Loading...
HomeMy WebLinkAboutNC0043532_Compliance Evaluation Inspection_20231101ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Andy Lucas Stanly County 1000 N 1st Street, Suite 12 Albemarle, NC 28001 SUBJECT: Compliance Sampling Inspection West Stanly WWTP NPDES Permit NCO043532 Rowan County Mr. Lucas: NORTH CAROLINA Environmental Quality November 1, 2023 On October 25, 2023, Roberto Scheller of this Office conducted a compliance inspection at the subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to ensure compliance with permit requirements and conditions. The subject facility appeared to be well operated and maintained; however, it was noted during inspection issues with the newly installed influent screening and grit removal equipment. The screening device and grit removal unit was not operational at the time of inspection. We wish to thank the operator for his assistance regarding this inspection. The enclosed report should be self-explanatory; however, should you have any questions, please contact myself or Roberto Scheller at (704) 235-2204 or roberto.scheller(c)-ncdenr.gov. Sincerely, EDocuSigned by: 11043F... for Andrew H. Pitner, P.G., Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Enclosure: Compliance Evaluation Inspection Report cc: Laserfiche D_E Q�/�� ��amuwrnn.W oirb� North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 I Mooresville. North Carolina 28115 704.663.1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO043532 111 121 23/10/25 I17 18 LC] I 19 I s I 20L] 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved ------------------- 67 I 72 I n, I 71 I 74 79 I I I I I I I80 701� I 711 LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:03AM 23/10/25 18/12/01 West Stanly WWTP 24939-B Barbees Grove Rd Exit Time/Date Permit Expiration Date Oakboro NC 28129 11:43AM 23/10/25 23/01/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Tommy Gibbons/ORC/704-486-0285/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Andy Lucas,1000 N 1st St Ste 12 Albemarle NC 28001/County Manager/704-986-3601/7049863711 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signatu 66qf„ k q�pr(s) Agency/Office/Phone and Fax Numbers Date Roberto Scheller U't DWR/MRO WQ/707-235-2204/ 10/31/2023 ��.,1� 91C2A007838943E... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Brandy Costne 1—signed by: r' WR/MRO WQ/704-235-2185/ 11/1/2023 7 858043E . EPA Form 3560-3 (Rev 43 A )`}�'revioils editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO043532 I11 12I 23/10/25 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The current permit became effective December 1, 2018 and expired January 31, 2023. The Permit Renewal Application was received by the Division on September 1, 2022. A draft permit was issued for review on October 10, 2023. At time of inspection facility was operating under expired permit. Permit is for the discharge of wastewater into the Rocky River via (Outfall #002) and emergency oufall to Long Creek (Outfall #001) until expansion above 0.9 MGD. This facility was under a SOC (SOC-S19-003)that expired on January 31, 2023. This facility expanded from 0.9 MGD to 1.2 MGD under Atuhorization to Construct #43532A01. A compliance review was conducted for violations that occurred from February 2023 through August 2023. The following violations were recorded: 03-2023 NOV-2023-LV-0370 04-2023 NOV-2023-LV-0392 05-2023 NOV-2023-LV-0496 06-2023 NOV-2023-LV-0581 07-2023 NOV-2023-LV-0721 08-2023 NOV-2023-LV-0766 The noted violations were for BOD, NH3 as N, and Fecal Coliform. It was also noted during inspection that influent screen and grit removal was not in operation. Page# Permit: NCO043532 Inspection Date: 10/25/2023 Owner -Facility: West Stanly WWTP Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Equipment taken out of service. Grit Removal Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? # Is disposal of grit in compliance? Comment: Grit removal taken out of service. Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE Page# 3 Permit: NCO043532 Owner -Facility: West Stanly WWTP Inspection Date: 10/25/2023 Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Surface Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ ❑ ❑ Comment: Facility has reported having issues with low DO in aeration basins. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? ❑ ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? ■ ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) ❑ ❑ ❑ ■ Comment: Pumps-RAS-WAS Yes No NA NE Are pumps in place? ■ ❑ ❑ ❑ Are pumps operational? ■ ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ❑ ❑ ❑ Comment: Disinfection -Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑ Page# 4 Permit: NCO043532 Owner -Facility: West Stanly WWTP Inspection Date: 10/25/2023 Inspection Type: Compliance Evaluation Disinfection -Liquid Yes No NA NE (Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑ Is bulk storage tank containment area adequate? (free of leaks/open drains) 0 ❑ ❑ ❑ Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? 0 ❑ ❑ ❑ Comment: De -chlorination Yes No NA NE Type of system ? Gas Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ ❑ Is storage appropriate for cylinders? ■ ❑ ❑ ❑ # Is de -chlorination substance stored away from chlorine containers? 0 ❑ ❑ ❑ Comment: Are the tablets the proper size and type? ❑ ❑ ■ ❑ Are tablet de -chlorinators operational? ❑ ❑ ■ ❑ Number of tubes in use? Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ■ ❑ ❑ ❑ Is the tubing clean? ■ ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 0 ❑ ❑ ❑ degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: At time of inspection effluent sampler recorded at 4 degrees Celsius. Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? ❑ 0 ❑ ❑ Page# 5 Permit: NCO043532 Inspection Date: 10/25/2023 Pump Station - Effluent Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: One of three effluent pumps not operational. Owner -Facility: West Stanly WWTP Inspection Type: Compliance Evaluation Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 6