinkAbout20231602 Ver 1_ePCN Application_20231128DW R Dlvislon of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 4/29/2022 Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned * Version# * 20231602 1 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed - send electronic notification Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Mary Plummer:mary.plummer Information for Initial Review 1a. Name of project: BP10.Ro40 - Replace Bridge No. 093 on SR 1937 (Old Pageland-Marshville Road) over Haney Branch 1a. Who is the Primary Contact?* Joel Howard 1b. Primary Contact Email: * 1c. Primary Contact Phone:* jmhoward@ncdot.gov (704)983-4423 Date Submitted 11/28/2023 Nearest Body of Water Haney Creek Basin Yadkin-PeeDee Water Classification WS-V Site Coordinates Latitude: Longitude: 34.943192-80.384049 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Union O Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only) T.I.P. or state project number: WBS # (1) BP10.R040 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 201902350 - Work associated with bridge construction, widening, replacement, and interchanges le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an AgentlConsultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 10 2b. Deed book and page no.: N/A 2c. Contact Person: 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No 2d. Address Street Address 706 W Main Street Address Line 2 City Albemarle Postal / Zip Code 28001 2e. Telephone Number: (704)983-4423 2g. Email Address:* jmhoward@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Marshville 2. Project Identification State / Province / Region NC Country USA 2f. Fax Number: 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address SR 1937 (Old Pageland-Marshville Road) @Haney Branch Address Line 2 city Marshville Postal / Zip Code 28103 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Haney Creek 3b. Water Resources Classification of nearest receiving water: WS-V 3c. What river basin(s) is your project located in? Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050603 4. Project Description and History State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Bridge Project: Existing site conditions: 2-lane rural transportation facility crossing waterbody. General land use: agricultural land, residential land, and the disturbed/maintained right-of-way. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.164 4g. List the total estimated linear feet of all existing streams on the property: 491 4h. Explain the purpose of the proposed project: To replace a structurally deficient bridge. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * Bridge 93, is a single span bridge that is a 24 feet long and will be replaced with an approximately 30-foot wide structure that includes two 11-foot travel lanes and three-foot paved shoulder on either side of the bridge. The bridge would be lengthened from 24 feet to approximately 58 feet. Standard road and bridge building equipment such as trucks, dozers, and crances will be used. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No Unknown Comments: See Attachment B - Delineation Materials 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Joshua Kotheimer, PWS Agency/Consultant Company: STV Engineers, Inc. Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts Q S1 2a1 Reason (?) Hand Clearing 2b. Impact type* (?) T 2c. Type of W. * Ftt,mland Hardwood Forest 2d. W. name Wetland C 2e. Forested * Yes 2f. Type of Jurisdicition * ?) Both 2g• Impact area * 0.005 (acres) S3 Fill P Bottomland Hardwood Forest Wetland A �=fo th 0.004 (acres) 2g. Total Temporary Wetland Impact 0.005 2g. Total Wetland Impact 0.009 2i. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.004 F S1 3a. Reason for impact (?) Site 2 - Bridge 3b.lmpact type* Temporary 3c. Type of impact* Other 3d. S. name* Haney Branch 3e. Stream Type* ?) Perennial 3f. Type of Jurisdiction* Both 3g. S. width Average (feet) 3h. Impact length* 67 (linear feet) S2 Site 4 - Bank Stabilization Permanent Bank Stabilization J Haney Branch Perennial Both Aveage (feet) 41 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 41 67 3i. Total stream and ditch impacts: 108 3j. Comments: There is 108 LF of temporary impacts, 41LF is accounted for within the permanent impacts and is not included in temporary impact totals. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Riprap bank stabilization at two drainage outfalls is being placed only on the stream banks and will not disturb the stream bed. The bridge replacement will be conducted from the upland areas/roadway approaches. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. Demolition and construction methods from the upland roadway approaches will be used to minimize potential temporary demolition related impacts and avoid construction related impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Permanent wetland impacts total less than 0.01 acre and permanent stream impacts are for bank stabilization and will not be a loss of streambed. Due to the minimal permanent impacts we are not proposing mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Project is located in the Yadkin-PeeDee River Basin and is not subject to NC Riparian Buffer Protection Rules 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: Please see attached Stormwater Management Plan in Attachment A G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * A Minimum Criteria Determination Checklist was prepared for this bridge replacement project. (Attachment C) 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No O O 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will not stimulate growth but may influence nearby land use. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?" Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?" Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Yes No If you answered "Yes" to 5g(1), did you discover any signs of bat use? Yes No Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP data and site specific surveys. See Attachment D for threatened and endangered species write-ups and biological conclusions. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?'� NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? " Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? See attached "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes No Historic Properties Present Form." (Attachment E) 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit Coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM maps Miscellaneous 0 u Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document BP10R040_Cover_Letter_With_Attachments (002).pdf 15.16MB DMSAccept_SR 1937_Bridge_Div 10.pdf 230.73KB File must be PDF or KMZ Comments Additional supplemental information is included with the cover letter. Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Joel M. Howard Signature .-WLM. #OWAio Date 11/28/2023 8