Loading...
HomeMy WebLinkAboutSWA000231_Stormwater Report_20231128 SWM & EC REPORT FOR RUSHER FARMS INDUSTRIAL DEVELOPMENT JUNE 19TH, 2023 PREPARED FOR TECTONIC, LLC ,,\\\\\„„,rrr,,,,; �ao��FEssRo*./14, •o SEAL 55103 %y0•FNG I g-cc- .`<%" �qs M, 6�6"� `vv ����/rrrrrnn����"�� DESIGN BY: NICHOLAS M. LUBINECKY, PE REVIEW BY: NICHOLAS M. LUBINECKY, PE ARCO DESIGN/BUILD ARCO DESIGN/BUILD 1 .0 Project Narrative This report is for the proposed project located at 721 Andrews Street in East Spencer, NC. The proposed site has a total disturbance of 62.0 acres. The site drains to a common convergence point of Town Creek. The site falls within the Town Creek Watershed.The site is zoned 85-ED. 1 .1 Existing Conditions The current land cover condition of the site is a mix between undisturbed woodlands and disturbed cleared farmland. Portions of the site outside of the disturbed areas include: easements, streams, wetlands, floodplains, single-family home, and minimal impervious areas. A variety of different soils types are present on site, see web soil survey in Appendix B. 1 .2 Proposed Conditions The proposed site improvements consists of two industrial buildings totaling 614,220 square feet, a gas station equaling 6,725 square feet, hardscapes, utilities, and associated infrastructure. Access to the site will be 721 Andrews Street. Four sediment basins on site will be used to control sedimentation in disturbed areas.The basins were designed to handle the 10 year 24 hour storm.The runoff on site will be channelized and directed to the sediment basin via lined swales. Swales were sized and lined to control the 25 year 24 hour storm. Additional erosion control measures including, rock construction entrance, silt fence, and soil stockpiles are also utilized on site. See calculations in Appendix C. Upon stabilization,the four sediment basins will be dewatered and converted to permanent wet ponds. The wet ponds have been designed to meet NCDEQ runoff treatment requirements. See summarization of each basin in table below. See additional calculations in Appendix D. Overall Drainage Summary DA 1-Year 2-Year 10-Year 25-Year 50-Year 100-Year Ex DP 1 1.75 5.21 21.31 34.22 45.50 57.71 Ex DP 2 4.07 12.36 50.84 81.55 108.35 137.30 Post DP 1 1.72 3.80 21.23 74.19 130.34 172.19 Post DP 2 3.61 12.08 50.61 123.16 216.56 278.69 DP1 Delta -0.03 -1.41 -0.09 +39.97 +84.84 +114.48 DP2 Delta -0.46 -0.28 -0.23 +41.61 +108.21 +141.39 Pond Summary Pond 1-Year WL 2-Year WL 10-Year WL 25-Year WL 50-Year WL 100-Year WL Pond 1 677.67 678.22 679.25 679.61 679.85 680.00 Pond 2 646.62 647.02 648.53 649.30 649.60 649.75 Pond 3 647.46 647.96 648.86 649.16 649.27 649.36 Pond 4 644.81 645.08 646.00 646.26 646.34 646.41 ARCO DESIGN/BUILD 1 .3 Water Quality The proposed wet ponds have been designed per NCDEQ Stormwater manual for water quality.The ponds are designed to treat 85%TSS. See additional calculations in Appendix E. Rusher Farms USGS K/V"' i Q: _ - 85 *:'\\,,,7"' • I ' ��,rf • 6--) _ , . 7. 3 b NORTH \ East Spencer CAROLINA t(7 ) , Jy uyc r JL r"" 85 5/11/2023, 11:09:15 PM 1:18,056 0 0.13 0.25 0.5 mi 0 Override 1 I I i i 1 + + + ii 0 0.2 0.4 0.8 km USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography USGS 2021 USGS National Flood Hazard Layer FIRMette $ FEMA _Legend 80°25'12"W 35°41'5"N @� SEE EIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT �/1 \ , N 4(- J ' Without Base Flood Elevation(BFE) Jffle�E � 1 fj� ` Zone A,V,A99 �'e�� �� � ,`' r- SPECIAL FLOOD With BFE or Depth Zone AE,AO,AH,VE,AR ^��►���% ` • '� HAZARD AREAS Regulatory Floodway /J 0.2%Annual Chance Flood Hazard,Areas EEj A. Zone a r of 1%annual chance flood with average 661 4, �.y . \ - ? , depth less than one foot or with drainage �1 ,` ,` y �Is . w. 6 areas of less than one square mile zone x ����� ��� \\ �� Future Conditions 1%Annual �,,ne e 1 Chance Flood Hazard zone x �f��' 10 ` �" Area with Reduced Flood Risk due to w��1,11 J ir. \ / 1.'' J OTHER AREAS OF Levee.See Notes.zone x E0 r % FLOOD HAZARD Area with Flood Risk due to LeveezoneD 1 6ygEE� �� NO SCREEN Area of Minimal Flood Hazard zonex ;TOWN OF EASTLSP�E�NCER ETJ ��, _ Effective LOMRs EXTRATERRITORIAL •JURISDICTIOZ�� j f ' 656 FEET OTHER AREAS Area of Undetermined Flood Hazard ZoneD EAST SPENCER ETJ �EET� 1 ��,� 0, GENERAL ----- Channel,Culvert,or Storm Sewer 652��� 370- 1 1 S ` ��� 0 STRUCTURES I I I 1 1 1 1 Levee,Dike,or Floodwall Q w Zone AE (� 648 FEET FEETE 1 `�'AI '�� 0 20.2 Cross Sections with 1%Annual Chance ET .. ., E � ,�.5 i 1 Water Surface Elevation 'I' Zone 4 ,� .�` e- - - Coastal Transect A. -•••••513^^^^" Base Flood Elevation Line(BFE) 4p'�11 �� f Limit of Study '' Zone AE (�`� Jurisdiction Boundary Fj. FLOODWAY �� - Coastal Transect Baseline rfl � �� -37105780 7001 OTHER - - Profile Baseline 3710577000J Zone AE /;�� FEATURES ��� Zone AE effY6/16/2009 1 t. O eff. 6/16/200r) Hydrographic Feature LOMR711!04-3050P .0 6' Digital Data Available eff. 11212013 1 ,, \ 1 1 Zone AE �,1.1 No Digital Data Available Zo / / N ` - '� MAP PANELSUnmapped H !1- / N 9 _ W W ,r The pin displayed on the map is an approximate ___ Jr/ 11 J • point selected by the user and does not represent z h an authoritative property location. AREA OF ry INII lAL FLOOD HAZARD 3-TOWN OFIEASTvSPENCER zonex `/ I. TOWN , This map complies with FEMA's standards for the use of .n-- %/ digital flood maps if it is not void as described below. to Cn "AST SPENCER // The basemap shown complies with FEMA's basemap r -/�,• t� (� .� -02 1 \ / / accuracy standards �j -- ( The flood hazard information is derived directly from the try./ r' eh ti authoritative NFHL web services provided by FEMA.This map 1 • was exported on 5/11/2023 at 10:21 AM and does not V �, • .- reflect changes or amendments subsequent to this date and �a�. time.The NFHL and effective information may change or become superseded by new data over time. iii00/Ir ___,_:;„____"r This map image is void if the one or more of the following map �• � 1��� II elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, ~�1 • '&1-1 FIRM panel number,and FIRM effective date.Map images for Feet 1:6 80°24'35"W 35°40'35"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 '�0� regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for \ RCS States Department of Agriculture and other Rowan County, Federal agencies, State Natural agencies including the Resources Agricultural Experiment North Carolina Conservation Stations, and local Service participants c i) ,4 Iv -i t _ AAti? i i 0 s . ' 4; : 7 1 7 ltdi,- , , ff`,o ,� t • 1 = �11, Y J + 4 .1i • r.-'1 6, ,.. ... • / j :Orr , . • Gleew • . J Jsw ` + c . . / q 001/7- 4 / ., n, , o NNE...moon ,fl�� ft l 1 / i� May 11, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs)or your NRCS State Soil Scientist(http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface 2 How Soil Surveys Are Made 5 Soil Map 8 Soil Map 9 Legend 10 Map Unit Legend 11 Map Unit Descriptions 11 Rowan County, North Carolina 14 CeB2—Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded 14 ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded 15 DoB—Dorian fine sandy loam, 2 to 6 percent slopes, rarely flooded 16 EnC—Enon fine sandy loam, 8 to 15 percent slopes 17 PaD—Pacolet sandy loam, 15 to 25 percent slopes 18 PcC2—Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded 19 RnC—Rion-Wedowee complex, 8 to 15 percent slopes 20 Ud—Udorthents, loamy 22 VnB2—Vance sandy clay loam, 2 to 8 percent slopes, moderately eroded 23 W—Water 24 References 25 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report Soil Map N O] W 55251) 552000 552700 552800 552900 553000 553100 553200 553300 553400 553500 35°41'29"N _ 35°41'29"N n , VnB2 4 AL [_ IMP" EnC +M RnC `‘`', A PaD .4,0j :?. VnB2. _ `B2 W °fig , r �T,,._ XS d'"' f ��� • A 1,. G -1 _.CeB2 '1.1 .1 PcC2 PcC2 ChA oB 4a 'c — I `� / - 0.000 Gawp Wa'nVI be vElid aft tG�os �= -° / 35°40'41"N I 35°40'41"N 552500 552600 552700 552800 552900 553000 553100 553200 553300 553400 553500 tl 3 3 Map Scale:1:7,200 if printed on A portrait(8.5"x 11")sheet. Meters 8 N 0 100 200 400 600 8 Feet 0 350 700 1400 2100 Map projection:Web Mercator Comercooniinates:WGS84 Edgetcs:UTM Zone 17N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .• Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression o,/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service .r US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Rowan County,North Carolina + Saline Spot Survey Area Data: Version 20,Sep 12,2022 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Mar 13,2022—May 31 Slide or Slip 9,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 to 8 64.5 45.9% percent slopes,moderately eroded ChA Chewacla loam,0 to 2 percent 24.1 17.2% slopes,frequently flooded DoB Dorian fine sandy loam,2 to 6 3.4 2.4% percent slopes,rarely flooded EnC Enon fine sandy loam,8 to 15 0.1 0.1% percent slopes PaD Pacolet sandy loam, 15 to 25 8.6 6.1% percent slopes PcC2 Pacolet sandy clay loam,8 to 20.1 14.3% 15 percent slopes, moderately eroded RnC Rion-Wedowee complex,8 to 13.5 9.6% 15 percent slopes Ud Udorthents, loamy 1.5 1.1% VnB2 Vance sandy clay loam,2 to 8 0.5 0.4% percent slopes,moderately eroded W Water 4.1 2.9% Totals for Area of Interest 140.4 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a 11 Custom Soil Resource Report particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. 12 Custom Soil Resource Report Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 13 Custom Soil Resource Report Rowan County, North Carolina CeB2—Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9w5 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Cecil, moderately eroded, and similar soils: 88 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cecil, Moderately Eroded Setting Landform: I nterfl uves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 6 inches: sandy clay loam Bt- 6 to 40 inches: clay BC-40 to 48 inches: clay loam C-48 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 14 Custom Soil Resource Report ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2vy6r Elevation: 330 to 660 feet Mean annual precipitation: 39 to 47 inches Mean annual air temperature: 55 to 63 degrees F Frost-free period: 200 to 250 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Chewacla, frequently flooded, and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chewacla, Frequently Flooded Setting Landform: Flood plains Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap-0 to 6 inches: loam Bw- 6 to 52 inches: sandy clay loam Cg- 52 to 80 inches: stratified sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat poorly drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.20 to 2.00 in/hr) Depth to water table:About 6 to 24 inches Frequency of flooding: NoneFrequent Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Ecological site: F136XY610GA- Flood plain forest, wet Hydric soil rating: No 15 Custom Soil Resource Report Minor Components Wehadkee,frequently flooded Percent of map unit: 5 percent Landform: Flood plains Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: Yes DoB—Dorian fine sandy loam, 2 to 6 percent slopes, rarely flooded Map Unit Setting National map unit symbol: 3vn0 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Dorian and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Dorian Setting Landform: Flats on stream terraces Landform position (three-dimensional):Tread Down-slope shape: Concave Across-slope shape: Linear Parent material: Old clayey alluvium derived from igneous and metamorphic rock Typical profile Ap- 0 to 6 inches: fine sandy loam E- 6 to 10 inches: fine sandy loam Bt1 - 10 to 18 inches: clay loam Bt2- 18 to 50 inches: clay C- 50 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table:About 18 to 36 inches 16 Custom Soil Resource Report Frequency of flooding: Rare Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F136XY660NC - High-bottomland forest, moist Hydric soil rating: No Minor Components Roanoke, undrained Percent of map unit: 5 percent Landform: Backswamps on stream terraces, depressions on stream terraces Landform position (three-dimensional): Flat Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: Yes EnC—Enon fine sandy loam, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3vn2 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Enon and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Enon Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: fine sandy loam BA - 7 to 10 inches: sandy clay loam Bt- 10 to 27 inches: clay BC-27 to 33 inches: clay loam 17 Custom Soil Resource Report C-33 to 80 inches: loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No PaD—Pacolet sandy loam, 15 to 25 percent slopes Map Unit Setting National map unit symbol: 3vnp Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Pacolet and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 5 inches: sandy loam E-5 to 8 inches: sandy loam Bt- 8 to 29 inches: clay BC-29 to 38 inches: sandy clay loam C-38 to 80 inches: sandy loam 18 Custom Soil Resource Report Properties and qualities Slope: 15 to 25 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: High Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No PcC2—Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9wj Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Pacolet, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 7 inches: sandy clay loam Bt- 7 to 24 inches: clay B-24 to 33 inches: sandy clay loam C-33 to 80 inches: loam 19 Custom Soil Resource Report Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No RnC—Rion-Wedowee complex, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3vp1 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Rion and similar soils: 55 percent Wedowee and similar soils: 30 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Rion Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss Typical profile Ap- 0 to 8 inches: sandy loam Bt- 8 to 26 inches: sandy clay loam BC-26 to 38 inches: sandy clay loam C-38 to 80 inches: sandy loam Properties and qualities Slope: 8 to 15 percent 20 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No Description of Wedowee Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 12 inches: sandy loam BE- 12 to 15 inches: sandy clay loam Bt- 15 to 29 inches: clay C-29 to 80 inches: sandy loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 21 Custom Soil Resource Report Ud—Udorthents, loamy Map Unit Setting National map unit symbol: 3vpf Elevation: 70 to 980 feet Mean annual precipitation: 39 to 51 inches Mean annual air temperature: 54 to 63 degrees F Frost-free period: 190 to 250 days Farmland classification: Not prime farmland Map Unit Composition Udorthents, loamy, and similar soils: 92 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents, Loamy Setting Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy and clayey human-transported material derived from igneous, metamorphic and sedimentary rock Typical profile C- 0 to 80 inches: sandy clay loam Properties and qualities Slope: 0 to 25 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 5.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Hydric soil rating: No 22 Custom Soil Resource Report VnB2—Vance sandy clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9wm Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Vance, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Vance, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap-0 to 6 inches: sandy clay loam E- 6 to 10 inches: sandy clay loam Bt- 10 to 38 inches: clay Cl -38 to 50 inches: sandy clay loam C2- 50 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 23 Custom Soil Resource Report W—Water Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No 24 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 25 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 26 CES$ Civil — Geotechnical — Surveying June 20, 2022 Wake Hamilton Tectonic, LLC 101 South Kings Drive Suite 200 Charlotte, North Carolina 28204 Reference: Geotechnical Engineering Evaluation Proposed Rusher 80 Acre Site Development East Spencer, North Carolina CESI Project Number: 220396.000 Mr. Hamilton, Concord Engineering &Surveying, Inc. (CESI) has performed a geotechnical engineering test boring and test pit evaluation of the above referenced site located at the end of Robinson Road in East Spencer, North Carolina. Our evaluation was performed within general accordance with our proposal number 220477.P00 dated May 25, 2022. On June 8, 2022, a CESI field engineer cleared to and observed 8 test pit excavations within the proposed roadways (that fell within the wooded portions of the property). Minor clearing along the woodline for 3 test boring locations was also performed. The test pits were performed to evaluate subsurface soil conditions and to determine the presence of topsoil, suitable and unsuitable soils, shallow rock, and groundwater. Starting on June 13, 2022, 27 soil test borings were performed advanced at the previously located soil test boring locations as follows: • Fifteen (15) soil test borings 20 feet deep within the proposed 365,040 SF warehouse location, • Nine (9) soil test boring 20 feet deep within the proposed 131,040 SF warehouse building location, • Two (2) soil test borings 10 feet deep within the proposed roadway, and • One (1) soil test boring 10 feet deep within the proposed future commercial / retail building location. 45 Spring Street, SW P.O. Box 268 Concord, N.C. 28026-0268 704-786-5404 www.cesicgs.com N.C. License Number C-0263 EXPLORATION AND FINDINGS The proposed development area will consist of three parcels identified as Rowan County Parcel Identification Numbers (PIN) 5780-01-07-3164 (75.31 acres, 440 Robinson Road), 5770-08-98-7853 (3.34 acres, no address), 5770-12-96-4341(0.59 acres, 721 Andrews Road), and 5770-12-95-1830 (0.8 acres, no address). Currently the parcels are undeveloped and farmed. An abandoned farmhouse with existing utilities with a well and possible septic tank, and multiple barns were observed on Parcel 5780-01-07-3164. The procedures used by CESI for field sampling and testing are in general accordance with established geotechnical engineering practice. Each of the test pits were excavated using a CAT 320 tracked excavator owned and operated by Mid Carolina Construction Services LLC of Salisbury, NC at the locations shown on the enclosed "Soil Test Pit/ Boring Location Plan". The soil test borings were advanced using a truck mounted Mobile B47 drill rig at the locations shown on the enclosed "Soil Test Location Plan". Test pit and test boring locations were created based on site features and preliminary development plans provided by the developer. NRCS has listed the site as having the following primary soils series: Cecil sandy clay loam (CeC2), Pacolet sandy clay loam (PcC2), and Pacolet sandy loam (PaD). Based on NRCS published documents, the Mecklenburg fine sandy loam soil series are known to contain ELASTIC SILT (MH) soils between 6" and 40" below the existing ground surface (BGS). However, no ELASTIC SILT (MH) soils were directly encountered at any of the test pit or soil test boring locations. Please note the presence of ELASTIC SILT (MH) soils may be encountered at other unexplored areas of the site. ELASTIC SILT(MH) soils have a high shrink swell potential and are unsuitable for direct footing, slab, and pavement support. Soil Test Pit Investigation Findings Soil strata in each test pit was observed, identified, and recorded by our field engineer. Presented in Table 1, below, is a summary of the test pit excavation findings. Table 1: Summary of Test Pit Data Topsoil, Leaf Litter, Groundwater Test Pit Termination / Test Pit and Organic Debris Depth Refusal Depth No. (Inches below Existing (Inches below Existing (Inches below Existing Ground Ground Surface) Ground Surface) Surface) TP-1 12" Not Encountered Terminated at 156" TP-2 10" Not Encountered Terminated at 170" TP-3 5" Not Encountered Terminated at 173" TP-4 10" Not Encountered Terminated at 188" Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 2 TP-5 8" Not Encountered Terminated at 188" TP-6 10" Not Encountered Terminated at 190" 6 TP-7 Not Encountered Terminated at 187" Organic stained until 20" TP-8 6" Not Encountered Refusal at 140" A layer of organic debris, leaf litter, and topsoil with roots measuring 5"to 12" in thickness was present at the surface of test pit locations. These organic laden soils are not suitable for structural fill or structure support and should be stripped and stockpiled for later use in non- structural areas of the site. Organic stained soils were encountered at test pit location TP-7 up to 20" BGS. This test pit was performed within a naturally formed drainage feature. Beneath the surface organic layer, we encountered weathered in place, residual soils consisting of SILT (ML) with varying amounts of fine to coarse SAND (SM), CLAY (CL), fine to coarse GRAVEL, and few COBBLES up to 12". Groundwater was not encountered at any of the test pit or soil test boring locations. However, based on the relatively low-lying topography of the eastern portion of the site, and presence of fine-grained soils on the site, minor complications due to groundwater should be anticipated during grading and utility installation operations after periods of rainfall. Weathered Rock was encountered at one test pit locations, specifically test pit TP-8 at 110" BGS. Please refer to the attached Record of Test Pit Excavations for further information on the depths WEATHERED ROCK was encountered. Texturally the weathered rock consisted of fine to coarse sandy SILT (ML). Track Hoe Refusal Rock was encountered one of the test pit locations, specifically test pit TP-8 at 140" BGS. We anticipate the rock at this location can be excavated further using larger conventional equipment, if required. Based on our observations, we do not anticipate complications due to track hoe refusal rock during construction phases. However, minor complications due to the presence of track hoe refusal rock should be anticipated during mass grading operations if borrow / swap operations are performed within the proposed stormwater BMP structure (TP-8) location. Soil Test Boring Investigation Findings Soil strata at each soil test boring location was observed, identified, and recorded by our field engineer. Presented in Table 2, below, is a summary of the test boring data Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 3 Table 2: Summary of Soil Test Boring Data Topsoil and / Groundwater Depth To Test Boring Test or PLOW Depth WEATHERED Termination Depth Boring ZONE Depth ROCK No, (Feet below Existing (Feet below Existing Ground (Inches below Existing Ground Surface) (Feet below Existing Surface) Ground Surface) Ground Surface) B-1 10" Plow Zone Not Encountered Not Encountered Terminated at 20' B-2 5"Topsoil Not Encountered Not Encountered Terminated at 20' B-3 10" Plow Zone Not Encountered Not Encountered Terminated at 20' B-4 8" Plow Zone Not Encountered Not Encountered Terminated at 20' B-5 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-6 6" Plow Zone Not Encountered Not Encountered Terminated at 20' B-7 6" Plow Zone Not Encountered Not Encountered Terminated at 20' B-8 12" Plow Zone Not Encountered Not Encountered Terminated at 20' B-9 4"Topsoil Not Encountered Not Encountered Terminated at 20' B-10 2" Plow Zone Not Encountered Not Encountered Terminated at 10' B-11 4"Topsoil Not Encountered Not Encountered Terminated at 20' B-12 4"Topsoil Not Encountered Not Encountered Terminated at 20' B-13 8"Topsoil Not Encountered Not Encountered Terminated at 20' B-14 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-15 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-16 3" Plow Zone Not Encountered Not Encountered Terminated at 20' B-17 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-18 3"Topsoil Not Encountered Not Encountered Terminated at 20' B-19 8" Plow Zone Not Encountered Not Encountered Terminated at 20' B-20 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-21 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-22 10" Plow Zone Not Encountered Not Encountered Terminated at 20' B-23 4" Plow Zone Not Encountered Not Encountered Terminated at 20' B-24 3" Plow Zone Not Encountered Not Encountered Terminated at 20' B-25 8" Plow Zone Not Encountered Not Encountered Terminated at 20' B-26 8" Plow Zone Not Encountered Not Encountered Terminated at 10' B-27 6" Plow Zone Not Encountered Not Encountered Terminated at 10' Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 4 A layer PLOW ZONE soils with roots measuring 3" to 12" in thickness was present at the surface of the test boring locations with exception of test borings B-2, B-9, B-11, B-12, B-13, and B-18. A layer of topsoil and rootlets was observed at these soil test boring locations measuring between 3" and 5" thick. These organic laden soils are not suitable for structural fill or structure support and should be stripped and stockpiled for later use in non-structural areas of the site. We anticipate any PLOW ZONE soils remaining after stripping operations may be mixed with underlying residual soils and be used as structural fill. Beneath the surface organic PLOW Zone and topsoil layer, we encountered weathered in place, residual soils consisting of: • SILT (ML) with varying amounts of fine to coarse SAND (SM) and CLAY (CL), • CLAY (CL) with varying amounts of SILT (ML), and fine to medium SAND (SM), and • Silty fine to coarse SAND (SM) Groundwater was not encountered at any of the test boring locations. However, based on the relatively low-lying topography of the eastern portion of the site, and presence of fine- grained soils on the site, minor complications due to groundwater should be anticipated during grading and utility installation operations after periods of rainfall. Weathered Rock or Auger Refusal Rock was not encountered at any of the test boring locations. We do not anticipated complications due to weathered rock during grading operations for the warehouse structure locations. RECOMMENDATIONS Before grading all conflicting utilities removed, protected or properly abandoned. Water wells, if encountered, should be properly abandoned by a certified well driller licensed in the state of North Carolina. An abandoned residence with existing utilities, a well and possible septic tank, as well as multiple barns were observed on the large parcel (PIN 5780- 01-07-3164). These structures should be evaluated for the presence of Recognized Environmental Conditions (RECs) and removed prior to construction operations. Topsoil, root zones, stumps, organics, household debris and any other unsuitable materials should be stripped beyond the proposed structural and pavement envelopes. We anticipate any PLOW ZONE soils remaining after stripping operations may be mixed with underlying residual soils and be used as structural fill. It was noted that small amounts of household debris and trash were observed on the surface near test pit location TP-3. In fill sections, the area should be stripped an additional width to accommodate a minimum 1:1 structural fill slope plus 5 feet. It was also noted that organic stained soils were encountered beneath the surface organics at test pit location TP-7 up to 20" BGS. We anticipate any organic stained soils remaining after stripping operations can be satisfactorily mixed with on-site or imported soils and be used as structural fill. Organic stained soils remaining at areas to receive fill placement or are at subgrade elevation should be closely monitored or removed. Currently grading plans and proposed design elevations are unknown. However, we anticipate soils from the central parts of the site will be cut down and used to fill on the Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 5 perimeter of the site. Regardless, below are our general recommendations for the cut and fill areas on the site: Cut Areas — Once the surface organic soils are removed, we anticipate the underlying residual soils will be sufficient to be used as structural fill for building, parking lots, and roadway support. The excavated soils should be evaluated for the presence of household debris, and ELASTIC SILT (MH). If slightly elastic SILT(ML), or small amounts of ELASTIC SILT (MH) are encountered in the cut areas, we anticipate it could be mixed with suitable on-site material and used as structural fill as long as they can remain stable during grading operations. After reaching final grade elevation the finished surface should be evaluated by proofrolling to identify areas of instability. Fill Areas —After stripping, areas receiving fill soils to provide support should be carefully evaluated for the presence of soft surficial soils by proofrolling with a 25-ton, four-wheeled, rubber-tired roller, a loaded dump truck, or similar approved equipment. The proofroll operation should be carefully monitored by our Engineer. Areas that wave, rut, or deflect excessively and continue to do so after several passes of the proofroller may need to be undercut to stiffer soils. The undercut areas should be backfilled in thin lifts with approved, compacted fill materials, preferably granular soils or aggregate base course stone. Areas containing ELASTIC SILT (MH) not discovered during our investigation should be thoroughly evaluated prior to structural fill placement. If undercutting and replacing with satisfactory fill soils is not feasible, chemical or mechanical subgrade stabilization methods may be implemented under direction of our Engineer. Recommendations for mechanical or chemical soil stabilization can be provided by CESI if required during grading operations. Due to the presence of fine-grained soils on the site, it is imperative that positive surface drainage be maintained during grading operations to prevent water from ponding on the surface. The surface should be rolled smooth and sloped away from structural areas to enhance drainage if precipitation is expected. Subgrades damaged by construction equipment should be immediately repaired to avoid further degradation in adjacent areas and to help prevent water ponding. Fill Material and Placement Recommended criteria for soil fill characteristics and compaction procedures are listed below. The project design documents should include the following recommendations to address proper placement and compaction of project fill materials. We do not recommend the use of soils of high plasticity, with a PI greater than 25 as structural fill. Earthwork operations should not begin until representative borrow soil samples are collected and tested (allow 3 to 4 days for sampling and testing). Earth Fill Materials ❑ General guidelines for project fill should control properties such as Plasticity Index (PI), gradation, and organic content. The use of the following USCS soil types, as defined by ASTM D 2487, should be satisfactory for use as project fill: GW, GP, Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 6 GM, GC, SW, SP, SM, SC, ML, MH (provided the PI is 25 percent or less for MH soils), or combinations thereof. ❑ Organic content should be no greater than 5 percent by weight, and no large roots should be allowed. Additionally, maximum particle sizes should be limited to 4 inches or less. Compaction Recommendations ❑ One standard Proctor compaction test and one Atterberg limits test for each soil type used as project fill. Gradation tests may be necessary and should be performed at the Project Geotechnical Engineer's discretion. ❑ Maximum loose lift thickness — 8 inches. ❑ Compaction requirements — 95 percent of the maximum dry density to a depth of 1 foot below subgrade, and 100 percent within the upper 1 foot as determined by the standard Proctor compaction test. ❑ Soil moisture content at time of compaction — within plus 3 percent to minus 3 percent of the optimum moisture content. ❑ One density test every 2,500 square feet for each lift or two tests per lift, whichever is greater (for preliminary planning only; the test frequency should be determined by our geotechnical engineering staff). ❑ Trench fill areas—one density test every 75 linear feet at vertical intervals of 2 feet or less. Sitework construction should be monitored by our Construction Materials Testing Engineer. Our Construction Materials Testing Engineer's (or technician) duties should include observation of proofrolling activities, evaluating soil subgrades prior to fill placement, density testing of the soil backfill and density testing of the aggregate base course stone. Field observations, monitoring, and quality assurance testing during earthwork and pavement construction are an extension of this analysis. Shallow Foundation Construction The building foundations should be sized for a maximum net allowable bearing pressure of 2,500 pounds per square foot. The exploration findings indicate the structures may be supported by shallow spread footings bearing on approved stiff residual soil, or newly placed structural FILL. We anticipate the total settlement potential of the footings to be less than 1" and maximum differential settlement to be less than a 1/2". All footings should bear at a minimum depth of 12 inches below exterior grades for frost protection. Properly reinforced building footings with adequate slab control joints are recommended to handle slight differential settlements, if they occur. CESI recommends a thorough foundation bearing surface evaluation be performed and the footing approved prior to concrete placement. Foundation bearing surfaces should be inspected by our Engineering Technician under our Engineer's review prior to concrete placement to confirm that suitable soils are present at the bearing elevation. We recommend that bearing surfaces be evaluated by hand auger borings with Dynamic Cone Penetrometer (DCP) testing equipment prior to concrete placement to determine whether the foundation bearing soils encountered during construction are similar to those found during our geotechnical exploration. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 7 DCP testing is a verification tool to be used for an economical bearing grade evaluation during construction. It will help detect isolated areas of soft residual soils or loosely compacted soils. Unsuitable soil detected during this evaluation should be repaired as directed by the geotechnical engineer. Footing bearing grades identified as having soft soils should be undercut and replaced with properly compacted structural fill soils or crushed aggregate. The depth and width of undercutting should be recommended by our Engineer. Bearing surfaces for shallow spread foundations should not be disturbed or left exposed during inclement weather. Saturation of the on-site soils will cause a loss of strength and increased compressibility. Excavations for footings in stiff residual soils or newly placed structural fill should be completed with a toothed bucket backhoe following excavation to reduce disturbance of the subgrade soils. Confined excavations should conform to applicable OSHA regulations and North Carolina State Building Codes. Upon their exposure, bearing grades should have excess and loosened material removed. The final grades should be firm and stable, and free of loose soil, rock, mud, water, or frost. If construction occurs during inclement weather and concreting of the foundation is not possible at the time it is excavated, a layer of lean concrete should be placed on the over excavated bearing surface subsequent to testing for protection. Also, concrete should not be placed on frozen subgrades. General Mass Rock Excavation: Track hoe refusal rock was encountered at one of the test locations, between at 140" BGS. Based on our findings, and anticipated grades, we do not anticipate complications due to track hoe refusal rock on the site unless deep cuts are made for mass grading or borrow/ swap areas. However, for contractual purposes, CESI recommends that Rock be defined as the following: Any material which cannot be excavated with a single-tooth ripper drawn by a crawler tractor having a draw bar pull rated at not less than 56,000 pounds (Caterpillar D8K or equivalent) or excavated by a trackhoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). Trench Rock Excavation: Any material which cannot be excavated with a backhoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). If these rock excavation conditions are encountered, CESI should be notified for verification and quantification. Excavation of trench rock will then require fracturing using jack hammering or blasting. Seismic Information In accordance with the International Building Code (IBC) as adapted by North Carolina and Chapter 20, Table 20.3-1 of the American Society of Civil Engineers (ASCE) 7-16 Design Standards, a Site Class "D" should be assigned to the site for seismic design purposes of the proposed barn location. Site specific subsurface data was determined to the boring termination depth of up to 20 feet below existing grade. The Seismic Site Class is derived from the standard penetration test data recorded during drilling. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 8 FOLLOW-UP SERVICES Field observations, monitoring, and quality assurance testing during earthwork, foundation installation and building construction are an extension of the geotechnical design. As a result, we recommend the following: • Verification of removal of topsoil, root zones, stumps, organics and household debris; • Proofroll observations of areas to receive structural fill, • Density testing during fill soil placement within structural pad areas and streets; • Utility trench backfill (storm, sanitary, and water placed within structural areas); • Foundation bearing evaluation within excavated footings; • Structural reinforced concrete testing and inspections; • Proofroll observations within the pavement areas prior to concrete curb, aggregate base course stone, asphalt and concrete placement. We appreciate the opportunity to be of service to Tectonic, LLC in this phase of the Rusher 80 Acre Property Development project in East Spencer, North Carolina. We look forward to helping you through project completion. If you have any questions, please feel free to call. Respectfully submitted, CESI 0111111111 )% CAfRp'' QcfZj)2 17-* Glij0/ '��rrrrn n l .\ Thomas Gray James G. (Jay) Eaves III, PE Project Engineer Division Manager ATTACHED: SOIL TEST LOCATION PLAN SOIL TEST LOCATION PLAN(with conceptual overlay) SOIL TEST TERMINATION/REFUSAL DEPTH PLAN SOIL TEST TERMINATION/REFUSAL DEPTH PLAN(with conceptual overlay) RECORD OF TEST PIT EXCAVATION KEY TO BORING SYMBOLS LOGS OF AUGER BORING SOIL TEST BORING PROCEDURE Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 20,2022 CESI Project Number 220396.000 Page 9 /l/o,Tti TP-4 B-12 B-13 TP-5 TP-1 TP-2 TP-3 B-22 B-23 B-24 B-25 B-15 B-18 vik B-14 B-16 TP-6 B-1 B-2 B-21 B-20 B-19 B-17 TP-7 B-11 B-3 B-4 B-5 B-6 B-7 B-10 B-8 B-9 TP-8 i %e'Y B126 TP-1 Griffin Const Jc ion Carolina SF dworks O Test Pit Location B-27 iy Test Boring Location , .; .. . • -Ai --,,, DATE: 6-17-22 CESF SOIL TEST LOCATION PLAN DRAWN BY: TKG/JT Proposed Rusher 80 Acre Site Development PROJECT#:220396.000 45 Spring Street SW PO Box 268 Concortl,North Carolina,28026-OTfiB East Spencer, North Carolina SCALE: NTS Phone:(]Od)]86-5400 Fax:(]Od)]6fi-]454 DRAWING NO.: 1 www.cesicgs.com License C-0263 I"'-•r„_ ) ;r - TP-4 _ _ i - ',B-13 B-12 TP- .. TP-1 TP-2 TP-3 ' - • . -24lit..• B-25 B-18 B-14 B-15 ,- t•. TP-6 . , � a' i _ II = -1 • ; , , III t, S6S DSO S . - 1 - J�r • a - -- 1 , . I:07 : AO • PitoPosto Pi - TP-7 •�, 11 • ' B-3 B 4-4 B-5 B-. — !f_ / •,,C B-10 TP-8 �. ) %. B-9 ` 1:� _ - - I B-,26 `\ B-27 ,-- 7cMOiROOD I • •a eiina - ,wor .s Gr�iffin'Constr�o ion • � - � 'UIN • ' WETLANDS—- 1 • L. a, It Test Pit Location r ' ' , B-1 Test BoringLocation -� r �,-, ���� '+� ' -_ _-• —.•_ .-ill • _ _ --. ��� * SOIL TEST LOCATION PLAN DATE: 6-17-22 CEST With Conceptual Overlay DRAWN BY: TKG/JT PROJECT#:220396.000 45 Spring Street SW Proposed Rusher 80 Acre Site Development PO Box 268 SCALE: NTS Concord,North Carolina,28026-0268 phone: )7886-5400 04 Fax East Spencer, North Carolina DRAWING NO.: 2 :((70)76-540 www.cesicgs.com License C-02fi3 % ii=Tti 188" 240" 156" 170" 173" 240" 188" 240" 240" 240" 240" 240" - 240" 240" 190" 240" 240" 240" 240" 240" 240" 240" v 187" it 240" 240" 240" 240" 240" 240" 120" 240" 240" 140" 1 .. 190" Termination Depth • Griffin Const .c Ion Carolina Sp dworks 120" (Test Pit, Inches BGS) 240" Termination Depth ,, i r ,f r �y (Test Boring,Inches BGS) Note:Values highlighted in yellow indicate REFUSAL depth DATE: 6-17-22 CESF SOIL TEST TERMINATION/REFUSAL DEPTH PLAN DRAWN BY: TKG/JT Proposed Rusher 80 Acre Site Development PROJECT#:220396.000 95 Spring Street SW PO Box 268 Concord,hoeNorth 704)Carolina, East Spencer, North Carolina SCALE: NTS Phone:(Carolina,200 Fax (704)78fi-7959 DRAWING NO.: 3 www.cesicgs.com License C-0203 /''`•r„_• ) I, ^, i , 188" i _ _ - 240"- 240 j 188 156" 170" 173" ' '`' - - 240"w�-1 240" 240' 240" 240" - 190" ii0/cF / � ...upW I l - - _ ',it,t y��. - - ,. , 166DO - ; , ) it - =� 187" - rr woe 240 "2A6 , " 240" 240" i 120" 1. 140" 1 40' 240" L L-01%.1.:f ..„, ; — r— , . � . i 12,0" • •a elina ,wor's 1 } Fx><Nr o,R000 Gr,ffin'Constrio ion • c ti • ' 'UIN . ' ,� v� rnroc wrntivcs— 1so" Termination Depth L-•-;:� (Test Pit, Inches BGS) ' 240" Termination Depth '" — ,. (Test Boring,Inches BGS) ? r '`10 • ~`•. Note:Values highlighted in yellow indicate REFUSAL depth SOIL TEST TERMINATION/REFUSAL DEPTH PLAN DATE: 6-17-22 CESt With Conceptual Overlay DRAWN BY: TKG/JT PROJECT#:220396.000 45 Spring Street SW Proposed Rusher 80 Acre Site Development SCALE NTS PO Box 268 Concord,North Carolina,28026-0268 phone: 04)786-7954 East Spencer, North Carolina DRAWING NO.: 4 Fax:((70)786-540 www.cesicgs.com License C-02fi3 C ESF RECORD OF TEST PIT EXCAVATION PROJECT: Rusher 80 Acre Parcel EXCAVATOR: Cat 320E CLIENT: Tectonic DATE: 6/8/22 CESI REPRESENTATIVE: T Gray CESI JOB NO: 220396.000 TEST PIT DEPTH (in.) DESCRIPTION NO. From To TP-1 0 12 Leaf litter, organic debris, topsoil, rootlets 12 36 Light brown and light reddish brown slightly clayey SILT (ML) with little fine SAND (SM) 36 80 Moist red, reddish brown, and yellowish red clayey SILT (ML) with little fine SAND (SM) 80 120 Moist yellowish red, yellowish brown, and light brown clayey SILT (ML) with pockets of yellow SILT (ML) 120 156 Moist white, light red, light brown, and yellow SILT (ML) with little fine to medium SAND (SM) Terminated at 156" TP-2 0 10 Leaf litter, organic debris, topsoil, rootlets 10 36 Light brown and reddish brown slightly clayey SILT (ML) with little fine SAND (SM) 36 72 Moist red and reddish brown clayey SILT (ML) with little fine to coarse SAND (SM) 72 115 Moist yellowish red, red, white, and light brown SILT (ML) with little fine to coarse SAND (SM) 115 170 Light brown, white, gray, and red SILT (ML)with little fine to coarse SAND (SM) Terminated at 170" CESI RECORD OF TEST PIT EXCAVATION PROJECT: Rusher 80 Acre Parcel EXCAVATOR: Cat 320E CLIENT: Tectonic DATE: 6/8/22 CESI REPRESENTATIVE: T Gray CESI JOB NO: 220396.000 TEST PIT DEPTH (in.) DESCRIPTION NO. From To TP-3 0 5 Grass, leaf litter, organic debris, topsoil, rootlets, and little household debris on surface in area 5 48 Moist red to reddish brown clayey SILT (ML), becoming damp after 36" 48 100 Moist to damp reddish brown, yellowish brown, and yellowish red clayey SILT (ML)with little fine to coarse GRAVEL 100 120 Moist light bluish gray fine to medium sandy silty CLAY (CL) with seams of yellowish brown clayey fine to medium sandy SILT (ML)with fine to coarse GRAVEL 120 160 Moist light bluish gray and light brown slightly clayey fine to medium sandy SILT (ML) with little fine to coarse GRAVEL 160 173 Moist light brown fine to medium sandy SILT (ML) Terminated at 173" TP-4 0 10 Leaf litter, organic debris, topsoil, rootlets 10 22 Pale light brownish gray clayey moderately elastic SILT (ML) 22 64 Light brown and light gray slightly elastic SILT (ML) 64 188 Moist light gray and light yellowish brown and olive SILT (ML)with very fine GRAVEL, little fine to medium SAND (SM), and pockets of WEATHERED ROCK sampled as the same Terminated at 188" C ESF RECORD OF TEST PIT EXCAVATION PROJECT: Rusher 80 Acre Parcel EXCAVATOR: Cat 320E CLIENT: Tectonic DATE: 6/8/22 CESI REPRESENTATIVE: T Gray CESI JOB NO: 220396.000 TEST PIT DEPTH (in.) DESCRIPTION NO. From To TP-5 0 8 Leaf litter, organic debris, topsoil, rootlets 8 32 Moist reddish brown to red clayey SILT (ML) with little fine to coarse SAND (SM) and pockets of brownish yellow slightly clayey SILT (ML) with little fine to medium SAND (SM) 32 88 Moist reddish brown, red, and brownish yellow slightly clayey SILT (ML) with little fine to medium SAND (SM) and fine GRAVEL 88 170 Moist brownish yellow, yellow, and light brown SILT (ML) with little fine to coarse SAND (SM), fine to coarse GRAVEL, and few COBBLES up to 12" 170 188 Light brown and light yellow SILT (ML) with little fine to coarse SAND (SM) and pockets of HEAVILY WEATHERED ROCK sampled as the same Terminated at 188" TP-6 0 10 Leaf litter, organic debris, topsoil, rootlets 10 45 Moist reddish brown to red clayey SILT (ML) 45 112 Moist light brown, yellow, and reddish brown SILT (ML) with little fine to medium SAND (SM) and little fine GRAVEL 112 190 Moist light brown, white, gray, light red, and black SILT (ML) with little fine to coarse SAND (SM), fine GRAVEL, and few COBBLES up to 12" Terminated at 190" C ESF RECORD OF TEST PIT EXCAVATION PROJECT: Rusher 80 Acre Parcel EXCAVATOR: Cat 320E CLIENT: Tectonic DATE: 6/8/22 CESI REPRESENTATIVE: T Gray CESI JOB NO: 220396.000 TEST PIT DEPTH (in.) DESCRIPTION NO. From To TP-7 0 20 6" Leaf litter, organic debris, topsoil, and rootlets, organic stained slightly clayey fine sandy SILT (ML) 6" to 20" 20 36 Moist to damp reddish brown fine to medium sandy clayey SILT (ML) with little coarse SAND (SM) 36 88 Moist light brown, yellow, and white slightly elastic SILT (ML) with little fine to medium SAND (SM) 88 187 Moist to damp light brown, gray, and white SILT (ML) with little fine to coarse SAND (SM) Terminated at 187", performed within natural drainage feature / swale TP-8 0 6 Grass, topsoil, rootlets 6 38 Moist reddish brown clayey SILT (ML) with little fine to medium SAND (SM) 38 72 Moist light brown, white, reddish brown, and light gray clayey SILT (ML) with little fine to coarse SAND (SM) and fine GRAVEL 72 110 Light brown, brown, yellow, light gray, and light red slightly micaceous fine to medium sandy SILT (ML) with little coarse SAND (SM) and fine GRAVEL 110 140 WEATHERED ROCK sampled as brown, light brown, reddish brown, black, and white slightly micaceous fine to coarse sandy SILT (ML) Refusal at 140" SOIL CLASSIFICATION CHART CORRELATION OF MAJOR DIVISIONS SYMBOLS TYPICAL GRAPH LETTER DESCRIPTIONS STANDARD PENETRATION RESISTANCE ■wo■s WITH CLEAN ' GW WELL-GRADED NoG ADRESRA GRAVELS, - RELATIVE DENSITY AND CONSISTENCY GRAVEL GRAVELS ......1. FINES AND o`?LS o`?LS GRAVELLY I Qo Qo POORLY-GRADED GRAVELS, SOILS (LITTLE OR NO FINES))o D�o DC GP GRAVEL-SAND MIXTURES,LITTLE DO n/Oe O O OR NO FINES COARSE 0 I U GRAINED GRAVELS WITH j(3 �O''C GM SILTY GRAVELS,GRAVEL-SAND- Sand and Gravel SOILS MORE THAN 50% FINES lb SILT MIXTURES OF COARSE DO o Q FRACTION !r Standard Penetration Resistance Approximate RETAINED ON NO. AVBlowSper Foot Relative Density AMOUNT OF FINES) f�� � " 0-4 Very Loose - '� s 5-10 Loose CLEAN SANDS G WELL-GRADED SANDS,GRAVELLY 11-20 Firm MORE THAN 50% SAND I SW SANDS,LITTLE OR NO FINES 21-30 Very Firm OF MATERIAL IS AND LARGER THAN SANDY `" 31-50 Dense NO.200 SIEVE SOILS POORLY-GRADED SANDS, SIZE (LITTLE OR NO FINES)::.:::::.:::.:::::::.. SP GRAVELLY SAND,LITTLE OR NO Over 50 Very Dense FINES SANDS WITH SILTY SANDS,SAND-SILT MORE THAN 50% FINES SM MIXTURES Silt and Clay OF COARSE FRACTION PASSING ON NO. Standard Penetration Resistance Approximate 4 SIEVE AMOUNT OF FINES) :.; SC MIXTURES CLAYEY SANDS,SAND-CLAY Blows per Foot Consistency 0-1 Very Soft INORGANIC SILTS AND VERY FINE 2-4 Soft ML R CLAYEY FIINEK FLOUR, OR SANDS OR CLAYEY 5-8 Firm SILTS WITH SLIGHT PLASTICITY 9-15 Stiff SILTS INORGANIC CLAYS OF LOW TO FINE AND LIQUID LIMIT `L MEDIUM PLASTICITY,GRAVELLY £t-! 0 GRAINED CLAYS SANCLAYS ] Very Hard ___ OL ORGANIC SILTS AND ORGANIC — — — SILTY CLAYS OF LOW PLASTICITY MORE THAN 50% INORGANIC SILTS,MICACEOUS OR OF MATERIAL IS MH DIATOMACEOUS FINE SAND OR SMALLER THAN SILTY SOILS CES$ NO.200 SIEVE SIZE SILTS AND LIQUID LIMIT CH INORGANIC CLAYS OF HIGH CLAYS GREATER THAN 50 l� PLASTICITY OH ORGANIC CLAYS OF MEDIUM TO ,,.., HIGH PLASTICITY,ORGANIC SILTS Key to Symbols and Descriptions HIGHLY ORGANIC SOILS ,, ,,„ ���' ,,I' = PT PEAT,HUMUS,SWAMP SOILS WITH HIGH ORGANIC CONTENTS NOTE DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS Log of Auger Boring No. B-1 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I I T I BLOWS 0 0 0 LE T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - - 10" PLOW ZONE - - - Moist very stiff light brown and red clayey SILT X_ _ (ML) 6-8-9 - - Moist stiff light brown and light red SILT (ML) x 4-5-6 — 5 — Moist stiff light brown and light red SILT (ML) x 5-6-6 - - Moist stiff light brown and white SILT(ML)with little fine SAND (SM) X 3-6-8 — 10— N N H U' Z_ K _ _ W W _ z - - Moist stiff light brown and white SILT(ML)with Li, little fine SAND (SM) 5-6-5 X o — 15— o z O - - O a o o - - O - _ o - - Moist very stiff light brown, light gray,white, and co light red SILT(ML)with little very fine SANDX 8-10-12 7• -207(SM) I- Q - _ Boring terminated at 20' co J W O - - K Q a W - - 0 0 Q o - - co 0 0 z o Key to Abbreviations co W • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-2 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina - Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%o) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- \5"Topsoil - - Moist very stiff red and reddish brown clayey X _ _ SILT (ML) 6-7-9 - - Moist stiff reddish brown slightly to moderately \/ elastic SILT(ML) J� 4-5-10 — 5 Moist stiff light brown, yellowish brown, red, and - - black slightly elastic SILT (ML) 5-6-8 • - - Moist stiff brown, reddish brown, and black Xslightly elastic SILT (ML) 4-6-8 10— N N 0 Z_ W W _ z - - Moist very stiff light brown SILT(ML)with seams of fine to coarse GRAVEL 7-9-11 o — 15— • - - U a o - - o - - Moist very stiff light brown, gray, and brown SILT(ML)with little fine SAND (SM) 7 10-12 —20 — Boring terminated at 20' - - U - - K a _ - U _ - co O o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-3 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I I T I BLOWS 0 0 0 L PE T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - - 10" PLOW ZONE - Moist very stiff clayey SILT(ML)with some silty _ _ CLAY(CL) X 8-9-12 - - Moist stiff mottled reddish brown, light brown, and white SILT(ML)with little very fine SANDX 8-6-8 — 5 — (SM) Moist stiff mottled reddish brown, light brown, X - - and white SILT(ML)with seams of light gray 3-4-6 CLAY(CL) - - Moist stiff white, yellowish red, and light brown very fine sandy SILT (ML) X 5-6-8 — 10— N N H U' Z_ K - - W W - z - - Moist stiff white, yellow, light red, and light gray Li, very fine sandy SILT (ML) 5-6-9 X 1\ o — 15— o z O - - O a o o - - O - _ o - - Moist hard light brown, light gray, and white X co slightly micaceous very fine sandy SILT(ML) 16-18-24 • cK • -20 Boring terminated at 20' J Q - - U, J W 0 - - K Q a w - - 0 0 Q o - - co 0 0 J 0 z o Key to Abbreviations co 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-4 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I I T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 — 8" PLOW ZONE '- - Moist very stiff reddish brown silty CLAY(CL) _ with little fine to medium SAND (SM) X11-12-12 - - Moist stiff light brown, reddish brown, brown, and white SILT(ML)with little fine to medium X 5-7-8 — 5 — SAND (SM) Moist stiff light brown, reddish brown, brown, \/ - - and white SILT(ML)with seams of yellowish /J�\ 3-5-6 brown and reddish brown slightly elastic SILT - - (ML) - - Moist stiff yellowish red, light brown, and white X SILT(ML)with little fine SAND (SM) 4-5-7 • —10— N 0 Z_ w w _ z - - Moist stiff yellowish red, light brown, and white SILT(ML)with little fine SAND (SM) 6-7-8 o —15— U Z O - - a 0 - - o - - Moist hard light brown,white, and light red SILT X co (ML)with little fine to medium SAND (SM) 11-14-20 -20 Boring terminated at 20' J • - - J w 0 - - a w _ _ 0 U o _ _ U U O 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-5 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- \4" PLOW ZONE "T - - Damp to moist very stiff reddish brown clayey _ SILT(ML) X 7-9-11 - - Damp to moist stiff reddish brown slightly clayey slightly elastic SILT (ML) 4-5-7 — 5 Moist stiff reddish brown, yellow, and light \/ - - brown slightly to moderately elastic SILT (ML) /J�\ 4-4-7 - - Moist stiff reddish brown, yellow, and light brown slightly to moderately elastic SILT (ML) 6-6-7 — 10— with seams of light brown and black slightly clayey SILT(ML) - 0 Z w • - z — — Moist stiff light brown, yellowish brown, brown, and black SILT(ML) 4-5-5 o — 15— U Z O - - a c� - - o - - o - - Moist very stiff brown, yellowish brown, and co black fine to medium sandy SILT(ML) 6-8-10 -20 Boring terminated at 20' - - U - - K a - - U _ _ co J o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-6 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- i 6" PLOW ZONE - Moist very stiff reddish brown and brown silty X _ CLAY(CL) 9-9-9 • - - Moist very stiff red, reddish brown, and black slightly clayey SILT(ML)with little fine to X 5-6-10 • — 5 — medium SAND (SM) Damp to moist very stiff red, reddish brown, and X- - black SILT (ML)with little fine to medium SAND 6-8-9 • (SM) - - Damp to moist very stiff red, reddish brown, and black SILT(ML)with little fine to medium SAND 7-8-9 • — 10— (SM) N 0 Z_ w w - z - - Moist stiff olive, light brown, yellowish brown, and black SILT(ML)with little coarse SAND 5-6-8 — 15— (SM) U Z O - - a o - - o - - Moist very stiff brown, black, gray, and light co brown slightly micaceous SILT(ML)with little 4-6-10 • >- -20 7 medium to coarse SAND (SM) co Q _ - Boring terminated at 20' J w O - - a w• - - 0 U o - - J 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-7 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L T BLOWS O 0 0 E T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - -- i6" PLOW ZONE �'- - - Moist stiff reddish brown clayey SILT(ML)with X _ little fine to medium SAND (SM) 6-5-6 - - Moist stiff reddish brown and yellow slightly — X micaceous slightly elastic SILT(ML) 4-4-6 — 5 — Moist firm light reddish brown, light brown, X - - white, and olive SILT (ML)with little slightly 3-3-5 micaceous fine to medium SAND (SM) - - Moist stiff brown, olive, light brown,white, and X reddish brown SILT(ML)with little slightly 4-4-5 10— micaceous fine to medium SAND (SM) N I\I N H Z_ K - - W W - - - Moist stiff brown, olive, light brown,white, and X W reddish brown SILT(ML)with little slightly 4-5-6 o —15— micaceous fine to medium SAND (SM) U Z O - - O a H o - - Moist stiff yellow, brown,white, and gray SILT co (ML)with little slightly micaceous medium to 5-5-6 • cK • -20 7 coarse SAND (SM) I— co _ - Boring terminated at 20' co J W U - - K Q a w _ - z U Q o _ - co O O J Z o Key to Abbreviations m Li, • -Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-8 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I I T I BLOWS 0 0 0 L E T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - — 12" PLOW ZONE '- Moist stiff brown and reddish brown slightly X- - clayey fine sandy SILT(ML) 6"7"7 - - Moist stiff reddish brown and yellow clayey SILT X (ML)with little fine GRAVEL 4-5-7 — 5 — Moist stiff light brown, yellowish brown, light X - - reddish brown SILT(ML)with little fine SAND 4-5-6 (SM) - - Moist firm light brown, yellowish brown, light reddish brown SILT(ML)with little fine SANDX 2-3-4 — 10— (SM) N N H o U' Z_ K _ _ W W _ z - - Moist to wet firm light brown, brown,white, and Li, black slightly micaceous SILT(ML) 2-2-4 X I\ o — 15— o z O - - O a H 0 - - O - _ o - - Moist stiff light brown, brown, and olive SILT X co (ML) 358 0• —20_ Boring terminated at 20' J Q _ _ J W O - - K Q a w _ _ 0 0 Q o _ _ Ui J 0 z o Key to Abbreviations co 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-9 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I I T I BLOWS 0 O I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 _ \4"Topsoil " - - Moist to wet firm reddish brown slightly clayey X _ fine sandy SILT(ML) 2-3-4 - - Moist very stiff light brown and reddish brown X clayey SILT(ML)with little fine to medium 7-7-9 — 5 — SAND (SM) Moist very stiff light brown, light gray, and \/ - - yellowish brown clayey fine sandy SILT(ML) /J�\ 7"7"11 - - Moist very stiff light brown, yellow, gray,white, and black SILT(ML)with little fine to coarse 8-11-12 — 10— SAND (SM)and little fine GRAVEL N 0 Z_ w w _ z - - Moist hard brown, gray,yellow, and white SILT X (ML)with little fine to coarse SAND (SM) 11-13-18 o — 15— U Z O - - a o - - o - - Moist hard brown, gray, light brown,yellowish X co brown, and white fine to coarse sandy SILT 12-14-22 -207(ML) Q _ _ Boring terminated at 20' J w O - - a w - - 0 U o _ _ U J 0 Z o Key to Abbreviations m GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-10 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/13/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L O 0 0 T BLOWS I G Y PERA FINES(%o) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - 0 2" PLOW ZONE "T Moist stiff reddish brown slightly micaceous - - clayey SILT(ML) 4-6-7 • - Moist stiff reddish brown, light brown, and gray - - SILT (ML)with fine SAND (SM) 4-5-6 — 5 — N Moist stiff reddish brown and light brown slightly micaceous SILT(ML) 3-4-6 w - - z Moist stiff reddish brown, grayish brown, light o - - brown, and black SILT(ML)with slightly micaceous medium to coarse SAND (SM) 5-6-7 0_ - 10— Boring terminated at 10' 0 z m m _ _ U a - - co O o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-11 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- \4"Topsoil - Moist stiff reddish brown silty CLAY(CL)with 0 X _ _ little fine to medium SAND (SM) 5-5-5 - - Moist stiff reddish brownslightly clayey SILT (ML)with little to trace fine SAND (SM) 4-4-5 — 5 — Moist stiff reddish brownslightly clayey SILT \/ - - (ML)with little to trace fine SAND (SM) x 4-5-6 - - Moist stiff light grayish brown, yellow, and reddish brown SILT(ML)with little to some fine 3-5-6 — 10— to coarse SAND (SM) N W W _ z - - Moist stiff light grayish brown, yellow, and \/ reddish brown SILT(ML)with little to some fine J� 3-5-7 • — 15— to coarse SAND (SM) • - - U a o - • - - Moist to wet stiff light brownish gray, light brown, co I black, and white SILT (ML)with little fine to 3-4-6 -20— medium SAND (SM) co _ _ Boring terminated at 20' U - - K a - - _ co O o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-12 Page 1 of 1 CES� Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- \4"Topsoil - Moist stiff reddish brown slightly micaceous X _ clayey SILT(ML)with little fine to medium 4-5-6 SAND (SM) - - Moist stiff reddish brown slightly micaceous SILT (ML)with little fine to medium SAND (SM) 3-3-6 — 5 Moist firm reddish brown slightly micaceous - - SILT (ML)with little fine to coarse SAND (SM) 3-4-4 - - Moist firm light grayish brown, light brown, and reddish brown slightly micaceous SILT(ML) 3-3-4 — 10— with little fine to coarse SAND (SM) N W W _ z - - Moist stiff light grayish brown, light brown, and reddish brown slightly micaceous SILT(ML) 3-4-5 — 15— with little fine to coarse SAND (SM) • - - U a o - - • - - Moist stiff light brownish gray, light brown, yellow, and black slightly elastic SILT (ML)with 3-5-7 -20 7 little very fine SAND (SM) - _ Boring terminated at 20' U - - K a - - _ co J o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-13 Page 1 of 1 CES� Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 — 8"Topsoil '"7 - Moist very stiff reddish brown clayey SILT(ML) X _ with trace fine SAND (SM) 7-7-11 - - Moist stiff reddish brown SILT(ML)with trace fine SAND (SM) 4-5-6 — 5 Moist stiff yellowish red and reddish brown \/ - - micaceous SILT(ML)with little fine to medium /J�\ 3-3-6 SAND (SM) - - Moist stiff light brown, yellow, and reddish brown micaceous SILT(ML)with little fine to 3-4-5 ir -10- coarse SAND (SM) N W W _ z — — Moist stiff yellowish brown, light brown, and light gray slightly elastic SILT (ML) 3-6-7 o — 15— U Z O - - a c� - - o - - o - - Moist stiff light brown, yellow, light brownish co gray, and white SILT (ML)with little fine to 3-5-8 • -20- coarse SAND (SM) co _ _ Boring terminated at 20' U - - K a - _ _ co J o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-14 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 \4" PLOW ZONE - - Moist stiff reddish brown SILT(ML)with trace X _ very fine SAND (SM) 5-5-8 • - - Moist stiff reddish brown, yellowish red, and light red SILT(ML)with trace very fine SAND 4-5-7 — 5 — (SM) Moist stiff reddish brown, light brown, and light \/ - - brownish gray SILT(ML)with trace fine to /J�\ 3-3-6 coarse SAND (SM) - - Moist stiff light brownish gray and light grayish \/ brown slightly micaceous SILT(ML)with trace 3-5-5 • -10— fine to coarse SAND (SM) N 0 Z_ w w _ z - - Moist stiff light brownish gray, light grayish X brown, black, and white slightly micaceous SILT 3-4-6 • — 15— (ML)with trace fine to coarse SAND (SM) U Z O - - a o - - o - - Moist stiff light brownish gray and light grayish co brown slightly micaceous SILT(ML)with little 8-8-12 -20- fine to coarse SAND (SM) co Q _ _ Boring terminated at 20' U, J w O — — a w — — 0 U o _ _ co U O 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-15 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I I T I BLOWS 0 0 0 L E T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - — o \4" PLOW ZONE I "T- - - Moist very stiff reddish brown slightly micaceous X _ _ slihtly clayey SILT(ML)with trace fine SAND 6-7-10 ( ) - - Moist stiff reddish brown and yellowish red — X slightly micaceous SILT(ML)with trace very 3-4-6 — 5 — fine SAND (SM) Moist stiff yellowish brown, light brown, reddish X- - brown, and black SILT(ML)with trace fine to 3-4-5 coarse SAND (SM) - - Moist stiff reddish brown, light brown, and black SILT(ML)with trace fine SAND (SM) X 3-6-6 —10— N N H o U' Z_ K _ _ W W - z - - Moist stiff light brown, light gray, yellow, and Li, white SILT(ML)with little fine to coarse SAND 3-4-6 X o — 15— (SM) o z O - - O a H o - - O - _ z• - - Moist very stiff light brown, light gray, yellow, co black, and white SILT (ML)with little fine toX 6-9-11 >- -20 7 coarse SAND (SM) I— co - _ Boring terminated at 20' co J W O - - K Q a w - - 0 0 Q o - _ co 0 0 z o Key to Abbreviations co 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-16 Page 1 of 1 CES� Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - 3" PLOW ZONE "T - - Moist very stiff reddish brown slightly micaceous X _ clayey SILT(ML)with trace fine SAND (SM) 6-10-12 - - Moist firm reddish brown and light brown slightly micaceous SILT(ML)with little fine to medium 3-3-4 — 5 — SAND (SM) Moist firm reddish brown and light brown slightly \/ - - micaceous SILT(ML)with little fine to medium /J�\ 2-3-3 SAND (SM) - - Moist firm light brownish gray, light grayish x brown, and reddish brown slightly micaceous 3-3-5 —10— SILT (ML)with little fine to coarse SAND (SM) N W W _ z - - Moist stiff light brownish gray and light grayish i i i i I brown SILT(ML)with little fine to coarse SAND 3-5-6 • — 15— (SM) • - - U a o - - o - - Moist very stiff light brownish gray, light grayish co brown,yellow, and white SILT(ML)with little to 6-7-10 -20- some fine to coarse SAND (SM) co _ _ Boring terminated at 20' U - - K a - - U _ _ co J o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-17 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I I T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 \4" PLOW ZONE "T - - Moist stiff reddish brown slightly micaceous X _ SILT (ML)with little fine to coarse SAND (SM) 4-6-7 - - Moist stiff reddish brown, yellowish red, and X 1 light brown slightly micaceous SILT(ML)with 3-4-5 • — 5 — little fine to coarse SAND (SM) Moist stiff reddish brown, yellowish red, and \/ - - light brown slightly micaceous SILT(ML)with /J�\ 3-4-5 little fine to coarse SAND (SM) - - Moist stiff light brown, light gray, yellow, and X white slightly micaceous SILT(ML)with little 3-5-7 — 10— fine to coarse SAND (SM) N 0 Z_ w w _ z - - Moist stiff light brown, light gray, yellow, and X white slightly micaceous SILT(ML)with little 5-5-7 — 15— fine to coarse SAND (SM) U Z O - - U a o - - I\D o - - Moist very stiff light brownish gray, light grayish co brown,yellow, and white SILT(ML)with fine to 7-8-10 -20 7 coarse SAND (SM)co I Q _ _ Boring terminated at 20' J w O - - a w - - 0 U o _ _ 0 J 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-18 Page 1 of 1 CES� Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%o) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- 3"Topsoil - - Moist stiff reddish brown clayey SILT(ML) X 5-6-7 • - - Moist stiff reddish brown slightly elastic SILT (ML) 4-6-7 — 5 Moist stiff reddish brown, yellow, and black \/ - - slightly elastic SILT (ML) /J�\ 4-5-6 - - Moist stiff reddish brown, yellow, and black slightly elastic SILT (ML)with trace fine SAND 3-6-7 — 10— (SM) N N H Z_ W W _ z — — Moist very stiff light grayish brown and reddish brown SILT(ML)with trace fine SAND (SM) 6-8-11 o — 15— U Z O - - a c� - - o - - o - - Moist to wet stiff light brownish gray and light brown slightly to moderately elastic SILT (ML) 3-5-7 -20 Boring terminated at 20' _ _ U - - K a _ _ _ co J o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-19 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 — 0 8" PLOW ZONE ''- - Moist very stiff reddish brown slightly clayey X _ SILT (ML)with little very fine SAND (SM) 8-10-9 • - - Moist very stiff reddish brown slightly clayey SILT (ML) 5-6-14 • — 5 — Moist very stiff reddish brown, yellow, and light \/ - - brownish gray clayey SILT(ML)with trace very 5-7-12 fine SAND (SM) - - Moist stiff reddish brown, yellow, and light brown slightly clayey SILT (ML)with trace very 5-6-9 —10— fine SAND (SM) N 0 Z_ w w _ z - - Moist very stiff light brownish gray, light grayish brown, and black SILT(ML)with trace very fine 6-8-14 • — 15— SAND (SM) 0 Z O - - U a o - - o - - Moist to wet very stiff light brownish gray, light co brown, and light gray SILT(ML)with little fine to 7-10-14 • >- -20 7 medium SAND (SM) co Q _ _ Boring terminated at 20' J w O - - a w - - 0 U o _ _ 0 J 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-20 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- \4" PLOW ZONE - Moist stiff reddish brown silty CLAY(CL) X 5-6-8 • - - Moist stiff reddish brown slightly clayey slightly elastic SILT(ML) 4-6-7 — 5 Moist stiff reddish brown, black, and yellow - - slightly elastic SILT (ML) 3-4-6 - - Moist stiff reddish brown, yellowish red, yellow, and black SILT(ML) 3-5-6 — 10— N 0 Z_ w w _ z - - Moist firm yellowish red, reddish brown, and \/ black SILT (ML)with trace very fine SAND (SM) /J�\ 2-3-4 o — 15— U Z O - - a o - - o - - Moist stiff yellowish red, light brown, black, and reddish brown slightly elastic SILT(ML) 3-4-5 -20 Boring terminated at 20' J • _ U, J w O - - K a w - U o _ _ co U 0 J 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-21 Page 1 of CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L I I T I BLOWS 0 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 — \4" PLOW ZONE - Moist very stiff reddish brown silty CLAY(CL) j X 8-10-14 • - - Moist very stiff reddish brown clayey SILT(ML) X 7-11-13 — 5 Moist very stiff reddish brown and light brown X- - clayey SILT(ML) 5-8-8 - - Moist stiff yellowish red, reddish brown, and white SILT(ML)with trace fine SAND (SM) 5-6-7 — 10— N 0 Z_ w w _ z - - Moist stiff reddish brown, yellow, and black SILT X (ML) 3-4-7 • o — 15— U Z O - - a o - - o - - Moist stiff reddish brown, yellow, and black SILT co (ML)with trace fine SAND (SM) 5-6-8 • -20 Boring terminated at 20' J • - U, J w O - - K a w - - U o - - co U O 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-22 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/14/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - 0 10" PLOW ZONE '-- - Moist very stiff reddish brown silty CLAY(CL) \/ 8-10-13 - - Moist stiff reddish brown, black, and yellow slightly clayey SILT(ML) 4-5-8 — 5 Moist very stiff reddish brown, light brown, - - black, and yellow SILT (ML)with little fine to 6-7-11 coarse SAND (SM)trace coarse GRAVEL - - Moist stiff reddish brown, light brown, black, and Xyellow slightly clayey slightly elastic SILT(ML) 5-6-9 - 10— with trace very fine SAND (SM) N W W _ z - - Moist to wet stiff reddish brown, light brown, light gray, and black slightly clayey slightly to 4-5-5 ▪ — 15— moderately elastic SILT(ML) • - - U a o - - • - - Moist to wet very stiff light brownish gray, light grayish brown, reddish brown SILT(ML)with 6-8-14 -20- trace very fine SAND (SM) _ _ Boring terminated at 20' U - - K a _ _ _ co O o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-23 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/15/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I I T I BLOWS 0 0 0 L E T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - — o- \4" PLOW ZONE I - - Moist very stiff reddish brown,white, and yellow X _ _ silty CLAY(CL) 8-11-16 - - Moist stiff reddish brown,white, and yellow clayey SILT(ML) X 4-6-7 — 5 — Moist stiff light brown, light brownish gray, and X - - reddish brown SILT(ML)with trace very fine 4-5-6 SAND (SM) - - Moist very stiff light grayish brown and light brownish gray SILT(ML)with little very fineX 6-7-10 — 10— SAND (SM) N N H o U' Z_ K _ _ W W - z - - Moist very stiff light brown, light brownish gray, Li, and black SILT(ML)with little very fine SAND $ 10-12 X o — 15— (SM) o z O - - O a o o - - O - z _ll I X • - - Moist stiff light gray and light brown SILT (ML) co with trace very fine SAND (SM) 5-5-8 >- -20 Boring terminated at 20' J Q - - J W 0 - - K Q a w - _ 0 0 Q o - _ Ui O O J 0 z o Key to Abbreviations co 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-24 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/15/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- 3" PLOW ZONE - - Moist stiff reddish brown clayey SILT(ML) X 4-6-7 - - Moist stiff reddish brown and light brown slightly \/ clayey SILT(ML)with trace very fine SAND /J�\ 3-4-6 - 5 — (SM) Moist stiff reddish brown, light brown, yellow, \/ - - and black SILT(ML)with trace very fine SAND J� 3-5-6 (SM) / \ - - Moist stiff reddish brown, light brown, yellow, \/ and black SILT(ML)with trace very fine SAND /J�\ 3-5-8 - 10— (SM) N W W _ z - - Moist stiff reddish brown, light brown, yellow, and black SILT(ML)with little very fine SAND 3-4-8 • — 15— (SM) • - - U a o - - • - - Moist to wet firm light brownish gray,white, and co light brown slightly to moderately elastic SILT 2"2"3 -20 7(ML)with trace very fine SAND (SM) co _ _ Boring terminated at 20' U - - K a _ _ _ co O o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-25 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/15/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS L I T I BLOWS 0 0 0 L E T I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - - 0 8" PLOW ZONE .7r7 - - Moist stiff reddish brown,yellowish red, and X _ _ yellow slightly clayey SILT(ML)with little fine to 3-4-7 medium SAND (SM) - - Moist very stiff light brownish gray, light brown, yellow, and black SILT (ML)with little fine to — X 5-8-12 — 5 — coarse SAND (SM) Moist hard light grayish brown, light gray, and X- - black SILT (ML)with little to some fine to 8"12"25 coarse SAND (SM) - - Moist hard light grayish brown,white, and light X gray SILT (ML)with some fine to medium 162222 — 10— SAND (SM) N N ,- o 0 _ _ 0 z_ K _ _ W W _ z - - Moist dense light brownish gray,white, and light ..T W brown silty fine to medium SAND (SM) 26-22-26 o — 15— / o z o - - 0 a o • - - 0 z - ^r o - - Moist very dense light brownish gray,white, ca X and light brown siltyfine to medium SAND (SM) 36-36-50/6 »• g cK 0 —20 Boring terminated at 20' I J Q - - J W 0 - - K 1 Q a w - _ 0 0 Q 1 o - - 0 0 J 0 z o Key to Abbreviations co w • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-26 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/15/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS 0 L I T I BLOWS O I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 _ - 0 8" PLOW ZONE . - �,aA _ _ Moist stiff reddish brown slightly micaceous silty CLAY(CL) 1\11 Moist very stiff reddish brown, light brown, and J black slightly micaceous slightly clayey SILT 7-10-9 (ML)with trace fine SAND(SM) — 5 — N Moist very stiff light grayish brown, light gray, and black SILT(ML)with little fine to medium 7_9_12 ▪ - - SAND (SM) 41\i Z w w - - Z 0 Z - Moist hard light grayish brown, light gray, and o - - black SILT (ML)with little fine to medium SAND 10-13-18 o (SM) 0 ▪ — 10 Boring terminated at 10' F- 0 Z • - - o co r m U, J _ _ w 0 a w U• - - Q 0 U O 0 0 Z o Key to Abbreviations m • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-27 Page 1 of 1 CES$ Project: Rusher 80 Acre Property Date Drilled : 06/15/2022 Location : Salisbury,North Carolina _ Project No. 220396.000 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Manual Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 I G Y PERA FINES(%) V H T W P 6 IN. • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - _ III I - 0 6" PLOW ZONE '-- Moist very stiff reddish brown and light brown - - slightly micaceous clayey SILT (ML) 9-13-14 - Moist hard reddish brown, light brown, and - - yellow clayey SILT(ML)with little fine to medium SAND (SM) 12-20-20 — 5 — N Moist very stiff light grayish brown, yellow, and reddish brown SILT(ML)with little fine to 7.9.10 - - coarse SAND (SM) 1 w • - - z z Moist dense light brownish gray, light brown, o - - yellow, and white silty fine to coarse SAND (SM) 10-14-18 U 0_ - 10— Boring terminated at 10' 0 0 m _ _ a - - Q U 0 o• Key to Abbreviations • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test FIELD PROCEDURE SOIL TEST BORINGS ASTM D-1586 The borings were made by advancing 5 inch diameter hollow stem augers. At regular intervals, soil samples were obtained through the hollow stem augers with a standard 1.4-inch I.D., 2.0-inch O.D., split-tube sampler. The sampler was initially seated 6 inches to penetrate any loose cuttings; then driven an additional foot with blows of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot was recorded and is designated as the standard penetration resistance. Penetration resistance, when properly evaluated, is an index to the soil's strength and density. The samples were classified in the field by the driller as they were obtained. Representative portions of each soil sample were then sealed in labeled glass jars and transported to our laboratory. The samples were examined by a graduate geotechnical engineer or engineering geologist to check visually the field classification. All boring data, including sampling intervals, penetration resistances, soil classifications, and groundwater level are shown on the attached Test Boring Records. CES$ Civil — Geotechnical — Surveying June 8, 2023 Wake Hamilton Tectonic, LLC 101 South Kings Drive Suite 200 Charlotte, North Carolina 28204 Reference: Supplemental Geotechnical Engineering Evaluation Proposed Rusher 80 Acre Site Development East Spencer, North Carolina CESI Project Number: 220396.100 Mr. Hamilton, Concord Engineering & Surveying, Inc. (CESI) has performed a supplemental geotechnical engineering test boring evaluation of the above referenced site located at the end of Robinson Road in East Spencer, North Carolina. Our evaluation was performed within general accordance with our supplemental proposal number 220477.P10 dated May 22, 2023. On May 31, 2023, a CESI field engineer observed 6 soil test borings performed within the northwestern corner of the property within the proposed retaining wall alignment and where deep cuts are anticipated during construction and grading operations. Each of the 6 borings were slated to be advanced to a depth of 35' below existing ground surface (BGS) to determine the presence of subsurface rock within areas that are proposed to have deep cuts during grading operations. It is noted that this evaluation is considered to be supplemental to our June 20, 2022 Geotechnical Engineering Evaluation report. EXPLORATION AND FINDINGS The proposed development area will consist of three parcels identified as Rowan County Parcel Identification Numbers (PIN) 5780-01-07-3164 (75.31 acres, 440 Robinson Road), 5770-08-98-7853 (3.34 acres, no address), 5770-12-96-4341(0.59 acres, 721 Andrews Road), and 5770-12-95-1830 (0.8 acres, no address). Currently the parcels are undeveloped and had previously been farmed. An abandoned residence with existing utilities, a well, possible septic tank or other buried structures, and multiple barns were observed on Parcel 5780-01-07-3164. 45 Spring Street, SW P.O. Box 268 Concord, N.C. 28026-0268 704-786-5404 www.cesicgs.com N.C. License Number C-0263 The procedures used by CESI for field sampling and testing are in general accordance with established geotechnical engineering practice. Each of the soil test boredom was advanced using a truck mounted Mobile B47 drill rig at the locations shown on the enclosed "Soil Test Location Plan". Test pit and test boring locations were created based on requests provided by the developer. Soil Test Boring Investigation Findings Soil strata at each soil test boring location was observed, identified, and recorded by our field engineer. Presented in Table 1, below, is a summary of the test boring data Table 1: Summary of Soil Test Boring Data Topsoil and / Groundwater Depth To Test Boring Test or PLOW Depth WEATHERED Termination Depth Boring ZONE Depth ROCK No, (Feet below Existing (Feet below Existing Ground (Inches below Existing Ground Surface) (Feet below Existing Surface) Ground Surface) Ground Surface) B-1 1"Gravel Not Encountered Not Encountered Terminated at 35' B 2 12"Topsoil and Terminated at 35' Not Encountered Not Encountered PLOW ZONE B-3 10" Plow Zone Not Encountered Not Encountered Terminated at 35' B-4 8" Plow Zone Not Encountered Not Encountered Terminated at 35' B-5 4" Plow Zone Not Encountered Not Encountered Terminated at 35' B-6 6" Plow Zone Not Encountered Not Encountered Terminated at 35' A 1" layer of gravel was encountered at the surface of soil test boring B-1, and topsoil and PLOW ZONE soils with rootlets measuring 4" to 12" in thickness was present at the surface of the remaining test boring locations. These organic laden soils are not suitable for structural fill or structure support and should be stripped and stockpiled for later use in non-structural areas of the site. We anticipate any PLOW ZONE soils remaining after stripping operations may be mixed with underlying residual soils and be used as structural fill. Beneath the surface organic PLOW Zone and topsoil layer, we encountered weathered in place, residual soils consisting of: • SILT (ML) with varying amounts of fine to coarse SAND (SM), • Clayey SILT (ML) Groundwater was not encountered at any of the test boring locations. However, based on the relatively low-lying topography of the eastern portion of the site, and presence of fine- grained soils on the site, minor complications due to groundwater should be anticipated during grading and utility installation operations after periods of rainfall. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 2 Weathered Rock or Auger Refusal Rock was not encountered at any of the test boring locations. We do not anticipated complications due to weathered rock during grading operations for the warehouse structure locations. NRCS has listed the site as having the following primary soils series: Cecil sandy clay loam (CeC2), Pacolet sandy clay loam (PcC2), and Pacolet sandy loam (PaD). Based on NRCS published documents, the Mecklenburg fine sandy loam soil series are known to contain ELASTIC SILT (MH) soils between 6" and 40" below the existing ground surface (BGS). However, no ELASTIC SILT (MH) soils were directly encountered at any of the test pit or soil test boring locations. Please note the presence of ELASTIC SILT (MH) soils may be encountered at other unexplored areas of the site. ELASTIC SILT(MH) soils have a high shrink swell potential and are unsuitable for direct footing, slab, and pavement support. RECOMMENDATIONS Based on our supplemental findings and consistency relative to previous findings, no changes to our previous recommendations are warranted. For continuity, below are our previous recommendations for grading operations: Before grading all conflicting utilities removed, protected or properly abandoned. Water wells, if encountered, should be properly abandoned by a certified well driller licensed in the state of North Carolina. An abandoned residence with existing utilities, a well and possible septic tank, as well as multiple barns were observed on the large parcel (PIN 5780- 01-07-3164). These structures should be evaluated for the presence of Recognized Environmental Conditions (RECs) and removed prior to construction operations. Topsoil, root zones, stumps, organics, household debris and any other unsuitable materials should be stripped beyond the proposed structural and pavement envelopes. We anticipate any PLOW ZONE soils remaining after stripping operations may be mixed with underlying residual soils and be used as structural fill. It was noted that small amounts of household debris and trash were observed on the surface near test pit location TP-3. In fill sections, the area should be stripped an additional width to accommodate a minimum 1:1 structural fill slope plus 5 feet. It was also noted that organic stained soils were encountered beneath the surface organics at test pit location TP-7 up to 20" BGS. We anticipate any organic stained soils remaining after stripping operations can be satisfactorily mixed with on-site or imported soils and be used as structural fill. Organic stained soils remaining at areas to receive fill placement or are at subgrade elevation should be closely monitored or removed. Currently grading plans and proposed design elevations are unknown. However, we anticipate soils from the central parts of the site will be cut down and used to fill on the perimeter of the site. Regardless, below are our general recommendations for the cut and fill areas on the site: Cut Areas — Once the surface organic soils are removed, we anticipate the underlying residual soils will be sufficient to be used as structural fill for building, parking lots, and roadway support. The excavated soils should be evaluated for the presence of household debris, and ELASTIC SILT (MH). If slightly elastic SILT (ML), or small amounts of ELASTIC Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 3 SILT (MH) are encountered in the cut areas, we anticipate it could be mixed with suitable on-site material and used as structural fill as long as they can remain stable during grading operations. After reaching final grade elevation the finished surface should be evaluated by proofrolling to identify areas of instability. Fill Areas — After stripping, areas receiving fill soils to provide support should be carefully evaluated for the presence of soft surficial soils by proofrolling with a 25-ton, four-wheeled, rubber-tired roller, a loaded dump truck, or similar approved equipment. The proofroll operation should be carefully monitored by our Engineer. Areas that wave, rut, or deflect excessively and continue to do so after several passes of the proofroller may need to be undercut to stiffer soils. The undercut areas should be backfilled in thin lifts with approved, compacted fill materials, preferably granular soils or aggregate base course stone. Areas containing ELASTIC SILT (MH) not discovered during our investigation should be thoroughly evaluated prior to structural fill placement. If undercutting and replacing with satisfactory fill soils is not feasible, chemical or mechanical subgrade stabilization methods may be implemented under direction of our Engineer. Recommendations for mechanical or chemical soil stabilization can be provided by CESI if required during grading operations. Due to the presence of fine-grained soils on the site, it is imperative that positive surface drainage be maintained during grading operations to prevent water from ponding on the surface. The surface should be rolled smooth and sloped away from structural areas to enhance drainage if precipitation is expected. Subgrades damaged by construction equipment should be immediately repaired to avoid further degradation in adjacent areas and to help prevent water ponding. Fill Material and Placement Recommended criteria for soil fill characteristics and compaction procedures are listed below. The project design documents should include the following recommendations to address proper placement and compaction of project fill materials. We do not recommend the use of soils of high plasticity, with a PI greater than 25 as structural fill. Earthwork operations should not begin until representative borrow soil samples are collected and tested (allow 3 to 4 days for sampling and testing). Earth Fill Materials ❑ General guidelines for project fill should control properties such as Plasticity Index (PI), gradation, and organic content. The use of the following USCS soil types, as defined by ASTM D 2487, should be satisfactory for use as project fill: GW, GP, GM, GC, SW, SP, SM, SC, ML, MH (provided the PI is 25 percent or less for MH soils), or combinations thereof. ❑ Organic content should be no greater than 5 percent by weight, and no large roots should be allowed. Additionally, maximum particle sizes should be limited to 4 inches or less. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 4 Compaction Recommendations ❑ One standard Proctor compaction test and one Atterberg limits test for each soil type used as project fill. Gradation tests may be necessary and should be performed at the Project Geotechnical Engineer's discretion. ❑ Maximum loose lift thickness — 8 inches. ❑ Compaction requirements — 95 percent of the maximum dry density to a depth of 1 foot below subgrade, and 100 percent within the upper 1 foot as determined by the standard Proctor compaction test. ❑ Soil moisture content at time of compaction — within plus 3 percent to minus 3 percent of the optimum moisture content. ❑ One density test every 2,500 square feet for each lift or two tests per lift, whichever is greater (for preliminary planning only; the test frequency should be determined by our geotechnical engineering staff). ❑ Trench fill areas— one density test every 75 linear feet at vertical intervals of 2 feet or less. Sitework construction should be monitored by our Construction Materials Testing Engineer. Our Construction Materials Testing Engineer's (or technician) duties should include observation of proofrolling activities, evaluating soil subgrades prior to fill placement, density testing of the soil backfill and density testing of the aggregate base course stone. Field observations, monitoring, and quality assurance testing during earthwork and pavement construction are an extension of this analysis. Shallow Foundation Construction The building foundations should be sized for a maximum net allowable bearing pressure of 2,500 pounds per square foot. The exploration findings indicate the structures may be supported by shallow spread footings bearing on approved stiff residual soil, or newly placed structural FILL. We anticipate the total settlement potential of the footings to be less than 1" and maximum differential settlement to be less than a 1/2". All footings should bear at a minimum depth of 12 inches below exterior grades for frost protection. Properly reinforced building footings with adequate slab control joints are recommended to handle slight differential settlements, if they occur. CESI recommends a thorough foundation bearing surface evaluation be performed and the footing approved prior to concrete placement. Foundation bearing surfaces should be inspected by our Engineering Technician under our Engineer's review prior to concrete placement to confirm that suitable soils are present at the bearing elevation. We recommend that bearing surfaces be evaluated by hand auger borings with Dynamic Cone Penetrometer (DCP) testing equipment prior to concrete placement to determine whether the foundation bearing soils encountered during construction are similar to those found during our geotechnical exploration. DCP testing is a verification tool to be used for an economical bearing grade evaluation during construction. It will help detect isolated areas of soft residual soils or loosely compacted soils. Unsuitable soil detected during this evaluation should be repaired as directed by the geotechnical engineer. Footing bearing grades identified as having soft soils should be undercut and replaced with properly compacted structural fill soils or Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 5 crushed aggregate. The depth and width of undercutting should be recommended by our Engineer. Bearing surfaces for shallow spread foundations should not be disturbed or left exposed during inclement weather. Saturation of the on-site soils will cause a loss of strength and increased compressibility. Excavations for footings in stiff residual soils or newly placed structural fill should be completed with a toothed bucket backhoe following excavation to reduce disturbance of the subgrade soils. Confined excavations should conform to applicable OSHA regulations and North Carolina State Building Codes. Upon their exposure, bearing grades should have excess and loosened material removed. The final grades should be firm and stable, and free of loose soil, rock, mud, water, or frost. If construction occurs during inclement weather and concreting of the foundation is not possible at the time it is excavated, a layer of lean concrete should be placed on the over excavated bearing surface subsequent to testing for protection. Also, concrete should not be placed on frozen subgrades. General Mass Rock Excavation: Track hoe refusal rock was encountered at one of the test locations, between at 140" BGS. Based on our findings, and anticipated grades, we do not anticipate complications due to track hoe refusal rock on the site unless deep cuts are made for mass grading or borrow / swap areas. However, for contractual purposes, CESI recommends that Rock be defined as the following: Any material which cannot be excavated with a single-tooth ripper drawn by a crawler tractor having a draw bar pull rated at not less than 56,000 pounds (Caterpillar D8K or equivalent) or excavated by a trackhoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). Trench Rock Excavation: Any material which cannot be excavated with a backhoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). If these rock excavation conditions are encountered, CESI should be notified for verification and quantification. Excavation of trench rock will then require fracturing using jack hammering or blasting. Seismic Information In accordance with the International Building Code (IBC) as adapted by North Carolina and Chapter 20, Table 20.3-1 of the American Society of Civil Engineers (ASCE) 7-16 Design Standards, a Site Class "D" should be assigned to the site for seismic design purposes of the proposed barn location. Site specific subsurface data was determined to the boring termination depth of up to 35 feet below existing grade. The Seismic Site Class is derived from the standard penetration test data recorded during drilling. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 6 Supplemental information not included in the June 20, 2022 report Optional MASW Testing Based on our subsurface investigation (using Standard Penetration Resistance values), a Seismic Site Class of"D"was attributed to the proposed structure location. If advancing the Site Class to "C" would be advantageous to the cost and design of the building structure, we anticipate it is possible that a higher Seismic Site Class can be acquired using Multichannel Analysis of Surface Waves (MASW) testing. A Multi Analysis of Surface Waves (MASW) Testing could be performed within the proposed development areas as follows: A MASW seismic survey should be performed to determine approximate shear wave velocity values within the depth interval of 0 to 100 feet below surface for seismic soil site classification. MASW seismic survey should be conducted at an estimated two locations within the building pad area. The MASW survey records surface wave seismic data and converts the data into approximate shear wave velocity values.A profile of approximate shear wave data is obtained within the depth interval of 0 to 100 feet that can be used to determine the site's seismic soil site classification. The MASW survey will be conducted using twenty-four, 4.5 Hz geophones connected to a Geometrics 24-Channel Geode seismograph. Each MASW test will consist of one spread of 24 geophones spaced 5 feet apart. The source will consist of a 20-pound sledgehammer placed 10 feet from the first geophone. Additional shots may be taken with varying hammer offsets to ensure the best depth penetration. The seismic data should be processed using SurfSeis software. Apparent depth versus shear wave velocity profiles will be generated for each survey line using the SurfSeis processing program. Depth-averaged shear wave velocity results should be utilized along with SPT data acquired during drilling to determine seismic site classification. Retaining Wall Parameters If free standing retaining walls should be required on the site, the walls should be designed using active earth pressure parameters. Walls that will be prevented from rotating and not free to deflect should be designed to resist the at-rest lateral earth pressure. Soils behind the retaining walls are assumed to exert a triangular stress distribution, which can be modeled in terms of an equivalent fluid weight. Passive earth pressure of soil adjacent to the footing, as well as soil friction at the footing base, may be used to resist sliding. The following table contains values of earth pressure coefficients and equivalent fluid unit weights for the active, at-rest, and passive earth pressure conditions. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 7 Lateral Earth Pressure Parameters Soil Type: Fine Sandy SILT (ML) Earth Pressure Equivalent Fluid Unit Frictional Coefficients Total Weight Resistance Unit Weight Coefficient Active At-rest Passive yi EFWA EFWO EFWP FR KA KO KP (pcf) (Active) (At-rest)(Passive) (pcf/f) (pcf/f) (pcf/f) 0.30 0.4 0.5 2.8 120 48 60 336 The above is based on a sandy SILT(ML)soil with angle of internal friction of approximately = 28 in a drained condition; development of hydrostatic pressure from leaking utility lines, adjacent water runoff, etc. are not considered. As such, it is recommended that a drainage system be implemented to quickly relieve any hydrostatic pressure behind wall sections. The system can be constructed of a washed stone layer separated from the adjacent soils by non-woven filter fabric and drained by weep holes and/or perforated pipe away from the structure. FOLLOW-UP SERVICES Field observations, monitoring, and quality assurance testing during earthwork, foundation installation and building construction are an extension of the geotechnical design. As a result, we recommend the following: • Verification of removal of topsoil, root zones, stumps, organics and household debris; • Proofroll observations of areas to receive structural fill, • Density testing during fill soil placement within structural pad areas and streets; • Utility trench backfill (storm, sanitary, and water placed within structural areas); • Retaining wall construction monitoring and testing; • Foundation bearing evaluation within excavated footings; • Structural reinforced concrete testing and inspections; • Proofroll observations within the pavement areas prior to concrete curb, aggregate base course stone, asphalt and concrete placement. Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 8 We appreciate the opportunity to be of service to Tectonic, LLC in this supplemental phase of the Rusher 80 Acre Property Development project in East Spencer, North Carolina. We look forward to helping you through project completion. If you have any questions, please feel free to call. Respectfully submitted, CESI `\``tttttnl l urrrru„/� oFESS% t 27837 6/;/23 kik --may171 4GIN N��.� �rrrrtrlllltttt" Thomas Gray James G. (Jay) Eaves Ill, PE Project Engineer Division Manager ATTACHED: SOIL TEST LOCATION PLAN SOIL TEST LOCATION PLAN(with conceptual overlay) SOIL TEST TERMINATION DEPTH PLAN SOIL TEST TERMINATION DEPTH PLAN(with conceptual overlay) KEY TO BORING SYMBOLS LOGS OF AUGER BORING SOIL TEST BORING PROCEDURE Rusher 80 Acre Property Development-Geotechnical Engineering Evaluation June 8,2023 CESI Project Number 220396.100 Page 9 . "r. 1 ..1 --,„.„ • l s--'.. * ;*-..-.' '1 - •19bir.,,,,—r .e A, ,v,,,,d, .7 fii' • r, ' ' , . ar..-.f; —41. , . . -x•il. ' •-% -.1 ..ti . , • .1.••• . 'ecZ'.1.41tr 4;--• .'t e to' ".*3-..:S‘e 4' :At'Ar 4. ...,. , l ** 7. ct oks:•,*;eZt.." ,,;.;,4.4',V lt,,ik.: ..,41.. yt .......0„ .,, . *•,,„....k., , ,. .,: '•••',' , - .A, •, • , t. r11 11 - -"- - -...).!,- . t.c..1 ...i. .-,. Sitlial' -. .4:„Iv....., 1....,. .3,.... 'a.,;*-- , . 4-_;,,I,-,,,„" 1 rik 1p, .,„1,-... -,,,,, 3.11:.w. , ' z k,_ ' 'Vt.. • ..,,,. _ , . "1 Arn: -`,0-••• - .4,u,i- _g..1:-. -1 .4+,7 et t--v,— •,2 ,4,.(,... -I ..;.„,te. - . , t),*....N Rs 1:-4 4.- 1 '`. • r'ir ..`' 1",-' _,_-,'..-: .- ...,41'•;4_ -..-e .-4 •,-Atkath -_,,,1-_ ' • -- • v,:". s '-'44.4441. ..• - ,4f..,,...\ ., B-5fie .-%, ' _ • , - , , ..), • • B-4 B-• 4,A:: -e.-?,,' :: 1;,, .4-7-, .; .- • - .'.. - ' ' i V.-7-411. #1/44S:•4 4.4 .9: B-3 .• , :4-,t, ‘;' -,,,,.... reP* .,"•••' .ecilla ,,• t s, B-1 r:'t,fr. %,4,-,.` '''i "1' ..-- , • -— - It..-•it .. ., ,,.... ,... '. , . N • ....t, v Nr ,-Itil. Ni - . .. B-2 ...._ ,. .- . . . B-1 Test Boring Location DATE: 6-2-23 CEST SOIL TEST LOCATION PLAN DRAWN BY: TKG Proposed Rusher 80 Acre Site Supplemental Borings PROJECT#:220396.100 95 Spring Street SW PO Box 268 Concord,North Carolina 28026-0268 East Spencer, North Carolina SCALE NTS Phone (704)786-5404 Fax (704)786 7954 DRAWING NO.: 1 1 A'ROY i •r'b } ------- CUT VW.,. I / 9 B-3 B-1 �t1 II:' i, Sit,' t h / , l»A j B-2 . . i r it 1 w - r . I wr: !BSI IllIEV ut i ,ii • t _ •�(jr Test Boring Location SOIL TEST LOCATION PLAN DATE: 6-2-23 CEST With Conceptual Overlay DRAWN BY: TKG PROJECT#:220396.100 95 Spring Street SW Proposed Rusher 80 Acre Site Supplemental Borings SCALE:Box 268 NTS Concord,North Carolina,28026-0268 Phone:(7]6°,]66-5°6A East Spencer, North Carolina DRAWING NO.: 2 Fax:(]0°)]Licens4 www.cesicgs.cc License C-0263 1 00 p -. s..,..... .e,4...14. ,.. 17, / ,1 -•,_, .. l , •!1. '1* • -. ' . ;I .1( . ;*e V).111V. 4 •"-* ''tee o''. ".*3-...:f.s.e 4' : /t...74 kli 1.% 6. . lit'i 2.# ' .1 • ' . ' ' ' ' ' . /1Ia .--' 1' ... (.t *li 1"re tic,plifil tjt,.ik.: at,411.. '-aa •-. 0„ * ,....k", ,,-L, : .. , . • ,' '," .14.,, ..,., ''''• , t r11 . ' ', irt ..** 1 • ;4_ _.,„, a,,. ,' Avin... , , . ,. ,,,. ,....,i , .. i,r1.4..... ..111r, litiosipione, 11 . ,:,',30' -.. • ,i'L*0- '-. -dr 4 -- ' 1 '• 4, '''.' ' :' t 7.or - ''''N..- *i.3,". --f....,_ , ,I. 4., -.1.1. •t' -.-4 3,1 mi. , s 11. _ ' Vit.,,A • ,b„iik_, if th. i ., , - •',_ 'r t'n: ... ..r- ,s, A •s'ir 't w t'' " ' . %4.4.4..- ..1'''.- 'te. - * . ' '6,4.--N MP.1:-4 4' 1 • • ir '‘ lk. _,-,''... :I*...t4rt.r;4_ -,r .-''' .114.0k . ' • ' -_ • '..i..7.): N4.44411111. t•ir*I hi. ,. . ...,.. • ,,,, ...„ • , 4P • . , nettrr.. • 35' •'II, - , ..-, •r s 35' 35' - • , w it' 1 ,` '- ',• ....,„ik....-sr. '--ri.Px 4 9w. '* .., " • ,,L ' 35' - . el. 35' : .. :"'• ,,.&.• •Ar . V Nr - • ' • . ,,,,': ....- ••.,... = 35' „...A. ...,i. ,. .r. .. ... . . . 35' Termination Depth DATE: 6-2-23 CESF SOIL TEST TERMINATION DEPTH PLAN DRAWN BY TKG Proposed Rusher 80 Acre Site Supplemental Borings PROJECT#:220396.100 45 Spring Street SW PO Box 268 Concord,North Carolina,28026 0268 East Spencer, North Carolina SCALE NTS Phone (704)786 5404 Fax (704)786 7454 DRAWING NO 3 maw cemcgs com License C 0263 <::: \1 k'ROY E. .rr� } f_- CUT Wl,. - -) - - - LMAX 4F . i! '' . , 35' 1 1' `� 35' ,11 II , Sit,' � I 35' REVISIONS 1 i_ _` 3 5' ,k_____ * Termination Depth SOIL TEST TERMINATION DEPTH PLAN DATE: 6-2-23 CEST With Conceptual Overlay DRAWN BY: TKG PROJECT#:220396.100 45 Spring Street SW Proposed Rusher 80 Acre Site Supplemental Borings SCALE:Box 268 NTS Concord,North Carolina,28026-0268 Phone: 04)786-7954 East Spencer, North Carolina DRAWING NO.: 4 Fax:((70)786-540 www.cesicgs.com License C-02fi3 SOIL CLASSIFICATION CHART CORRELATION OF MAJOR DIVISIONS SYMBOLS TYPICAL GRAPH LETTER DESCRIPTIONS STANDARD PENETRATION RESISTANCE ■wo■s WITH CLEAN ' GW WELL-GRADED NoG ADRESRA GRAVELS, - RELATIVE DENSITY AND CONSISTENCY GRAVEL GRAVELS ......1. FINES AND o`?LS o`?LS GRAVELLY I Qo Qo POORLY-GRADED GRAVELS, SOILS (LITTLE OR NO FINES))o D�o DC GP GRAVEL-SAND MIXTURES,LITTLE DO n/Oe O O OR NO FINES COARSE 0 I U GRAINED GRAVELS WITH j(3 �O''C GM SILTY GRAVELS,GRAVEL-SAND- Sand and Gravel SOILS MORE THAN 50% FINES lb SILT MIXTURES OF COARSE DO o Q FRACTION !r Standard Penetration Resistance Approximate RETAINED ON NO. AVBlowSper Foot Relative Density AMOUNT OF FINES) f�� � " 0-4 Very Loose - '� s 5-10 Loose CLEAN SANDS G WELL-GRADED SANDS,GRAVELLY 11-20 Firm MORE THAN 50% SAND I SW SANDS,LITTLE OR NO FINES 21-30 Very Firm OF MATERIAL IS AND LARGER THAN SANDY `" 31-50 Dense NO.200 SIEVE SOILS POORLY-GRADED SANDS, SIZE (LITTLE OR NO FINES)::.:::::.:::.:::::::.. SP GRAVELLY SAND,LITTLE OR NO Over 50 Very Dense FINES SANDS WITH SILTY SANDS,SAND-SILT MORE THAN 50% FINES SM MIXTURES Silt and Clay OF COARSE FRACTION PASSING ON NO. Standard Penetration Resistance Approximate 4 SIEVE AMOUNT OF FINES) :.; SC MIXTURES CLAYEY SANDS,SAND-CLAY Blows per Foot Consistency 0-1 Very Soft INORGANIC SILTS AND VERY FINE 2-4 Soft ML R CLAYEY FIINEK FLOUR, OR SANDS OR CLAYEY 5-8 Firm SILTS WITH SLIGHT PLASTICITY 9-15 Stiff SILTS INORGANIC CLAYS OF LOW TO FINE AND LIQUID LIMIT `L MEDIUM PLASTICITY,GRAVELLY £t-! 0 GRAINED CLAYS SANCLAYS ] Very Hard ___ OL ORGANIC SILTS AND ORGANIC — — — SILTY CLAYS OF LOW PLASTICITY MORE THAN 50% INORGANIC SILTS,MICACEOUS OR OF MATERIAL IS MH DIATOMACEOUS FINE SAND OR SMALLER THAN SILTY SOILS CES$ NO.200 SIEVE SIZE SILTS AND LIQUID LIMIT CH INORGANIC CLAYS OF HIGH CLAYS GREATER THAN 50 l� PLASTICITY OH ORGANIC CLAYS OF MEDIUM TO ,,.., HIGH PLASTICITY,ORGANIC SILTS Key to Symbols and Descriptions HIGHLY ORGANIC SOILS ,, ,,„ ���' ,,I' = PT PEAT,HUMUS,SWAMP SOILS WITH HIGH ORGANIC CONTENTS NOTE DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS Log of Auger Boring No. B-1 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS O 0 0 L T BLOWS E T I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - - 0 ,-- 1" Gravel _ - - Stiff reddish brown clayey SILT(ML) X 3-5-9 • _ 5 _ Stiff reddish brown and brown SILT (ML) X 3-6-8 _ Stiff reddish brown, red, light brown, and yellow X 2-5-6 _ SILT(ML) J - - X 2-4-5 • —10- - - Stiff red, reddish brown, black, and light brown X 3-4-5 t -15— SILT (ML) N ,- O _ _ 0 O - - z _ _ W - - Stiff red, light brown, yellow, and black SILT x 2-4-6 Z —20— (ML) 0 Z W 0 0 _I z o 3-6-9 l\P 0_ —25— M N O N o Z _ _ ° - - Moist stiff reddish brown, light brown, black, and x 2-5-94\P 1- —30— yellow SILT(ML) Z w - 2 a• - - a - - Moist very stiff light brown, yellow, black,white, X 5-8-11 o —35 7 and reddish brown SILT(ML) 0_ - - Boring terminated at 35' W - - O - 0 J Z o Key to Abbreviations m 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-2 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS O 0 0 L T BLOWS E T I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - - o 12"Topsoil and PLOW ZONE - - Stiff reddish brown clayey SILT(ML) X 4-5-7 - - Very stiff reddish brown clayey SILT(ML) X 3-7-9 — 5 — I _ _ Stiff reddish brown and yellow slightly clayey X 2-5-6 _ SILT (ML) - - Moist stiff reddish brown, light brown, and X 3-4-5 —10— yellow SILT(ML)with trace CLAY(CL) - - Moist stiff reddish brown, light brown, yellow, X 2-5-8 • —15— and black SILT(ML) N H 0 0 - - z K - _ w X 2-4-7 z —20— z w 0 o z _ _ o - - Stiff light brown, reddish brown, black, and x 3-4-6 • —25— yellow SILT (ML) M N - O N 0 z - - o - j Moist very stiff light brown, yellow, gray, reddish x 4-7-11 • —30— brown, and black SILT(ML) z w - 2 a• - - a D - - - - Moist very stiff gray, light brown, and white SILT X 4-8-11 • o —35 - (ML) I— I - - Boring terminated at 35' - - o Key to Abbreviations m w • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-3 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L O 0 0 T BLOWS I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 10"Topsoil and PLOW ZONE �- - - Stiff reddish brown clayey SILT(ML) x 3-4-6 - -' Moist stiff reddish brown, yellowish red, and X 2-4-5 — 5 — light brown SILT(ML)with little fine SAND (SM) _ Moist stiff light brown, yellowish red,white, and X 2-4-5 _ reddish brown SILT(ML) - - Moist stiff white, light brown, and light yellow X 2-4-6 —10— SILT(ML)with little fine SAND (SM) - Moist stiff white, gray, and black SILT(ML) x 3-5-9 —15 N K - _ \ / • —20— o z 0 • - - Z _ • - - Very stiff light brownish gray,white, black, and X 4-7-11 • —25— light brown SILT(ML) - - N - N 0 Z - - o - - Moist very stiff light brownish gray, light brown, x 6-11-16 —30— black, and reddish brown SILT(ML) • w - 2 a• - - a - - - - Very stiff light brown, yellow,white, and reddish 5-11-16 • o -35 7 brown SILT(ML) I - - Boring terminated at 35' - - o Key to Abbreviations w • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-4 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) E E AND REMARKS O 0 0 L T BLOWS E T I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 - _ 3"Topsoil and PLOW ZONE - - Very stiff reddish brown clayey SILT(ML) X 5-8-10 /II - - Stiff reddish brown,yellowish red, and light I x 3-4-5 • — 5 — brown SILT(ML) _ Stiff yellowish red, light brown, and reddish X 2-4-5 • _ brown SILT(ML) - - Moist stiff yellowish red and light brown SILT X 2-4-5 • —10— (ML) j\D - - Moist stiff light brown, yellow, and reddish X 2-4-6 —15— brown SILT(ML) N H O _ _ 0 Z _ W - - Moist stiff light brown and yellow SILT(ML) X 3-6-8 z —20— o Z W 0 0 o - - Very stiff yellow, light brown, and black fine ± X 5-8-8 • • —25— sandy SILT(ML)with trace coarse SAND (SM) M 0 - O N 0 z _ _ ° - - Very stiff yellow, light brown,white, and black X 5-7-10 • —30— very fine sandy SILT (ML) Z w - 2 a• - - a D - - - - Stiff light brown,white, red, brown, and black X 4-5-8 o —35 SILT (ML)with small seams of reddish brown • - -land light brown silty CLAY(CL) Lu • - - Boring terminated at 35' u) W 0 J Z o Key to Abbreviations m 0,• GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content i LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-5 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L O T BLOWS O I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 _ _- 0 - rr 3"Topsoil - - Stiff reddish brown clayey SILT(ML) 4-4-5 - -' Moist firm red, reddish brown, and yellow SILT X 2-3-4 — 5 — (ML)with little CLAY(CL) _ Moist stiff red, yellow, black, and light brown I X 3-4-5 _ SILT(ML) x 3-5-7 —10— - - x 4-6-8 • —15— N 0 O _ - Z W - - Moist stiff light brown, reddish brown, red, black, X 4-6-8 • • —20— and yellow SILT(ML) Z _ _ W 0 o - - Moist very stiff light brown, brown, black, red, ± X 4-6-10 • —25— yellow, and reddish brown SILT(ML) - M N - N 0 Z _ _ ° - - Very stiff light brown, yellow, yellowish red, and ' x 4-8-11 4\1 • —30— black SILT (ML) - - w - 2 a• - - a - - - - Moist very stiff light brown, yellow, gray, and x 6-8-11 • o —35— black SILT(ML) I — 0 - - Boring terminated at 35' W - - 0 J Z o Key to Abbreviations w • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test Log of Auger Boring No. B-6 Page 1 of 1 CE�� Project: Rusher Property Supplimental Borings Date Drilled : 05/31/2023 Location : East Spencer,NC _ Project No. 220396.100 Drilling Method: Auger Rig Type: Mobile B47 Surface Elevation Not Determinettl. Cave-in Depth: ft. Initial GWL: Not Encountered ft. Delayed GWL: N/A ft. Boring Diameter: 6 Hammer: Drop Northing: ft. Easting: ft. SAMPLE TYPE 11 DISTURBED ® SPT SAMPLE ■ SHELBY TUBE ❑Q NO RECOVERY 0 CORE SAMPLES D MATERIAL CLASSIFICATION PL(%) NMC(%) LL(%) P AND REMARKS L T BLOWS O 0 0 I G Y PERA FINES(%) V H T W P 6 IN • SPT N-Value(bpf) (ft) (ft) H L E 10 20 30 40 50 70 90 -- 0 - \6"Topsoil and PLOW ZONE i1777 - Very stiff reddish brown clayey SILT(ML) 3-6-12 - Stiff reddish brown and red slightly clayey SILT -- 3-5-6 — 5 — (ML) II i1/1 _ Stiff red, reddish brown, yellow, and black SILT 3-4-6 _ - (ML) 3-4-7 —10— - Stiff red, light brown, reddish brown, black, and -- 4-6-7 • —15— yellow SILT (ML) V\ • _ - w 4-6-9 • • —20— o • _ _ Z _ • - - Very stiff light brown, red, brownish yellow, and -- 4-6-10 • • —25— black SILT (ML) N - - N 0 Z _ _ ° - - Very stiff yellow, light brown, reddish brown, x 3-6-12 • • —30— and black SILT(ML) w - 2 a• - - a - - - - Very stiff light brown, yellow, and black SILT -- 4-9-12 o —35--(ML) I - - Boring terminated at 35' - - o Key to Abbreviations w • GWL-Groundwater Level PL-Plastic Limit NMC-Natural Moisture Content LITH-Lithologic Symbol LL-Liquid Limit SPT-Standard Penetration Test FIELD PROCEDURE SOIL TEST BORINGS ASTM D-1586 The borings were made by advancing 5 inch diameter hollow stem augers. At regular intervals, soil samples were obtained through the hollow stem augers with a standard 1.4-inch I.D., 2.0-inch O.D., split-tube sampler. The sampler was initially seated 6 inches to penetrate any loose cuttings; then driven an additional foot with blows of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot was recorded and is designated as the standard penetration resistance. Penetration resistance, when properly evaluated, is an index to the soil's strength and density. The samples were classified in the field by the driller as they were obtained. Representative portions of each soil sample were then sealed in labeled glass jars and transported to our laboratory. The samples were examined by a graduate geotechnical engineer or engineering geologist to check visually the field classification. All boring data, including sampling intervals, penetration resistances, soil classifications, and groundwater level are shown on the attached Test Boring Records. CEST Civil — Geotechnical — Surveying May 31, 2023 Wake Hamilton Tectonic, LLC 101 South Kings Drive Suite 200 Charlotte, North Carolina 28204 Reference: Seasonal High Groundwater Determination Proposed Rusher 80 Acre Site Development East Spencer, North Carolina CESI Project Number 220396.100 Mr. Hamilton, CESI has performed a seasonal high groundwater determination for three proposed Stormwater BMP's for the Rusher 80 Acre Site Development project. We completed this seasonal high groundwater determination in accordance with an email request from Tim Wipperman of Arco Design/Build and your concurrence. On 5-25-23 CESI performed hand auger borings within the locations of the proposed BMP ponds. Test location coordinates as well as approximate ground elevations and bottom of proposed basin elevations were provided by Arco prior to our mobilization. The test locations were not surveyed. Rather, recreational grade GPS equipment was utilized to locate the test points. See below for approximate test locations. • AI\ ARCO ,/ DESIGN/BUILD • )31 r I` ;\ ' \\\` I \` \\X , - 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicgs.com NC License No. C-0263 Once each of the hand auger borings was complete, the soils and site conditions were recorded, and each location was left open to acclimate. On 5-30-23 CESI returned to the site to observe the conditions of the augered hole. The following seasonal high water table information should be utilized for basin design: BMP-1 At BMP-1, hand auger cuttings consisted of residual slightly sandy clayey SILT (ML) down to a termination depth of 7 feet below ground surface. No water was encountered during hand auger boring operations nor approximately 120 hours later. Based on our geotechnical findings and site observations, the seasonal high groundwater elevation is deeper than elevation 638. BMP-2 At BMP-2, near surface hand auger cuttings consisted of residual slightly sandy clayey SILT (ML). However, the soils transitioned from moist at 2' and very moist at 4'. Water was encountered at 6 feet below ground surface and presented difficulties advancing deeper in the soil stratum. Multiple attempts were taken but the amount of subsurface water prevented excavation past 7 feet below ground surface. The subsurface was allowed to acclimate a moment and was measured at 6' below ground surface. Approximately 120 hours after hand auger boring operations, the conditions of the augered hole were observed. The water level had stabilized at a level 6.5'below ground surface. Based on our geotechnical findings and site observations, the seasonal high groundwater elevation is approximately 646.0. The civil designer should be notified of the findings and will have to modify the proposed BMP configuration accordingly. BMP-3 At BMP-3, hand auger cuttings consisted of residual slightly sandy clayey SILT (ML) down to a hand auger refusal depth of 10 feet below ground surface. It was noted that layers of slightly elastic SILT (ML) was encountered between 6' and 8.5' below ground surface. No water was encountered during hand auger boring operations. However, groundwater was encountered approximately 120 hours after hand auger boring operations and the water surface measured. Based on our geotechnical findings and site observations, the seasonal high groundwater elevation is approximately 637.0. Based on the preliminary information provided, slight modification of the BMP may be warranted. Rusher 80 Acre Site Development(East Spencer, NC)SHWT Determination May 31,2023 CESI Project Number 220396.100 Page 2 We appreciate the opportunity to be of service on the Rusher 80 Acre Site development project. If you have any questions, please feel free to call. Respectfully submitted, CESI \\\c�H`\\\���m CA RO4'/�i ' pF ESS/p�ti9 19rqP° SEAL < , 27837 5/ . 1/23 FNGI C. 01/4, ` 4 James G. (Jay) Eaves III, PE Engineer/ Division Manager NC Registration Number 27837 Rusher 80 Acre Site Development(East Spencer, NC)SHWT Determination May 31,2023 CESI Project Number 220396.100 Page 3 5/11/23, 10:17 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 °°\ Location name: Salisbury,North Carolina,USA* '''' Latitude:35.6824°,Longitude: -80.4136° a noon I Elevation:m/ft** i .175,i 4' *source:ESRI Maps "w -.nu° **source:USGS "`" y POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.62 5.47 6.38 7.01 7.69 8.15 8.54 8.88 9.22 9.43 (4.26-5.02) (5.05-5.95) (5.87-6.94) (6.43-7.60) (7.03-8.34) (7.42-8.83) (7.73-9.26) (7.99-9.64) (8.22-10.0) (8.34-10.3) 10-min 3.69 4.37 5.11 5.60 6.13 6.49 6.79 7.03 7.29 7.43 (3.40-4.01) (4.04-4.76) (4.70-5.56) (5.14-6.07) I (5.60-6.64) (5.90-7.03) (6.14-7.36) (6.33-7.64) (6.50-7.93) (6.56-8.10) 15-min 3.08 3.67 4.31 4.72 5.18 5.48 5.72 5.92 6.12 6.22 (2.84-3.34) (3.38-3.99) (3.96-4.68) (4.34-5.12) (4.74-5.61) (4.98-5.94) (5.18-6.20) (5.32-6.42) (5.45-6.66) (5.49-6.78) 30-min 2.11 2.53 3.06 3.42 3.84 4.13 4.38 4.61 4.87 5.03 (1.94-2.29) (2.34-2.76) (2.82-3.33) (3.14-3.71) (3.51-4.16) (3.75-4.47) (3.96-4.75) (4.15-5.00) (4.34-5.30) (4.45-5.49) 60-min 1.32 1.59 1.96 2.23 2.56 2.80 3.02 3.23 3.49 3.67 (1.21-1.43) (1.47-1.73) (1.81-2.13) (2.05-2.42) (2.34-2.77) (2.54-3.03) (2.73-3.27) (2.91-3.51) (3.11-3.80) (3.25-4.01) 2-hr 0.758 0.918 1.14 1.31 1.52 1.68 1.83 1.98 2.17 2.30 (0.698-0.826) (0.844-1.00) (1.05-1.24) (1.20-1.42) (1.38-1.65) (1.52-1.82) (1.65-1.99) (1.77-2.15) (1.91-2.36) (2.01-2.51) 3-hr 0.537 0.650 0.811 0.932 1.09 1.21 1.33 I 1.45 1.60 1.72 (0.495-0.586) (0.599-0.709) (0.746-0.884) (0.854-1.01) (0.992-1.18) (1.10-1.31) (1.20-1.44) (1.29-1.57) (1.41-1.74) (1.49-1.87) 6-hr 0.326 0.393 0.491 0.566 0.665 1 0.743 0.821 0.899 1.00 1.08 (0.300-0.356) (0.362-0.430) (0.451-0.536) (0.518-0.616) (0.606-0.722)1(0.672-0.806) (0.736-0.890)1(0.798-0.974) (0.878-1.09) (0.936-1.18) 12-hr 0.191 0.230 0.288 0.334 0.396 0.446 0.496 0.548 0.618 0.673 (0.176-0.208) (0.212-0.252) (0.265-0.315) (0.306-0.364) (0.360-0.430) (0.402-0.482) (0.443-0.536) (0.484-0.591) (0.537-0.667) (0.576-0.726) 24-hr 0.115 0.138 0.174 0.201 0.238 0.268 0.298 0.329 0.371 0.404 (0.107-0.123) (0.129-0.149) (0.162-0.186) (0.187-0.216) (0.221-0.256) (0.249-0.287) (0.276-0.320) (0.304-0.353) (0.341-0.399) (0.370-0.435) 2-day 0.066 0.080 0.100 0.115 0.135 0.151 0.168 ' 0.185 1 0.207 0.225 (0.062-0.071) (0.075-0.086) (0.093-0.106) (0.107-0.123) (0.126-0.144) (0.141-0.162) (0.156-0.179)I(0.171-0.197) (0.191-0.222) (0.206-0.241) 3-day 0.047 0.057 0.070 0.081 0.095 0.106 0.118 0.129 0.145 0.158 (0.044-0.050) (0.053-0.061) (0.066-0.075) (0.075-0.086) (0.089-0.101) (0.099-0.113) (0.109-0.126) (0.120-0.138) (0.134-0.156) (0.145-0.169) 4-day 0.038 0.045 0.055 0.064 0.075 0.084 I 0.093 0.102 0.114 I 0.124 (0.035-0.040) (0.042-0.048) (0.052-0.059) (0.060-0.068) (0.070-0.080) (0.078-0.089) (0.086-0.099) (0.094-0.109) (0.105-0.122) (0.114-0.133) 7-day 0.025 0.030 0.036 0.041 0.048 0.053 0.059 0.064 0.072 0.078 (0.023-0.026) (0.028-0.031) (0.034-0.038) (0.038-0.043) (0.045-0.051) (0.050-0.057) (0.055-0.062) (0.060-0.069) (0.067-0.077) (0.072-0.084) 10-day 0.020 0.023 0.028 0.032 0.037 0.041 0.045 0.049 0.054 0.058 (0.019-0.021) (0.022-0.025) (0.027-0.030) (0.030-0.034) (0.035-0.039) (0.038-0.043) (0.042-0.047) (0.045-0.051) (0.050-0.057) (0.054-0.062)I 20-day 0.013 0.016 0.018 0.021 0.024 0.026 0.028 0.031 0.034 0.037 (0.013-0.014) (0.015-0.016) (0.018-0.019) (0.020-0.022) (0.022-0.025) (0.025-0.027) (0.027-0.030) (0.029-0.032) (0.032-0.036) (0.034-0.039) 30-day 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.023 0.026 0.027 (0.010-0.011) (0.012-0.013) (0.014-0.016) (0.016-0.017) (0.018-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) 45-day 0.009 0.011 0.012 0.013 0.015 0.016 0.017 0.018 0.020 0.021 (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.019-0.021) (0.020-0.022) 60-day 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.017 (0.008-0.009) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.017-0.018)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=intensity&units=english&series=pds 1/4 5/11/23, 10:17AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.6824°, Longitude: -80.4136° 10.000 1 1 I 1 1 . Average recuence c c :::: T G — 200 a 500 — 1000 0.001 — c c c c c 6- 6- 6- i- k- >, >,>. >, >, >, >, >,>. 'F •- •- .1= •- -c -c -c -c -c IO IO ID co IO co co IO IO N r11 lb N V N A4. -D -0-D -0 -D -D -D -0-0 iA OI -I rn lD r-1 f r- o o fo CI o ID Duration 10.000 1 I 1 I- _ 1 1 .. 1.000 ---------- l Duration — 5-min — 2-day I 0.100i 0.010 - _ — 2-hr — 20-day i — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day 0.001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu May 11 14:17:12 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=intensity&units=english&series=pds 2/4 5/11/23, 10:17 AM Precipitation Frequency Data Server Spencer EastspIar 2.9 3km nd 2mi Large scale terrain X Bristol -,�_ ,1 • 0 �ty ,, Winston-Salem • • Durham �' Greensboro • tot Mitchell I Raleigl • —•— Asheville NORTH IAROLINA 0" 'Charlotte Fayetteville • 100km 60mi > I ry AROI TNA Large scale map )ort Poo' .I Johnson City Winston-Salem Greensboro Durham Raleigl Ash, © North Carolina arl otte F + inn Greenville 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=intensity&units=english&series=pds 3/4 5/11/23, 10:17AM Precipitation Frequency Data Server SPOLt_..Bn st 0l • Johnson Ci • Winston-Salem Greensboro Durham . Raleig Asheville • • North Carolina Charlotte • Fflvill • Greenville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=intensity&units=english&series=pds 4/4 5/11/23, 10:16 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 °°\ Location name: Salisbury,North Carolina,USA* '''' Latitude:35.6824°,Longitude: -80.4136° a none I .„ .175,i Elevation:m/ft** i 4' *source:ESRI Maps "w -.nu° **source:USGS "`"". POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.385 0.456 0.532 0.584 0.641 0.679 0.712 0.740 0.768 0.786 (0.355-0.418) (0.421-0.496) (0.489-0.578) (0.536-0.633) (0.586-0.695) (0.618-0.736) (0.644-0.772) (0.666-0.803) (0.685-0.836) (0.695-0.857) 10-min 0.615 0.729 0.852 0.934 1.02 1.08 1.13 1.17 1.22 1.24 (0.567-0.668) (0.673-0.794) (0.783-0.926) (0.857-1.01) (0.934-1.11) (0.984-1.17) (1.02-1.23) (1.06-1.27) (1.08-1.32) (1.09-1.35) 15-min 0.769 0.917 1.08 1.18 1.30 1.37 1.43 1.48 1.53 1.55 (0.709-0.835) (0.846-0.998) (0.991-1.17) (1.08-1.28) (1.18-1.40) (1.25-1.48) (1.29-1.55) (1.33-1.61) (1.36-1.66) _(1.37-1.69) 30-min 1.06 1.27 1.53 1.71 1.92 2.06 2.19 2.30 2.43 2.52 (0.972-1.14) (1.17-1.38) (1.41-1.66) (1.57-1.86) (1.75-2.08) (1.88-2.24) (1.98-2.38) (2.07-2.50) (2.17-2.65) (2.22-2.74) 60-min 1.32 1.59 1.96 2.23 2.56 2.80 3.02 3.23 3.49 3.67 (1.21-1.43) (1.47-1.73) (1.81-2.13) (2.05-2.42) (2.34-2.77) (2.54-3.03) (2.73-3.27) (2.91-3.51) (3.11-3.80) (3.25-4.01) 2-hr 1.52 1.84 2.28 2.61 3.04 3.35 3.66 3.95 4.33 4.61 (1.40-1.65) (1.69-2.00) (2.10-2.49) (2.39-2.84) (2.77-3.30) (3.04-3.64) (3.29-3.98) (3.53-4.30) (3.83-4.72) (4.03-5.03) 3-hr 1.61 1.95 2.44 2.80 3.27 3.64 4.00 4.35 4.81 5.16 (1.49-1.76) (1.80-2.13) (2.24-2.65) (2.56-3.04) (2.98-3.55) (3.29-3.94) (3.59-4.33)_ (3.88-4.72) (4.23-5.23) (4.48-5.62) 6-hr 1.96 2.35 2.94 3.39 3.98 1 4.45 4.92 5.39 6.01 6.49 (1.80-2.13) (2.17-2.57) (2.70-3.21) (3.10-3.69) (3.63-4.33) I (4.02-4.83) (4.41-5.33) (4.78-5.84) (5.26-6.52) I (5.61-7.04) 12-hr 2.30 2.77 3.47 4.03 4.78 5.37 5.98 6.60 7.45 8.11 (2.12-2.51) (2.55-3.04) (3.19-3.79) (3.69-4.39) (4.34-5.18) (4.84-5.81) (5.34-6.46) (5.83-7.13) (6.47-8.04) (6.94-8.74) 24-hr 2.75 3.32 4.16 4.82 5.72 6.43 7.15 7.90 8.91 9.70 (2.57-2.95) (3.11-3.57) (3.89-4.47) (4.50-5.18) (5.32-6.14) (5.97-6.90) (6.62-7.67) (7.28-8.47) (8.18-9.57) (8.88-10.4) 2-day 3.19 3.84 4.78 5.51 6.49 7.27 8.06 8.87 9.96 10.8 (2.98-3.41) (3.60-4.11) I (4.47-5.11) (5.14-5.88) (6.05-6.93) (6.76-7.77) (7.47-8.61) (8.19-9.48) (9.16-10.7) (9.91-11.6) 3-day 3.40 4.08 5.05 5.81 6.84 7.65 8.48 9.32 10.5 11.4 (3.18-3.62) (3.83-4.36) (4.73-5.39) (5.43-6.19) (6.38-7.29) (7.12-8.17) (7.86-9.05) (8.62-9.96) (9.64-11.2) (10.4-12.2) 4-day 3.60 4.32 5.32 6.11 7.18 8.03 8.90 9.78 11.0 11.9 (3.38-3.83) (4.06-4.60) (4.99-5.67) (5.72-6.51) (6.70-7.65) (7.48-8.56) (8.26-9.49) (9.05-10.4) (10.1-11.8) (10.9-12.8) 7-day 4.15 4.96 6.03 6.87 8.03 8.95 9.88 10.8 12.1 13.1 (3.92-4.42) (4.68-5.27) (5.68-6.40) (6.47-7.30)_ (7.54-8.53) (8.37-9.50) (9.21-10.5) (10.1-11.5) (11.2-12.9) (12.1-14.0)_ 10-day 4.73 5.63 6.76 7.65 8.83 9.76 10.7 11.6 12.9 I 13.9 (4.49-5.01) (5.34-5.95) (6.40-7.14) (7.23-8.07) (8.33-9.33) (9.19-10.3) (10.1-11.3) (10.9-12.3) (12.1-13.7) (12.9-14.8) 20-day 6.37 7.52 8.87 9.94 11.4 12.5 13.7 14.8 16.4 17.6 (6.06-6.69) (7.15-7.89) (8.43-9.31) (9.44-10.4) (10.8-12.0) (11.8-13.2) (12.9-14.4) _(13.9-15.6) (15.3-17.3) (16.4-18.6) 30-day 7.88 9.26 10.8 11.9 13.4 14.6 15.8 16.9 18.4 19.6 (7.53-8.24) (8.85-9.68) (10.3-11.2) (11.4-12.4) (12.8-14.0) (13.9-15.3)_ (14.9-16.5) (16.0-17.7) (17.3-19.3) (18.4-20.6) 45-day 9.91 11.6 13.2 14.5 16.2 17.4 18.6 19.8 21.4 22.5 (9.52-10.3) (11.1-12.1) (12.7-13.8) (13.9-15.1) (15.5-16.8) (16.6-18.1) (17.7-19.4) (18.8-20.7) , (20.2-22.3) (21.3-23.6) 60-day 11.8 13.7 15.5 16.9 18.6 19.9 21.2 22.4 24.0 25.2 (11.4-12.3) (13.2-14.3) (14.9-16.1) (16.2-17.5) (17.9-19.3) (19.1-20.7) I (20.3-22.0) (21.4-23.3) (22.9-25.0) 1 (23.9-26.3) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=depth&units=english&series=pds 1/4 5/11/23, 10:16AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.6824°, Longitude: -80.4136° 30 1 1 1 Average recurrence 25 i interval (years) c — 1 20 - 2 a v — 5 c 15 ----- — 10 • — 25 'B. — 50 'v 10 ' — 100 0- — 200 5 .. _ T -. - 500 r_ _� — 1000 0 — -E •E •E E •E L L L L L r0 f0 /0 N 40 l0 l0 r0 r0 O N f11 lb N � � �� � � � �� IA OI -I rn lD r-1 (V N f�1 I. O N 0 CI ID Duration 30 r 25 c r 20 _ Duration a a) — 5-min — 2-day 15 — 10-min — 3-day 15-min — 4-day +.. — 30-min — 7-day E. 'G 10 — 60-min — 10-day v a` — 2fir — 20-day 3-hr — 30-day 5 _ — 6-hr — 45-day — 12-hr — 60-day 0 '— i i I i r I 1 1 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu May 11 14:16:36 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=depth&units=english&series=pds 2/4 5/11/23, 10:16 AM Precipitation Frequency Data Server Spencer EastspIar 3km nd 2mi Large scale terrain X Bristol -,�_ ,1 • 0 �ty ,, Winston-Salem • • Durham �' Greensboro • tot Mitchell I Raleigl • —•— Asheville NORTH IAROLINA 0" 'Charlotte Fayetteville • 100km 60mi > I ry AROI TNA Large scale map )ort Poo' .I Johnson City Winston-Salem Greensboro Durham Raleigl Ash, © North Carolina arl otte F + ille Greenville 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=depth&units=english&series=pds 3/4 5/11/23, 10:16AM Precipitation Frequency Data Server SPOLt_..Bn st 0l • Johnson Ci • Winston-Salem Greensboro Durham . Raleig Asheville • • North Carolina Charlotte • Fflvill • Greenville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6824&Ion=-80.4136&data=depth&units=english&series=pds 4/4 <DEl> <DE2> EX IDA 1 EX Er 2 EDP1 EDP2 Existing Design Point 1 Existing Design Point 2 SubCat Reach 'On. MU _ _ _ _ Routing Diagram for NC111 -Storm Prepared by ARCO Business Services, Printed 6/23/2023 HydroCAD®10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.75 2 2 2-Year Type II 24-hr Default 24.00 1 3.32 2 3 10-Year Type II 24-hr Default 24.00 1 4.82 2 4 25-Year Type II 24-hr Default 24.00 1 5.72 2 5 50-Year Type II 24-hr Default 24.00 1 6.43 2 6 100-Year Type II 24-hr Default 24.00 1 7.15 2 NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 3 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 49.720 61 >75% Grass cover, Good, HSG B (DE1, DE2) 51.700 55 Woods, Good, HSG B (DE1, DE2) 101.420 58 TOTAL AREA NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 101.420 HSG B DE1, DE2 0.000 HSG C 0.000 HSG D 0.000 Other 101.420 TOTAL AREA NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 49.720 0.000 0.000 0.000 49.720 >75% Grass cover, Good DE1, DE2 0.000 51.700 0.000 0.000 0.000 51.700 Woods, Good DE1, DE2 0.000 101.420 0.000 0.000 0.000 101.420 TOTAL AREA NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 6 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=0.20" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=1.75 cfs 0.522 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=0.20" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=4.07 cfs 1.154 af Reach EDP1: Existing Design Point 1 Inflow=1.75 cfs 0.522 af Outflow=1.75 cfs 0.522 af Reach EDP2: Existing Design Point 2 Inflow=4.07 cfs 1.154 af Outflow=4.07 cfs 1.154 af Total Runoff Area = 101.420 ac Runoff Volume = 1.676 af Average Runoff Depth = 0.20" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment DE1: EX DA 1 Runoff = 1.75 cfs @ 12.53 hrs, Volume= 0.522 af, Depth= 0.20" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph I I I I 1 I 1 1 ❑Runoff 11 75 cfs 1 I I I I I I I I Type II 24-hr 111711, R'lainfal102. 5 ' Ruihoff Area=31.600 arc I I I I I I I / Runoff Volume=0.5{2�22 of I *II �n IffIlIDeptl� O II I I I LL 1 1 FlOW Length=1,785' Tc=35.16 min I 1 " 1 1 1 o r //l�//��//�l//��// ,,,,,,,, ,,;,�,,;, ,,;, ,,;,,,,, l( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DE2: EX DA 2 Runoff = 4.07 cfs @ 12.46 hrs, Volume= 1.154 af, Depth= 0.20" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph I I 1 I I 1 I I 1 1 1 I I 1 1 1 1 1 I I 1 I I 1 I I I I I I I I I ■Runoff - I I4o7cfs _L I H I _L I 1 I _1 I - 4/ 1 I I I I I I I I I I Type 11124-hr I I 1�Y�alrl R1lainfall 2.�15�' - I 1 Hof# Area=69.820 arc - 31 I I 1 I - 1 1 Runoff1Volume=1 .154 of 1 ou;n4171Dppth=0. 011' LL 2 I Flow' Length=3,350' 1 1 I I I I I 1 1 1 - I 1 i 1 1 1 1 Tc=32.10 min I I I ////// I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 9 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 0.20" for 1-Year event Inflow = 1.75 cfs @ 12.53 hrs, Volume= 0.522 af Outflow = 1.75 cfs @ 12.53 hrs, Volume= 0.522 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph / I I I I I ❑Inflow I I I ® 0 Outflow UM- IInflowlArea=31 .600 ac /% I I II II II II j1I 1I II II II II 0 1� 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 10 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 0.20" for 1-Year event Inflow = 4.07 cfs @ 12.46 hrs, Volume= 1.154 af Outflow = 4.07 cfs @ 12.46 hrs, Volume= 1.154 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph / I I I I I I I I I I ❑Inflow —1— —I _l407 5 I—I — F 0 Outflow 1 '407cfs 1 Inflow Area=69.820 ac 4— Øllllll 1 1 I 1 I I I I I I I 1 3 1 I 1 11 I I 1 1 w 1 _ 1_ A _ 1 L 1_ I I_ L A I_ L _I 1_ A _ 3o 1 1 Li 2 I 1 I 1 . 1 I 1 I 1 im‘imal 1 ' I I I I I 0 / . I I 4II IIiI���' '' �fT (�S�ST�fT �T1�T�fT (�1(� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 11 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=0.38" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=5.21 cfs 1.012 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=0.38" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=12.36 cfs 2.237 af Reach EDP1: Existing Design Point 1 Inflow=5.21 cfs 1.012 af Outflow=5.21 cfs 1.012 of Reach EDP2: Existing Design Point 2 Inflow=12.36 cfs 2.237 af Outflow=12.36 cfs 2.237 af Total Runoff Area = 101.420 ac Runoff Volume = 3.249 af Average Runoff Depth = 0.38" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment DE1: EX DA 1 Runoff = 5.21 cfs @ 12.43 hrs, Volume= 1.012 af, Depth= 0.38" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph 1 1 1 1 1 1 1 I I I I I ❑Runoff - 1521 cfs I I I I 1 1 1 I * I 1 {, 5./ 1 I 1 I I I I I 1 Type 11124-hr 1 12.Year1 R'ainfall�3.42;' 4� 1 i 1 1 / I I RUhOff Area 31.6D0 arc - I I I I I 1 1 1 - 1 Runoff Volume=1.012 of -- - L 1 ulIY" IIDepuh7-0-3a'1 3Z / I 1 11 I FlOW Langth=1,7�85' Tc=35.16 nin - %% I 1 1 I 1 1 I �T'Y 5 1 / t fi rt rt ����II/ 1 1 1 1 id!:0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment DE2: EX DA 2 Runoff = 12.36 cfs @ 12.38 hrs, Volume= 2.237 af, Depth= 0.38" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph 11 1 I I 1 I I I I I I I I I 1 1 1 1 1 H - I- t -I- t - I - 1- -h -I- f -I- T -I - H - t -I- - -1 - H - ■Runoff 131/ 1 1 12.36 cfs I I I I I I I I I I I I I I I I 12 1 1 1 1 1 Tyrpe II124-hr / / - I- 7 -1 T T -1- T -1 - - I- T -1- T 11 Y - - H _ I_ 4 _ 1_ 4 1 4 �2� ar Railnfall3. 2� 10 -/ 1 1 1 I I I I I I I Ru wf#-Area=69.820_at 1 1 1 1 1 I I 1 1 I 1 1 1 1 4- H - 1- -F H H -f -1 - -Runoff--V- 0 -7 of t - - H I 1 1 1 1 1 T"1"� 1� Yp p ""1 LL 6_ Ø 5- I 1 1 I I I I I 1 1 1 1 Tc=32.10 m i n 3iv I 1 1 � I I I I I I I I I I I I I 2_ T1 1 1 1 1 1 1 1 I I I I I -1 - 177 1 T 1 T f 1 1 1- 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 14 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 0.38" for 2-Year event Inflow = 5.21 cfs @ 12.43 hrs, Volume= 1.012 af Outflow = 5.21 cfs @ 12.43 hrs, Volume= 1.012 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph / I I I ❑Inflow - I I 1 I I 115.21 cfs I I 1 I 1 ElOutflow '5.21cfs 1 1 I 1 Inflow Area=31 .600 ac � 5- i/ I I I 1 I I I II I I I I 4 / 1 I 1 1 I I I II I I I I // r rt I r -1 1 rt I r I I r —1 1— -r —1 o LL _ - I- -H -I - I- + -1- ]- H -I- -H - 2 I I I I I I 1 ( 1 1 I I I 1_11 I 1 I I 1-"/ 1 1 1 1 1 .� //// 1 1 1 1 1 I I I I I I I ///////// i 1 1 1 1 I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 15 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 0.38" for 2-Year event Inflow = 12.36 cfs @ 12.38 hrs, Volume= 2.237 af Outflow = 12.36 cfs @ 12.38 hrs, Volume= 2.237 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph I I I I I 1 1 1 1 1 -1 - - f- H 1 t 1 1- 1 1 t 1 1 -1 1 1- H 1 -1 Inflow L -,- y 11236cfs I 1 I —1— L H -I- I -I - 1- L I- L L - I- �Outflow 13� - 1 1 1 1123;fs r 1 1 1 Inflow Area=6918201 ac 12� 111! -t -1- L -I - -I- t- - - 1- t -1 - 1- -I -I- fi -1 - 1- - -1- 1- H - L -1- L1 -I- LJ - I- t1 - L1I- LILL1LL 10 9� g� 4 -1- 1- H - 1- + -1 - H 4 -1- + -1 - 1- -P -I 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 3 �: i I I 1 I 1 1 I 1 1 1 1 1 1 1 1 I LL 51 ' -1 -1- L -1 - �/ 1- 1- H - 1- + -1 - HH -1- H 1 - 1 -1 -1- 1- H - 1 - 4 / 1 _ I 1 1 I 1 1 1 1 1 1 1 1 � i % 2� - 1 -1 /� ' //�/f� // 1 1 1 . 1: A / �1T ITS�1T ITS fr l f ��f 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 16 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=1.07" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=21.31 cfs 2.821 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=1.07" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=50.84 cfs 6.232 af Reach EDP1: Existing Design Point 1 Inflow=21.31 cfs 2.821 af Outflow=21.31 cfs 2.821 af Reach EDP2: Existing Design Point 2 Inflow=50.84 cfs 6.232 af Outflow=50.84 cfs 6.232 af Total Runoff Area = 101.420 ac Runoff Volume = 9.053 af Average Runoff Depth = 1.07" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment DE1: EX DA 1 Runoff = 21.31 cfs @ 12.37 hrs, Volume= 2.821 af, Depth= 1.07" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph 1 1 1 I I 1 1 1 1 I 1 1 1 1 I I 1 1 234./ _ 1 1 1 I I 1 1 I I 1 1 I I 1 1 I I 1 1 I I 1 1 - ■Runoff 224/ / H — I— 4 —I—121.31 cfs I— H — I— 4 —1— 4 —1— 4 —1 — h- 4 — 1— —1 — '-11 — — 21 — rt I fi h H 1 H 1 T 1 t 1 L rt 1 1 ypel 11—L4 20 1 T 1 T T T T 1 18 1 1 1 1 1 1 1 1 1 1 1 o-7 TYpa11 Kai Inf H� `I � — � }�Q - 17 , - - I - -I- - H 1 I T 1 R�IIIVff�1rea 31.V_VV_afrr 16 — H 1 H -1- - ' H H 1 H —I— T —Ip H 1 H H 11— H 1 H 15 " T - 1— T —I— - T T — I— T —1— T -IRu noff lume 2.82 -af 14 — 13 1 1 1 1 1 1 1 1 1 1 1 1 L. 1 1ii � , 1 1 _I I 1 1 T I L n4fF1LIgp hz1. 7L 12; G 011 - I- -I- - I- H - I- 4 -I- -I- -blowtemdth='9785' 10� � � T 1 T T 1 T 1 � rt 1 fi�� 94 _ 8� _ 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1Tc 35.IV in - 7 ,_ 1 1 1 1 1 1 1 1 1 1 (� 64/ - 1- I -1- -. I- - 1- -1- -L -1- -1 - H - 1- I -1-`� -_1 _0 - 54/ — - I - I H I t I h 1 I- t I t 1 T - 3 1 T I - I- T -I- T -I- T I T T - I- T -I- T I T = 2� I 1_ I ' 1 1 1 1 I ' ' 1 1 ' ' 1 I_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment DE2: EX DA 2 Runoff = 50.84 cfs @ 12.32 hrs, Volume= 6.232 af, Depth= 1.07" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph �) I I I I I I I I I I I I I I I I I I 551 I I I I I I I I I I I I I I I I I I I I I I I ■Runoff - I- 4 -1-Iso.84 H I- -I T -I- H -I - H - I- 4 1- L -I H - 50:-/ 1 1 1 ./ 1 1 1 1 1 1 1 1 1 1 (Type 11124-hr rt 1- 1 7I I OTYar RlainfaIIT4.�2� 45� 401-/ 1 1 Runoff Area=69.820 at - 351 1 1 1 Runoff Volume=6.232 af 30 � � - 1- Imo - -1- I -1- kiingffllp`I'p4hT1.1107lv' I 1 I I I I I LL 25� 1 1 1 1 Flom Len jth=3,350' 20- 1 1 1 I I I I I I 1 I I 1 Tc=32.i0 mi n - I- 4 I I- -I -1- -I - - I- 4 I-r6-Kt 15_ 1 1 1 I I I I I 1 I I 1 1 I `T'Y if 10� 7 I- - 7 T 1 7 -1 7 1 � - 4_ 1 1 1 At ,, 1 1 1 1 1 1 1 1 o= ����ll��ll��������� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 19 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 1.07" for 10-Year event Inflow = 21.31 cfs @ 12.37 hrs, Volume= 2.821 af Outflow = 21.31 cfs @ 12.37 hrs, Volume= 2.821 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph I I I I I I I I I I I I I I I L L 1 _I L J T L I_ L I_ L L L _ - CInflow 23� / z- H -1- L 1 21,31 -1 H H 1 + 1 1 H 1 t 1 1- H 1 H H 1 - -0 Outflow 22=/ / z- 7 I T 1121.31ds -1- T T 1 T -I-Inflow Ar a=3 t600-iac- 20� z / 1 1 1 0 I I I I I I I I I I I I I I I I 194/ / -1- -1I- - - 1- T -1- 1- 4 -1- T -1 - 1- -1- 1- - - 1- - 184-/ / /- t -1- t -1 1- 1- - - 1- t -1- 1- -1 -1- t -1 - 1- t -1- 1- - - 1- - 17 / z- 1 1 1 1 I I I I I I I I I I I I I I I I I 164/ / / - - 154/ / L 1 L I _ _1 L A 1 I 1 L A 1 L I 1 L 1 L L 1 - 144/ / z- 4 -I- L 1 - -I- I- -I 1 T -I- I- 4 -I- T 1 1 4 -I- L -I 1 - u13 / 7 -1- T -1 -1- TT - 1- T -1 - TT -1- T -1 - 1- T -1- TT - 1- - 3 11 / � 1 1 1 _1 I I I I I I I I - LL 104"/ / 4 1 L 1 I- I- -1 1 T -1- I- -I -1 T 1 1 4 -1- L -I 1 - 9/ / fit -1- t -1 r -1- 1- -I - 1- t -1- 1- -1 -1- t -1 - 1- t -1- 1- t - - - 8� / /- T -I- T -1 1- TT - 1- T -1- TT -1- T -1 - I 7 -1- 77 - I- - 7 / /-64 / /- L _1_ L -1 1 _ L _1 - 1- 1 _I_ L _I _I_ L _I - 1- L _I- L L - I_ _ 5 / fi rt/`1 "/� 1 H 1 - - I- T I rt I- I T 1 1 rt 1 -H 1 - 37. 1k " A. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 20 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 1.07" for 10-Year event Inflow = 50.84 cfs @ 12.32 hrs, Volume= 6.232 af Outflow = 50.84 cfs @ 12.32 hrs, Volume= 6.232 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph I I I I I I 1 I I I - I I I I I I I I I I I I I I ■Inflow 55 4 -1- T I 50 84 cfs I I— —I — I— + —I— I— 4 —I— + —I — I— 4 —I— —I — I— ❑Outflow 1 5084cfs. I I 1 Inflow Area=6918201 ac 501/ 45� / I I I I I I I I I I I 1 i I 1 I 1 I 1 I 401/ -t -I- -I - 2 - ± -I- I- 4 -I- t -I - - -t -I- 1- -I - - - 30:/ / H I - / - 1 I - I H 1- 1 1 1 H -I 1_ _I - 3 = i 1 1 1 1 1 1 1 1 ' 251-/ rt -1- -r -I - r i -1- -r -1 - I- rt -1- 1- - - I- - i 1 I I I 1 I I 1 201/ 15?' I - I- -I -I I I I I I IInk 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 21 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=1.58" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=34.22 cfs 4.174 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=1.58" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=81.55 cfs 9.222 af Reach EDP1: Existing Design Point 1 Inflow=34.22 cfs 4.174 af Outflow=34.22 cfs 4.174 af Reach EDP2: Existing Design Point 2 Inflow=81.55 cfs 9.222 af Outflow=81.55 cfs 9.222 af Total Runoff Area = 101.420 ac Runoff Volume = 13.395 af Average Runoff Depth = 1.58" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment DE1: EX DA 1 Runoff = 34.22 cfs @ 12.35 hrs, Volume= 4.174 af, Depth= 1.58" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph -f - I- t -I- I - t i t -I- i I I I - t -I- 1- -I - r 38: H - 1 t -I- - - H H - I- H -I fi -I- H 1 - H H I- ± -I- t 1 f- - ■Runoff 36� - 1- t - 134 22 cfs I 1- —I — I— H — — t- —I— 1 —1 — b H — 1— ± —II— H H- — b - 34 - 1 t -I - f- H - I H 1- fi -I- 1-II + I - HH I H H I HH I + I t 30 _ 1- + -I- - HH - I- -1- + -1- 5rYw gaiifa11r5`l2H - 28 H - I- + -I- ,/- - H - I- 4 -I- + -1-Runoff Are-a 3I.VVV'at 264./ - H - 1 H- -I- - - HH - 1 H -1- H- -I- H 1 - HH - 1 H- -I H 1 - H - 24 H - I- + -1- - H H - I- 4 -1- + -1RU-foffFV-Okinleg4.f74--af - 22 - I- 4 -I- - H - I- 4 -1- -1- 1Hff1D+ #�+1.1 -20_ -1 - I- H- -I- - 1- H - I- H- -I- -1- G IB 1 Y 1 p7 7 1— 16- - I- 4 -1- 1- - I- 4 -1- -1- -1 -4- - I- -I- -k�c-1 - - 1 ,— -I - 1- 4 -I- - '- H - I- H- -1- � -I- H- -1 - H- -f - ITC—�.i6-111Tf - 104-/ „ - 1- _L -I- 1- - 1- -1- -1- -1 - H - I- -H -I-`"till 8� 1 H 1 - J I _L 1 _L I H- H I H I H H- - _ 1- 1 1 _1 _ -I _ I ' 1 - - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment DE2: EX DA 2 Runoff = 81.55 cfs @ 12.30 hrs, Volume= 9.222 af, Depth= 1.58" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph - I- 4 -I- 4 -I - - I- 4 -1- + -1- 4 -1 - 4 -• 1 -1- 4 -1 - 4 - 90- H - 1- H -I- H -1 - - I- 4 -1- H -1- H -1 - - I- 4 -1- -1 - H - ■Runoff 85 -/ L. H - 1- 7 -I-IB1.sscfsL H H I 7 -1 T -I- H -1 H 4 - I_ _L -II- H -1 H - 80 _ J - 14 L L J 1 1 -1 L 41- L -1 L I - 1Type]I�4 75 11 1 1 I I 1 1 I I I I 1 . 1 70 -1 / 1 1 1 1 5�lfe-ar, Ryinf4l1r5.1/L1y� 65- I L1-Ru- Iof AcCa 69 82O-ad - 60� / 1 1 1 1 1 11 1 1 1 1 1 1 55 1 1 1 / 1 1 -IRW f Obff ilfau l'nie:9.222 a1 _ LL 40 / 1 F1bv/ Lenit=3, 35T' 0 7 L -I 1 7 1 T 1 71 I I 1 I 1 L 35� - I- r r 4 1 7 1 T -1- r -1 r 4 1�C=331O mI fl 307" 1 - 1- t r H I- H -1 T -I H -1 L 1- H 1 25 ' r 41 - I- t L I- fi I T -I- t -I H I EiiiiThIEi 10� 3_ - 1- 4 1 1 -1- -1 - 1 1 I- -1 - - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 24 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 1.58" for 25-Year event Inflow = 34.22 cfs @ 12.35 hrs, Volume= 4.174 af Outflow = 34.22 cfs @ 12.35 hrs, Volume= 4.174 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph z— —L I t- I — — I t I I— 1 I t I I- t 1 t —I 1 - ■Inflow 386�� _1_ 13422 cfs I — 1— t —1 — I— rt —I— t —I — 1— rt —I— 1— —I — I- ■Outflow I 3 / z— —L I 3422cfs fry 34 , — — I— T —I-Inflow A1"ea 3 I t600- c 32� , _ _ _/ T - I- T —I - 77 —I- 7 —I — I- 7 —I- 77 — I- - 30 7 1 T 1 — / — I— T 1 7 7 1 T 1 1 7 1 7 7 1 - 24 , r— 7 —1— 7 —1 / 1 — 1— T —1 — 7 7 —1— T 1 7 —1— 7 7 26 3� 244 / � I 4 I I I I I I I I I 7 22'/ , 1 1 1 1 1 1 1 1 1 1 ---a 20� , ,.- 1 1 1 1 1 1 1 1 1 1 a 18-/ z 1 1 1 1 1 1 1 1 1 1 u_ 16� , � I I 1 1 1 1 1 1 1 1 1 14� , 1 1 e / 1 1 1 1 1 1 1 1 1 12� / 1 1 �� 1 1 1 1 1 1 1 1 1 10 -- , - 1 1 1 �% 1 1 1 1 1 1 1 1 1 8y / I I I I I I I I I I I6 I 4 0 041/ 0 ��/%I T*f' rl rI rlrr' rlrrrl'I^ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 25 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 1.58" for 25-Year event Inflow = 81.55 cfs @ 12.30 hrs, Volume= 9.222 af Outflow = 81.55 cfs @ 12.30 hrs, Volume= 9.222 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph + -I- + -I - I- -I - I- + -I- + 4 -I- + I -I- + + - I- - / 4 I h I I 4 -I I- -I I -k I I- 4 I + I I 4 I -I I - ■Inflow 90; / 4 1 L 1 181.55 cfs l-I I- -I I -k I I- 4 I + I I 4 I- fi -I I _ •Outflow 85+' / 4 I I8155cfsr 1 I_ _11 -k 1-Inflow Area=69 820-llc- - 80� / 4 I h V -I- I- -I I -k I I- 4 I + I I 4 I 1- -I - I - 75i / I -I- L -1 ,/ I- -I - 1- L -I- I- -I -1- -H -I - 1- -I- 1 1 70 / I -I- b -1 - 1- -H -I- I- -I -1- -H -I - 1- -L -I- 1- - - I- - 65i/ / L I L -I / - 1 _L I L I 1- L -I 1- _1 -1 1_ _I - I - 60i-/ / I I L / - L _I I _L I L _I I L I I L I L L I - 554 / L _I- L J L - 1- 1 _I_ L I _I- I _I - 1_ L _I_ I L - I_ _ 5 5°: / L _I_ L _I L tHHttHflt I_ 1 I 11 1 35� / L _1_ L _I _1_ L _I - 1_ 1 _I_ L I _1_ 1 _I _ 1_ L _I_ L L - I_ - 304/ / 1 1 1 1 1 1 I I 1 I 1 1 25 -/ / 1 1 1 1 1 1 I I 1 I 1 1 204-/ / 1 1 1 I I I I I I I 1 1 15� / 1 1 t 1 1 1 1 1 I 15 / / //// Pi1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 26 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=2.03" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=45.50 cfs 5.347 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=2.03" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=108.35 cfs 11.813 af Reach EDP1: Existing Design Point 1 Inflow=45.50 cfs 5.347 af Outflow=45.50 cfs 5.347 af Reach EDP2: Existing Design Point 2 Inflow=108.35 cfs 11.813 af Outflow=108.35 cfs 11.813 af Total Runoff Area = 101.420 ac Runoff Volume = 17.160 af Average Runoff Depth = 2.03" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment DE1: EX DA 1 Runoff = 45.50 cfs @ 12.34 hrs, Volume= 5.347 af, Depth= 2.03" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph - I 4 -I- T 1 - 4 - 4 -I 4 -1 - - I- 4 -I- T -I H 50: - I- t -I- t -1 - t - I- t -1- t -1- -1 - rt - I- t -I- t -1 - - ■Runoff 484-/ - I 1 1 I 145.50 cfs r I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 464/ - ��/��p 44 -1 - I- H- -1- - !- - - 1- -1- _I- A_ -1 - L- - - ITypel lL244 FF — 424/ - I- t -I- 1 - I- t -I- t -I Yeaf gaipfall r - 40� pnT I V 38- , 364/ '— I - 1- L -I- / LJ - 1- L -1- L -I_Runoff Ace_a 31_.600ad - 34 H - 1 H -I- - - H H 1 4 -I- H -I- H 1 - H H � I- -I- H 1 - H - 32 - I- T -I- .✓ T P 1 T 1 T -IRurrroffrVOIUmeg5.347-af 30_ - w 284-/ I - I- L -I- - / L J - I- L -1- L -I- L in Iff u = 267 � � I -AI - HH - I 4 -I- + -1- H - Q -- I FJ� 0 24 � � - 1- 7 -I- I- 71 - 1- T 717 T 717 7 F1IoW L �i,85 20� � I 1 1 I 1 I I 1 1 I I 1 1 I I 1 I 1 - 18 -I - I- 4 1 - H -1 - I- 4 -I- T -1- I- -1 - 44 - 1��: i fl - 16 - I- rt -1- - I- rt -I- rt -1- r -I - r -r - I- T -1-rti -5Q 144 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 `f 1" 12 ' 104/ - H I- 4 -I- - H H I- 4 -I- T -I- H I H 4 I- 4 -I- T 1 H - 8 - I_ t -1- I- t -1- t -1- t -1 - -h 1 1 I- t -1 6� - 1 1 1 1 1 1 I I 1 1 I ' 1 1 4=/ 2' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment DE2: EX DA 2 Runoff = 108.35 cfs @ 12.29 hrs, Volume= 11.813 af, Depth= 2.03" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph H — I— + —I — + H — I— + —I— + —I — + H — I + —I— - — I— H — 1— + 1 - 120, 7 - 1- T -1 - 1 - 17 7 - - T -I - 7 7 - I- T -1- r i _ 17 7 ❑Runoff 115 T 110� I II osss cfs 105_ - I_ 1 _I _ 1 _ I_ 1 _1_ 1 _I _ L H _ I_ 1 _1_ L _I Ty-p-e l l-24 h r + -1 - H - 1- H -I- + -I - H H - 95� 7 T 1 7 r 7 1 T 1 7 -1 - 1-""!-- �►ei�f "1-vT431 ' 95= I 1 I I 1 R ff ea1_bg V at 8 - 80 L H 7 I 1 1 L I + Q L - 1 + I- + - + -1 + I - + fQf' Volum¢=11--0-1 oaf - - 1- T -1 - 7 � 7 717 T -1 - 7 7 - 1- T R D# Depih -2:03" 65 0 55- � � - I_ 1 _I - _ _ 1 _1 _ _ 1_ -L Flow Length=3,350' IA on_ 45 ' — I— + —I — 1 7 r 1 r H 1 7 -1 r 1 �7- 2Tv 45_ 40_' / I I I 1 1 II 1 I II 1 I I S8- 30-7 1 L I � LL 1 L I LA I L 1 LJ 7 L 1 25 - 20_ + I + A 7717 T7177 17 1777 17 r _1 - 17 7 15_ 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 29 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 2.03" for 50-Year event Inflow = 45.50 cfs @ 12.34 hrs, Volume= 5.347 af Outflow = 45.50 cfs @ 12.34 hrs, Volume= 5.347 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph /- 4 -I- T -I - I- -I - I- T -I- I- 4 -I- T I -I- I- -I - I- - z— rt 1 L 1 -1 1- -1I I I Lrt 1 T 1 r 1 1 TT 1 - CInflow 501/ / � 1 1 1 ❑Outflow 4sso cfs I I I I 1 I I 1 I 1 1 I 1 1 I��++ 1 11 48� i /- — 45soor5 -Inflow Area=31- E®aa� - 46� i � � I � - I- � � ITI 44 -/ / 7 -I T I T T T 7 7 T T 7 7 7 42 -' — - 40=/ i L 1 L I _ / _ LJ 1 T 1 L _I 1 L I 1 L 1 LL 1 _ 38tz / k4 -1— + -1 1— f— H - 1— + -1 — H —I -1— -1 - 1— —1- 1— H - 1- - 36� / - 1 1 1 1 / + I I I I I I I I � i 324./ / 4 -I- T -I 4/ -I- I- -I - I- T -I- I- 4 -I- T -I - I- 4 -I- I- -I - I- - 304 / r H 1 t 1 1 t- H 1 T 1 L 1 1 t 1 1 H 1 1- H 1 - f, 28=( / /- 1 I I I I I I I I I I I I I I I I I I I I 265-/ / / - 33241/ i ,.- 4 -1- T -1 -1- I- - - 1- T -1- I- 4 -1- T -1 - 1- 4 -1- I- - - I- - u_ 22 / r rt -1- T -1 -1- r -I - I- 1 -I- 1- rt -1- rt -1 - 1- rt -1- r -I - I- - 18 / z_ L -1- L -1 _1- L _I - 1- 1 -1- L _I -1- L -1 - 1- L -1- L L - 1- _ 16" / k 4 -1- T -1 -1- I- -I - 1- + -1- I- -I -1- + -1 - 1- 4 -1- 1- H - 1- - 14 T T T T T T T T T T T 104-/ L 1 L _I _ ! J I T I LA I T I I L I L _I I _ 8 i fi t I- fi - - 1 + 1 L -I 1 t 1 1 t 1 t t 1 - 6= / ' I 1 1 1 1 1 1 1 4 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 30 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 2.03" for 50-Year event Inflow = 108.35 cfs @ 12.29 hrs, Volume= 11.813 af Outflow = 108.35 cfs @ 12.29 hrs, Volume= 11.813 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph -[ I + H I + I I + I + -r - I + - 7 I T - T I T I T T 1 1 I 1 1 I 1 7 -17 T ■Inflow 120- i 0 Outflow 115 ' i 1 -I- L 1831o8s5�l_I _ 1_ 1 -1_ L 1 _ I_ 1 -I _ 1_ 1 -I_ L 1 1_ L _I _ 108.35cfs - ,n flow1��69.8�' 110� / / � I � � - i I I T I � � �{'+ YY a Q�r 105_' i rt -I- T -I / - - I- T -I- TT - I- T -1 - I- T -I- T7 -I- T -I - 100� / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 95-/ 90=' i 4 1 4 -I - 1 - 1 4 1 14 - 1 4 1 - 1 4 1 1 -4 1 4 85� / 4 74 - 1 74 77 fi t 77 77 7H 80; 75i� / - N • 70 / / -L -I- L- -I - - 1- T -1- 1- -L - 1- -1 - 1- T -1- 1- -i -1- - - 45 65-!-/ / / 4 1 H 1 + 1 + -[ 1 + 1 1 + 1 + H 1 + H 3 60; / I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 55 ' /u` ' 1 _I_ L _I V I - I_ 1 _I_ L1 _ I_ 1 _I _ I_ 1 _I_ L1 _I_ L _I _ 50= i 45J / 4 -1- -I / - 1- T -1- 1- 4 - I- + -1 - 1- T -1- 1- 4 -1- + - - 40_' i 7 -1- T - - 1- T -I- T T - I- T T - 1- T -1- T 7 -I- T T - 35 1 1 1 1 1 1 I I I I I I I I I I I I I I 1 25_' / 4 -I- - / I- T -I- 1- 4 - I- + -I - I- T -I- 1- 4 -I- + - - 20_' / -t 1 7 -1 -0 -r 1 7 -t 1 -r 1 1 rt 1 7 rt 1 7 - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 31 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDE1: EX DA 1 Runoff Area=31.600 ac 0.00% Impervious Runoff Depth=2.51" Flow Length=1,785' Tc=35.6 min CN=58 Runoff=57.71 cfs 6.614 af SubcatchmentDE2: EX DA 2 Runoff Area=69.820 ac 0.00% Impervious Runoff Depth=2.51" Flow Length=3,350' Tc=32.0 min CN=58 Runoff=137.30 cfs 14.614 af Reach EDP1: Existing Design Point 1 Inflow=57.71 cfs 6.614 af Outflow=57.71 cfs 6.614 af Reach EDP2: Existing Design Point 2 Inflow=137.30 cfs 14.614 af Outflow=137.30 cfs 14.614 af Total Runoff Area = 101.420 ac Runoff Volume = 21.228 af Average Runoff Depth = 2.51" 100.00% Pervious = 101.420 ac 0.00% Impervious = 0.000 ac NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment DE1: EX DA 1 Runoff = 57.71 cfs @ 12.33 hrs, Volume= 6.614 af, Depth= 2.51" Routed to Reach EDP1 : Existing Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 17.700 55 Woods, Good, HSG B 13.900 61 >75% Grass cover, Good, HSG B 31.600 58 Weighted Average 31.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.8 100 0.0100 0.06 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 7.8 1,685 0.0500 3.60 Shallow Concentrated Flow, Shallow Grass Flow Unpaved Kv= 16.1 fps 35.6 1,785 Total Subcatchment DE1: EX DA 1 Hydrograph 11 1 I 1 1 1 I I I I I I I 4 1 I 1 1— I 4 1 I — ❑Runoff 60 / 1 1 1 1 157.71 cfs 1 1 1 1 I I I I I I I I I I I I 1 1 1 1 ITy pelf 24 r 50� I00-TYoar1I�ainfallTT.1T51 - 45 -/ / Runoff toff Area31.600 at IRunoffl Volumleg6.614 af 351/ unpit Dpp;hz2.151 ' - 30� _Flbv� Length="1,7�$5' - 25� I Tc=35 6ina-in 20 15 I I— 1�1j 0 10 -/ 1 I 1 I I I ' 1 I 57 I 1 1 I 1 1 I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment DE2: EX DA 2 Runoff = 137.30 cfs @ 12.29 hrs, Volume= 14.614 af, Depth= 2.51" Routed to Reach EDP2 : Existing Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 34.000 55 Woods, Good, HSG B 35.820 61 >75% Grass cover, Good, HSG B 69.820 58 Weighted Average 69.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Wooded Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 Earth, grassed & winding 32.0 3,350 Total Subcatchment DE2: EX DA 2 Hydrograph I L I 1 1 1 1 1_ 1 1 1 1 1 1 I 150- I I I I I 1 1 1 1 1 I I 1 1 I 1 1 ❑Runoff 140 1 1 1 137.3o cfs l 1 1 1 I I I I I I I I I 130=' � 1 -r 1 1-1?- 7 1 J F i Type 1 l 2 t1 r- - 1 1O0_Y1,ea1r I ►ai if*IT+7.+151;' 110 1 / I Runoff Area-- 69.82Q aac_100 rt r -k unq .6101. �i1F1�= 4$1�4 af- 90= — 1 -k 1 -LRtmoff Depth-4 511'- 80 1 1 I 1 I I I I I 70 Flow Length=3,350' 607' - -1 T 3270 50-' 1 1 -L 1 1 -L 1 -1 1 -1 _ci4=58_ E1EH ± 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t 1 1- 1 1 ± 1 ± 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 34 Summary for Reach EDP1: Existing Design Point 1 Inflow Area = 31.600 ac, 0.00% Impervious, Inflow Depth = 2.51" for 100-Year event Inflow = 57.71 cfs @ 12.33 hrs, Volume= 6.614 af Outflow = 57.71 cfs @ 12.33 hrs, Volume= 6.614 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP1: Existing Design Point 1 Hydrograph /- 4 -I- k - - I- -1 -1- i- -I - 1- T I - i ❑Inflow - 1157.71 cfs I 1 1 1 0 Outflow 60= 57Y fr. H I 1 Inflow Area=31 .600 ac 55 + -I- t -I H - I- + -I - H -[ -I- + -. I I I 507 I I I I yI I I I I I I I I I I I I I I I 45- - -L -1- t -1 - 1 T HHJTHHTH : _I ,/ I I 11 I I 1 3357 - T - T 1 / F - T T T T T J 0 30 - J -1- L -1 -�/_I_ L J _ 1_ T _I _ L J 1- J -I I- J -1 L J _ - LL I I I I 1 1 1 1 1 1 1 1 1 1 1 25- 1 T 7 1 1 1 1 1 1 1 1 1 1 1 20- - 4 -1- -1 1- I- - - 1- T -I - 1 4 1- T -I I- 4 -1 k J - - 1 1 1 1 1 1 1 1 1 1 1 15- 10 + -1 - H -h -1- + -1 - I- - 1 , Z Z 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 35 Summary for Reach EDP2: Existing Design Point 2 Inflow Area = 69.820 ac, 0.00% Impervious, Inflow Depth = 2.51" for 100-Year event Inflow = 137.30 cfs @ 12.29 hrs, Volume= 14.614 af Outflow = 137.30 cfs @ 12.29 hrs, Volume= 14.614 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach EDP2: Existing Design Point 2 Hydrograph 1 I T J 1 L _ 1 1 I L LL _ _ - _ _ _ I T _ -' I I I 1 I 1 1 I 1 I I 1 I I 1 _ 1 1 I I I I I ■Inflow 150t) / /-1 1 1 1 I f37.30cfs 1 1 1 I 1 I I 1 I 1 1 I 1 I I 1 I 0 Outflow 140 r 1 1 137.30 cfs � / 1 1 1 1 1 inflow 1Area=69i.9207a-c 130 -/ rrt I 1- 1- rt 1 Lrt I T I 1 rt 1 L1 1 T1 1207 / )— 4 —I— —I — 1— 4 —1— I— 4 — I— H —1 — 1— 4 —. J I L _, I 1 1 I L J I L I 1 1 I L J 1 T — 110� i 1 I I 1 / I I I 1 I I I 1 1 1 I I 1007 1— 1 1 1 y 90 -) 1 1 1 I I I I I I I I I I I I 15 801 fi -f 1 T -I - / 1 fi 1 L -t I fi 1 1 -f 1 L -[ I T - 3 )- 4 -1- -I -1 - I- 4 -1- 1- 4 - I- -1 - 1- 4 -1- u- 70- / 1 1 1 1 1 1 I I 1 1 1 1 1 1 I 507 / /7 1 1 1 1 1 1 I 1 1 1 1 1 1 401 / /F 7 T -I - - - - - - T T T T - - 30/ -[ -I- 1- H -' - 1- 1 )_ 1 -1- LJ I 1 20 101 Z/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) <DP6> <DPi> <DP2> <DP3> <DP4> Undetain-d 1 Pond11 DA Pont 2 DA Pondl3 DA Pondl4 DA � U U 1P 2P /3F\ 4P fond 1 Pond 2 Po d 3 Pond 4 <DP5> I Undetained 2 PDP1 PDP2 Post Design Point 1 Post Design Point 2 (Subca) Reach 'On. MU _ _ Routing Diagram for NC111 -Storm Prepared by ARCO Business Services, Printed 6/23/2023 HydroCAD®10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.75 2 2 2-Year Type II 24-hr Default 24.00 1 3.32 2 3 10-Year Type II 24-hr Default 24.00 1 4.82 2 4 25-Year Type II 24-hr Default 24.00 1 5.72 2 5 50-Year Type II 24-hr Default 24.00 1 6.43 2 6 100-Year Type II 24-hr Default 24.00 1 7.15 2 NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 3 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 32.930 61 >75% Grass cover, Good, HSG B (DP1, DP2, DP3, DP4, DP5, DP6) 38.370 98 Paved parking, HSG B (DP1, DP2, DP3, DP4) 30.120 55 Woods, Good, HSG B (DP5, DP6) 101.420 73 TOTAL AREA NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 101.420 HSG B DP1, DP2, DP3, DP4, DP5, DP6 0.000 HSG C 0.000 HSG D 0.000 Other 101.420 TOTAL AREA NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 32.930 0.000 0.000 0.000 32.930 >75% Grass cover, Good DP1, DP2, DP3, DP4, DP5, DP6 0.000 38.370 0.000 0.000 0.000 38.370 Paved parking DP1, DP2, DP3, DP4 0.000 30.120 0.000 0.000 0.000 30.120 Woods, Good DP5, DP6 0.000 101.420 0.000 0.000 0.000 101.420 TOTAL AREA NC111 - Storm Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 6 Pipe Listing (selected nodes) Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 1P 670.50 669.00 109.0 0.0138 0.012 0.0 36.0 0.0 2 2P 642.00 641.50 68.0 0.0074 0.012 0.0 36.0 0.0 3 3P 642.00 641.50 59.0 0.0085 0.012 0.0 36.0 0.0 4 4P 642.00 641.50 94.0 0.0053 0.012 0.0 36.0 0.0 NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 7 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=1.76" Tc=0.0 min CN=90 Runoff=70.00 cfs 2.943 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=1.25" Tc=0.0 min CN=83 Runoff=41.44 cfs 1.677 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=2.11" Tc=0.0 min CN=94 Runoff=32.58 cfs 1.438 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=2.11" Tc=0.0 min CN=94 Runoff=25.89 cfs 1.142 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=0.18" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=1.81 cfs 0.594 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=0.18" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=0.60 cfs 0.144 af Reach PDP1: Post Design Point 1 Inflow=1.72 cfs 2.556 af Outflow=1.72 cfs 2.556 af Reach PDP2: Post Design Point 2 Inflow=3.61 cfs 3.730 af Outflow=3.61 cfs 3.730 af Pond 1P: Pond 1 Peak Elev=677.67' Storage=86,730 cf Inflow=70.00 cfs 2.943 af Outflow=1.31 cfs 2.412 of Pond 2P: Pond 2 Peak Elev=646.62' Storage=45,748 cf Inflow=41.44 cfs 1.677 af Outflow=1.09 cfs 1.317 af Pond 3P: Pond 3 Peak Elev=647.46' Storage=39,338 cf Inflow=32.58 cfs 1.438 af Outflow=1.20 cfs 1.225 af Pond 4P: Pond 4 Peak Elev=644.81' Storage=36,334 cf Inflow=25.89 cfs 1.142 af Outflow=0.51 cfs 0.594 af Total Runoff Area = 101.420 ac Runoff Volume = 7.937 af Average Runoff Depth = 0.94" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DP1: Pond 1 DA Runoff = 70.00 cfs @ 11.89 hrs, Volume= 2.943 af, Depth= 1.76" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph I I I I I I I I I I I I 11 1 75y I I I I I I I I I I I I I I I 1 1 ■Runoff H 1 r 1170.00 cfs I H H 1 rt fi 1 H 1 r - H wI H 70 - - 1- - -I- - H- -1 - I- 4 -1- - -I- T -1 - E Typeal�2-4-h-r - 65� 1 1 1 I 1 1 I I I 1 I H�I 60 1 1 1 1 1 1 1 1 17TeaT Rlainfall7L.1/ JI 55 I I I I I 1 Runoff Area20.110 at - 1- H 1 L H 1 rt T 1 L H rt 1 T 1 L L 50 H - 1- + -1- I - H - 1- 4 -1- - -IRunoffFtOkim1eg2.943-af - y 45- 1 1 1 V 1 1 1 1 1 1 7� 64 407 1 1 1 1 1 1 1 1 1 T_"1Y I� il71•Iful a 35- 1 1 1 1 1 1 1 1 1 1 1 1 1 Tc0.10 Min 1 - I- T -I- - 7 -I - I- 7 -I- T -I- T -1 - 7 - I- T -I-��+AA' AAP r+ -'�11 - - 30� H - 1- H- -1- - L H - 1- H- -I- + -I- L I - H -F - I- H- -1-Cr1�0 - 254/ _ 1- L 1 LA 1 L -1 L 1 L -1 LA 1- L ILI L 20 -/ I I I I I I I I I I I I I I I I I I I I I 15i./ I 1 1 I I I I 1 1 I I 1 1 I I 1 1 I I 1 1 H - 1- T -I- ' 7H - I- 7 -1- T -1- 7 -1 - 77 - 1- T -1- T -1 - 77 15: H - 1- t - - H - - L -1 + - L -1 - - 1- t - -1L 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DP2: Pond 2 DA Runoff = 41.44 cfs @ 11.89 hrs, Volume= 1.677 af, Depth= 1.25" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph H I t I H -I I- fi I t I T I b H I t I T I H - 46; 1 T T T T T T T T T T I T I T ■Runoff 44� 14144 40 — I I I I I 1 I I 1 1 I I 1 1 I I ITylpe]F24 - 38 - I- 4 - - - - - I 4 T I T IppPH— 44 II _T � 36 - H - I- t - - - - H- -I - I- H- -I- fi -I- T����y�ue-a' maul I'�'� 34 - - I- T - TT I T T Ruoff Aria t&i2-0 30 - - - - 284-/ 1 1 1 / 1 1 1 1 1 1 IRI MOff Ybrui11e#1.673:a 24� - - 1- t I- H - I- H- -1- fi -I- H- �''i"Q 0 1 +msGs7� 022 - I- rt -I- I- H- - I- - -I- T -1- T -I - H- H - I-TO mi1n - 184/ — 164-/ — II II 1 1 1 1 II 11 1 1 1 1 1 I GN- Z3 14/ — 1 4 1 H 1 4 1 T 1 H _ 1 4 1 T I H - 124-/ — - 1- -1- - 4 - I- -k -1- -1- -1 - 14 - 1- -1- -1 - - 10 - I- rt -1— T — I— rt —I— rt -1— T —I — PH — I— rt -1— T —I — r 1 I I I I I I I I I I I I I I 1 I I 1 1 I 1 ' I 1 I I 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DP3: Pond 3 DA Runoff = 32.58 cfs @ 11.89 hrs, Volume= 1.438 af, Depth= 2.11" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph - - I- + -I- # -I - . - I- 4 -I- + -I- I - 4 -I- 4 -I - H - 36i/ -T - I- -I- H- -1 - H - - I- 4 -I- H- -I- H- -1 - I- 4 -I- H- -I - H- - ■Runoff 34L:-/ H- - I- H -IH32.88cfsI_ H H - I- H -1- H -I- -H -1 - - I- H -I-'H -1 - H - 32� - _ 1- L -I- L - L J - I_ H _I_ L _I_ L L - L -1 - ITyp9_I! 2_4 ' - 30 A I- L - - L J I- L -1 L I L I�/pL A L I H I 28� I 1 1 1 1 1 1 1 1 1 7 r Tar Rainfa11=r2.1/ 51 26 1 1 1 1 1 1 1 1 1 1 nbf 8.I Akea= 80_at 24� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 `1 1 _ 224-/ I I 1 1 1 1 1Runoffl orume I.43`8 al • 2• 0y - - -1 I I I I I I _ I__11 " 11Dp� 117-211���� • 18; - - - - .I,,, y� TcO.'0 Ih'li�l LL 16= -1 - I- 7 7 -1 - I- 7 -I- T -I- T 71 - 1 7 - 17 T -17 n-r -1 - 77 - 147- - 1- 7 -I- - 7 - 1- 7 -1- T -1- T -I - r - 1- 7 -1-CN--94 12� - 1- t - - rt -1- t -1- t -1 - 1- t -1- t -1 - - 10 - t - L 4 -1 t -1 L -1 L 1 t 1- t -1 8� H - I- H H - I- 4 -1 T -I- L -1 - H A - I H -I- H -1 - H t ^✓ - L 1- L -1 -1- L -1 - L - 1- L 1- -1 4� H 4 - L I- L -I- t -I- L -1 - L - 1- L - -1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DP4: Pond 4 DA Runoff = 25.89 cfs @ 11.89 hrs, Volume= 1.142 af, Depth= 2.11" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph 1 1 I I 1 I I I I I 11 1 28 -/ 1 1 1 1 1 1 I I I I 1 1 1 ■Runoff —I 7 -19 1 1 — T —1 — T — 26 Typeal--2-4-hr - 24 I 1 I I 1 1 I I 1 I earl 1 I 22� ,r 1 1 1 1 1 1 1 I 1 '17 T ar Rlainf�N-r2.1/ J�' 20 rt _ 1 T 1unbff Awed �500 arc 18 1 1 I I I 1 1 I 'Runoff Volumleg1.142 af 16� T - I- Q1DTpbl�1" — -I - I- - T -I - 1- T -1- T -1- T - r"T" c 14-' -I_ _1 - I- 4 - H 4 1- 4 -I T _I- H -I - H 4 - I T&O Till h " 12 -/ I 1 1 I I I I I I 1 I I I I I I I 10� r 1 1 1 1 I I I I I 1 1 1 1 1 1 Ci�t�q-94 —1 — 1- -r - r -I 1- T -1- r -1- r -1 - 1 rt - I- -r 1 r 1 I - 81/ 6" f 1 I I I I I I I 4� T ' ^ 1 1 1 1 1 1 1 1 1 r 1 T I I I 1 - I - 2��j 0-4"/ (// ( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment DP5: Undetained 2 Runoff = 1.81 cfs @ 12.50 hrs, Volume= 0.594 af, Depth= 0.18" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph ' — 4 —I— + -1— # —I — # 4 — I I- 4 I 21 I I I I I I I I I I I I 1 ❑Runoff 11.81 cfs I 1 1 1 I I I I I 1 1 1 1 1 1 1 1 1 (Type II124-hr 1.Ylalr1 Rlainfall�2.�15�' 1 1 Runoff Area=40.670 ad 1 Runoff Volume=0.594 af 3 1 I 1 1 1 In gff Depih_#0.14316, 1 FlOw' Length=3,350' 1 Tc=32.0 min �4. 1 CNL5�7 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment DP6: Undetained 1 Runoff = 0.60 cfs @ 12.19 hrs, Volume= 0.144 af, Depth= 0.18" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.75" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph 1 1 1 1 1 1 1 1 I I I I I 0.65 1 I 1 I I I I I I I I 1 1 1 1 I I 1 ❑Runoff 1- 1 1 -I -Io.6o�J- -I- t -1 - - t -I- t -I - I- th - 1- t -I - t- ti - 0.6� 1 1 1 i 1 1 1 1 1 1 1 1 Type 4 III2hr 0.55 / 1 1 1 1 1 1 1 _Il 1 `� = fi � - 1— + — — � 1 � � 1 � Ip�.��ar1-R�1ya,�n#�AI2. ,�y� 0.5� J_ I 1 L -1— L -I - 1- L -Rtirtof-AI� =9.840-a - 0.45� 1 1 1 1 1 1 {I �.I I Imo/ I I II I� I I I 1 1 1 1 1 Run Volume=Oi44 af- 0.4� b }�Q� w : 1 1 1 r -1— 4 — 1— 4 —1— Rut —n Dp1— }�'0. Iv 'LL :.:; � 11 1 1 FIo'w 'Length=400' d- -I - I- + - - + - - I- + -I - 1 + -I- I - H4 - I -I - I- + 02 1 1 1III 1 1 1 I I I I Slojpe=0.0100 '/' 1 1 I— 1 -r 1— 1 -r 1 1- 1 C 1Q 0 0.1� 1 �/�I/ 1 1 1 1 1 1 1 1 eN 57 /// 1- -11- T -1 - 1- T -I - r7 - 0.05- J 0 , ,,,(,., , // 1 ��/ �/ �/���/��//� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 14 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 1.02" for 1-Year event Inflow = 1.72 cfs @ 12.20 hrs, Volume= 2.556 af Outflow = 1.72 cfs @ 12.20 hrs, Volume= 2.556 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph / 1 I I I I I I I I I I I I 1 I I ❑Inflow I 1172 cfs I 1 1 1 1 1 1 ❑Outflow - I 11.72 cfs 1 1 I I Inflow Area=29.950 ac LL I I I l 1 1 I l l 1 l l 1 1 1 1 1 1 i I I I I I I I I I I I I I I I 0 ,.,(..,(.,. ,.,(.,. .,. ,.,(.,. ... ,.,(.,. ,.,(,.,(.,. ,., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 15 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 0.63" for 1-Year event Inflow = 3.61 cfs @ 13.72 hrs, Volume= 3.730 af Outflow = 3.61 cfs @ 13.72 hrs, Volume= 3.730 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph /— I I I 0 Inflow 4 13.61 cfs , ❑Outflow c`j!� Inflow)Area=71 .470 ac _ %// II II 3 / �j�// / I To . . 1- 0 // . 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 16 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 1.76" for 1-Year event Inflow = 70.00 cfs @ 11.89 hrs, Volume= 2.943 af Outflow = 1.31 cfs @ 15.50 hrs, Volume= 2.412 af, Atten= 98%, Lag= 216.5 min Primary = 1.31 cfs @ 15.50 hrs, Volume= 2.412 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 677.67'@ 15.50 hrs Surf.Area= 39,897 sf Storage= 86,730 cf Plug-Flow detention time=784.0 min calculated for 2.409 af(82% of inflow) Center-of-Mass det. time= 708.2 min ( 1,512.4 - 804.3 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.31 cfs @ 15.50 hrs HW=677.67' (Free Discharge) 41- =RCP_Round 36" (Passes 1.31 cfs of 98.65 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.66 cfs @ 7.62 fps) -3=Orifice/Grate (Orifice Controls 0.64 cfs @ 4.72 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 17 Pond 1 P: Pond 1 Hydrograph / I I 1 1 1 1 1 I 1 1 I 1 1 I 1 1 f/ — — ❑ Inflow 75� � � — l7000atsl 1— � 1— I I— � —I- 1— —11 � —I- 17 —I ❑Primar Y 70 z A— ' -I -Inflow Area=2O111-O- a-c 65- z- —1 — 1 — —[ — 1— 1 I— k, 4 I 1 I 1 1 1 I Peak' Eiew=�7/17.b/I 60 , A— 1 1 1 1 1 $tckr`Tg= "I,7$0 of 55� � � I I I I I 50 / " I I I I 1 1 1 1 1 1 I I I I I I A454 rrt I t — 1 - 1— 1 - 1 - 1— fi 1- 1 1 1— -1 — 040� 4 -1- -k 1 —1 - 4 - 3 = / L 1 L _1 L L _ .2 35./ " 30 / A— 1 1 1 1 1 1 1 1 1 1 1 1 25' / 1 1 1 1 1 1 1 1 I I I 204 / r 7 1 L 1 — —1— 7r 1— I— I L I 7 I 1 7 — 15 ,/ k -F —I— * -1 - I I I i i 1 - 1 - -1 1 1 L 1 L 10- / 1 1 ' 1 ' 1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 18 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 1.25" for 1-Year event Inflow = 41.44 cfs @ 11.89 hrs, Volume= 1.677 af Outflow = 1.09 cfs @ 14.49 hrs, Volume= 1.317 af, Atten= 97%, Lag= 156.0 min Primary = 1.09 cfs @ 14.49 hrs, Volume= 1.317 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 646.62'@ 14.49 hrs Surf.Area= 20,230 sf Storage= 45,748 cf Plug-Flow detention time=765.1 min calculated for 1.317 of(79% of inflow) Center-of-Mass det. time=676.1 min ( 1,507.6 - 831.5 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=1.09 cfs @ 14.49 hrs HW=646.62' (Free Discharge) -1=RCP_Round 36" (Passes 1.09 cfs of 64.94 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.37 cfs @ 7.61 fps) 3=Orifice/Grate (Orifice Controls 0.72 cfs @ 2.08 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 19 Pond 2P: Pond 2 Hydrograph / r- -h -I- t -1 - I- fi - 1 - 1- -I - I- , 1 - I- -I -I- fit - I- fi -I- I- - - I- - z- 0 1 1 1 1 1 1 1 1 1 1 I I I I I ' I I I Inflow 46; / ■Primar 444/ / 1 _1_ 1 _1 141 44 ors I I 1 I 1 1 1 1 I 1 1 1 _ I_ _ - y 42; / ,- 4 -I- 4 Inflow Area=16.120-1aci - 40 / z- 4 I -h -1 - I -1- L - T 1 1 38 / - 1 I I 1 IIII I 1 1 1 r eak Eiev=6 -6 - 36� / 34;/ i 1 I I I I I I 1 t qU ..gI4 14 32� i H 1 T 1 T 1 L 7 �}01 304/ / 4 -I- t -1 - I -1- f- -1 -1- + -1 - H H -1- H H - 1- H -I - H H - I- - y28� / /- 7 -1- T 1 T T - I- T T -I- T -I - I- T -I - T T 26 / , c22 -/ / - -I- T -1 - I- -[ -1- T -I - 1- H -1- !- - - I- - LL 204/ i fi H 1 t - - 1- -1 - 1- rt 1 I- I -I- L -I - I- t 1 1 - 1 - 18; / 7 -I- T 1 1 T T -1- T -1 - T T -1- T T - I- T 717 T T 16; / 14 / 12 ' i L I L 1 - 1 LL 1 L 1 LA 1 LJ I L I 1L I _ 104-zi ,- -4 -1- T -1 - P' -1- I- -E - 1- + -1 - - H _I_ # H _ 1- + -1 HH - 1- 8� / 7 -1- T -1 a 1- T- T - 1-1 - I- 7 -I- T T - 1- T - 1 T - '- 6� i /- -1- i i 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 20 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 2.11" for 1-Year event Inflow = 32.58 cfs @ 11.89 hrs, Volume= 1.438 af Outflow = 1.20 cfs @ 13.17 hrs, Volume= 1.225 af, Atten= 96%, Lag= 76.8 min Primary = 1.20 cfs @ 13.17 hrs, Volume= 1.225 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 647.46'@ 13.17 hrs Surf.Area= 18,752 sf Storage= 39,338 cf Plug-Flow detention time=511.8 min calculated for 1.225 af(85% of inflow) Center-of-Mass det. time=444.6 min ( 1,228.0 - 783.4 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.20 cfs @ 13.17 hrs HW=647.46' (Free Discharge) 41- =RCP_Round 36" (Passes 1.20 cfs of 78.04 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.16 cfs @ 7.43 fps) -3=Orifice/Grate (Orifice Controls 1.04 cfs @ 5.30 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 21 Pond 3P: Pond 3 Hydrograph /- H 1 t I I + -1- t- -1 I I H -1 I- t H - 1 I -I- H H - - - , r- -1 -1- * -I - -1- 1- -1 -I- + -I - - -1 -I- 4H - I- + -I - I I ID Inflow 36� / - (32.58 cfs I ❑Primary 341z i 4 I -I - - -I I- -I I -I -InfI61W+Areamgnit8ac - 32� i r- -I -1- 1- -1 - -I- I- -I -I- -k -1 - I- -I- ''- 1- 6-41.4 30� / 4 -I- -L -I - -1- I- -I -I- -k -I - 1- 4 P eakIE Ilev� i�F( , 284! / I I- -II H -I H � Q 26 / J I L I I _1 I- -II 1 1 L 4S ra_g_e-4gl,3 e - 24+/ / L _I L -1 - -1- L _I -1- 1 -1 - I- _I -1- I _I - 1- I _I - L L 22; / L -I- L l _ / _I- L J -I- 1 -I - L I -I- L _I - I_ 1 _I _ L _I 20; / L I L -I - _I L1 11 I LI I L1 11 1 L1 - - c 18; / / L I L -I - - -I L1 11 I LI I L1 11 1 L -I - LL 16; i L -1_ L -I _ _I- L I _1- 1 -1 - L I -1- L 1 _ I_ 1 -1 - L _I 14 -/ / / 1 I L I _1 L I ' 1 1 ' 1 1 I 1 1 - 12-' / I 1 I I 1 1 1 1 1 1 1 1 1 10+/ / 1 I I 1 1 8, / I I I '/ ' 1 8:/ i i 2-7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 22 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 2.11" for 1-Year event Inflow = 25.89 cfs @ 11.89 hrs, Volume= 1.142 af Outflow = 0.51 cfs @ 15.05 hrs, Volume= 0.594 af, Atten= 98%, Lag= 189.5 min Primary = 0.51 cfs @ 15.05 hrs, Volume= 0.594 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 644.81'@ 15.05 hrs Surf.Area= 15,076 sf Storage= 36,334 cf Plug-Flow detention time=789.6 min calculated for 0.594 af(52% of inflow) Center-of-Mass det. time=679.8 min ( 1,463.2 - 783.4 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=0.51 cfs @ 15.05 hrs HW=644.81' (Free Discharge) -1=RCP_Round 36" (Passes 0.51 cfs of 36.12 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.13 cfs @ 7.96 fps) 3=Orifice/Grate (Orifice Controls 0.38 cfs @ 1.88 fps) 4=Orifice/Grate ( Controls 0.00 cfs) -5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 1-Year Rainfall=2.75" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 23 Pond 4P: Pond 4 Hydrograph I I I I I I I A I I I I I I I I I I I I I ❑ Inflow 28-v /- -1 t2589cfs I 1 1 ❑Primary 26� , '~ 1-A-I -It1fIawrea=6.500-lac-c I I 24z PeaicJElllevr6-411' 20� siolra1 1=36�,334 c 18� — _i - I- 4 -1- i_ _1 - 42 16/ /- - 1 I I I I I _ i 1 1 1 I I I I I 14� i /- 1 1 1 1 I I I I I o - 112� fi - -I - - -I- I- I - I- I- -1I- -1- 1- -1 8� / I 1 1 1 I I I I I 6y z- rt - -1 - -I- I I- I 1- I L -I I rt 1 r -I 44 r- 4 - 1 - - 1— , —I — I— —1— -1 - 1— -1 1 — II II III ;% gip,„,;,,,,,,,, ;%!�� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 24 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=2.28" Tc=0.0 min CN=90 Runoff=89.46 cfs 3.821 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=1.71" Tc=0.0 min CN=83 Runoff=56.23 cfs 2.295 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=2.66" Tc=0.0 min CN=94 Runoff=40.41 cfs 1.814 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=2.66" Tc=0.0 min CN=94 Runoff=32.11 cfs 1.441 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=0.35" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=6.09 cfs 1.188 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=0.35" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=2.35 cfs 0.288 af Reach PDP1: Post Design Point 1 Inflow=3.80 cfs 3.472 af Outflow=3.80 cfs 3.472 af Reach PDP2: Post Design Point 2 Inflow=12.08 cfs 5.590 af Outflow=12.08 cfs 5.590 af Pond 1P: Pond 1 Peak Elev=678.22' Storage=109,475 cf Inflow=89.46 cfs 3.821 af Outflow=2.22 cfs 3.185 af Pond 2P: Pond 2 Peak Elev=647.02' Storage=53,872 cf Inflow=56.23 cfs 2.295 af Outflow=3.12 cfs 1.923 af Pond 3P: Pond 3 Peak Elev=647.96' Storage=48,965 cf Inflow=40.41 cfs 1.814 af Outflow=1.85 cfs 1.590 af Pond 4P: Pond 4 Peak Elev=645.08' Storage=40,515 cf Inflow=32.11 cfs 1.441 af Outflow=1.35 cfs 0.889 af Total Runoff Area = 101.420 ac Runoff Volume = 10.846 af Average Runoff Depth = 1.28" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment DP1: Pond 1 DA Runoff = 89.46 cfs @ 11.89 hrs, Volume= 3.821 af, Depth= 2.28" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph 7 - 1— T -1 - 7T - 1- 7 -1- I — I— T -1— r —I — I- 7 —I— 1 1 100= 7 — T 7 - 1— 7 1 I I 7 I T L P 1 7 I 7 1 ❑Runoff 95_ T — 1— T —I89.46 cfs T T —1— T —I — T T — I— T —1— T 7 —I— T —1 — 85= 80= - 1 1 1 1 1.1 tar rv1 �Iti l I..5. L1 70_- - Rut Off/fir :at O 11a 0_ at_ 65_' _ I_ 1 I I I III 60_' 1 I I 1 1 1 1 u o l�#1 YH oIume=&82 II at 55-' 1 I 1 1 1 1 a, u1� I^ _1IF7L'QI,1 0 451 1 I I 1 I I 1 I I 1 1 I 1 T- Q.O mill_ u` 401 _ _ 1 1 1 I I I I I 351 1 I I 1 I I 1 I I 1 1 I I 1 \,y 90- 301 _ I 1 I II I I I I I I I I I 251 1 1 1 1 1I I I I I I I I I I 201 i _ I_ _ _ I_ 1 _1_ L _I _ L 1 I 1 I L I I_ J I L _I _ 151 L _ LL 1 L I LA 1 1 _1 L _I _ 1_ L I L 1 _ 101 ' 1 1 I I I 1 1 L _I 1 1 ' 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment DP2: Pond 2 DA Runoff = 56.23 cfs @ 11.89 hrs, Volume= 2.295 af, Depth= 1.71" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph 1 1 1 1 1 1 1 1 1 1 I I I I I I 60 -/ 1 1 I I 1 1 I 1 1 I 1 1 I I 1 1 ■Runoff J _ I_ 1 _I I562�s1 1 _I- 1 _I_ 1 .I _ LJ _ I_ 1 _I_ L _I — L _ 55� I 1 I I I I I I I I I ITyrpe lli 24-hr 50 ._ 1 - - 1- 7 -1— T -1— T -1 — 17 — I- 7 -1— T - - ` - 1 1 1 1 1 I 1 27Year1 Rai nfal l�3.421' 45 -/ I 1 I IIIII Runoff Area16.120 at 40� _ 1_ 1 1 1 1 1 1 RunoffVvlumleg2.2% of 35� /y 1 1 I I 1 1nQff'1Depth1�71 ' 0 30 1 I I I I I 1 1 1 1 Tc=L.Velaln — LL : T 25-/ 1 1 I I I I I 1 I I I II I I 4— H — I— -I 1- H — 1— 4 —1— —1— 4 —1 — 1 - 1 -I-VrN-' -83 20� 1 I I 1 1 I I I I I I 15� I I : ,L A/ I I 1 -1— —1 - 1 - 10 -/ 1 1 1 1 1 I I I I I 1 1 1 1 1 I 1 I I I I I I 5_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment DP3: Pond 3 DA Runoff = 40.41 cfs @ 11.89 hrs, Volume= 1.814 af, Depth= 2.66" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph J _ I_ I _I_ L _I _ - I_ I _I- I _I_ L _I _ I _ 1 _I_ L _I - L _ 44/ - I- 1 -I- L I - 11 1 T I- L -I I- L -I L - ■Runoff 424/ — - 1- 4 -1-I4o4i cfs I 1 - I- -1- T -1- -1 - - I- -11- -11 - - 40� — -- - I- rt -1- / 1- - 1- rt -1- t -1- t -1 - rt - IT pe-1F-2441-r 38 T I T T T I T22 QI- 7 1- T -111- 36 - I- 1 I I 1 1 I I 1 `7Ilk i�f7�N7 142 34� � - - - - 324/ _ 1 - 1- _I 1 1 1 1 1 1 1 Run nbf Area=8in a _ 304/ I - I- I I- I - I- I -I- T -I- I -1 L`,I - I_ I -I_ QI -1 - L - 28 -4 - I- + -I- - - H - I- 4 -I- + -IRu AtOkiM1eg1-.8 - y 264/ - - I- if -1- / - r -1 - 1- if -1- t -1-_ if Alin- ff1D`r h-2:1 - 24� - T -I- - T T T T T LL 20- 1 1 1 ' 1 I I 1 1 I I 1 1 I I 1 Tc-O A_thi fl - 18 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1I A 11 16-/ J - 1_ _I _ L J _ 1_ 1 _1_ I _I_ L _I _ L I _ 1_ 1 -1_CN 94 14/ - I - 1- I - - - - I I - I- 4 -1- T -I- 4 -1 14 - 1- 1 -I- t -1 I - 12 - - I- t I H 1 fi -1 t 1 t -1 1 ± 1 t 1 1g - 1- T I _ 1 7 I 7 -1 T I T 1 7 - 1- T I T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 44/ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 111 11 11 0- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment DP4: Pond 4 DA Runoff = 32.11 cfs @ 11.89 hrs, Volume= 1.441 af, Depth= 2.66" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph I I I I I I I I I I I I I I I I I I I I I I I r -I- t r r r -1- r rrt r 1- r r - ■Runoff 34� -1 - 1- t 1-13211dsl- -1 1- t -1 t -1- t -1 t - 1- ± 1 t 11 r 327 — - I- 4 -I- - r - - 1- - -I- T -I- I - r - - ITypelV2-44ff 30i/ - I - - - - I- - -1- r 4 -k I ]- 61 - 28� , - I- - - - - � � I- -I T _2-7�YearR�ainfall n3n2� _ 26� ▪ - I- 1 - - r 1- 1 -I 1 imbff /'�'� a 6JVV_ad 244-/ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22 11 1 11 1 1 1 Runoff VoIumIeg1.441 af y 20� 1 1 1141174.10u1�I I I I I I I I I I I pp 1 1 1 1 1 1 1 1 1 1 1 Tc_ O IO ti 14:-/ 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 C 194 12 -/ ▪ 1- t 1- 7 -1 T -1- 7 r - 1- T 1 T - 104' - r . r 1- r r -1- r r rt r 1- r r 8: - 1- t r - I t -1- t -I- t -1 - - 1- ± -1- t r - 6� — - 1- 4 - 1- 4 -I- T -1- -1 4 - 1- -I- -1 - - 44-/ 41 4 - ! I- -1 -L -1- -1 - 1- - L -1 - - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment DP5: Undetained 2 Runoff = 6.09 cfs @ 12.39 hrs, Volume= 1.188 af, Depth= 0.35" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph I I 1 I I 1 I I 1 1 I I I I I 1 I I I I 1 I I 1 1 1 I I 1 1 ■Runoff ) (6.09cfs J — — I— -k —1 — — — — 1— - 1 — — I— —I— - 6--/ I I I I I I 1 1 I Type II124-hr ± 11 ar R1lainfalh3. 2�' _ 5-7 1 I I Runoff Area=40.670 at I T 1 -Ru-nofflifolume=ti-8-8-af - 4 ungff 11Dppth7O. 511 LL 3- 1 1 1 1 1 1 1 1 1 FloW Len7 th=3 350' - 1 I I 1 / I 1 I I I I I I I ' I I 1 1 1 1 i 1111 I Tc=32.10 m i n 2- 1� 1 I (4, (j T I I I 1 I I 1 I I 1 ` N 11 51/ 1--/ 1 �� 1 1 1 1 1 1 ��� 1 1 1 1 ( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment DP6: Undetained 1 Runoff = 2.35 cfs @ 12.14 hrs, Volume= 0.288 af, Depth= 0.35" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.32" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph ` I —77- I I I I I I I I I I I I I I ❑Runoff I I I 12.35 cfs J I I I I I I I I I I I I I I Type II 24-hr 1 2 11271N ar;R'1ainfalt=3 26L - IRunbff Area=9.840 at I 1 1 I 1 1 1 1 1 1 Runoff Volume=0.288 of N / 1 1 1 Ou'n Iff1De th=0. 5�' `-' / Q p 1 LL / I I I FIdw Length=400' T 1 7 1 I T 17 F 7 — I 1 1 1 Slope=0.0100 Tc=15;8 miri CN57 I I I I I I I o !����//�l//��//� loll/ll/ill/�ll�/ll�/ �( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 31 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 1.39" for 2-Year event Inflow = 3.80 cfs @ 12.15 hrs, Volume= 3.472 af Outflow = 3.80 cfs @ 12.15 hrs, Volume= 3.472 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph / I I I L 1 r 1 rt 0 Inflow 1380 cfs I I I I El Outflow � 4- 1380 cfs r Inflow Area=29.950 ac 1 L 3— � I I 11 11 o LL _ / /1 i ./ 0 . o���p , 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 32 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 0.94" for 2-Year event Inflow = 12.08 cfs @ 12.42 hrs, Volume= 5.590 af Outflow = 12.08 cfs @ 12.42 hrs, Volume= 5.590 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph I ❑Inflow 13 112 08 cfs I El Outflow 11208cfs 1 Inflow Area=71 .470 ac 12 11= /� I 1 I 10= / —1 — —I— + —1 — I— -t —1— 'EH = — — —1 l 1 — I 1 1 I I I 7 T 1 1 1 Ø $ r1rTIrTTIrT I I I I 1 1 1 1 LL 67 I I I I I I I I I I I I I 5_ L -1- L -1 - / �/� I— L —1 1- L L — ' - 4- 1 � 1 - L A. � I 1 1 I 1= / .4Aezzez / / / / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 33 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 2.28" for 2-Year event Inflow = 89.46 cfs @ 11.89 hrs, Volume= 3.821 af Outflow = 2.22 cfs @ 14.08 hrs, Volume= 3.185 af, Atten= 98%, Lag= 131.4 min Primary = 2.22 cfs @ 14.08 hrs, Volume= 3.185 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 678.22'@ 14.08 hrs Surf.Area= 42,621 sf Storage= 109,475 cf Plug-Flow detention time=726.4 min calculated for 3.185 af(83% of inflow) Center-of-Mass det. time=653.5 min ( 1,450.3 - 796.8 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.22 cfs @ 14.08 hrs HW=678.22' (Free Discharge) 41- =RCP_Round 36" (Passes 2.22 cfs of 103.34 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.73 cfs @ 8.41 fps) -3=Orifice/Grate (Orifice Controls 0.81 cfs @ 5.92 fps) -4=Orifice/Grate (Orifice Controls 0.68 cfs @ 2.33 fps) -5=Orifice/Grate ( Controls 0.00 cfs) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 34 Pond 1 P: Pond 1 Hydrograph rt — T - 1 T — — T 1 T -1 1 I T rt 1 T -1 1007 I 1 1 1 I 1 1 I 1 1 1 1 1 1 1 ❑ Inflow 1 189.46 cfs I I 1 1 I 1 I I 1 I 1 1 ❑Primary 95 W , 90 / 1 1 I Inflow 1Ara 2 .1 ac 80 , I I �pae I�� 80=' , 1 I I I I I Ple0 VI 0.44 75_' , 1 1 1 I 1 1 1 1 1 1 1 70 , )_ i 1 L _I _ 1 I 1 I L _L 1 L a td 1 1LV ,'F�a _I 65-' , )_ A _I_ _1 - 1 rl _I_ _ _ I_ 1 _1 _ I- 1 -I 60=' / /1_ 4 1 A I - I- 1 - I I4 I - 15 55; - 3 50: , fib -1- t 1 - 1 1 1 - t 1 -YE' 45' fi 1 t -1 1 - - rt I t - 1 t -1 T I I- rt 1 1- - 40 ' , Al— rt I T —I 1 - — T I T 1 T —I T 1 Trt 1 T — 35_ , ,L 30=' , _ 251 / 1 1 1 1 1 I I I I 1 201 , 1 1 151 , � 1 ' 1 ' I I I 1 101 , 1 1 � I 5 , /////////////�//I / /fiiiii///I//iiiii/////////////////////////////////////// o- ' J///%%///%%//%%//%/////////////////////%//%%%//////////////////// 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 35 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 1.71" for 2-Year event Inflow = 56.23 cfs @ 11.89 hrs, Volume= 2.295 af Outflow = 3.12 cfs @ 12.70 hrs, Volume= 1.923 af, Atten= 94%, Lag= 48.5 min Primary = 3.12 cfs @ 12.70 hrs, Volume= 1.923 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 647.02'@ 12.70 hrs Surf.Area= 21,006 sf Storage= 53,872 cf Plug-Flow detention time=565.1 min calculated for 1.923 af(84% of inflow) Center-of-Mass det. time=491.9 min ( 1,314.4 - 822.5 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=3.12 cfs @ 12.70 hrs HW=647.02' (Free Discharge) -1=RCP_Round 36" (Passes 3.12 cfs of 70.70 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.40 cfs @ 8.19 fps) 3=Orifice/Grate (Orifice Controls 2.72 cfs @ 2.98 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 36 Pond 2P: Pond 2 Hydrograph / 1 1 1 I 1 1 1 1 1 1 1 I I I I I I I I — 1 I I I I I I I I I I I I I I ❑ Inflow z 0 Primary ) I5623cfsI 4 -I- 4 -I - I- 4 -I I - / Inflow Area=1611201ac 55 / A- 1 1 1 50� z 1 - -1- 1- 1 1- Peak Eiev=647.b2' 45� A- - 1 -11 1 $t a g 51,-8 of- 40 - k 4 - -I I -I- -F 1- I I- 1 - 1 4 I 4 H I 1 1 1 1 1 1 1 42 42 35� A- c30 -/ k - - -1 LL 25-' - , 1 i 20i/ A- - -I - -1- 1- I- - -1- t 1 -h 1 1- - 15_ A 1 1 10 -/ fit 1 t 1 1 fi 1 fi 1 - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 37 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 2.66" for 2-Year event Inflow = 40.41 cfs @ 11.89 hrs, Volume= 1.814 af Outflow = 1.85 cfs @ 12.81 hrs, Volume= 1.590 af, Atten= 95%, Lag= 55.5 min Primary = 1.85 cfs @ 12.81 hrs, Volume= 1.590 of Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 647.96'@ 12.81 hrs Surf.Area= 19,762 sf Storage= 48,965 cf Plug-Flow detention time=479.6 min calculated for 1.588 af(88% of inflow) Center-of-Mass det. time=421.5 min ( 1,198.5 - 777.1 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.85 cfs @ 12.81 hrs HW=647.96' (Free Discharge) 41- =RCP_Round 36" (Passes 1.85 cfs of 84.37 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.18 cfs @ 8.17 fps) -3=Orifice/Grate (Orifice Controls 1.24 cfs @ 6.30 fps) -4=Orifice/Grate (Orifice Controls 0.44 cfs @ 2.31 fps) -5=Orifice/Grate ( Controls 0.00 cfs) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 38 Pond 3P: Pond 3 Hydrograph L I L I I_ 1 _I_ LL I I LI I LI I L I LL 4 -I- L 1 - I- 4 -1 I- -I I- T -I 1 4 -1 4 4 - I 4 -I- I- - ❑ Inflow 44� i ,- -h -I- t -1 40.4l�I -I- f- -h -I- t -1 - I- -h -I- t -I - I- t -I- I- -1 0 Primary j 44024-/ / /- 1 I I . I I I I I I hlflow Area=&i1�1ac � / - - - I I I I I I I I I I I I I I II A ll I I 36 i -L I L I I _I_ L L 1 1 I L I Peak1EIlevr- 4716r 34/ i _ 4 -I- t -I - I -I- I- -I -I- + -I - 1- 4 H -I - 1- + pI C1 32 i ,- rt -1- r -1- rrt -1- t -1 - 1- rtSt-ocag-Q-4115V05CT 30' r- 1 LiLLLiLihLhLLLE 28� i264-/ i �24 4-/ / ,- 4 -I-3224-/ / ,- 4 -I- t -I - I- -I -I- tH - I- H -I- HH - I- - 20 ' ,- 7 -1- r -I 1 7 I I I I1 I T -1 17 1 77 I 18; / 164-/ i � - 14 / I I I I I I I I I I I I I I I I I I I I I - 12 / 4 -I- -I - I -I- I- -I -I- + -I - 1- 4 -I- 4 -I - I- 4 -I- 1 -I - I- - 104"/ / 4 -I- fi -I _ I -I- I- -I -I- t -I - - 1 -I- t i- - I- t -' 1 H - I- - 8� z- 7 - T 1 I r 7 I T I I 7 T - 1 7 - 7 7 - , 6; / - - 2-2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 39 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 2.66" for 2-Year event Inflow = 32.11 cfs @ 11.89 hrs, Volume= 1.441 af Outflow = 1.35 cfs @ 12.92 hrs, Volume= 0.889 af, Atten= 96%, Lag= 62.0 min Primary = 1.35 cfs @ 12.92 hrs, Volume= 0.889 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 645.08'@ 12.92 hrs Surf.Area= 15,462 sf Storage= 40,515 cf Plug-Flow detention time=599.2 min calculated for 0.889 af(62% of inflow) Center-of-Mass det. time=495.7 min ( 1,272.8 - 777.1 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=1.35 cfs @ 12.92 hrs HW=645.08' (Free Discharge) -1=RCP_Round 36" (Passes 1.35 cfs of 41.10 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.13 cfs @ 8.35 fps) 3=Orifice/Grate (Orifice Controls 1.22 cfs @ 2.59 fps) 4=Orifice/Grate ( Controls 0.00 cfs) -5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 2-Year Rainfall=3.32" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 40 Pond 4P: Pond 4 Hydrograph 1 7 I 1 I I I I I I I I I 1 I I I 71- -1- T -I - I- 7 -I- T- 7 - I- T -I - I- 7 -I- T 7 - I- T -I- 7 7 - ❑ Inflow 1 z7 7717 T 1 132.11�l 1 r 7 717 T 717 7 7 717 7/�7 1 7 1 7 7 - ❑Primary 34� / z- -r 1 r 1 - - -1- 1- H -1 I 1 Inflolw-Area=6-I5OO-Inc- 32� z _ _ rt -1- -r -1 - I I -1- 1- H - 1- I -1 - I- 1 -1- fi 1 - 1- rt 1- 30- , fig -I- fi -I - I -I- f- - - I- + -I - P-e-a-k-E-Ilev- 5. ' 28� ^ C.�j k + -I- + -11 - I - -11 + + I- + 11 1H +sto -4ol,olpCT- 26-' 247- ,I- H -I- H 1 - - -1- I- -I -I + 1 H 4 -1 H J I + -1- 1 J - 22' / 4 -1- H -1 1 - H -4 - I- + -I - I- - -I- H - - I- 4 -I- H - 13.15 20- / r 4 -1- -L i 1 1 i 1 - I- 4 -1- - - 1- -k -I- 1- - 318- / - - -1 -1- -H4 - 1- -L -I- l- _I LL 16' / 4 _1 _ I- I - I H I H J I 4 1 1 J - 14 -/ / J _ J 1- _ 1 J A 1 J J 1 1 1 L J 12; / _1- LJ -1- 1J - Lli -1- LJ - 1- 1 -1- I 1 10 / / _1- LJ -1- 1 -1 - LH -1- JJ - 1- 1 -I- 1 1 8- / 6" i 1 I 1 1 1 1 I 1 1 I 1 1 1 �4 / 1 A l' 1 1 1 1 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 41 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=3.70" Tc=0.0 min CN=90 Runoff=140.53 cfs 6.205 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=3.01" Tc=0.0 min CN=83 Runoff=96.63 cfs 4.046 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=4.13" Tc=0.0 min CN=94 Runoff=60.80 cfs 2.816 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=4.13" Tc=0.0 min CN=94 Runoff=48.31 cfs 2.237 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=1.01" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=27.22 cfs 3.423 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=1.01" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=10.61 cfs 0.828 af Reach PDP1: Post Design Point 1 Inflow=21.23 cfs 6.310 af Outflow=21.23 cfs 6.310 af Reach PDP2: Post Design Point 2 Inflow=50.61 cfs 11.337 af Outflow=50.61 cfs 11.337 af Pond 1P: Pond 1 Peak Elev=679.25' Storage=155,897 cf Inflow=140.53 cfs 6.205 af Outflow=12.21 cfs 5.482 af Pond 2P: Pond 2 Peak Elev=648.53' Storage=88,037 cf Inflow=96.63 cfs 4.046 af Outflow=11.02 cfs 3.658 af Pond 3P: Pond 3 Peak Elev=648.86' Storage=67,520 cf Inflow=60.80 cfs 2.816 af Outflow=16.77 cfs 2.578 af Pond 4P: Pond 4 Peak Elev=646.00' Storage=55,348 cf Inflow=48.31 cfs 2.237 af Outflow=12.02 cfs 1.678 af Total Runoff Area = 101.420 ac Runoff Volume = 19.556 af Average Runoff Depth = 2.31" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment DP1: Pond 1 DA Runoff = 140.53 cfs @ 11.89 hrs, Volume= 6.205 af, Depth= 3.70" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph 1 1 1 1 1 1 1 1 1 1 1 I I I I 1 1 1 1 150� I I I I I I I I I I I I I I I I I I ❑Runoff - 4— ± — I— T — 140.53 ds — — -k I_ -I t I- - 1 1 140" _ I— T 1 1 ' — 1— 4 —1— 1— _Type 11124-hr 130_ , l ar;kailifll=4.02 ` 120 _ 110� — '— - Runoff Area20.1110 at r T - I- T —1 — T T I- -r 1 T 1 r -i I rt 1 L 1 1001 .- -[ - 1- 4 1 --u+1off1VOIume=I6 2-05 of w 901 r ! - - / - - arfoff DpI h0�` 3 801 1 1 `f l `0 701 1 1 I I I TC0.0 Min � T 7 1 7 T II 771 60- —I — I— + —1 — I— 4 -CNg90- 501 J_ L _ I _I _ L 1 L I L 1 401 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 301 1 1 I 1 I I I I I I I I I I I I — T — I — I 7 —I— T —1777 — 177 —I- 7 7 — I- 7 -1 — 201 — ' ± 1 ± —1 — 1 t —1— 1— ± — I— —1 — '— t 1 — 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment DP2: Pond 2 DA Runoff = 96.63 cfs @ 11.89 hrs, Volume= 4.046 af, Depth= 3.01" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph I I I I I I I I I I I I I I I I I I I I 105_' ,- L I L I L J L L 1 L L H 1 1 -I L -1 - I- 1 - 111 I - ❑Runoff 100-' ,- H - 1- -L -1 -I96.63cfsI- I- H -I- H -I - H4 - I- I -I- 1- -I - 1- H - I- H -I - 95 - 1 + 1 - L� - 4 -1- + 1 H -T - I- H -1- 1 -Type I1124-hr 913i/ - 1- t -1 - 1- -h 1- t -1 - 1- --f - - 1- 1 - - - � -I- `f 85 fi - 1- -r -1 - 1— rt -1- -r -1 - 1- -[ -g-07Y-eari-m41n#4-11-74. &1 - 807 I T -I - T - i 7 1 T I 1 - RinaffArta1Z11211 75= 70_' I 65 ' 1 1 1 1 1 1 I I RunO#�ll 1Volume=4.046 of h/ _ _ I_ I 1 1 / 1 1 1 1 1 1 1 ib 55 _ 1_ 1 1 1 -1- 1 -1 _ L _1 - 1- l `L"� `iP hi93 11 _ 0 50 - I- T -I- -I - - I- -I- �`+ o--I no lL 45-' 1 - 1- + -1 - 1 I -1- H -I - I 1 - I- T -1- H H - I II- -H 1 401 — - - 1- ± -1 - - fi -1- t -1 L H - 1- t -1 1- -I - 35_' — 7 - T 1 T 7 T 1 7 T L 7 T 201 - - 151 � 1- _ 1 1 1 1 1 101 ,_ _ 01 , �� ������� �( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment DP3: Pond 3 DA Runoff = 60.80 cfs @ 11.89 hrs, Volume= 2.816 af, Depth= 4.13" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph I I I I I I I I I I I I I I I I I 651/ I I I I I I 1 1 I I 1 1 I 1 1 I I 1 1 ■Runoff J - 1- 4 1_160.8o GIs I- 1 J - I- 4 -1 t -1- -1 I- J 1 -k 1 t 1 1 - 60 1 IIII I I 1 1 I I 1 1 I I ITkpe 111 24-hr 551-' 1 1 I I 1 1 I I I‘,El rI . I.. . 6.26. J - 1- t -1- - t J 1 1 t 1 QT I-`I'"17 Kai ll74-�N`Li- - 50 1 1 1 _ 1 I 1 1 I I Runoff nbff Area=8 _80-ad - 45 / 1 - - - I- 7 -11- T -iRumoffVolume=2.81-6- af - i 40: - 1 - L _II- 1 - L L L 1 _t H �' 35� 1 1 1 1 �n9ff Dp p h7?-1' 11 LL 30 III 1 1 1 1 1 1 Tc0.10 min J - I- 4 - 1 -I I- 4 -1- t -I- k -1 - I- -[ - 1- + -I-�+k 1 1 - 25� 1 I I I I I IIIIII C N 94 -I - 1- t - t J I- t -1- t -I- t -1 - I- -i - 1- t -I- t -1 t - 10 1 1 1 I I I I `� 1 1 1 1 1 - r -1 - 7 - 5 o= iiiioiiii�iiiiii / �/�/��/ll�/�/���� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment DP4: Pond 4 DA Runoff = 48.31 cfs @ 11.89 hrs, Volume= 2.237 af, Depth= 4.13" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph I I I I I I I I I I I I I I I I I I I I I J — - 7 — — + — LJ - 1 — + — — + — — L � — I- 1 — + -1L _ ■Runoff 50 1 I 148.3l s I I I 1 1 I I 1 1 I I 1 I 4— — 7 —'— - — I- 4 -1 + -1— + -1 — ITYpell+2-44 451/ `. = fi - 1- -1 - - 1— - -1- -- -1- 0-7 arrmiaipfaII 4. 21- 35 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Runoff Volumleg2.237 af ( 30 / _ 11_ _II _ I_ _11_ I _I_ _OuLn4ff 11 Dgp hz4..11,1,,3,1" _ 0 25- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Tc0.10 Ih1if1 LL = 4— H — I- 7 — HH I- 4 —I + —I— + — — HM I + I H I H 20% 1 1 I I I I I I I I CNg94 - 7 1— 7 —1 + —1— 7 — 1— 7 1 T 1 + 1 7 — 15� 1 1 / 1 I I I I I I I I I I I I I I 10 1 1 1 1 1 1 - T 51-/ 1 1 1 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment DP5: Undetained 2 Runoff = 27.22 cfs @ 12.32 hrs, Volume= 3.423 af, Depth= 1.01" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph - I- 4 -I- + - 1 - I- 4 -I- + -I- + -I - 1 -1- A- -I - I- - 307v I I I I I I I I I I I I I I I I I I I I I I ■Runoff 287' I 1 1 I 12z22 cfs 1 I I I I I I I I I I I I I I I I 26- I I I 1 1 1 1 1 1 1 I I ITfpe1li y�=C 4- -I I � - -11 - O�Y ar Rlainfallz4.02- 24� 22 I I I I I I Ru-h-off Area=40,E 7O-at 1 1 I I I I I I I I I I I I 1 1 1 I- T 1- 7 -I- T -RunoffrVolume=3.42-3 of 187- 1- H - I- 4 -1- + -I- - I . 16� 1_ _1 - 1- 1 -1_ 1 _1_ L _ �ngfflD�phz1_,01L - LL 14 - I- I I 1 1 1 1 1 FJtyv !L th 3,35O 12/ I 1 1 1 1 1 1 1 1 1 I I I - 1 7 0 7 7 r -1 r - r - 11-C 33.1)iPn-i n - 10� - I- 7 H 4 I- 7 H14 T -I- H -I H 4 - I- H HI HrL_ J 8_ I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I `T ��I' Lt 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment DP6: Undetained 1 Runoff = 10.61 cfs @ 12.11 hrs, Volume= 0.828 af, Depth= 1.01" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=4.82" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph 11 1 I 1 1 1 I I I I I I I I -I_ L I - H I I L I H I _ _ L I H - ❑Runoff 11L/ I 1 1 iliosiersil I 1 1 1 1 I 1 1 10- fi - I- -I j 1 Type-IFr24 r o-7lf air; '1ainfaH43-2�' - � � 1 _ / - 1 -L 1 1- 1 '-Ruinbff Area=9 84fl aO - 8L/ I 1 1 I I I I I I I I I I I I I I I - I- -1 T -Runoff-Volume=0.828-af - 1 1 1 -Li1:1b'11 - U. i - 1- 1 /- � � - - -1- - - -1 -FiowllLength=4@0' - 4� 1 / i I I I I Slope=O Oi10O'P I_ _IV 1 1 1 1 1 1 1 1 1 1 1 IT1 5 ini'i - 3� 1 1 1 1 1 1 1 1 1 1 1 1 1 `' Iv 11l I -F I- I fi I 1- I I I I I I I I I I I I I � T 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 48 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 2.53" for 10-Year event Inflow = 21.23 cfs @ 12.13 hrs, Volume= 6.310 af Outflow = 21.23 cfs @ 12.13 hrs, Volume= 6.310 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 4 -I- 4 -1 - I- 4 -1- I- -I - 1- 4 -I- - 4 -1- 4 -I - 1- 4 -I- 4 - - I- ❑Inflow 234 - -t -I- t -I 21.23 cfs l—1— I— —I — 1 t —I— t 1/ 11�y 4 —I — 1 7t —I/per 7�/�n7 --/II-- - 0 Outflow 22_ -1- - 121.23 cfs 1/ 1— F T - 1- T I Inflor• Arep=29 95OJac 21= 20_' - L 1 L I _ _1_ L A 11 1 LA I L 1 I L 1 LL 1 - 19= 4 -I- 4 -1 - I- -I - 1- -k -I- I- 4 -1- -k -I - 1- 4 -I- - - I- - 181 - rt -I- t 1 -1- r - 1 1 I I- -I1 rt 1 1 rt 1 r - 1 - 17= I I I I I I I I I I I I I I I I I I I I I 16_ 15 JI_ LI 001 -I- L _ ILIL _LIL1IL1LL1 - 13= 7 -I- T -1 - 1 - TT - 1- T -I- TT -I- T -I - 1- T -I- TT - 1- - 3 12= -I- � 0 11; Li 10_ 4 -I- L _I _ 1 I- -I I -k 1 I- -I1 -k 1 I 4 1 -I 1 - 9_ -t -1 #- -1 - I I - 1- ± -I- -1- t -I - - -I- 1- -1 - I- 8 - 6= 1 -I- L 1 �'' _ 1 -I _ LA 1 _I - L -I- L _ _ I- _ 5_ - 4 I L -I A��II/'/''�`i� _L i - i_ 4 1 + I I- 4 I 1- -I I - 4_' 1 -I- T -I ��II�j ��I//� - TT -1- T -1 - 1 1 -I- TT - I- - 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 49 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 1.90" for 10-Year event Inflow = 50.61 cfs @ 12.27 hrs, Volume= 11.337 af Outflow = 50.61 cfs @ 12.27 hrs, Volume= 11.337 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph / I I I ❑Inflow 55- A— —I— t —I _I 50.61 cfs I—I— I— —I — I— — — L — —I— + ❑Outflow 50.61cfs I I I I Inflow Area=71 .4701ac 50_ I I I , I I I I I I I I I I I I 451/ ,- L _I_ L _I _I/,/ _I_ L J _ I_ 1 I _ L A 1_ L _I I_ L _I L L _ I = i I I I I I I I I I I I I I I : : : jTT I I I I I I I I u 30- L _I- L —I _I 1_ _I _ I— 1 I — L _l 1— 1 —I I— L —I L 1 _ LL 25- -I— — I— I —I — 1 1 —I— t —I — I— 1 -I- 1 - - 1- - I 20- I I I I I I 15 � - - -I- - � � — II— - 1 10= I I 5- / / / j /% 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 50 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 3.70" for 10-Year event Inflow = 140.53 cfs @ 11.89 hrs, Volume= 6.205 af Outflow = 12.21 cfs @ 12.30 hrs, Volume= 5.482 af, Atten= 91%, Lag= 24.5 min Primary = 12.21 cfs @ 12.30 hrs, Volume= 5.482 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 679.25'@ 12.30 hrs Surf.Area= 47,747 sf Storage= 155,897 cf Plug-Flow detention time=540.9 min calculated for 5.482 af(88% of inflow) Center-of-Mass det. time=483.7 min ( 1,266.9 - 783.2 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=12.20 cfs @ 12.30 hrs HW=679.25' (Free Discharge) 41- =RCP_Round 36" (Passes 12.20 cfs of 111.55 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.85 cfs @ 9.73 fps) -3=Orifice/Grate (Orifice Controls 1.05 cfs @ 7.67 fps) -4=Orifice/Grate (Orifice Controls 2.25 cfs @ 5.10 fps) -5=Orifice/Grate (Weir Controls 8.05 cfs @ 1.63 fps) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 51 Pond 1 P: Pond 1 Hydrograph �f� I I I I 1 I I 1 I I I -I- I / I I I I I I I I I ❑ Inflow , 1504/ 7 — I140.53cfs I I— 1'MsT - I /� 1 J 11— 1— 11,— ❑Primary 140� - -F -1- 'n H - 1- 1 -Iinflow 1Area=2a.Ii-Vi-ac— L7 -1- _1 - 1_ _1- p11-41 I- 7 130� 1 1 rams Frey- 19-I 120 / CC pn 1 1 1 1 1 1 1 1 A -1 eT"7g 6'142 '.If 1001 /77 1- 77 1 / - I T - 7 -1- T - - 1- T -1 - T7 -1- T7 - w 901 / L7 1 tl 1 t ' t - 1 t 1 Lfi 1 L -1 -1- -1 - 1- 1 - 1- -1 - 1 4 -1- J- 4 - 801 c _ / i 1 L J 1 _ 1 I L I 1 L I a 701 , 1 I I 1 I 1 1 I I I I I 601 / /7 1 1 1 1 1 I I I I I 501 , "P 1 1 1 I 1 I I I I I I 404/ 'Lrt 1- fi1 - 1 1— rt -1- 1- � — 30? / —I— — I / —I- 1 L L — 1 , L 1 L 1 1 L - 20- , 112 21 cfs 1 1 1 1 W. 0= 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 52 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 3.01" for 10-Year event Inflow = 96.63 cfs @ 11.89 hrs, Volume= 4.046 af Outflow = 11.02 cfs @ 12.14 hrs, Volume= 3.658 af, Atten= 89%, Lag= 14.8 min Primary = 11.02 cfs @ 12.14 hrs, Volume= 3.658 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 648.53'@ 12.14 hrs Surf.Area= 24,189 sf Storage= 88,037 cf Plug-Flow detention time=344.6 min calculated for 3.658 af(90% of inflow) Center-of-Mass det. time=295.3 min ( 1,101.6 - 806.3 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=11.02 cfs @ 12.14 hrs HW=648.53' (Free Discharge) -1=RCP_Round 36" (Passes 11.02 cfs of 89.46 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.50 cfs @ 10.11 fps) 3=Orifice/Grate (Orifice Controls 10.53 cfs @ 5.96 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 53 Pond 2P: Pond 2 Hydrograph , I I l l l , l l l l//1_ 1_ 1 -I- L _ - I- i 1 I- -1- L _ - I- 1 I _ L 1- L ❑ Inflow ❑Primary j 105_' i 4 -1- -1I96'63'Is l —I — 1— 4 -1- ♦- 4 -1- 4 - 1-/�+ -1 - 1 4 -1-/�f 100_' i ,r rt -I- L -i - 1 -I - 1 rt —I— 1— rt -II 1floff/1Are-a=16-.1-2Ot-ai- 95_' i ,r 1- -I T r T �p T r 7 r 90_' i — e� cIFev 8.Ja ' 85_' i � (} $1 1yI 751 i 1 I L J I 1 I 1 1 L f I L r r?UI7-L YIV""L�� 701 i 1 4 -I- L -I - 1 4 I I 4 I I- 4 1 k - 1 + 1 14 1 1- -1 651 / A- -1I L - I 1 I ± 1 1 -1 I H - I T -I - H fi -1- 1- - - u 601i T 1 T - 1 T1- I- I r - O 50= i' � `� 45'' i � 1 I 1 I 1 I I I I I I I I I I I I I I 40 ' / A 1 L _I 1 1 I 1 1 L H I L J I T H L 1 I L - 35 ' i 14 -I- L4 - I -I - 1 4 -I- 14 1- f- 4 - 1 - - - 14 1- H - - 30 / A -I- LH - 1 1 - I t -I- 1H -I HH - 1- - -I- 1- - - 25 / fi -r -1- 1- -I1 1 1 -r -1- r H -1- T - 1 - - 1 r - 20:' i 15 ' / 4 11.02 cfs , 101 / I I /� i i 1 1 1 ' 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 54 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 4.13" for 10-Year event Inflow = 60.80 cfs @ 11.89 hrs, Volume= 2.816 af Outflow = 16.77 cfs @ 12.01 hrs, Volume= 2.578 af, Atten= 72%, Lag= 7.1 min Primary = 16.77 cfs @ 12.01 hrs, Volume= 2.578 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 648.86'@ 12.01 hrs Surf.Area= 21,646 sf Storage= 67,520 cf Plug-Flow detention time=382.3 min calculated for 2.575 af(91% of inflow) Center-of-Mass det. time= 338.4 min ( 1,103.8 - 765.5 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=16.38 cfs @ 12.01 hrs HW=648.85' (Free Discharge) 41- =RCP_Round 36" (Passes 16.38 cfs of 94.60 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.20 cfs @ 9.35 fps) -3=Orifice/Grate (Orifice Controls 1.53 cfs @ 7.77 fps) -4=Orifice/Grate (Orifice Controls 0.99 cfs @ 5.05 fps) -5=Orifice/Grate (Weir Controls 13.66 cfs @ 1.94 fps) G=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 55 Pond 3P: Pond 3 Hydrograph I . I 1 I 1 1 . I I I 1 1 1 1 1 I � _ _ I I I I I I III I I I I I ❑ Inflow / 16o 80 cfs I ❑Primary _IntlolwArea=8.1 MIIac 55� / ' 1 1 1 Peak-ElevI=6418 41f' / 50� Storage=b7,5201 cf 45i k / 40L-/ r 1 1 - 7 - - 1- 7 -I - 7 -1 0 35� / J - -1 - - - -1- _L 1- 1 1- I H _I I _L I 1_ _I - 3 - / 1 1 1 I 1 I 1 ,° 30� / /I j - I I I I 25 / fi 1 1- t - - 1- fi -I 1- 201/ 1 - 16.77 cfs — — _ — _ — 15- j - -I - I 1 / 10 -/ k 1 1 - -I - I- - / I I I 1 I 1 5 -/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 56 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 4.13" for 10-Year event Inflow = 48.31 cfs @ 11.89 hrs, Volume= 2.237 af Outflow = 12.02 cfs @ 12.01 hrs, Volume= 1.678 af, Atten= 75%, Lag= 7.4 min Primary = 12.02 cfs @ 12.01 hrs, Volume= 1.678 of Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 646.00'@ 12.01 hrs Surf.Area= 16,796 sf Storage= 55,348 cf Plug-Flow detention time=396.7 min calculated for 1.678 af(75% of inflow) Center-of-Mass det. time= 308.1 min ( 1,073.6 - 765.5 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=11.46 cfs @ 12.01 hrs HW=645.99' (Free Discharge) -1=RCP_Round 36" (Passes 11.46 cfs of 52.39 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.15 cfs @ 9.53 fps) 3=Orifice/Grate (Orifice Controls 3.76 cfs @ 4.78 fps) 4=Orifice/Grate (Weir Controls 7.55 cfs @ 1.59 fps) -5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) NC111 - Storm Type II 24-hr 10-Year Rainfall=4.82" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 57 Pond 4P: Pond 4 Hydrograph / 1 1 1 1 1 1 1 1 1 1 f/ _ -1 I_ L _I - I_ 1 _1_ L _I _ 1_ 1 -I - I- _I _1_ _1 - I- _L _1 _ t- _1 - ❑ Inflow 1 - / I I 48.31` 1 I 1 1 I 1 1 I 1 1 II 1 1 I 1 11 ❑Primary 50� fi rt 1 f -1 t- -I -1- fi -1 Inf Io1wtA7 ea=6-i5GO sari - 45� 1 1 1 1 1 1 1 I Pe-a - Ilew=b4 :60v - 40:-/ 1 1 111111 �S orage= 5,348 cf - 35:"/ ,l- 4 -1- -1 - -1 I- -I1 T 1 1- 4 1- k -, 1- -[ - z 1 1 / 1 1 1 1 1 1 I I I I I I 1 4 30� T T 717 T - - - 71 T T 717 T 71 7 T T 717 T T 7 17 T 7 T T 0 25� ' LL - z 1 I I 1 I I I I I I 1 I I I I I I I 20:-/ L 1 L - -1 LL 1 L 1 LA 1 L _I 1 L LL - / 1 1 I I I I I I I I I I I I I I 15� ,l- 4 -1- tj12.02cfs - 1HH -1 + 1 - LH -1 H 1- H -1- LH - - - 10� r 1 1 1 1 1 1 III 1 1 1 1 i 5� %///ir// �`�////jjjj/%��������%i�iiiiiiiiiiiiiiiiiiiiiiiiii////////////%ii//% o-% // 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 58 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=4.57" Tc=0.0 min CN=90 Runoff=170.94 cfs 7.664 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=3.83" Tc=0.0 min CN=83 Runoff=121.24 cfs 5.148 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=5.02" Tc=0.0 min CN=94 Runoff=72.92 cfs 3.422 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=5.02" Tc=0.0 min CN=94 Runoff=57.95 cfs 2.719 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=1.51" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=44.50 cfs 5.113 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=1.51" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=17.06 cfs 1.237 af Reach PDP1: Post Design Point 1 Inflow=74.19 cfs 8.156 af Outflow=74.19 cfs 8.156 af Reach PDP2: Post Design Point 2 Inflow=123.16 cfs 15.203 af Outflow=123.16 cfs 15.203 af Pond 1P: Pond 1 Peak Elev=679.61' Storage=173,488 cf Inflow=170.94 cfs 7.664 af Outflow=63.06 cfs 6.919 af Pond 2P: Pond 2 Peak Elev=649.30' Storage=107,269 cf Inflow=121.24 cfs 5.148 af Outflow=40.81 cfs 4.754 af Pond 3P: Pond 3 Peak Elev=649.16' Storage=74,088 cf Inflow=72.92 cfs 3.422 af Outflow=43.56 cfs 3.179 af Pond 4P: Pond 4 Peak Elev=646.26' Storage=59,702 cf Inflow=57.95 cfs 2.719 af Outflow=40.73 cfs 2.157 af Total Runoff Area = 101.420 ac Runoff Volume = 25.303 af Average Runoff Depth = 2.99" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment DP1: Pond 1 DA Runoff = 170.94 cfs @ 11.89 hrs, Volume= 7.664 af, Depth= 4.57" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph 1 t 1 t4 H- t 1 4 - 1- t 1 1- - I- t 1 t -1 190--/ -I - I- t -I - 1- - I- rt -I- T -1 - -1 - I- t -1- 1- -I - I- rt -I- t -I - ❑Runoff 180",' 4- -1 I t 1 no.s4 fi I t I 1- -1 I- t I 1- -I -1 I t I 170ir - - I- - -1 - - - -H -I- t -I - 1 -f - I- t I 1- -Type FI 124-hr 160f- _ 1- + -1 - - I- -1- -1 - 150f/ k - I- + -I - - I- 4 -I- + -I — {�5. ar���Pri�IyfaIIL�s7�.}■ 21y_ 140� + I 1- -t Fturi AreaLV�11 V C�{r 1301 - I- + -I - I - -I - I- + -I- -I - I- -1 -I- + -I - 1201 - 1- + -1 - 1 -Runoff IVO!ume=l7-664 af- 1001 I- 4 1- I tXulln9TT Dp-P h9 p7Ir 0 901 - I- -I I- 4 -I- -I - - I- -I- -I _Tr_co-.o 111111 LL 801 1 + -1 - 1- - - 4 -1 t -I - 4 4 - I- + -I- 1- 4 4 -II- -k -I 701 I + -1 - 1- - - H- -I- t -I - H- -1 - I- + -I- 1- -4 - CN 9-V- 601 ,_ 4 _ 1_ 4 I - - I- —I— —I - - I- -I- -I - I- -I- -I - 50' 4 I_ 4 -I HH- I I I 14 14 I 1- 4 H I H- I - 401 4 1 4 -1 HH 1 t I 14 I H 1 1- 4 _1 1 4 301 - I- I I p . I I I I I ' '- -I- 1- I I- -I- 1 201 _1 I _1 1 H- H I I _1 ' 4 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment DP2: Pond 2 DA Runoff = 121.24 cfs @ 11.89 hrs, Volume= 5.148 af, Depth= 3.83" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph Z' 1 1 1 1 1 1 1 1 I I I I I I I I I I 130� I 1 I I 1 1 I I 1 I I 1 1 I I 1 1 I 1 1 ❑Runoff 4- -1 - I- + - -I 121.24 cf I- I- 4 -I- -1 - 1- -1 - I- + -I- 1- -I - - H -I- + 1 120i1/ 1 1 I 1 1 1 1 I I 1 1 I ITy,,,lpe II1 C24-hr 110 / r 4 1 1 1- 1 1 r --4S�I ari_Rai lifa,I1_9a7.i2`. 1 , 1 1 I 1 i Rtlhof Ar- ` a±1-6.1'2a e& 901 1 1 I I 1 1 I II I I II I I II I ^ 80: - -1 1 I 7 f r runof Volume=�51-48 af - 11 I 11 1 1 I I u11n4'n1upp h93.�36r . 60� 1 1 1 1 1 1 1 1 1 1 1 TC0.0 Mill — ± - 1- -I - t - - -1 1- t - 1- -1 - I ± -1 1- H I -1 1I t 1 50-?/ 1 1 1 1 1 1 I I I I I I I 1 1 CN83 40zT 1 I 1 1 1 1 II I I II I I I II I 4- 4 1 - - fi 1- t -I 1- 1 - 1 t -1- 1- -1 - I- -1 - 1- t 1 - 30_ 1 1 f / 1 1 1 1 I I I II I I I II I 201 1 1 1 1 1 I I I I 11 1 ' 1 1 1 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment DP3: Pond 3 DA Runoff = 72.92 cfs @ 11.89 hrs, Volume= 3.422 af, Depth= 5.02" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph I_ H I i H I H I H I_ H I H H 80� _ I I I I I I I I I I I I I I I I I I I _ ■Runoff 755-/ I I I I 172.92 I 1 I I 1 1 I I 1 1 I I 1 1 11 I �1 1 70y I I I I I I I I Type Il 24 hi - I- T 717 T - 7 7 - 1- 7 717 T 717 71 - 1 7 717.T .-1- T -4- - 65 �/e�r �J � � I -LI - � � I rt I fi I 5-T I-`r`r"t �a � ��1•�� 60 - _ 1- 4 -1- - -1 - 1- 4 -1- + -1- +Runbff Ahea=8-. 1-80 ao - 55� 1 1 1 I 1 I I 1 1 I I 1 1 I I 1 1 I I 1 1 504 I I I I 1 1 1 1 1 1 Runoff Volumleg3.422 af 45 1 1 1 1 1 1 1 1 1 1 7 _ I__4I 1^p1 �7� 40� -1 - 1- -r -1- - -1 - 1- rt - - fi -1- fi -I - rt - I- LL 35 / T ��O� �Yl � H - I- H -1- - H -I - 1 4 -I + -1- H 1 - H4 - I H -1- nk I - H - 304/ 1 1 J - I- _I 1_ J _ I_ _I _L _I_ L _I - L H - 1- -1-CKA q�4 _ 254/ I I I I I I I I I I 20� � 1I I I I I I I I I I I I I I I I I I 104-/ 4- - 1- -1 -1- + -1- -H -1 - L1 - 1 1 -h -1 - H 0 2 4 6 8 10 12 14 16 18 20 2'2 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment DP4: Pond 4 DA Runoff = 57.95 cfs @ 11.89 hrs, Volume= 2.719 af, Depth= 5.02" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph I I I I I I I I I I I I I I I I I I I I I I I _ J - I- 1 -I- L I - L J I- I -I L -I- L -I - L J - I I I- L -I L _ ■Runoff 60 -/ I 1 I I 57 95cfsl 1 I I 1 1 I I 1 1 I I 1 1 I 1 11 1 1 I I 1 I I 1 1 I I 1 1 I I 1 Ty pel I i 24 55 -/ p a 50� I I 1 I T `I' L a IH - �U71 ar �ainf- 115 45� - -I 7 1 7 I 1 7 1 T I Runbff Ares OO ad J _ I_ L 1_ J _ I_ L _1_ L _I_ L -I - L J _ I_ L _I_ L _I _ L _ 40 1 1 1 I I 1 1 I 'Runoff'VolumleP2.719 af 35 � � _ 11_ _11 � _ �_ _11_ _�_ �n4ff 11P P_ hz5..p,,?y��' _ 0 30� 1 1 1 1 I I I I I 1 1 1 Tc0.'O mil l LL - - 7 - I- T -I - 1- 7 -1- T -1- T -I - 1- 7 - 1- T I �+TA'1 77 - 25� ,_ _I _ I_ _I 1_ J _ 1_ L _1_ I _1_ L _ — L J — 1— L J-Cl_P_94 _ 20' 1 1 15- 1 , 1 1 I I I I I I I I I I I ,,_ J — I— 4 ,y L J I- 7 -1 L -I- L - L -[ 1 -L I- L -1 H - 10 1 1 1 1 1 I 1 1 I I 1 1 1 I I 1 1 I 1 1 1 1 1 I I 1 1 1 I 1 1 5 . 1 ����� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28�� 30���32 34 36�� 38�� 40�� 42��� 44 416 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment DP5: Undetained 2 Runoff = 44.50 cfs @ 12.30 hrs, Volume= 5.113 af, Depth= 1.51" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph 11 1 I I 1 I I I I I I I I I I I I 48 ,_ _1 11 1 L 1 LJ 11 1 + 1 L I LI 11 1 L 1 L _ ■Runoff 464' - I- I -1 144.s0 cfs — I— — — —1— —I — — — 4 —1— —I — - 444/ - rt — ram 1 rt + 1 fi r rt 1Typ-e-I I-24 4i-r 42 - - - 40 I 1 1 1 I I 1 1 I 1 1 W _ 36 / 4- - 1- -h -I- - I- - 1- -1- t -I-Rant:a 1. a 40-. ad 34 1 I I 1 I I 1 I I I I I I Iy�I r I�.,,,�I,, I aIr I I 30 ' I I 1 I - /- L J I 1 I + 1RLL�ff IOUL I Ie 5.1l 13 - y 28 I 4 I I- l - I- I -I- + -I- L -4 1 1p„ I 1 26 fi � - - 1 -I- -. � r1 - - rt - - � -I- 9fID9p-4h71�5-11 - a 24 I I I I / 1 1 1 1 1 1 1 1 F_IO th=3,350! - LT_ 22 204 - I - 1- -I- _. / I_ I - I- I -I- I -I- L -1 - _4 - 11 11—'Ln—I — I _ 184 - + I + I - L + - I + I + -I- + 1 - + + - - 16_' ' - 1- T -1- - 7 I T 717 - - - - I 717 L 14- ('� 12=' I 1_ 1 1 1 1 1 1 1 1 1 1 1 1 1 I 10- 11 4 —I — L 14 1 + I 1 4 1 4 I 1 — 84' l - I- -r -1— A rt fi -1— r — rrt -r 1— r r _ 6 I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment DP6: Undetained 1 Runoff = 17.06 cfs @ 12.10 hrs, Volume= 1.237 af, Depth= 1.51" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=5.72" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph I r I t I r , r r 1 r I t 1 r 19: H - - rt -I- t - - r H - I- t t -I- t - - b H - 1- rt -I- t -I - r - ■Runoff 18+' - 1- t -1-117.06 r1 - I- t -I- t -I- t -1 - - I- t -I- t -11 - 174/ - - r I t r -1 r t I 1- - r -t 11 ypel It'4-hr 16� - I- t -I- t r 1 - I- fi -I- t -I- - H - I- t -I H - 1- t -1- t t - I- t -I- t -I- 4-0-71- r y� 't ¢wpl' 2 - 14� H t 1 t - r H t + 1 RI.Iribf A ea=9 4O a{ 13� I + - rH t Ip 1 H I I + 1 H 12 - 1- + -I- + H H - I- 4 -I- + -Run S--Y-o gl-.23-7-af - + -I- - I- + -I- + -I- + I- + + I n 10 + - I- + -I- + - r + I- + -I- + -I- + . ngf1D 1'�„ h -' 4 9 - I- + -I- + - + - I- + -I- + -I- + -I _now 1ten 11=�F@V - u- 8� H- - I- + -I- - + 4 - I- + -1- + -I- + -1 - 4 + - I- 4 -n-n+ n-11 - ,+, - + + + + + H- Slope-O O1pOO-�I - 6� 14 I rH - I- 4 -I- + -I- 4- 1 - # H - IT _,��4n 1 5� - I- -L -I- - I- -I- -I- -I - - 1- -/��►1�-I I - 24-/ , - I- 1 ' I I ' ' - L -I ' 1 I - - 1= 1 o 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 65 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 3.27" for 25-Year event Inflow = 74.19 cfs @ 12.00 hrs, Volume= 8.156 of Outflow = 74.19 cfs @ 12.00 hrs, Volume= 8.156 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph 1 I I I I I I I I ❑Inflow 80=' 17419 cfs I 0 Outflow / � 7 -I- r _1,74.,;f5( r -I - I- Inflow Area=29:950-1 ac 75_ z 70 ,/ r 7 -I- r -I I r -I - 1- T -I - r I -I- T -I - I- -I 1 1 65, fit -I- t -1 -1- I- - - I- t -I - r -1 -I- t -1 I- t -I- r t - I - ,.- 4 -1- k -I -I- i- -I - I- + 1 - r4 I- t -1 I- 4 -1 1- -I - 1 - 60 H -1- L -I -I- r _I - I- H 1 - L H 1- t -1 I- H -1 L _I - 1 _ 55_ / 1 1 I I I II I I I I I I I II _ 50_ / I 1 1 1 1 1 1 1 1 1 1 1 1 1 ; ` 45� z � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3340 -/ /- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Li 35./ I I I 1 I I 1 I I I 1 I 1 I 1 30_ r 1- T -1 - -1- r -I - 1- T 1 - r I 1- r -1 1- r -I r r - I - 25 -r -1- t -1 - /d -1- I- H - 1- t -I - r -I 1- t -1 1- -1 -1 r i - 1 - 20_ 'r 4 -I- 4- -1 r/ -1- I- 4 - I- + -I - 4 - -I- + -I - I- 4 -I- 4 4 - I- - 4 _1_ L _1 �� 1 I I 1 I i 1- 4 -1- 4 -1 - 44 -I- L _ - I- - 15- / L _I_ L _I I _[ _1- L _I _ I_ L _I_ L L - 1_ - 5-:,j e 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 66 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 2.55" for 25-Year event Inflow = 123.16 cfs @ 11.97 hrs, Volume= 15.203 af Outflow = 123.16 cfs @ 11.97 hrs, Volume= 15.203 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph 1 1 1 1 1 I I I I .in1IL - Irt1I1rt — ❑Inflow 1123.16 cfs I 1 - - 1 _1— L _l — 0 Outflow 130_ 1123.16cfs 1 1 1 1 1 Inflow Area=71 .470 ac 120E 1 1 1 1 w 1 1 1 1 1 1 1 110 1 rt —1— 1— -I - I- rt -1- t- rt - 1- fi -1 - 1- rt - i1LJ _ 11LA1L11LIL _ 1L _ 100- 1 1 1 1 1 I 1 1 1 1 1 1 1 90 1t t I I 1 I I 1 1 1 1 1 80- 1 —1— I— —h — 1— t —1 — 1— —1— I— —h —1— t —1 — 1 1 1 I 1 1 1 1 1 1 1 0 70= 1 1 1 I 1 1 1 1 1 1 1 Li 60- 1 0 I I 1 I I 1 1 1 1 1 50- " — H —I— I— H — I— H I - 1 H -1— I— H —I— HH - 40_ 1 / 1 1 _ 1 1 30_' 1 1 ,44 107 20— ��� ���� ������ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 67 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 4.57" for 25-Year event Inflow = 170.94 cfs @ 11.89 hrs, Volume= 7.664 af Outflow = 63.06 cfs @ 11.99 hrs, Volume= 6.919 af, Atten= 63%, Lag= 5.9 min Primary = 63.06 cfs @ 11.99 hrs, Volume= 6.919 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 679.61'@ 11.99 hrs Surf.Area= 49,565 sf Storage= 173,488 cf Plug-Flow detention time=452.7 min calculated for 6.919 of(90% of inflow) Center-of-Mass det. time=402.5 min ( 1,179.9 - 777.4 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=60.70 cfs @ 11.99 hrs HW=679.60' (Free Discharge) 41- =RCP_Round 36" (Passes 34.74 cfs of 114.20 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.88 cfs @ 10.13 fps) -3=Orifice/Grate (Orifice Controls 1.12 cfs @ 8.18 fps) -4=Orifice/Grate (Orifice Controls 2.58 cfs @ 5.84 fps) -5=Orifice/Grate (Weir Controls 30.16 cfs @ 2.53 fps) G=Broad-Crested Rectangular Weir(Weir Controls 25.96 cfs @ 1.50 fps) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 68 Pond 1 P: Pond 1 Hydrograph � rt 1 -1 - I- -r 1 1 -1- 1- - 1 1- rt -1- I- -1 1907 / fi rt 1 r H 1 fi - I -r 1 t - t I b rt 1 11 ❑ Inflow ` / fi rt -1- ff 170.94 cfs 1 —1'— —I — 1— t —1 — 1 nrt -11-fir 1 — ❑Primary) 180 i -r 1 r -I 1 r Ii 1 fl off/1 Area 2 Vf.1171-ac 170= z _ _ _ _ _ _ _ _ _ _ _ �(��_ / T 7 7 - 1 — 1 7 T f T Ar- LJ�v���I9•n11' 160- F.� 140= 130= z 120=' i I 1 1 1 1 1 1 1 1 I I I a 110= 1 1 1 1 1 1 1 1 1 1 1 °- 1001i � 1 1 1 1 1 1 1 1 c 90V 1 1 1 1 1 1 1 a 801 / 1— 1 1 1 1 1 1 1 701 , 1 163.06 cfs I ' I I 1 I 1 601 / 1 1 1 1 1 1 501 i1— 1 1 1 1 1 401 i1 1 1 1 1 1 301 , ' 1 1 201 / 1 1 1 10 0 „ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 69 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 3.83" for 25-Year event Inflow = 121.24 cfs @ 11.89 hrs, Volume= 5.148 af Outflow = 40.81 cfs @ 12.00 hrs, Volume= 4.754 af, Atten= 66%, Lag= 6.6 min Primary = 40.81 cfs @ 12.00 hrs, Volume= 4.754 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.30'@ 12.00 hrs Surf.Area= 25,894 sf Storage= 107,269 cf Plug-Flow detention time=283.6 min calculated for 4.749 af(92% of inflow) Center-of-Mass det. time=243.9 min ( 1,043.3 - 799.4 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=40.66 cfs @ 12.00 hrs HW=649.30' (Free Discharge) -1=RCP_Round 36" (Passes 24.14 cfs of 97.61 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.54 cfs @ 10.95 fps) 3=Orifice/Grate (Orifice Controls 12.90 cfs @ 7.30 fps) 4=Orifice/Grate (Weir Controls 10.70 cfs @ 1.79 fps) 5=Broad-Crested Rectangular Weir(Weir Controls 16.52 cfs @ 1.38 fps) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 70 Pond 2P: Pond 2 Hydrograph 1 1 1 I I I I I I I I I I I /1/F I I I I I I I I I I I ❑ Inflow ❑Primary 130 -/ A- 1121.24 fs —I'—Mrt� 1 — —w tom, —I — fi —1'—nt 120� / I 1_ 1 Inflow LLea116.12O ac 1 I 1 1 1 l -eels Elev=6'9.1 u'- 110� � — 1001-- -1- 1 - 1 1 -S-O atje1107,;6p-cf 90 i 801-/ /77 -I- 77 77717T7177771 70:,/ 7 _I_ L- A _ I- L _ 1 1 L _L 1 L- _I I T 1 L- 1 I L- - 3 - / I I I I 1 I I I 1 I I I I I 1 LL 601 A 1 1 1 1 1 1 1 I I I I 1 1 501-A fi 7 -I- t 1 - 1 - I- t -1- f- -h -1- t 1 1 t -1- 1 _. 401 / I ao.8 cfs 1 1 1 1 1 1 = , 1 1 1 1 1 1 1 1 1 30 / 1 1 1 I ' 1 z 201/ A- 1 1 10- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 71 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 5.02" for 25-Year event Inflow = 72.92 cfs @ 11.89 hrs, Volume= 3.422 af Outflow = 43.56 cfs @ 11.96 hrs, Volume= 3.179 af, Atten= 40%, Lag= 4.3 min Primary = 43.56 cfs @ 11.96 hrs, Volume= 3.179 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.16'@ 11.96 hrs Surf.Area= 22,288 sf Storage= 74,088 cf Plug-Flow detention time=333.5 min calculated for 3.176 af(93% of inflow) Center-of-Mass det. time=295.3 min ( 1,055.9 - 760.6 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=41.11 cfs @ 11.96 hrs HW=649.14' (Free Discharge) 41- =RCP_Round 36" (Passes 36.11 cfs of 97.63 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.21 cfs @ 9.69 fps) -3=Orifice/Grate (Orifice Controls 1.61 cfs @ 8.18 fps) -4=Orifice/Grate (Orifice Controls 1.11 cfs @ 5.67 fps) -5=Orifice/Grate (Weir Controls 33.18 cfs @ 2.61 fps) G=Broad-Crested Rectangular Weir(Weir Controls 5.00 cfs @ 0.92 fps) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 72 Pond 3P: Pond 3 Hydrograph /- 4 —I— —1 — I- 4 —I- 1— -1 — I— . —1 - 1- 4 —I- 4 - - I- 4 -1- 1 - — I i I I I 1 1 I I I I I I I I I I ❑ Inflow 80 / /- 1 1 172.92 cfs I 1 1 1 11 I 1 1 I 1 1 I 1 1 0 Primary 751/ / /- - - 1 1 FnflolWlA►reamglfiaOac I 1L1 Peak-��111ev=649 Il V 65 / c�^ �J /� Q 60� k _1 _ , - -1- _E 1- I- �7 kVrCa ems# 41,�J �7 �r 55� 1 I I I I I I I I 50� I - 4 -1 - 4 _1 I / y 451/ /- {43.56 cfs I - 40 -/ , ' 1 1 1 1 1 1 - a 355/ ,/ I I I I I I I 30 / " 25 / r 1 1 1 1 1 1 - -1 20� // A- - / -I- - H -I- - I - I- - -I- H - - I H -1- IH - - - 15� -LI // -I- - 4 -1- - -I - I- - -I- 1 - - 1- 4 -' - 1 -1 - - - H 10 / 1 I 1 I I I I I 1 5 -/ 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 73 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 5.02" for 25-Year event Inflow = 57.95 cfs @ 11.89 hrs, Volume= 2.719 af Outflow = 40.73 cfs @ 11.95 hrs, Volume= 2.157 af, Atten= 30%, Lag= 4.0 min Primary = 40.73 cfs @ 11.95 hrs, Volume= 2.157 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 646.26'@ 11.96 hrs Surf.Area= 17,183 sf Storage= 59,702 cf Plug-Flow detention time=335.5 min calculated for 2.157 af(79% of inflow) Center-of-Mass det. time=254.3 min ( 1,014.9 - 760.6 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=39.12 cfs @ 11.95 hrs HW=646.24' (Free Discharge) -1=RCP_Round 36" (Passes 27.06 cfs of 56.12 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 9.84 fps) 3=Orifice/Grate (Orifice Controls 4.22 cfs @ 5.37 fps) 4=Orifice/Grate (Weir Controls 22.69 cfs @ 2.30 fps) -5=Broad-Crested Rectangular Weir(Weir Controls 12.06 cfs @ 1.24 fps) NC111 - Storm Type II 24-hr 25-Year Rainfall=5.72" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 74 Pond 4P: Pond 4 Hydrograph / 1 I I I � -I- L -I - I- 1 _I- L _I - I_ 1 -I - I- _I -I- _I - I- _L _I - !- _I ❑ Inflow 1 - / I I 57'95cfs 1 I 1 1 I 1 I 1 1 I 1 1 I 1 1 ❑Primary 60� / 1 1 I 1 I 1 I 1 1 I 1 Intl o1w1Area=6 i5OO lac i 55� k4 -1- -I - 1 -1- I- -E - 1- + -1 - - -I -1- -HH - 1- - - � - ' 1 1 I I I I I I 'Peak IEllevr +-6416.1G6' 50_ z'- I I I I ' I ' I I I I 45 / - - -I I I I I I2I rtb Fag-e— vil4 of / fi I 1 40.73 fs I I I 40 -/ i 1 I / I I I I I w a 35� z- T 717T 71 71 7 7 717 T1 0 30� / r_ 1 -I_ L _I I -1 -I - 1- 1 -1 - L LL - - 1 251( 1 1 1 1 1 1 1 1 1 20 / 4 1 -k - -1- - 1- _1 _ I- 1- k 1- 4 1 1- - - - ' 1 I I I I y 15- 1 1 1 / 1 1 1 1 1 1 1 10i/ k — —F 1 1 1 H — 1 H H H — — - - ' I I I I I I 5- 0- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 75 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=5.27" Tc=0.0 min CN=90 Runoff=194.80 cfs 8.824 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=4.49" Tc=0.0 min CN=83 Runoff=140.68 cfs 6.034 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=5.72" Tc=0.0 min CN=94 Runoff=82.45 cfs 3.901 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=5.72" Tc=0.0 min CN=94 Runoff=65.51 cfs 3.100 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=1.94" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=59.71 cfs 6.585 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=1.94" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=22.66 cfs 1.593 af Reach PDP1: Post Design Point 1 Inflow=130.34 cfs 9.656 af Outflow=130.34 cfs 9.656 af Reach PDP2: Post Design Point 2 Inflow=216.56 cfs 18.413 af Outflow=216.56 cfs 18.413 af Pond 1P: Pond 1 Peak Elev=679.85' Storage=185,570 cf Inflow=194.80 cfs 8.824 af Outflow=118.38 cfs 8.063 af Pond 2P: Pond 2 Peak Elev=649.60' Storage=115,090 cf Inflow=140.68 cfs 6.034 af Outflow=93.52 cfs 5.637 af Pond 3P: Pond 3 Peak Elev=649.27' Storage=76,679 cf Inflow=82.45 cfs 3.901 af Outflow=61.77 cfs 3.655 af Pond 4P: Pond 4 Peak Elev=646.34' Storage=61,171 cf Inflow=65.51 cfs 3.100 af Outflow=54.04 cfs 2.536 af Total Runoff Area = 101.420 ac Runoff Volume = 30.037 af Average Runoff Depth = 3.55" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment DP1: Pond 1 DA Runoff = 194.80 cfs @ 11.89 hrs, Volume= 8.824 af, Depth= 5.27" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph 1 1 I 1 1 1 1 1 I I I I I 210-' — 1 1 I 1 1 I 1 1 I 1 1 1 I 1 1 I 1 1 ❑Runoff 200 ' ,- - I L J 194.8°cr5 I I- 1 1 I I L I _ I 1 _I L J I I I 1 _ 190_' - 1 ± 1 - L 1 I _1 _ L _1 1 _L 1 L _Type 11124-h r 180_' — H - 1 + -I - H - - H -1 I -I L r� Ic `i 170_' - 1 fi 1 - 1- - 1- H 1 fi 1 1- ` 7—T-e a r M41 r -I 411-71 43I 160_' � - - - - rt - - - - r � 7sliOfflar :ai1'I� � 1401 1 1 1 1 1 - unofffVoIume L824 of 13V/ - - - • 1201 : I - I- I 1 1 1 1 1 1 1 1 1 1 I�I ■ I,1� • 1101 a � I I I I I I I I I I I I I11 I1-11J1l��J.1"` I 1[ 1001 - H - 1- - -1 - 1_ - - H I- -I L 1 - I I -I L _ T-C O-.O miir LL 901 — H - 1- -1 - - - I -1- I -1 - 4- 1 - I- I -1- L H - 4 -/'+II-��IAAn11 - 801 - - - 1- - -1 - t - - 1- ± -1 - 1 -1 L H -1 -C-N 9V- 701 - - - - -r rt 1 -r L rt 601 7 - 1 7 T 7 T F 1 1 1 501 � 301 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 204/ 1 1 _ 1- 1 1- 1 1 _ I- J 1 10 0 2 4 6 8 10 12 14 16 18 20 2'2 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment DP2: Pond 2 DA Runoff = 140.68 cfs @ 11.89 hrs, Volume= 6.034 af, Depth= 4.49" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph 1 1 1 1 1 1 I I I I I I I I I 1 1 150� I I I I 1 1 1 1 1 I I 1 1 I 1 1 ❑Runoff 4- ± - 1- L -I 14o.6acrs - ± 1- - 1- - t -1 1- -11 -1 1 fi 1 140" - - 1- -L -1 1 - 1 1- - L L 1 1 _Type 11124-hr 130� 1 1 11 aI�Rd1I111?I196.$J`L 120= = - - '- 110 Runoff Area16.1120 at i - I- rt -1 - r fi 1- 1 — 1— t 1 1- -i - 1- rt /1� -h 1 1001 , _ 1_ 4 1 -Ru+lof#1Volume=I&034 of w 90- r ! - - - / - 1— urfoff Dp171}'hr�4.' 96, 801 1 1 1 1 `f 1 1 - 701 _ _T_C0_.0_ Min � T 7 1 7 -IIA'7 -I 601 -1 - 1- + -1 - - 4 -CNq@3- 501 ),_ _1 _ ILI L I L L I 1 li I L 1 401 I I I I I I I I I I I I I I I I I I I I I 301 I I I I I I I I I I I I I I I I I I I — T - I- T - 1 / T -I- T -I - TT - I- T -I- T 7 - I- 7 -1 - 201 - - - 1- - -r 1 1- -[ - 1 t -1- - - 1- -r - - fi 1 - 10- 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment DP3: Pond 3 DA Runoff = 82.45 cfs @ 11.89 hrs, Volume= 3.901 af, Depth= 5.72" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph J _ I_ H _I_ L _I _ _ I_ L _1- L _I_ 1 _ H -I_ L _I - L - 90 -/ 1 1 I I I 1 1 I I 1 1 1 1 I I 1 1 - ■Runoff 8514/ I 1 I 182.45 cfs I 1 1 I I 1 1 I I 1 1 I I 1 1 so; 1 1 I I Tkpe III 24-hr 754-/ 1 I I 1 1 1 1 1 SJu-7YE ar —1Ih HTV. `• 7oy - I I I I I I I I I � I I 654-/ 1 1 1 1 1 1 1 1 flbff A!' =O. I-OL at 1 1 1 I I I I IB 1 {I II I I 1.�.,�,I I4 I 1 55� - I- 1 1 1 1 IRartoff Itol me3.9V �I�j of 50� - 11 -11 / 1- - I- 7 -1 1- T -I- 7 T-"1" 1� h �� 040-" T IH 1 H T 1 T 1 IH LL 40� Tc�� ii�i H - -1 1- rt T 1 T � rt -r 1 T 1I- 35 — - I- -I I- - I- -r - - fi -1- fi -I - r rt - - -r -I-GNP-94 - 30� - 1- t 1- H - 1- -1- fi -1- -1 - H - 1- -1- t -1 - H - 254 H - 1- H -I ' 1- H - 1- H -I- H -1- H -1 - H H - 1- + -1- t -1 - H - 20i-/ H - I- 4 -I- p H - I- 4 -1- T -1- H -1 - p H - I- + -I- H -1 - p - 15� - 1- H -1- - / 1 H - 1 4 -I- T -I- T -1 - H H - 1- H -I- T -1 - H - 10� J - 1- H -I- / IJI- I - T -I- T -1 - HA - 1- H - T -1H - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 79 Summary for Subcatchment DP4: Pond 4 DA Runoff = 65.51 cfs @ 11.89 hrs, Volume= 3.100 af, Depth= 5.72" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph I I I I I I I I I I 11 1 704/ J I I I I I I I I I I I 1 1 ■Runoff 4- H - 1- H —I I65.51GIs I H —1— f - — —1 — H - 65� 1 TYpeJL24hr 601/ 1 1 1 1 1 1 1 1F a1 F�1ai 1rlf N u1 55 / 4- I - - H - - - H H I- H -I- I Ranbff Aired 6 5OO ad - 50� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 45 I I 1 1 I RunoffVolumleg3.100 af c35 " 1_ J _ 1_ L _1_ L _1_ 1_ _I _ LJ _ 1_TC 10 n - LL 301/ 1 I I I I I I I I I I I I I A�I 25� 1 1 I I 1 1 1 1 1 1 1 1 C-1 94 4- -I 1- H - 1- t -I- t -1- t -I - I- rt - I- t -1- t -I - r - 20 J _ I_ L ' 1- J _ 1_ L _1_ L _1_ L _I _ LJ - 1- L _I_ L _I _ L - 151/ I 1 �� 1 I I I I I I I I 101/ 1 1 1 1 1 I I 1 1 I I 1 I 1 1 I I - - -I - 1- r r r 1 fi 1 r 1 1 r t 1 r 5 ' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment DP5: Undetained 2 Runoff = 59.71 cfs @ 12.30 hrs, Volume= 6.585 af, Depth= 1.94" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph _ I_ 1 1 I I 1 1 1 I I 1 1 65 -/ I 1 1 I I 1 1 I 1 I I I I I I I I I I I ■Runoff i - I- L —1- L - L L L I LI — ITyp-e]I 441r - 551/ I 1 I I 1 1 I I 1 1 1 I I 1 501/ 0a7Y rPaf RlainfaN ,437 - = 1 1-Ruin-off Area=40.6-7O-a — 45-b 1 1 I I 1 1 1 1 1 1 1 1 1 i 1 1 1 401/ 1 1 1 1 1 1 Runoff-VoFume6.585af 35_ 41 1 1 I I 1 1 � Q `'p T `� 30- 1 1 1 1 FlOW Length=3,350' 25- 1 1 I I I I I 1 1 1 1 Tc=32.10 nl i n 20� � I I I I I I I I I I I I I I I I . r — I— 7 - 1— r —I— fi -1— r —I — rrt — I— r -1— �1�� 15_ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 7 1 1 T 1 1 T 1 T I 5- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment DP6: Undetained 1 Runoff = 22.66 cfs @ 12.09 hrs, Volume= 1.593 af, Depth= 1.94" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=6.43" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph 4- - I 4 I T I - 4- - 4 -I T - T I - - - - I- T 1 T I 4 - 25 T T T T T I- T T 1 T 1 T T T T T ■Runoff 24 1 1 1 1122.66cfsil 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23 � 22/ -- -I 1 4 -1- T 4- - I- 4 -I- T -I- T -1 L4 IType-IlL2-4-hM 214 - I- rt -1- 1 r - I- rt -I- -r -1- n-I -pr rt - -.rt 1- fi -I - r - 20 1 1 pv7.YY`" F�aipfaN� .431 6 - 19 18 — 4- I L I L I _ I L 1 T 1 RUnbff Aiea 9- 84V-a 174/ 4- - 1- t -1- t - f- 4- - 1- fi -1- t -1- t -1 - 4- 4- -�.I..-..�.,mot f- -,,,�, 1- t -1 - - 16 — I 1 1 I I 1 I I 1 1 I 1RunoffrVo ume �q .693 154 � 144 4 1 1 I t L J L1 1 T I T L ^ 1„ T H - 135 - 4 1- 4 -1- - - I- 4 -1- T -I T unQ 4-- PL- • /�/�� - 121r, � � T I 1- T I- T 1 T 1 T O*ILen �4OOr u- 11 - 10 4E - I- 1 _I_ - 1 I _ I_ 1 _I- L _I_ 1_ -I _ L I - I_,1�-_n_/�t /-�I _v 1 _ 9� -1 - 1- 4 -1- - /- - - - I- 4 -1- T -1- T -I - L SIOP A)100 8 - I- rt -1- 0 1- - I- rt -I- T -1- T -I - r -r - I- Tp-I -• 6 ,_ 1 1 1 I / 1 I I 1 1 I I 1 1 I I � i _ 1�� C11 - 14 I - 4 I I T 1 T 14 I T �I�I� 'I - 44/ 4- - 1- ± -1- I- 1 - 1- ± -1- t -1- t 1 - 4- -t 1 1 1- t- -I - b I I I 21/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 82 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 3.87" for 50-Year event Inflow = 130.34 cfs @ 11.96 hrs, Volume= 9.656 af Outflow = 130.34 cfs @ 11.96 hrs, Volume= 9.656 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph 1 1 1 1 1 1 1 1 1 1 1 /1/7 I I I I I I I I I I I I I I I I I I I I I ■Inflow 140 -/ T T —I— T 1 130.34 cfs I rt —1— T T — II— 1A �TT —1 — 1— T —1— T 1 -1- r -1 - Outflow 130_ / 4 I I 34 cfs I — 1 4 I 1— 4 — inflow 29.95ff—a — - / 1 1 1 1 I I I I I I I I I I 1 I I I I 12017 / 1 1107 " I I 1 I I I I I I I I I I I I 1007 / fi —I— 1 T 1 1- rt 1 T 1 rt 1 1- rt 1 fi — 90 - / 1 I I 1 I I I I I I II I 80� / 1 I 1 1 I I I I I I 1 3 70i/ /T T I 1 T 1 T T I T 1 T 1 T o - / / )_ 1 -I — H _I— — I— H _I — I— H _I— 50- / I I 1 1 1 1 1 1 1 1 1 1 I I 1 I 40 -/ /7 1 1 1 I I 1 1 I 1 1 I I I 1 I I 304 / T4IT1T1TT1TIT1T -r1T 20: / 1 1 I 1 1 I 1 104-/ ... 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 83 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 3.09" for 50-Year event Inflow = 216.56 cfs @ 11.95 hrs, Volume= 18.413 of Outflow = 216.56 cfs @ 11.95 hrs, Volume= 18.413 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph 7 I 1- -II t I - I t I t 1 7 I T - T I T T I T 7 ❑Inflow 240� / 1216.56 cfs 0 Outflow I 230 ' / )- 1 -1- L 1I - 1- 1 -I- 1 _L - 220" / k 7 -I- 1— 12165�cfs —I 1 T -I- I- - Inflow Area=71 .470 ac 2104''' z ,1T7 -1- 7 -I -I - TT -I- TT - 1 1 1 1 - I 1 200 / - 190=' z' / 180 / / 4 -I- 1 I - -I - 1 T -I- I- 4 - I H -I - 1 4 -I- I- A -I- H 4 170 ' / H H H - H H H H fi t H H H H H H 160 / /- I 150=' w 1402/ / 7 -I- I - -I - 1- T -I- 1 - - I- H -I - 1- T -I- 1 - -I- H _ — 130iv / 7 -I- HH - 1 - 1 t -I- HH - I H 1 - 1 t -I- H4 -I H H - 3 120� i 0 110 -/ i 100=' i 1 _I_ L _Ir _I _ I_ 1 _I_ L J _ I_ 1 _I _ I_ 1 _I_ L 1 _1_ L _I _ 90ir i 7 -I- H -I 0/ -II- -I -I- 80_' i 7 -1- T - -I - 1- T -I- T7 - I- T -I - 1- T -I- T7 -I- TT - 70_' / 60_ i 40_' / rt -1- fi - 1 rt 1- rt rt 1 - 1 rt 1- rt -1- fi - 30°; ' 1 %`�i�/////// /1 1 1 1 1 �0 ////////////////// 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 84 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 5.27" for 50-Year event Inflow = 194.80 cfs @ 11.89 hrs, Volume= 8.824 af Outflow = 118.38 cfs @ 11.96 hrs, Volume= 8.063 af, Atten= 39%, Lag= 4.3 min Primary = 118.38 cfs @ 11.96 hrs, Volume= 8.063 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 679.85'@ 11.96 hrs Surf.Area= 50,777 sf Storage= 185,570 cf Plug-Flow detention time=403.5 min calculated for 8.063 af(91% of inflow) Center-of-Mass det. time= 357.7 min ( 1,131.3 - 773.6 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=112.34 cfs @ 11.96 hrs HW=679.83' (Free Discharge) 41- =RCP_Round 36" (Passes 53.85 cfs of 115.91 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.91 cfs @ 10.39 fps) -3=Orifice/Grate (Orifice Controls 1.16 cfs @ 8.50 fps) -4=Orifice/Grate (Orifice Controls 2.77 cfs @ 6.28 fps) -5=Orifice/Grate (Weir Controls 49.01 cfs @ 2.97 fps) G=Broad-Crested Rectangular Weir(Weir Controls 58.49 cfs @ 2.03 fps) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 85 Pond 1 P: Pond 1 Hydrograph 1 1 1 1 1 1 I ' i I I I I I I I I ❑ Inflow 210-' / 4 1 j 1194.80 cry] 1— 1Inflow H —I I—/� H 4 1,��H,,�,, ❑Primary 200 i 4 -I- H - I- 1 - Area=20,1 -0-a-C- 190t ' fi rt -I- fi - r - t 1- rt - 180 / 1 1 I 1 1 yak e,vw•l9415 170; / lV 160/ i /7 1 1 1 1 1 1 S- 0--atle -18§ -57C -f- 150- i )- I I 1 I I I - 1 - I_ I- J - 140=' / ,l- - 1 I I- -k -I - I- 4 -1- 1 130i' i e a8 ors + -I - H -F -1— 5 120=' i fi -I 111:W 0 1001i ,- _1_ 7- 1 90 i � 1 801 / � J1L I 111 - L I IIIIIL 701i 1- 4 -I- L I- 4 -I- 4 - -I- H4 - 1 ! - 44 I- L - - 601 ' ,- 4 1 L / I tL H -F I L - 501 i t r I 1 1 r - 1 r - 1 - - 1 r - 401 i � 301 i /I- 20= i 1 ' 1 1 ' 1 1 1 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 86 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 4.49" for 50-Year event Inflow = 140.68 cfs @ 11.89 hrs, Volume= 6.034 af Outflow = 93.52 cfs @ 11.96 hrs, Volume= 5.637 af, Atten= 34%, Lag= 4.1 min Primary = 93.52 cfs @ 11.96 hrs, Volume= 5.637 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.60'@ 11.96 hrs Surf.Area= 26,575 sf Storage= 115,090 cf Plug-Flow detention time=249.6 min calculated for 5.637 af(93% of inflow) Center-of-Mass det. time=213.1 min ( 1,008.1 - 794.9 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=86.75 cfs @ 11.96 hrs HW=649.56' (Free Discharge) -1=RCP_Round 36" (Passes 41.72 cfs of 100.25 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.55 cfs @ 11.23 fps) 3=Orifice/Grate (Orifice Controls 13.62 cfs @ 7.71 fps) 4=Orifice/Grate (Weir Controls 27.55 cfs @ 2.45 fps) 5=Broad-Crested Rectangular Weir(Weir Controls 45.04 cfs @ 2.00 fps) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 87 Pond 2P: Pond 2 Hydrograph I I I I I I I i 1 1 1 1 1 1 ' 1 1 1 1 1 1 ' ' 1 1 I I I I ❑ Inflow 1507 rt I 7 -I 1140.68.f.] I- IL I- rt Iri - - D Primary 4 -I- -HH - I- 1 -Inflow Area-16.1-'na-C 14047 � 1 _1_ _I _ 1_ 1 _1_ L I_ I_ 130� III plaI E 9. '- 120 , 1 1 1 1 1 1 1 I I 1 I sfoi*Ie11�it t GA "I 1101i /r 1 I I I I 1 I I I I I i+ 1001 , / 7 1 r I93.52ofs I1 T 717 7 7 717 T 7 7 7 T 717 7 7 717 7 i w 901 / fi 1 t1 -1 - I t -I- L -t -I L -I - I- t -1 - I- fi -I- 1- 1 - 801 -1- -I -I - I- 4 -1- I- 4 -1- -I - I- -1 - I- 4 -1- J- -I - c = i )_ 1 1 L 1 1 I 1 1 L L I LA I I 1 L I I L I a 701 i 1 ' I 1 I I 1 I 1 1 I 1 1 1 1 1 1 601 / /r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 501 / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 401 fi rt 1 - rt -1- 1- 1 - / 30?' ill - - 1 � - - L I L Lif L - 20_ / 1 1 1 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 88 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 5.72" for 50-Year event Inflow = 82.45 cfs @ 11.89 hrs, Volume= 3.901 af Outflow = 61.77 cfs @ 11.94 hrs, Volume= 3.655 af, Atten= 25%, Lag= 3.4 min Primary = 61.77 cfs @ 11.94 hrs, Volume= 3.655 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.27'@ 11.94 hrs Surf.Area= 22,542 sf Storage= 76,679 cf Plug-Flow detention time=306.7 min calculated for 3.655 af(94% of inflow) Center-of-Mass det. time=270.5 min ( 1,028.0 - 757.5 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=59.68 cfs @ 11.94 hrs HW=649.26' (Free Discharge) 41- =RCP_Round 36" (Passes 46.36 cfs of 98.93 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.21 cfs @ 9.84 fps) -3=Orifice/Grate (Orifice Controls 1.64 cfs @ 8.35 fps) -4=Orifice/Grate (Orifice Controls 1.16 cfs @ 5.92 fps) -5=Orifice/Grate (Weir Controls 43.34 cfs @ 2.85 fps) G=Broad-Crested Rectangular Weir(Weir Controls 13.33 cfs @ 1.28 fps) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 89 Pond 3P: Pond 3 Hydrograph R I C H 1 _I_ LJ _ I_ I _ HJ I LJ I H I HL J —I— L _I _ I_ 1 _1_ L J _ 1_ 1 _I _ I_ J —1_ J J _ 1_ 1 _I _ L 1 ❑ Inflow 90; i _ J _I_ L _I 82.45 _1_ L J _ 1_ 1 _I _ I_ J —1_ L _I _ 1_ 1 _I _QL� 1 ❑ Primary 85� , ' L 1 L 1 _1 L J 1 1 1 InfIowiAIea .I8-VJac - 804-/ / J _1_ L _I _ _I_ L J _ I_ 1 _I _ I_ J61_w�'J 1_ J w � 75� / I 1 1 I I I I r eaKJt l IQiv= �Fv._JG_/I r _ 70; / I I I I I I I I I I I Ie 1 1 Imo+ �I 65 - / ,_ J _1_ L (61.7;fs _1_ LJ _1_ 1 _I _ I_ J$ Or'age- 615V7.7_1c1 604/ / I I I 1 I 1 I 1 I 1 I 1 55/ 1 1 _ /` 1 1 1 1 1 1 1 1 1 1 0 50� / 1 I _I I 1 I 1 I 1 I 1 I 1 45� / 1 1 1 1 1 1 1 1 1 1 I 1 a 40 -/ , /— 1 1 I 1 / 1 1 1 1 1 1 1 I 1 I 1 354-/ /— I_ 30� i � 1 1 1 1 1 1 1 1 1 1 1 1 1 25 -/ / 1 1 1 / 1 1 1 1 1 1 1 1 I 1 15� / /— ' I I I 1 I 5__fre,z,:1%-v,,,Z77.4 ----, ...0., dr:"" / / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 3'8 4'0 4'2 4'4 4'6 4'8 Time (hours) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 90 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 5.72" for 50-Year event Inflow = 65.51 cfs @ 11.89 hrs, Volume= 3.100 af Outflow = 54.04 cfs @ 11.93 hrs, Volume= 2.536 af, Atten= 18%, Lag= 2.4 min Primary = 54.04 cfs @ 11.93 hrs, Volume= 2.536 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 646.34'@ 11.93 hrs Surf.Area= 17,311 sf Storage= 61,171 cf Plug-Flow detention time=300.5 min calculated for 2.533 af(82% of inflow) Center-of-Mass det. time=226.2 min ( 983.7 - 757.5 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=51.00 cfs @ 11.93 hrs HW=646.32' (Free Discharge) -1=RCP_Round 36" (Passes 32.65 cfs of 57.34 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 9.93 fps) 3=Orifice/Grate (Orifice Controls 4.35 cfs @ 5.53 fps) 4=Orifice/Grate (Weir Controls 28.15 cfs @ 2.47 fps) -5=Broad-Crested Rectangular Weir(Weir Controls 18.34 cfs @ 1.43 fps) NC111 - Storm Type II 24-hr 50-Year Rainfall=6.43" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 91 Pond 4P: Pond 4 Hydrograph 1 I I 1 I 1 1 1 1 1 1 I 1 1 I 1 1 I ❑ Inflow / ,- - 1 65.51 cfs f 0 Primary 65 -II lowArea=6.500sac ,60� /- 1 1 1 1 Pea1H EI11evr 41IV.34' 55� j 154.04 cfs 50 -/ fi - / - - - - -1- I- S orage ♦I,1 71 c -1- L 1- I- 1 L 1 L I L L 1 45� 1 � 1 1 1 1 1 1 1 ' I 1 1404 ,- 1 1 , c 35� /- 7 / LL 30� — / -I 25' 0�2 1 1 1 1 1 1 1 I I I I I 15 r rt - -1 - / -1- -rt -I- 1 I- 1 L 1 rt I- -I 10i 'r 1 1 - 4 1 1 1 L 1 4 1_ _1 5- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 92 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP1: Pond 1 DA Runoff Area=20.110 ac 77.37% Impervious Runoff Depth=5.97" Tc=0.0 min CN=90 Runoff=218.89 cfs 10.005 af SubcatchmentDP2: Pond 2 DA Runoff Area=16.120 ac 59.99% Impervious Runoff Depth=5.17" Tc=0.0 min CN=83 Runoff=160.37 cfs 6.944 af SubcatchmentDP3: Pond 3 DA Runoff Area=8.180 ac 89.12% Impervious Runoff Depth=6.44" Tc=0.0 min CN=94 Runoff=92.08 cfs 4.388 af SubcatchmentDP4: Pond 4 DA Runoff Area=6.500 ac 90.00% Impervious Runoff Depth=6.44" Tc=0.0 min CN=94 Runoff=73.17 cfs 3.487 af SubcatchmentDP5: Undetained2 Runoff Area=40.670 ac 0.00% Impervious Runoff Depth=2.41" Flow Length=3,350' Tc=32.0 min CN=57 Runoff=76.21 cfs 8.180 af SubcatchmentDP6: Undetained 1 Runoff Area=9.840 ac 0.00% Impervious Runoff Depth=2.41" Flow Length=400' Slope=0.0100 '/' Tc=15.8 min CN=57 Runoff=28.70 cfs 1.979 af Reach PDP1: Post Design Point 1 Inflow=172.19 cfs 11.210 af Outflow=172.19 cfs 11.210 af Reach PDP2: Post Design Point 2 Inflow=278.69 cfs 21.785 af Outflow=278.69 cfs 21.785 af Pond 1P: Pond 1 Peak Elev=680.00' Storage=193,293 cf Inflow=218.89 cfs 10.005 af Outflow=158.07 cfs 9.230 af Pond 2P: Pond 2 Peak Elev=649.75' Storage=119,120 cf Inflow=160.37 cfs 6.944 af Outflow=126.45 cfs 6.544 af Pond 3P: Pond 3 Peak Elev=649.36' Storage=78,600 cf Inflow=92.08 cfs 4.388 af Outflow=76.39 cfs 4.139 af Pond 4P: Pond 4 Peak Elev=646.41' Storage=62,394 cf Inflow=73.17 cfs 3.487 af Outflow=66.54 cfs 2.921 af Total Runoff Area = 101.420 ac Runoff Volume = 34.984 af Average Runoff Depth = 4.14" 62.17% Pervious = 63.050 ac 37.83% Impervious = 38.370 ac NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment DP1: Pond 1 DA Runoff = 218.89 cfs @ 11.89 hrs, Volume= 10.005 af, Depth= 5.97" Routed to Pond 1 P : Pond 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 15.560 98 Paved parking, HSG B 4.550 61 >75% Grass cover, Good, HSG B 20.110 90 Weighted Average 4.550 22.63% Pervious Area 15.560 77.37% Impervious Area Subcatchment DP1: Pond 1 DA Hydrograph /� 4 - 1 T 1 - 1- -I I- 4 -1 - - I- 4 -1- 1- -I 4 -I- 4 1 - 240-' H - 1- + -1 - '7 H - H H -1- t -1 - I- -1 - I- t -1- 1- H - I- - -I- t -1 - ❑Runoff 230-' � 7 - 17 T -I 1218.80 1- 17 7 -1- T -1 - T T - I- T 71- T T - T 7 -1- T -1 - 220 I I I I I I I I I I I I I I I 1 Tip l l l2 h r 210 190_' 4— H - I + -1 - 1— - - H -I- H —1 — 1— -1 - 1Y--I � 1- 1K H-1— 1 1801 -1 1 1 1 1 1 1 T 1 1- -1 RiirtOff Atea1=zfi11 Q ac 1701 T - - - 1601 1 I 1 1 1 1 1 1 1 1 ' I I 1501 3- -1 - 1- + 1 - I- 4 -1- T -I - 1]C�fi1 OlUrne �0-0-0-af y 1401fi -1 - 1- t -1 - - 1- r -1- t -1 - r 1 - 1- rRtlllbff Der hy� T'r 1 130 — c 120 110:1 — L - I- 1 -1 - - I- 1 -1- L _I - L _1 - 1- 1 -1- Tc�O.1Dlllll'L LL 1001 ,_ 4 1 1 1 4 -1- T -I - 1- 41 - I- 4 -1- - 1 4 901 — r - 1 -I - - 1- r -1- t -1 - r rt - 1- r -1- r , - 1- r 1 801 I I I I I I I I I I I I 701 601 -- L - 1 -1 - - L1 -1- 1 -1 - Li - 1- 1 -1- L -1 - 1- L -1- 1 1 50' -- 4 - I- - -1 H4 1 T I 144 I ± 1 1- -I - 1- -1 I + 401 ,- -r 1 1 - I- I 1 T I 1- -1 1 1 1 r I - 1 7 I T 1 - 201 1 r� ' 1 1 1 1 1 ' ' 1 1 ' 1 1 ' 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment DP2: Pond 2 DA Runoff = 160.37 cfs @ 11.89 hrs, Volume= 6.944 af, Depth= 5.17" Routed to Pond 2P : Pond 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 6.450 61 >75% Grass cover, Good, HSG B 9.670 98 Paved parking, HSG B 16.120 83 Weighted Average 6.450 40.01% Pervious Area 9.670 59.99% Impervious Area Subcatchment DP2: Pond 2 DA Hydrograph 1 1 1 1 1 I I I I 1 1 1 1 T T 71 7 1 1 T 7 T ❑Runoff 170� r -1 — I— T -1116o.3��r5I — rt 1— T -1 r -r - 1 -r -1 r - rt 1 fi 160� -1 - I- + -I - 1, - - -L I- T -1 1- -i - 1 t -I 1- -Type 1I124-hr 150i/ - -[ - 1- + -1 - 1- - - 4 1- -I I- + 1 I- -I 4 I- `i 1404-/ ,,_ _1 - I- ± -1 - 1- - - 4 I_ T -1 i_ _F l y07_YeariRainf41197n151 130� _1 - I- 1 -I - 1_ - - 1 I- T -1 1_ RtitioffArea 16.112V at- 120/ 1 1 1 1 1 I I I IssI I I I I I I I 1101 1 1 1 1 I 1 Runo111Vollure=6,�.I9�444 J. af w 1001 1 I 1 1 Iallrf` 1I 1� I174'11 II 90 0 1 T_cQ,Q Milt 701 1 1 1 I I I I I I 1414 �+I I I 601 1 1 1 1 1 1 1 1 1 \,y- 8-37 - I- T -I - T - - 7 I- T -I 7 -4 - 1 T -I- 1 T 1 501 ,r -1 - I- T -1 - t - - rt 1- T -1 r -r - 1 -r -1- r -1 - I- rt - 1- r 1 - 401 -1 - 1- t -1 - t - - -L 1- ± -I 1- -i - I t -1- 1- -I - 1- -1 - I- ± 1 - 301 ,_ _[ 1 - 4 1- T -1 - 1- -4 - 1 + -1- r -1 - I- 4 - 1- 1 - 201 _I 1 - 4 1- T -1 1- -4 - 1 -k -1- r 1 - I- 4 - 1- 1 - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment DP3: Pond 3 DA Runoff = 92.08 cfs @ 11.89 hrs, Volume= 4.388 af, Depth= 6.44" Routed to Pond 3P : Pond 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 7.290 98 Paved parking, HSG B 0.890 61 >75% Grass cover, Good, HSG B 8.180 94 Weighted Average 0.890 10.88% Pervious Area 7.290 89.12% Impervious Area Subcatchment DP3: Pond 3 DA Hydrograph I I I I I I I 1 1 I I I I I I I I I I I 100 ' I I I I I I I 1 1 I I 1 I I 1 1 I I 1 1 I 1 1 ❑Runoff g5 L _ 1_ 1 _I 9228Cfs _ I L -1_ 1 _I - L I _ I- I _1_ L I _ I_ L _I_ I _I _ 90 L - I 1 - L - I- L I t I L I_ 1 L _Type 11124-hr I + -1 - 4 —I— + I �ii IO ar Ka111 1[77+1 75-' 1 + -1 - 1- I 4 —I— + I ] 'RurToff AIea=81'8a at_ 70= - I- t I I- fi -1- t -I - --p1 -� I- t -1`- 1- -I - 1- �w-I- t -1 65/ I- fi 1 - fi fi I t 1- - rnof1 V olume=4 388 af- — 60=' T I - T/ T 1 7 -r I 1 ,,re 557 - 1- T -1 I- 7 -1- T -I - - I- 1.1111 - pY1 Pirt}F h-96T�Q 41 - '50 o I I I I I I I SO.Q min 40 \i1J 94- 35 30_' 25" -1 1 ' 1 1 I II I I I I I I I I I 20 1 1 I II I I I I I I I I I 15-' 1 I/ I I I I II I I I I I I I I I 10 _I 1 1 _ I_//1//1_ L _I//1//1//_ III__/_ 1 52/ �� 0 - �������� �� � / /r/r// 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 96 Summary for Subcatchment DP4: Pond 4 DA Runoff = 73.17 cfs @ 11.89 hrs, Volume= 3.487 af, Depth= 6.44" Routed to Pond 4P : Pond 4 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 5.850 98 Paved parking, HSG B 0.650 61 >75% Grass cover, Good, HSG B 6.500 94 Weighted Average 0.650 10.00% Pervious Area 5.850 90.00% Impervious Area Subcatchment DP4: Pond 4 DA Hydrograph � _ I_ 1 _I_ L _I _ i — I_ 1 _1— 1 _I_ L _I _ _ 1 _I_ L _I — L - 80" I 1 1 I I 1 1 I I 1 1 I I 1 1 I 1 1 I I 1 1 ■Runoff 754./ 1 1 1 I 17317cfsl 1 I I 1 1 I I 1 1 I I 1 1 I �II 70y 1 1 1 I 1 1 I I 1 1 I I 1 1 I I ITypelli 24 r 65 I- ± 1 - -1 1- - -11 t 11 VQTYear KlalritaH l.1'l5H 60 - I- - - - - 1- - -1- T -1- R nbff Mea=6500_at - 554/ I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 504 I I I I 1 1 1 1 1 1 (Runoff Volumleg3.487 of 3 1 1 1 1 1 1 � I__QI I^QI � 1 �, 4 A Ivo 1- - 0 40- - 1- rt - - - 1- rt - - fi -1- -r -I - rt - I- LL 35: Tc��O — 1— 4 -I- -1 4 1 I �+A'1 Awl - 304./ ,_ J - 1- _I 1_ J - 1_ L _1- L _1_ L _I - L H - 1- L _ 254/ 1 1 1 I I I I I I I I I I I I I I I 204 1 1 1 ' 1 I I I I I I I I I I I I I I 15= I 1 1 I I 1 1 I I 1 1 I I 1 1 I I 1 1 104-/ 4- - I- 1 -1- + -1- -H -1 - L1 - 1 1 -h -1 - H - 54/ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment DP5: Undetained 2 Runoff = 76.21 cfs @ 12.29 hrs, Volume= 8.180 af, Depth= 2.41" Routed to Reach PDP2 : Post Design Point 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 23.880 55 Woods, Good, HSG B 16.790 61 >75% Grass cover, Good, HSG B 40.670 57 Weighted Average 40.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 100 0.0200 0.08 Sheet Flow, Woods Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.32" 8.8 1,900 0.0500 3.60 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 2.1 1,350 0.0200 10.60 286.27 Channel Flow, UNT Flow Area= 27.0 sf Perim= 14.5' r= 1.86' n= 0.030 _ 32.0 3,350 Total Subcatchment DP5: Undetained 2 Hydrograph 1 1 I I - rt I 7 I 7 1 I 4 I 1 1 I - 85_ I - I- t -I- H H - I- 7 -1- # -I- -H -1 - H 7 - I- t -I- t -1 - H - ■Runoff 80i/ - - I- 4 -1-176.21cfs I- 4 4 - I- 4 -1- 4 -I- 4 -1 - 4 4 - I-�4�-I- 7 -1 - 4 - 75 I- L I - L J I L -I L I L 1 L � IType]U-24h 70� 1 1 1 1 1 I I 1 1 I 11 1 I I I I 1 1 1 1 1 1 I I YU7 I W ti niainfg1171•1 f51 604/ I I I I 1 1 1 1 1 1 I Ruiioff Are_&4Q.ma 1 1 1 1 I I I I I I I I I I I I I I I I I 554-/ 4 TIT - rt -1 T -RunoffrVoI-U-n'1ieg8. i1 8V a1 50: - 1- - 1- fi -1- fi -1- - - � � - 1- t - - to-IQ- � 45� � � - - � -I- 44 - I- 4 -1- 4 -I- 7Fill-HYuYVp u7 -11- - �° 40 I L I - L J I L 1 I _I_ L _Row Edit 3 3501 - 35� 1 1 1 1Al 1 1 1 1 1 1 1 1 1 1 1 11 1 30 I I I I r I 1 1 1 1 1 1 1 1 1 1 ITc=32.O rain 254/ I I I I / I 1 1 1 1 1 1 1 1 1 1 1 1 A 5 t 20y `T' 1- 15 t fi fi -1 T 1 5= 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 98 Summary for Subcatchment DP6: Undetained 1 Runoff = 28.70 cfs @ 12.09 hrs, Volume= 1.979 af, Depth= 2.41" Routed to Reach PDP1 : Post Design Point 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.15" Area (ac) CN Description 3.600 61 >75% Grass cover, Good, HSG B 6.240 55 Woods, Good, HSG B 9.840 57 Weighted Average 9.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.7 100 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.32" 3.1 300 0.0100 1.61 Shallow Concentrated Flow, Shallow Field Flow Unpaved Kv= 16.1 fps 15.8 400 Total Subcatchment DP6: Undetained 1 Hydrograph - - rt -I- 7 I I - -I I I I- T —I — 7 32_ - I- -I- -I L - I- -I- -I- 4- -I - H - I- 4- -I- 4- -I - H - ■Runoff 30 1 I L 1 I28.7o cfs I L I I L I I ILI L L I L I L I L 28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 'Type 111 24-hr 26 1 1 1 1 1-1�� `I'"` nlai Ip N77:11 `' I I I I I I I I I I I I OJT P� 24: -r 1 t fi t l tunbf Awed=9-$40 arc - 22 - - I- 4- -I- - L - I- 4 -I- -I- 4- -I - H 4- - I- 1 -I - H� - 20 I 1 I I 1 1 1 1 IBW_n_OfL VOl_{.1.11 l.979 w w 18 1 1 1 1 1 1 1 1 1 �#1Dph1�' 3 16yT I I I I I I I I I I I •, ` m o 1�1o►W'Length 400 LL 147-/ 124"/ - 1- - -I- L -1 - I- -4 -I- -I- 4- -I - L- Slope OO100-'e - 10� 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 *" �'$ 6y 7 - I- 7 I - I rt 1 T I T 1 I I T I �i1�1I I- - 4- H - 1- + -'- ' - 1- -1- + -1- -1 - L 1 - 1 1 - H 0111/� i�oi��oiiiiioj , l( 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 99 Summary for Reach PDP1: Post Design Point 1 Inflow Area = 29.950 ac, 51.95% Impervious, Inflow Depth > 4.49" for 100-Year event Inflow = 172.19 cfs @ 11.95 hrs, Volume= 11.210 af Outflow = 172.19 cfs @ 11.95 hrs, Volume= 11.210 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP1: Post Design Point 1 Hydrograph 4 —I— + 4 — I— + —I — I— + —I— + 4 + 4 —I— + 4 ' — 4 —I- 4H - 1 + —I - 1 4 —I- 44 — I- 4 1 - 1 4 —I- 44 —I- 44 — ■Inflow 190=' i k H I H _1 1172.19 cfs l I 1 + —I— I— H I T I 1 H —I— I— H —I— H H ❑Outflow $° / —F —1— ,1721;cis 1 — 1— H -1- t- —F - InflowlATea=29t.950-a-c- 170_' / 160=' / fi H —1— H H —1 — 1— rt —1— I- H — I— H —1 — 1— H —1— t H —I— H H — 150=' fi rt 1 H -I - 1 r -r 1 r rt 1 -r 1 r rt 1 r rt 1 H - 140=' z '130= / fi -r -1— r -I -1 - 1— -r -1- r -r — 1— r -1 - 1— r -1- r -r —1— r -1 — 120= � H H H I HH T T HH T � y 110 u 100_' I I 1 I I I I I I 1 1 I I I c 90 LL 80_/ / /7 1 1 I I I I I I 1 1 1 1 1 70' / 1 I I 1 1 I I I 1 I I I 60 " / I I I 1 1 I I I 1 I I I 11 1 1 1 I 1 1 1 50=' � 40 / I 1 1 1 // I 1 1 1 1 1 20' / 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 100 Summary for Reach PDP2: Post Design Point 2 Inflow Area = 71.470 ac, 31.92% Impervious, Inflow Depth > 3.66" for 100-Year event Inflow = 278.69 cfs @ 11.93 hrs, Volume= 21.785 af Outflow = 278.69 cfs @ 11.93 hrs, Volume= 21.785 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Reach PDP2: Post Design Point 2 Hydrograph / I I 11 1 I I I I I I I I 71 I I I I I I I I I I I I I I I I I I I I I I ■Inflow 300- / /7 1 I 1 278.69 cfs I I I 1 I II M 11 I 1 1 I I A I 1 I El Outflow _I_ t 278.69 cfs 280 -1 - I- - -1- I- rt - l flow 1Afe�7 1.47-0tac- " 260i, / 4 1 4 —I —1 — 1 4 —I— L 4 — I— 7 —1 — 1 4 —I— L A —I— 7 4 — = / 1 1 1 1 1 I I I I I I I I I I I I I I 240 -/ �/ 220� / 1 1 1 1 I I I I I I I I I I 1 1 1 200� / /7 1 1 1 I I I I I I I I I I 1 1 1 y 180% / firt 1- I 7T I 77 1 -r 1 1 rt 1 L7 1 r - 160 k 4 -1- H- 1 4 -1- 4 4 - 1- + -1 - 1- 4 -1- 4 4 -1- 4 - 3 / )_ J I L J L J 1 _L _I 1 L 1 L J L — LL 140� / 120� / I 1 1 1 1 e 1 1 1 100� / /7 1 1 1 1 /� 1 1 1 807 /7 rt —1— 7 7 / — 7 7 — J 1_ L J 401 / _ II 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 101 Summary for Pond 1 P: Pond 1 Inflow Area = 20.110 ac, 77.37% Impervious, Inflow Depth = 5.97" for 100-Year event Inflow = 218.89 cfs @ 11.89 hrs, Volume= 10.005 af Outflow = 158.07 cfs @ 11.94 hrs, Volume= 9.230 af, Atten= 28%, Lag= 3.4 min Primary = 158.07 cfs @ 11.94 hrs, Volume= 9.230 af Routed to Reach PDP1 : Post Design Point 1 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 680.00'@ 11.94 hrs Surf.Area= 51,537 sf Storage= 193,293 cf Plug-Flow detention time=365.3 min calculated for 9.230 af(92% of inflow) Center-of-Mass det. time= 323.0 min ( 1,093.3 - 770.3 ) Volume Invert Avail.Storage Storage Description #1 675.00' 247,323 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 675.00 22,198 0 0 676.00 31,747 26,973 26,973 677.00 36,608 34,178 61,150 678.00 41,526 39,067 100,217 679.00 46,501 44,014 144,231 680.00 51,532 49,017 193,247 681.00 56,619 54,076 247,323 Device Routing Invert Outlet Devices #1 Primary 670.50' 36.0" Round RCP_Round 36" L= 109.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 670.50'/669.00' S= 0.0138 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 675.00' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 676.50' 5.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 677.75' 9.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 679.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 679.25' 50.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=154.23 cfs @ 11.94 hrs HW=679.99' (Free Discharge) 41- =RCP_Round 36" (Passes 69.10 cfs of 117.10 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.92 cfs @ 10.57 fps) -3=Orifice/Grate (Orifice Controls 1.19 cfs @ 8.72 fps) -4=Orifice/Grate (Orifice Controls 2.90 cfs @ 6.57 fps) -5=Orifice/Grate (Weir Controls 64.09 cfs @ 3.25 fps) G=Broad-Crested Rectangular Weir(Weir Controls 85.13 cfs @ 2.31 fps) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 102 Pond 1 P: Pond 1 Hydrograph / 4 1 -1 - 1- T -I - I- 4 -I- I -I- 4 -1 - I- -, -I - 1 4 -1- 4 -1 4 1 7 4 1 t 1 1 t 1 7 1 1 7 H 1 t 1 7 4 1 1 ❑ Inflow 2401" / 1 1 1 1 1 I218.89crs I I 1 I I 1 I 1rrMM 1 I 1y� I I 1 I 1 1 ❑Primary 230"v �/ 220- 4 -1- _ - 1 -I - 1- 4 -1- 1- 7 -IU1flQwIAmo,ea 2a.1 i0ia i 210_/ i /- 4 -I- H H - 1 1 - 1 t -I- # 7 -1- t 1 + 'wH 7 200 ' / z 1 I 1 I 1 1 1 I I 1 I 1 1 -eaktlev 0 0. - 190_' / � 1_ L 1 _1 _ 1 1_ 1 1 180_ 1 _ _1 _ _ 1 _ _ _1 _ _ L r S o age 'I� 49;9 170- i /- -+ 1 H 1158.07 as 1 1 Cl- 160i"' / /'- 7 -1- 7 -1 , - I 771777717771717T71777717771 150 ' i /I J J _I_ J J _ I_ 1 _I _ L 1 _I_ L w 140" / /- 1 -1- L _ ° 130_' / ,r7 -I- 7 - - L — 1 + -I- 74 -1 + 4 - 1 + -I - 17 -I- 1 -♦ 120 z ,- 7 I 77 -/ - 1 1 T 1 17 1 7 - 1 T 717 77 1 77 LL 100� I _I _ 1_ 1 _I_ LJ _1_ JJ _ 1_ 1 —I _ L1 -1_ LJ _ 90i/ / /- -1 - 1- 4 -1- 44 -1- 44 - 1- 4 -1 - 17 -1- 4 -1 - 804" i /- -I - 1- -r -1- 1- rt -1- 7 - - 1- T -1 - 7rt -1- r -I - 70 II 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' 504/ i ,r7 I LA - - 1 1 4 I I- 4 1 - 1 T I 1 = 1 1- -I 401' z - fi 1 —' — 1— — —'— 1— —' —1— fi - — 1— — —' — 1 —1— 1— 1 - 204-/ L 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 103 Summary for Pond 2P: Pond 2 Inflow Area = 16.120 ac, 59.99% Impervious, Inflow Depth = 5.17" for 100-Year event Inflow = 160.37 cfs @ 11.89 hrs, Volume= 6.944 af Outflow = 126.45 cfs @ 11.94 hrs, Volume= 6.544 af, Atten= 21%, Lag= 3.0 min Primary = 126.45 cfs @ 11.94 hrs, Volume= 6.544 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.75'@ 11.94 hrs Surf.Area= 26,919 sf Storage= 119,120 cf Plug-Flow detention time=221.4 min calculated for 6.537 af(94% of inflow) Center-of-Mass det. time= 190.2 min ( 981.2 - 791.0 ) Volume Invert Avail.Storage Storage Description #1 644.00' 154,643 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 644.00 13,734 0 0 645.00 17,141 15,438 15,438 646.00 19,006 18,074 33,511 647.00 20,969 19,988 53,499 648.00 23,034 22,002 75,500 649.00 25,210 24,122 99,622 650.00 27,495 26,353 125,975 651.00 29,842 28,669 154,643 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 68.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 644.00' 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.25' 18.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 649.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=120.33 cfs @ 11.94 hrs HW=649.72' (Free Discharge) -1=RCP_Round 36" (Passes 54.53 cfs of 101.80 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.56 cfs @ 11.39 fps) 3=Orifice/Grate (Orifice Controls 14.03 cfs @ 7.94 fps) 4=Orifice/Grate (Weir Controls 39.94 cfs @ 2.77 fps) 5=Broad-Crested Rectangular Weir(Weir Controls 65.80 cfs @ 2.29 fps) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 104 Pond 2P: Pond 2 Hydrograph 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 /T T -'- T - - I- T -' - I- 7 -I- T 7 - 1- T -I 1 T -I- T - ❑ Inflow ❑Primar 170� / � r - 1soT s7cfs — I T I T 7 I'MsT� � IwT I T�+rt I'nr i - Y 160� / fi rt 1 1- -I - T 1 1- rt -Inflow ll ow Area`16r.1-20- 150� I r �a E� 7 9 .- 140 / H -1- t 126.45 cfs - ,1 130� H � Dael i' ,1IZ C' 120� 11* /1 1 4 - 1- ' -I - I- 4 -I- HH - F. 100l / k 1 1 - 1 - 1 4 -1- 4 - 7. 3 90- / )- 4 1 1 1 - H 4 -1- J- _1 LL 80- / I_ 4 1- / - L 1 _ I _L 1 L 4 I 1_ _I 701 / /iL1 L - 1 1 L _, I L _ I 1 I I_ A I 1_ _I 601 / 1 _I_ L J I L _I_ L _1 _I_ L _I _ I_ 1 _I I- 1 _I_ L _I _ 5* / )_ 1 _1_ L _J -1_ L1 -I_ L _ I - I_ 1 _ 1_ _I _I- L _I _ 401 / 1 1 1 1 1 / 1 1 I I 1 I 1 I 1 I I 1 301 i 1 1 4Sz1 ' 1 1 1 1 1 I I I I 1 10, , , ,,, , ,...a......_ 0- . . . 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 105 Summary for Pond 3P: Pond 3 Inflow Area = 8.180 ac, 89.12% Impervious, Inflow Depth = 6.44" for 100-Year event Inflow = 92.08 cfs @ 11.89 hrs, Volume= 4.388 af Outflow = 76.39 cfs @ 11.93 hrs, Volume= 4.139 af, Atten= 17%, Lag= 2.3 min Primary = 76.39 cfs @ 11.93 hrs, Volume= 4.139 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 649.36'@ 11.93 hrs Surf.Area= 22,727 sf Storage= 78,600 cf Plug-Flow detention time=282.5 min calculated for 4.135 of(94% of inflow) Center-of-Mass det. time=250.7 min ( 1,005.5 - 754.8 ) Volume Invert Avail.Storage Storage Description #1 645.00' 118,908 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 645.00 12,210 0 0 646.00 15,876 14,043 14,043 647.00 17,818 16,847 30,890 648.00 19,839 18,829 49,719 649.00 21,944 20,892 70,610 650.00 24,134 23,039 93,649 651.00 26,383 25,259 118,908 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 59.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0085 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 645.00' 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 646.00' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 647.50' 6.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Device 1 648.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 649.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=72.70 cfs @ 11.93 hrs HW=649.34' (Free Discharge) 41- =RCP_Round 36" (Passes 52.99 cfs of 99.71 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.22 cfs @ 9.93 fps) -3=Orifice/Grate (Orifice Controls 1.66 cfs @ 8.46 fps) -4=Orifice/Grate (Orifice Controls 1.19 cfs @ 6.06 fps) -5=Orifice/Grate (Weir Controls 49.93 cfs @ 2.99 fps) G=Broad-Crested Rectangular Weir(Weir Controls 19.70 cfs @ 1.47 fps) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 106 Pond 3P: Pond 3 Hydrograph _ I I I I I 4 1 :1_ L _ _ L _I _ I_ 1 _ _ J J _ _ L _ I_ _' I _ 1 _I- L J - ❑ Inflow 100_' / J 1 H _II 92.08cfs I I 1 4 I 1 4 I -H —I — H H 1 1- -I ❑Primary 95 / -F -I- HH - 1 -I - 1- - -I- -F -F -Inflow lArea=8i1-301-ac 90 / fi4 I L - 1 H1 t 1 I1 -1- tH 1 'A`'h_ +wl(� c1 85 i L T rt rIC�I� lei, 4k9.ia1 80 ' / i 76.39 cfs 75=' i /7 7 717 T i 71 - I T -1- 7 7 -1- T - 17 T 71 - 7 17 70 / , 1 I 1 I I 1 I I 1 1 1 orage= MF� VVI '' ct 65 ' i I— I I 1 I - I I I I I I I I I I I I I I I I I w 60=' i I I 1 I - I I I I I I I I I I I I I I I I I ".5.72, 554-' i )_ J I LJ - I L ± I LJ I L _I 1 I I L1 1 LA c 501i )_ J -I- 7 -I -I - 1- 4 -1- 1- -1- -H -I - 1- T -I - HH -1- 1- -I - 351 / firt I L4 - - 1 t I 14 1 7H 1 t I tt 1 L - 30' i n 17 T 717 7 7 717 T 7 717 T 7 7 T 717 r 25 20' i ' � 0 15 / z I 1 / 1 1 ' _1_ 1 1 1 _1_ 1 10_ 5 i/ . /////' � Z / ///////I ///////////////////////////// / 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 107 Summary for Pond 4P: Pond 4 Inflow Area = 6.500 ac, 90.00% Impervious, Inflow Depth = 6.44" for 100-Year event Inflow = 73.17 cfs @ 11.89 hrs, Volume= 3.487 af Outflow = 66.54 cfs @ 11.91 hrs, Volume= 2.921 af, Atten= 9%, Lag= 1.6 min Primary = 66.54 cfs @ 11.91 hrs, Volume= 2.921 af Routed to Reach PDP2 : Post Design Point 2 Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 646.41'@ 11.91 hrs Surf.Area= 17,417 sf Storage= 62,394 cf Plug-Flow detention time=274.8 min calculated for 2.918 af(84% of inflow) Center-of-Mass det. time=205.2 min ( 960.0 - 754.8 ) Volume Invert Avail.Storage Storage Description #1 642.00' 72,921 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 642.00 10,109 0 0 643.00 12,615 11,362 11,362 644.00 13,953 13,284 24,646 645.00 15,347 14,650 39,296 646.00 16,798 16,073 55,369 647.00 18,306 17,552 72,921 Device Routing Invert Outlet Devices #1 Primary 642.00' 36.0" Round RCP_Round 36" L= 94.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 642.00'/641.50' S= 0.0053 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 642.00' 1.7" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 644.50' 12.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 645.75' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Primary 646.00' 40.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Erimary OutFlow Max=63.16 cfs @ 11.91 hrs HW=646.39' (Free Discharge) -1=RCP_Round 36" (Passes 38.17 cfs of 58.44 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 10.01 fps) 3=Orifice/Grate (Orifice Controls 4.46 cfs @ 5.68 fps) 4=Orifice/Grate (Weir Controls 33.55 cfs @ 2.62 fps) -5=Broad-Crested Rectangular Weir(Weir Controls 24.99 cfs @ 1.60 fps) NC111 - Storm Type II 24-hr 100-Year Rainfall=7.15" Prepared by ARCO Business Services Printed 6/23/2023 HydroCAD® 10.20-2g s/n 12793 ©2022 HydroCAD Software Solutions LLC Page 108 Pond 4P: Pond 4 Hydrograph 7/ I I I I I I I 1 1 1 1 I 1 1 I 1 1 1 1 1 ❑ Inflow 80� / ' I I I I 73.17 cfs _1 1 1 1 1 I _1_ 1 I _ 1 1 1 1 1 I ❑ Primary 75� , 1 1 1 I ifIOIW 1A►rea=6.15O11ac 70� " 1 I 166.54 cis I 1 1 1 1 I p 1 11'' 1C 1 I Imo+ IA 65� / z- 1 1 T 1 -1- - 7 - 1- - 1 -r e Q k-G I lev=V'T6 Al, - 60 k I -H 11 / - -1I- -E 1I- II - II S -or ��e= 21, 0`, c 55L , I I I I 504 / z- / F 451 i � 40 -/ / z- 1 I I I I I I I I - LL 355-' /- 1 I I I / 30� / " 1 I I 25 ,/ " rt -1- t -1 1 1 1 1 _ - 20 / A- -1- t 1 - -I- - H -1- - 1 - I- - -1 H - - 1 H -1- 1H - - - 4 -1- H I -/ -I- - H -I- - 1 - I- - I- 1 - 1- 4 -' - I- -I - - - 15i 10�(10� / 1 1 1 I I I I I 1 5 -/ /��� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ARCO DESIGN/BUILD Wet Pond 1 Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: June 23, 2023 Designed: NML Checked: NML Site Information Sub-Area Location: Wet Pond 1 Drainage Area (sf): 875,950 Impervious Area (sf): 677,752 Impervious Cover(%): 77% Stage-Storage Forebay _ Area Incremental Total Volume Stage Contour (sf) _Volume (cf) (cf) _(ft) 669.00 250 0 0 0.00 671.00 952 1,202 1,202 2.001 673.00 1,719 2,671 3,873 4.00 674.00 2,377 2,048 5,921 5.00 675.00 3,071 2,724 8,645 6.00 Stage-Storage Permanent Pool Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 671.00 9,964 0 0 0.00 672.00 12,038 11,001 11,001 1.00 673.00 14,282 13,160 24,161 2.00 674.00 16,634 15,458 39,619 3.00 675.00 19,014 17,824 57,443 4.00 Stage-Storage Pond Storage _ Area Incremental Total Volume Stage Contour _ (sf) _Volume (cf) (cf) _(ft) 675.00 22,198 0 0 0.00 676.00 31,747 26,973 26,973 1.00 677.00 36,608 34,178 61,150 2.00 679.00 46,500 83,108 144,258 4.00 681.00 56,619 103,119 247,377 6.00 MDC 1 Impervious Cover(%): 77% Average Depth: 3.02 SA/DA Ratio: 2.51 Surface Area Required: 21,986 Surface Area Provided: 22,198 PASS MDC 2 Permanent Pool Volume (cf): 57,443 Permanent Pool Area (sf): 19,014 Average Depth: 3.02 MDC 3 Sediment Storage Elevation: 670.50 MDC 5 Forebay Volume (cf): 8,645 Permanent Pool Volume (cf): 57,443 Volume Ratio: 15% PASS MDC 7 Design Storm (in): 1 Storage Volume Required: 54,481 Orifice Size (in): 4.00 Orifice Flow(cfs): 0.30 Temp. Pool Lower Volume: 0 cf Temp. Pool Upper Volume: 19,014 cf Temp. Pool Lower Elevation: _ 675.00 ft Temp. Pool Upper Elevation: 676.51 ft Drawdown Time (days): 2.1 PASS Anti-Float Collar Device Sizing Riser Outer Width: 6 ft Riser Inner Width: 5 ft Riser Outer Length: 6 ft Riser Inner Length: 5 ft Volume of Water Displaced: 306 cf Riser Wall Thickness:_ 0.5 ft Weight of Water Displaced 19,104 lbs Top of Riser 679.00 ft Factor of Safety: 1.25 Invert of Riser 670.50 ft Weight Requird of Device: 23,879 lbs Vegetated Shelf Elevation 675.00 ft Thickness of Device: 0.5 ft Weight Concrete: 150 pcf Length of Device: 8 ft Weight Submerged Concrete: 87.6 pcf Weight of Device: 16,725 lbs Weight Soil: 120 pcf Weight of Soil: 15,120 lbs Total Weight: 31,845 lbs PASS J Anti-Seep Collar Design Maximum Water Level: 680.00 ft Increase in Flow Path: 15% Invert of Pipe: 670.50 ft Flow Length: 81 ft Pipe Slope: 0.014 ft/ft Collar Projection: 2 ft Pond Slope: 3 :1 Number of Anti-Seep Collars: 3 ft Length Satruated Pipe: 70 Minimum Spacing: 10 ft Chosen Spacing: 20 Maximum Spacing: 28 ft Z + 4 ) � rpipe slope (ft / ft )1 Ls - Y 0.25 - pipe slope ' PASS ARCO DESIGN/BUILD Wet Pond 2 Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: June 23, 2023 Designed: NML Checked: NML Site Information Sub-Area Location: Wet Pond 2 Drainage Area (sf): 702,156 Impervious Area (sf): 421,197 Impervious Cover (%): 60% Stage-Storage Forebay Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 640.00 807 0 0 0.00 641.00 1,132 970 970 1.00 642.00 1,514 1,323 2,293 2.00 643.00 1,956 1,735 4,028 3.00 644.00 2,458 2,207 6,235 4.00 Stage-Storage Permanent Pool Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 640.00 7,506 0 0 0.00 641.00 8,242 7,874 7,874 1.00 642.00 9,017 8,630 16,504 2.00 643.00 9,833 9,425 25,929 3.00 644.00 10,691 10,262 36,191 4.00 Stage-Storage Pond Storage Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 644.00 13,734 0 0 0.00 645.00 17,141 15,438 15,438 1.00 647.00 20,969 38,110 53,548 3.00 649.00 25,210 46,179 99,727 5.00 651.00 29,842 55,052 154,779 7.00 MDC 1 Impervious Cover(%): 60% Average Depth: 3.39 SA/DA Ratio: 1.90 Surface Area Required: 13,341 Surface Area Provided: 13,734 PASS MDC 2 Permanent Pool Volume (cf): 36,191 Permanent Pool Area (sf): 10,691 Average Depth: 3.39 MDC 3 Sediment Storage Elevation: 639.50 MDC 5 Forebay Volume (cf): 6235 Permanent Pool Volume (cf): 36,191 Volume Ratio: 17% PASS MDC 7 Design Storm (in): 1 Storage Volume Required: 34,515 Orifice Size (in): 3.00 Orifice Flow(cfs): 0.18 Temp. Pool Lower Volume: 0 cf Temp. Pool Upper Volume: 10,691 cf Temp. Pool Lower Elevation: _ 644.00 ft Temp. Pool Upper Elevation: 645.73 ft Drawdown Time (days): 2.2 PASS Anti-Float Collar Device Sizing Riser Outer Width: 6 ft Riser Inner Width: 5 ft Riser Outer Length: 6 ft Riser Inner Length: 5 ft Volume of Water Displaced: 252 cf Riser Wall Thickness:_ 0.5 ft Weight of Water Displaced 15,732 lbs Top of Riser 649.00 ft Factor of Safety: 1.25 Invert of Riser 642.00 ft Weight Requird of Device: 19,665 lbs Vegetated Shelf Elevation 644.00 ft Thickness of Device: 0.5 ft Weight Concrete: 150 pcf Length of Device: 8 ft Weight Submerged Concrete: 87.6 pcf Weight of Device: 14,250 lbs Weight Soil: 120 pcf Weight of Soil: 6,720 lbs Total Weight: 20,970 lbs PASS J Anti-Seep Collar Design Maximum Water Level: 650.00 ft Increase in Flow Path: 15% Invert of Pipe: 642.00 ft Flow Length: 66 Pipe Slope: 0.007 ft/ft Collar Projection: 2 Pond Slope: 3 :1 Number of Anti-Seep Collars: 2 Length Satruated Pipe: 58 Minimum Spacing: 10 Chosen Spacing: 20 Maximum Spacing: 28 z 4 1 pipe slope (ft 1 ft ) , 0.25 - pipe slope ' PASS ARCO DESIGN/BUILD Wet Pond 3 Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: June 23, 2023 Designed: NML Checked: NML Site Information Sub-Area Location: Wet Pond 3 Drainage Area (sf): 356,269 Impervious Area (sf): 317,501 Impervious Cover(%): 89% Stage-Storage Forebay _ Area Incremental Total Volume Stage Contour (sf) _Volume (cf) (cf) _(ft) 642.00 1,462 0 0 0.00 643.00 1,782 1,622 1,622 1.00 644.00 2,130 1,956 3,578 2.00 645.00 2,507 2,319 5,897 3.00 Stage-Storage Permanent Pool Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 640.00 4,073 0 0 0.00 642.00 5,745 9,818 9,818 2.00 643.00 6,725 6,235 16,053 3.00 644.00 7,753 7,239 23,292 4.00 645.00 8,825 8,289 31,581 5.00 Stage-Storage Pond Storage Area Incremental Total Volume Stage Contour _ (sf) Volume (cf) (cf) _(ft) 645.00 12,210 0 0 0.00 646.00 15,876 14,043 14,043 1.00 647.00 17,818 16,847 30,890 2.00 649.00 21,944 39,762 70,652 4.00 651.00 26,383 48,327 118,979 6.00 MDC 1 Impervious Cover(%): 89% Average Depth: 3.58 SA/DA Ratio: 2.95 Surface Area Required: 10,510 Surface Area Provided: 12,210 PASS MDC 2 Permanent Pool Volume (cf): 31,581 Permanent Pool Area (sf): 8,825 Average Depth: 3.58 MDC 3 Sediment Storage Elevation: 639.50 MDC 5 Forebay Volume (cf): 5,897 Permanent Pool Volume (cf): 31,581 Volume Ratio: 19% PASS MDC 7 Design Storm (in): 1 Storage Volume Required: 25,297 Orifice Size (in): 2.00 Orifice Flow(cfs): 0.08 Temp. Pool Lower Volume: 0 cf Temp. Pool Upper Volume: 8,825 cf Temp. Pool Lower Elevation: _ 645.00 ft Temp. Pool Upper Elevation: 646.64 ft Drawdown Time (days): 3.8 PASS Anti-Float Collar Device Sizing Riser Outer Width: 6 ft Riser Inner Width: 5 ft Riser Outer Length: 6 ft Riser Inner Length: 5 ft Volume of Water Displaced: 234 cf Riser Wall Thickness:_ 0.5 ft Weight of Water Displaced 14,609 lbs Top of Riser 648.50 ft Factor of Safety: 1.25 Invert of Riser 642.00 ft Weight Requird of Device: 18,261 lbs Vegetated Shelf Elevation 645.00 ft Thickness of Device: 0.5 ft Weight Concrete: 150 pcf Length of Device: 8 ft Weight Submerged Concrete: 87.6 pcf Weight of Device: 13,425 lbs Weight Soil: 120 pcf Weight of Soil: 10,080 lbs Total Weight: 23,505 lbs PASS J Anti-Seep Collar Design Maximum Water Level: 650.00 ft Increase in Flow Path: 15% Invert of Pipe: 642.00 ft Flow Length: 67 Pipe Slope: 0.008 ft/ft Collar Projection: 2 Pond Slope: 3 :1 Number of Anti-Seep Collars: 2 Length Satruated Pipe: 58 Minimum Spacing: 10 Chosen Spacing: 20 Maximum Spacing: 28 L � - z + 4 1 + pipeslope (ft / ft)� y ( ) 0.25 - pipe slope t PASS ARCO DESIGN/BUILD Wet Pond 4 Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: June 23, 2023 Designed: NML Checked: NML Site Information Sub-Area Location: Wet Pond 4 Drainage Area (sf): 283,140 Impervious Area (sf): 254,826 Impervious Cover(%): 90% Stage-Storage Forebay _ Area Incremental Total Volume Stage Contour (sf) _Volume (cf) (cf) _(ft) 638.00 652 0 0 0.00 639.00 878 765 765 1.00 640.00 1,134 1,006 1,771 2.00 641.00 1,419 1,277 3,048 3.00 642.00 1,734 1,577 4,624 4.00 Stage-Storage Permanent Pool Area Incremental Total Volume Stage Contour (sf) Volume (cf) (cf) (ft) 638.00 5,098 0 0 0.00 639.00 5,758 5,428 5,428 1.00 640.00 6,446 6,102 11,530 2.00 641.00 7,162 6,804 18,334 3.00 642.00 7,906 7,534 25,868 4.00 Stage-Storage Pond Storage _ Area Incremental Total Volume Stage Contour (sf) _Volume (cf) (cf) _(ft) 642.00 10,109 0 0 0.00 643.00 12,615 11,362 11,362 1.00 1 645.00 15,347 27,962 39,324 3.00 646.00 16,798 16,073 55,397 4.00 647.00 18,306 17,552 72,949 5.00 MDC 1 Impervious Cover(%): 90% Average Depth: 3.27 SA/DA Ratio: 3.15 Surface Area Required: 8,919 Surface Area Provided: 10,109 PASS MDC 2 Permanent Pool Volume (cf): 25,868 Permanent Pool Area (sf): 7,906 Average Depth: 3.27 MDC 3 Sediment Storage Elevation: 637.50 MDC 5 Forebay Volume (cf): 4,624 Permanent Pool Volume (cf): 25,868 Volume Ratio: 18% PASS MDC 7 Design Storm (in): 1 Storage Volume Required: 20,292 Orifice Size (in): 1.75 Orifice Flow(cfs): 0.05 Temp. Pool Lower Volume: 0 cf Temp. Pool Upper Volume: 7,906 cf Temp. Pool Lower Elevation: _ 642.00 ft Temp. Pool Upper Elevation: 643.39 ft Drawdown Time (days): 4.3 PASS Anti-Float Collar Device Sizing Riser Outer Width: 6 ft Riser Inner Width: 5 ft Riser Outer Length: 6 ft Riser Inner Length: 5 ft Volume of Water Displaced: 171 cf Riser Wall Thickness:_ 0.5 ft Weight of Water Displaced 10,676 lbs Top of Riser 645.75 ft Factor of Safety: 1.25 Invert of Riser 641.00 ft Weight Requird of Device: 13,344 lbs Vegetated Shelf Elevation 642.00 ft Thickness of Device: 0.5 ft Weight Concrete: 150 pcf Length of Device: 8 ft Weight Submerged Concrete: 87.6 pcf Weight of Device: 10,538 lbs Weight Soil: 120 pcf Weight of Soil: 3,360 lbs Total Weight: 13,898 lbs PASS J Anti-Seep Collar Design Maximum Water Level: 646.00 ft Increase in Flow Path: 15% Invert of Pipe: 641.00 ft Flow Length: 41 Pipe Slope: 0.005 ft/ft Collar Projection: 2 Pond Slope: 3 :1 Number of Anti-Seep Collars: 1 Length Satruated Pipe: 36 Minimum Spacing: 10 Chosen Spacing: 20 Maximum Spacing: 28 z 4 1 pipe slope (ft 1 ft ) , 0.25 - pipe slope ' PASS 5/11/23,5:39 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Emergency Spillway Basin#1 Name Emergency Spillway Basin #1 Discharge 51.42 Channel Slope 0.01 Channel Bottom Width 40 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 51.42 cfs 2.17 ft/s 0.57 ft 0.046 3 lbs/ft2 0.36 lbs/ft2 8.45 STABLE E Unvegetated Underlying Straight 51.42 cfs 2.17 ft/s 0.57 ft 0.046 2.84 Ibs/ft2 0.34 Ibs/ft2 8.36 STABLE E Substrate SC250 Straight 51.42 cfs 1.72 ft/s 0.71 ft 0.066 10 lbs/ft2 0.44 lbs/ft2 22.57 STABLE E Reinforced Vegetation Underlying Straight 51.42 cfs 1.72 ft/s 0.71 ft 0.066 10 Ibs/ft2 0.42 Ibs/ft2 23.84 STABLE E Substrate https://ecmds.com/project/156512/channel-analysis/244954/show 1/1 5/11/23,5:38 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Emergency Spillway Basin#2 Name Emergency Spillway Basin #2 Discharge 39.04 Channel Slope 0.01 Channel Bottom Width 40 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 39.04 cfs 1.91 ft/s 0.49 ft 0.047 3 lbs/ft2 0.31 lbs/ft2 9.76 STABLE E Unvegetated Underlying Straight 39.04 cfs 1.91 ft/s 0.49 ft 0.047 2.84 Ibs/ft2 0.3 Ibs/ft2 9.6 STABLE E Substrate SC250 Straight 39.04 cfs 1.5 ft/s 0.62 ft 0.07 10 lbs/ft2 0.39 lbs/ft2 25.81 STABLE E Reinforced Vegetation Underlying Straight 39.04 cfs 1.5 ft/s 0.62 ft 0.07 10 Ibs/ft2 0.37 Ibs/ft2 27.08 STABLE E Substrate https://ecmds.com/project/156512/channel-analysis/244971/show 1/1 5/11/23,9:52 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Emergency Spillway Basin#3 Name Emergency Spillway Basin #3 Discharge 58.23 Channel Slope 0.01 Channel Bottom Width 40 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 58.23 cfs 2.29 ft/s 0.61 ft 0.045 3 lbs/ft2 0.38 lbs/ft2 7.93 STABLE E Unvegetated Underlying Straight 58.23 cfs 2.29 ft/s 0.61 ft 0.045 2.84 Ibs/ft2 0.36 Ibs/ft2 7.87 STABLE E Substrate SC250 Straight 58.23 cfs 1.83 ft/s 0.75 ft 0.065 10 lbs/ft2 0.47 lbs/ft2 21.26 STABLE E Reinforced Vegetation Underlying Straight 58.23 cfs 1.83 ft/s 0.75 ft 0.065 9.85 Ibs/ft2 0.44 Ibs/ft2 22.19 STABLE E Substrate https://ecmds.com/project/156512/channel-analysis/244972/show 1/1 5/11/23, 10:08 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Emergency Spillway Basin#4 Name Emergency Spillway Basin #4 Discharge 44.34 Channel Slope 0.01 Channel Bottom Width 40 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 44.34 cfs 2.03 ft/s 0.53 ft 0.047 3 lbs/ft2 0.33 lbs/ft2 9.13 STABLE E Unvegetated Underlying Straight 44.34 cfs 2.03 ft/s 0.53 ft 0.047 2.84 Ibs/ft2 0.32 Ibs/ft2 9.01 STABLE E Substrate SC250 Straight 44.34 cfs 1.6 ft/s 0.66 ft 0.068 10 lbs/ft2 0.41 lbs/ft2 24.27 STABLE E Reinforced Vegetation Underlying Straight 44.34 cfs 1.6 ft/s 0.66 ft 0.068 10 Ibs/ft2 0.39 Ibs/ft2 25.53 STABLE E Substrate https://ecmds.com/project/156512/channel-analysis/244973/show 1/1 ARCO DESIGN/BUILD Riprap Outlet Protection Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: May 11, 2023 Designed: NML Checked: NML Pipe Velocity Calculation Pipe Name: Sediment Basin 1 Outlet Location: Skimmer Sediment Basin 1 HW Coefficent Table Pipe Diameter: 36 in PVC= 130 Pipe Slope: 0.01 ft/ft DIP = 140 Friction Loss Coefficient: 110 HDPE = 150 Factor of Safety 1.1 CMP = 60 Full Pipe Max Velocity: 10.06 fps RCP = 110 Full Pipe Max Flow: 71.11 cfs Figure 8.06.b.1 25 20 —ZONE-6— Zv 7 U N y) 15 \ _ o 10 u c� NEN ZUNE2 ` __ 5 ZONE i i I �� 0 1 0 1 2 3 4 5 6 7 8 9 10 Pipe Diameter(ft) Zone Selected: 2 Steep Apron Grade (10%+): No Riprap Design Material: Class B Length: 18 ft Stone Diameter: 8 in Width at Outlet: 9 ft Thickness: 12 in Width at End of Pad: 21 ft Cabs basetl on N060T method.See NC Erosion Control Manual8.06.06 page 1 of 1 ARCO DESIGN/BUILD Riprap Outlet Protection Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: May 11, 2023 Designed: NML Checked: NML Pipe Velocity Calculation Pipe Name: Sediment Basin 2 Outlet Location: Skimmer Sediment Basin 2 HW Coefficent Table Pipe Diameter: 24 in PVC= 130 Pipe Slope: 0.01 ft/ft DIP = 140 Friction Loss Coefficient: 110 HDPE = 150 Factor of Safety 1.1 CMP = 60 Full Pipe Max Velocity: 7.79 fps RCP = 110 Full Pipe Max Flow: 55.08 cfs Figure 8.06.b.1 25 20 —ZONE-6— Zo 7 U N • 15 \ � I u 10• \ \ 1 i v . —� > 5 ZONE I 0 0 1 2 3 4 5 6 7 8 9 10 Pipe Diameter(ft) Zone Selected: 2 Steep Apron Grade (10%+): No Riprap Design Material: Class B Length: 18 ft Stone Diameter: 8 in Width at Outlet: 6 ft Thickness: 12 in Width at End of Pad: 20 ft Cabs basetl on NVOOT method.See NC Erosion Control Manual8.06.06 page 1 of 1 ARCO DESIGN/BUILD Riprap Outlet Protection Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: May 11, 2023 Designed: NML Checked: NML Pipe Velocity Calculation Pipe Name: Sediment Basin 3 Outlet Location: Skimmer Sediment Basin 3 HW Coefficent Table Pipe Diameter: 36 in PVC= 130 Pipe Slope: 0.01 ft/ft DIP = 140 Friction Loss Coefficient: 110 HDPE = 150 Factor of Safety 1.1 CMP = 60 Full Pipe Max Velocity: 10.06 fps RCP = 110 Full Pipe Max Flow: 71.11 cfs Figure 8.06.b.1 25 20 —ZONE-6— Zv 7 U N y) 15 \ _ o 10 NEN ZUNE2 Tu ` __ 5 ZONE I i I �� 0 1 0 1 2 3 4 5 6 7 8 9 10 Pipe Diameter(ft) Zone Selected: 2 Steep Apron Grade (10%+): No Riprap Design Material: Class B Length: 18 ft Stone Diameter: 8 in Width at Outlet: 9 ft Thickness: 12 in Width at End of Pad: 21 ft Cabs basetl on NVOOT method.See NC Erosion Control Manual8.06.06 page 1 of 1 ARCO DESIGN/BUILD Riprap Outlet Protection Design Calcs Project Information Project: Rusher Farms Location: Rowan County, NC Project Number: NC111 Date: May 11, 2023 Designed: NML Checked: NML Pipe Velocity Calculation Pipe Name: Sediment Basin 4 Outlet Location: Skimmer Sediment Basin 4 HW Coefficent Table Pipe Diameter: 24 in PVC= 130 Pipe Slope: 0.01 ft/ft DIP = 140 Friction Loss Coefficient: 110 HDPE = 150 Factor of Safety 1.1 CMP = 60 Full Pipe Max Velocity: 7.79 fps RCP = 110 Full Pipe Max Flow: 55.08 cfs Figure 8.06.b.1 25 20 —ZONE-6— Zo 7 U N • 15 \ � I u 10• \ \ 1 i v . —� > 5 ZONE I 0 0 1 2 3 4 5 6 7 8 9 10 Pipe Diameter(ft) Zone Selected: 2 Steep Apron Grade (10%+): No Riprap Design Material: Class B Length: 18 ft Stone Diameter: 8 in Width at Outlet: 6 ft Thickness: 12 in Width at End of Pad: 20 ft Cabs basetl on NVOOT method.See NC Erosion Control Manual8.06.06 page 1 of 1