HomeMy WebLinkAboutNCC233519_ESC Approval Submitted_20231128 STATEci:'\.
ROY COOPER , 2
Governor '4, 10 ,,
•,1 :::.�_ ,•0 �Q,,r
MICHAEL S.REGAN . ^�,,,,.1 , /
Secretary `�4"^"
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
November 19, 2020
LETTER OF APPROVAL
Charlotte Pipe&Foundry
Attention: Kenneth Boatright
1335 South Clarkson Street
Charlotte,North Carolina 28208
RE: Project Name: Charlotte Pipe&Foundry Machining(Express Review)
Acres Approved: 1.3
Project ID: STANL-2021-010
County: Stanly
City: Oakboro
Address: West 8th Street
River Basin: Yadkin
Stream Class: Other
Submitted By: Charlotte Pipe& Foundry
Date Received by LQS:November 18,2020
Plan Type: New
Dear Mr. Boatright:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCGO1 permit. However, on or after May 1,2019, a$100 fee will be
charged annually.This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
5 North Carolina Department of Environmental Quality,I Suite DIvision o1 f Energy,Mineral and Land Resources
N(N fTH G11ie,IN:
Mooresville Regional Office 1610 East Center Avenue 301 Mooresville,North Carolina 28115
oepanma t at Environments'a,anrr 704,663.1699
Letter of Approval
Charlotte Pipe& Foundry
November 19,2020
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
\O'Ul_
es Moore
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
em:trippmyrick@myrickc.com
cc: Inspection Department
N• N g ,0 O
ct N ,g
O 'ci 4 .5
cd � -
� � U � )
w
4 O cd I a) {
,.ZO Q� v :g F-+ 1 .- V
o o ct - ,� U
C
P40 a) 1-c cd L.)
•v
o vct
L.
.-rC) ,i O E
u) c„ 1 = .1_, ,
__ LL °4 •. •.
.•,, 0 _, 71- c.)
ri
Cr)cd
M �; i U I
CA
k9 O E '—' i O 0Cd
.jCir 'ici 41 r, ...„.,.,.,., ,,„ „ •' 4 CD ."" C..) •' 4 ILI 1 0 Z
2:%-- , a N E--I + 0) — -�
ICI , ����� ' , 0 CA �II
C �b _ rie
Z
cA
til cas) c..) c.. ., 0 r.,1 0 :-:;,..-,' 0
0 .5 nc) 745, .11) (e:Y
U O Cl..)
O �, /"
�, c N V.
_L.
- � � � � 0 � 0
tt
•cA a) c) m 0 N O