HomeMy WebLinkAboutNC0043532_Compliance Evaluation Inspection_20231101ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Andy Lucas
Stanly County
1000 N 1st Street, Suite 12
Albemarle, NC 28001
SUBJECT: Compliance Sampling Inspection
West Stanly WWTP
NPDES Permit NCO043532
Rowan County
Mr. Lucas:
NORTH CAROLINA
Environmental Quality
November 1, 2023
On October 25, 2023, Roberto Scheller of this Office conducted a compliance inspection at the subject facility.
This inspection was conducted as a Compliance Evaluation Inspection (CEI) to ensure compliance with permit
requirements and conditions. The subject facility appeared to be well operated and maintained; however, it was
noted during inspection issues with the newly installed influent screening and grit removal equipment.
The screening device and grit removal unit was not operational at the time of inspection.
We wish to thank the operator for his assistance regarding this inspection. The enclosed report should be
self-explanatory; however, should you have any questions, please contact myself or Roberto Scheller at (704)
235-2204 or roberto.scheller(c)-ncdenr.gov.
Sincerely,
EDocuSigned by:
11043F...
for Andrew H. Pitner, P.G., Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Division of Water Resources, NCDEQ
Enclosure: Compliance Evaluation Inspection Report
cc: Laserfiche
D_E Q�/��
��amuwrnn.W oirb�
North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 I Mooresville. North Carolina 28115
704.663.1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO043532 111 121 23/10/25 I17 18 LC] I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved -------------------
67
I 72 I n, I 71 I 74 79 I I I I I I I80
701� I 711 LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:03AM 23/10/25
18/12/01
West Stanly WWTP
24939-B Barbees Grove Rd
Exit Time/Date
Permit Expiration Date
Oakboro NC 28129
11:43AM 23/10/25
23/01/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Tommy Gibbons/ORC/704-486-0285/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Andy Lucas,1000 N 1st St Ste 12 Albemarle NC 28001/County
Manager/704-986-3601/7049863711 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signatu 66qf„ k q�pr(s) Agency/Office/Phone and Fax Numbers Date
Roberto Scheller U't DWR/MRO WQ/707-235-2204/ 10/31/2023
��.,1�
91C2A007838943E...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Brandy Costne 1—signed by: r' WR/MRO WQ/704-235-2185/ 11/1/2023
7 858043E .
EPA Form 3560-3 (Rev 43 A )`}�'revioils editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO043532 I11 12I 23/10/25 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The current permit became effective December 1, 2018 and expired January 31, 2023. The Permit
Renewal Application was received by the Division on September 1, 2022. A draft permit was issued
for review on October 10, 2023. At time of inspection facility was operating under expired permit.
Permit is for the discharge of wastewater into the Rocky River via (Outfall #002) and emergency
oufall to Long Creek (Outfall #001) until expansion above 0.9 MGD.
This facility was under a SOC (SOC-S19-003)that expired on January 31, 2023.
This facility expanded from 0.9 MGD to 1.2 MGD under Atuhorization to Construct #43532A01.
A compliance review was conducted for violations that occurred from February 2023 through August
2023.
The following violations were recorded:
03-2023 NOV-2023-LV-0370
04-2023 NOV-2023-LV-0392
05-2023 NOV-2023-LV-0496
06-2023 NOV-2023-LV-0581
07-2023 NOV-2023-LV-0721
08-2023 NOV-2023-LV-0766
The noted violations were for BOD, NH3 as N, and Fecal Coliform.
It was also noted during inspection that influent screen and grit removal was not in operation.
Page#
Permit: NCO043532
Inspection Date: 10/25/2023
Owner -Facility: West Stanly WWTP
Inspection Type: Compliance Evaluation
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment: Equipment taken out of service.
Grit Removal
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# Is disposal of grit in compliance?
Comment: Grit removal taken out of service.
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
Yes No NA NE
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ❑
❑ ❑ ❑
Yes No NA NE
Page# 3
Permit: NCO043532 Owner -Facility: West Stanly WWTP
Inspection Date: 10/25/2023 Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system
Surface
Is the basin free of dead spots?
0
❑
❑
❑
Are surface aerators and mixers operational?
0
❑
❑
❑
Are the diffusers operational?
0
❑
❑
❑
Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑
❑
❑
Comment: Facility has reported having issues with low DO in aeration basins.
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
❑
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
■
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
❑
❑
❑
■
Comment:
Pumps-RAS-WAS
Yes
No
NA
NE
Are pumps in place?
■
❑
❑
❑
Are pumps operational?
■
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
Comment:
Disinfection -Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑
Page# 4
Permit: NCO043532 Owner -Facility: West Stanly WWTP
Inspection Date: 10/25/2023 Inspection Type: Compliance Evaluation
Disinfection -Liquid
Yes
No
NA
NE
(Sodium Hypochlorite) Is pump feed system operational?
0
❑
❑
❑
Is bulk storage tank containment area adequate? (free of leaks/open drains)
0
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
0
❑
❑
❑
Comment:
De -chlorination
Yes
No
NA
NE
Type of system ?
Gas
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
❑
❑
Is storage appropriate for cylinders?
■
❑
❑
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Comment:
Are the tablets the proper size and type? ❑ ❑ ■ ❑
Are tablet de -chlorinators operational? ❑ ❑ ■ ❑
Number of tubes in use?
Comment:
Effluent Sampling
Yes
No
NA
NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
■
❑
❑
❑
Is the tubing clean?
■
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: At time of inspection effluent sampler recorded at 4 degrees Celsius.
Pump Station - Effluent
Yes
No
NA
NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
❑
0
❑
❑
Page# 5
Permit: NCO043532
Inspection Date: 10/25/2023
Pump Station - Effluent
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment: One of three effluent pumps not operational.
Owner -Facility: West Stanly WWTP
Inspection Type: Compliance Evaluation
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Comment:
Yes
No
NA
NE
■
❑
❑
❑
❑
❑
❑
❑
❑
❑
Yes
No
NA
NE
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Page# 6