Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutHE-0014 WetlandandSurfaceWaterImpactsSummaryWETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 11 +91 LT
Bank Stabilization
0.000
7
2
-L- 54+97
1 @ 72" Pipe BURIED 1'
0.005
0.001
120
10
3
-Y2- 12+55 to 13+53 RT
Bank Stabilization
0.004
81
4
-Y2- 16+47 RT
Channel stabilization
0.003
0.002
16
10
4
-Y2- 16+52 RT
Channel Improvements
0.005
15
4
-Y2- 16+70
1 @ 95"x67" Pipe BURIED 1'
0.001
11
4
-Y2- 16+49 LT
Channel Improvements
0.001
15
4
-Y2- 17+00 LT
Bank stabilization
0.000
10
TOTALS*:
1 0.00
1 0.00
1 0.00
1 0.00
1 0.00
1 0.01
1 0.01
1 194
1 101
1 0
*Rounded totals are sum of actual impacts
NOTES:
Site 3 is removal of existing driveway pipes and establishing an open channel.
Revised 2018 Feb