Loading...
HomeMy WebLinkAboutNCC233519_ESC Approval Submitted_20231128 STATEci:'\. ROY COOPER , 2 Governor '4, 10 ,, •,1 :::.�_ ,•0 �Q,,r MICHAEL S.REGAN . ^�,,,,.1 , / Secretary `�4"^" BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 19, 2020 LETTER OF APPROVAL Charlotte Pipe&Foundry Attention: Kenneth Boatright 1335 South Clarkson Street Charlotte,North Carolina 28208 RE: Project Name: Charlotte Pipe&Foundry Machining(Express Review) Acres Approved: 1.3 Project ID: STANL-2021-010 County: Stanly City: Oakboro Address: West 8th Street River Basin: Yadkin Stream Class: Other Submitted By: Charlotte Pipe& Foundry Date Received by LQS:November 18,2020 Plan Type: New Dear Mr. Boatright: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1,2019, a$100 fee will be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. 5 North Carolina Department of Environmental Quality,I Suite DIvision o1 f Energy,Mineral and Land Resources N(N fTH G11ie,IN: Mooresville Regional Office 1610 East Center Avenue 301 Mooresville,North Carolina 28115 oepanma t at Environments'a,anrr 704,663.1699 Letter of Approval Charlotte Pipe& Foundry November 19,2020 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, \O'Ul_ es Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet em:trippmyrick@myrickc.com cc: Inspection Department N• N g ,0 O ct N ,g O 'ci 4 .5 cd � - � � U � ) w 4 O cd I a) { ,.ZO Q� v :g F-+ 1 .- V o o ct - ,� U C P40 a) 1-c cd L.) •v o vct L. .-rC) ,i O E u) c„ 1 = .1_, , __ LL °4 •. •. .•,, 0 _, 71- c.) ri Cr)cd M �; i U I CA k9 O E '—' i O 0Cd .jCir 'ici 41 r, ...„.,.,.,., ,,„ „ •' 4 CD ."" C..) •' 4 ILI 1 0 Z 2:%-- , a N E--I + 0) — -� ICI , ����� ' , 0 CA �II C �b _ rie Z cA til cas) c..) c.. ., 0 r.,1 0 :-:;,..-,' 0 0 .5 nc) 745, .11) (e:Y U O Cl..) O �, /" �, c N V. _L. - � � � � 0 � 0 tt •cA a) c) m 0 N O