HomeMy WebLinkAbout20140090 Ver 8_Design/Maps/Site Plans Revised_20231121Baker, Caroline D
From: Euliss, Amy
Sent: Tuesday, November 21, 2023 11:21 AM
To: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA); Conchilla, Ryan
Cc: Shaver, Larry B; Trantham, Darren K; Sawicki (Gannett Fleming), Jeremy P; Smith,
Thomas A
Subject: RE: [External] RE: U-2579AB permit site 19
Attachments: U-2579AB permit site 19
Thanks Steve!
Jeremy,
You can proceed with the revision. Please be sure to get the rock keyed into the pool as requested by DWR (attached
email). Please also place a copy of the email and the attached email from DWR in the project files.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
From: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>
Sent: Tuesday, November 21, 2023 11:13 AM
To: Euliss, Amy <aeuliss@ncdot.gov>; Conchilla, Ryan <ryan.conchilla@deq.nc.gov>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Trantham, Darren K <dktrantham@ncdot.gov>; Sawicki (Gannett Fleming),
Jeremy P <ext-jpsawicki@ncdot.gov>
Subject: [External] RE: U-2579AB permit site 19
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Amy,
I wanted to follow up with a confirmation that that construction of a proposed plunge pool below the outfall of the RCP
(Site # 19) will not require a permit modification. This is the case because construction of the plunge pool is a minor
alteration in an area authorized for impacts below the RCP culvert and will not result in a loss of waters. This
determination of no loss is based upon NCDOT constructing the plunge pool based upon submitted design drawings
(below in e-mail string) and by implementing comments from NCDEQ related to placement of rock rip rap and native
material below the culvert (plunge pool construction) in a manner to anchor this material in place (during high flows)
while not restricting water flow down stream during drier periods (low flow conditions). Although it is not required,
consideration of the construction of a low flow channel through the apron area (outlet of the plunge pool) may provide
an opportunity to provide an unrestricted flow down stream during low flow conditions. Please let m know if you have
any questions. Thanks.
Stephen A. Brumagin
NCDOT Project Manager
U.S. Army Corps of Engineers,
Charlotte Field Office, Wilmington District
Work cell 704 798-6471
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Tuesday, November 14, 2023 8:06 AM
To: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>; Conchilla, Ryan
<rvan.conchilla@deg.nc.gov>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Trantham, Darren K <dktrantham@ncdot.gov>; Sawicki (Gannett Fleming),
Jeremy P <ext-ipsawicki@ncdot.gov>
Subject: [Non-DoD Source] RE: U-2579AB permit site 19
Steve and Ryan,
Steve, per our conversation, we are going to install a plunge pool lined with rip rap at the pipe outlet. The revised plan is
included below. Its our understanding that a permit modification will not be required since the plunge pool will not be a
loss of water. Ryan, I've included a picture of the current perched pipe. These were provided to Dave
previously. Please advise if you have any questions.
DETAIL EEE
"P-9-AFTFI) ENERGY DISUPATOR 9ASIN
• M,F Noy xww+ � f j� 1
4
Dissipator size will be
— fit
k' -4r I
`
z
dictated b channel
�- �
t lM Nm ulokw ���
I
width. Not to extend
_
J
beyond adjacent lateral
PLAN
channel except it
4�
"�; � AY
additional length is
rt 64vISv1;
needed to tie to stream
bed elevation.
{
„
#E
W911MF
-Y5� STA. 13 fi 50.0 5fi ECTIQN `
fIMTGHLINE SHEET 2S �
J oN1. \ �a
Ali F. REi LILT A C. REH UH
LEJAHd 470N10 lEOM
`r ; N
FIDDL
YM. pvERgr MALISSA L. G tiE
j uhn A. KI D ASH Y 8. 6vERBY
5 �#' Rr LE S
' it ErNxRR
AGoi,ER .R. DnAmo ° 4 U ER y SITE 1$
LEA. � Ra
SAH 1Fi°lIA9 ° ti ti t - h Y � xa BANK STAAIIIUT
I1 EL A.MKKOLA iii 111 � Al JS S1RLAJA
�-cc CLASS 'R M
w"l• S r k C a L�4 EST. 30 T
i$E . U n-1
a s wv�
1 Ei4° ,uF-al�exw i� 1
% NC 04 _ i F° L F 5Fti _ � Luo�nu �`� y
C
NCtO
1_T _.,`•: S ITF 19
91 F
� L. DE HFSE FR CIS � dL�.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss .ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
3
From: Euliss, Amy
Sent: Friday, November 3, 2023 8:02 AM
To: Sawicki (Gannett Fleming), Jeremy P <ext-Ipsawicki@ncdot.gov>; Wanucha, Dave <dave.wanucha@deg.nc.gov>;
Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Trantham, Darren K <dktrantham@ncdot.gov>
Subject: RE: U-2579AB permit site 19
We would take the material that is in the existing bank along with rip rap and build the channel up. The existing material
is typical of the piedmont and a mixture of silt, clay and small cobble. We would not add any red clay to the stream. The
channel as installed too narrow, so we will open that up to the appropriate width, and use any suitable material in the
stream. We aren't opposed to using only rip rap if that is what ya'II prefer. We suggested native material because we
are hoping to keep the impact from being deemed a the 'loss of water'. We'll see what Steve has to say, and go from
there.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
From: Sawicki (Gannett Fleming), Jeremy P <ext-Ipsawicki@ncdot.gov>
Sent: Thursday, November 2, 2023 3:50 PM
To: Wanucha, Dave <dave.wanucha@deg.nc.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV
USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Trantham, Darren K <dktrantham@ncdot.gov>
Subject: RE: U-2579AB permit site 19
Dave,
Please see attached photos. As we need to widen the channel at the turn and that rip rap can be reused for this purpose
I'd estimate we wouldn't need to supplement with more than a ton to complete what's needed.
Let me know if you need anything else on this.
Thanks,
Jeremy Sawicki
Assistant Resident Engineer
Division 9, Lexington Construction Office
North Carolina Department of Transportation
336 249 6255 office
321 230 9732 mobile
ext-ipsawicki(cancdot.gov
452 Central Avenue
Lexington, NC 27292
From: Wanucha, Dave <dave.wanucha@deg.nc.gov>
Sent: Thursday, November 2, 2023 3:28 PM
To: Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA)
<Stephen.A.Brumagin@usace.army.mil>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Sawicki (Gannett Fleming), Jeremy P <ext-jpsawicki@ncdot.gov>; Trantham,
Darren K <dktrantham@ncdot.gov>
Subject: RE: U-2579AB permit site 19
Hi Amy,
What will the native material consist of? I'm thinking that if it is mostly sand/gravel that it
would likely be flushed out during the next storm event. Wouldn't rip rap alone take care of
the perch and allow upstream sediments and native material backfill riprap voids overtime
with subsequent storm events? Just wondering what the best approach might be. If possible,
could you send a couple of pictures of the perched outlet's existing condition and channel and
estimates of amount of riprap needed? Not sure about a formal permit modification at this
time. I would like to hear the Corp's opinion.
Thanks for the notification.
Dave W.
Dave Wanucha
Environmentol Speciolist 11
Transportation Permitting Branch for NCDOT Divisions 9 and 11
Division of Water Resources, Department of Environmental Quality
Office/Cell: (336) 403-5655
Dave.Wanucha@deg.nc.gov
5
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Thursday, November 2, 2023 2:42 PM
To: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>; Wanucha, Dave
<dave.wanucha@deg.nc.gov>
Cc: Shaver, Larry B <Ibshaverl@ncdot.gov>; Sawicki (Gannett Fleming), Jeremy P <ext-jpsawicki@ncdot.gov>; Trantham,
Darren K <dktrantham@ncdot.gov>
Subject: U-2579AB permit site 19
We have a small pipe perch at permit site 19 on the U-2579AB project. We propose to place rip rap mixed with native
material to the stream bed to bring the stream bed elevation up to the existing pipe. If we combine rip rap with native
material, can we proceed without a permit modification? The additional rip rap/native material combo would be within
the are permitted as bank stabilization. In the picture below, there is purple text and an arrow to the location.
Thanks
-Amy
LEGEND:
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
1-10�*
�• s
4
z>
Fn
r-r rr,
c
Mun
F I D DLE'RS-
(E S �77S-2-5)
Z.
MI �
LJRNER
BRdN0 0. FTUR ER A'
I _ _
DETAIL III
BANK STA13ILI7ATION AT
JURISRICFIOYAL SMEAF.L
� r.oi b scaNl
Ll-
Fa.evxrla�
�rs�ol
T" of Lk — CL I mp--p-a
STA,P*86--kf15KY � T
E}r m-1
� 11
SITE 18
�.x We ne,
'and na
# the be(
utlet t
. itch tc
X R) LEA SIDE
BANK STABILIZATI
AT JS MEAM
CLASS 'I' RIP 1p�--
EST- 50 TT
}� ECM E _2
of
C am, NCDO
SITE 19
111 i~F
7
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.