HomeMy WebLinkAboutHE-0014 WetlandandSurfaceWaterImpactsSummaryWETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 11 +91 LT Bank Stabilization 0.000 7 2 -L- 54+97 1 @ 72" Pipe BURIED 1' 0.005 0.001 120 10 3 -Y2- 12+55 to 13+53 RT Bank Stabilization 0.004 81 4 -Y2- 16+47 RT Channel stabilization 0.003 0.002 16 10 4 -Y2- 16+52 RT Channel Improvements 0.005 15 4 -Y2- 16+70 1 @ 95"x67" Pipe BURIED 1' 0.001 11 4 -Y2- 16+49 LT Channel Improvements 0.001 15 4 -Y2- 17+00 LT Bank stabilization 0.000 10 TOTALS*: 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.01 1 0.01 1 194 1 101 1 0 *Rounded totals are sum of actual impacts NOTES: Site 3 is removal of existing driveway pipes and establishing an open channel. Revised 2018 Feb