Loading...
HomeMy WebLinkAboutNCG110060_New Draft NCG11 Notice Email_20231127 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Monday, November 27, 2023 4:56 PM To: crosd100@embarqmail.com Cc: Georgoulias, Bethany Subject: [External] Stormwater General Permit Renewal Info - NCG110060 Attachments: NCG110060_NCG110000 New Draft Notice Letter_20231127.pdf Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear NPDES NCG110000 Storwmater Permittee: We are writing to you with important information about the NPDES Stormwater NCG110000 General Permit.As part of litigation, the N.C. Division of Energy, Mineral, and Land Resources (DEMLR)will post a new draft NCG110000 General Permit for public comment beginning December 1, 2023, until January 10, 2024. Upon finalization and issuance of the new General Permit next year, a new Certificate of Coverage (COC)will be issued for all facilities with active coverage. Your facility will then be subject to the new General Permit NCG110000, anticipated to be re-issued on March 1, 2024. Permittees will receive information about how to obtain a new renewal COC in early spring and should check the General Permits section of our website (https://deq.nc.gov/sw-industrial)for updates. Please see the important letter attached, which is being mailed out by hard copy to the Responsible Official associated with this Owner Entity. With this email, we are also reaching out to permit and facility contacts in our system as of 11/13/2023 so that the information gets to all the right people. (If any contacts needs to be updated, please submit a request at: https://edocs.deq.nc.gov/Forms/SW-Permit-Contact-Updates) Permit COC No.: NCG110060 Permittee: Contentnea Metropolitan Sewerage District Facility Name: Contentnea Sewerage District WWTP Facility Location: 900 Wiley Gaskins Rd, Grifton, NC County: Pitt PROPOSED DRAFT GENERAL PERMIT AND PUBLIC NOTICE INFORMATION: The Division of Energy, Mineral, and Land Resources (DEMLR) invites public comment on, or objections to, the following NPDES Industrial Stormwater General Permit to be revised and re-issued.The public comment period begins at 9:00am on 12/1/2023 and ends at 5:00pm on 01/10/2024. Persons wishing to comment or object may submit written comments to the address below during the public comment period. All comments received during the public comment period will be considered in the final determinations regarding permit issuance. Public comments may result in changes to the proposed permitting actions. All comments should reference the specific permitting actions listed below and the permit number. DEMLR intends to re-issue the following NPDES industrial stormwater General Permit: NCG110000 for Treatment Works: Proposed issuance date 03/01/2024 Beginning December 1, the proposed new draft General Permit and Fact Sheet may be viewed at: 1 https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-public-notices If you have any questions concerning this permit, please contact our NPDES General Permits Coordinator, Brittany Cook, at(919) 707-3648, or by email at brittany.cook@deq.nc.gov. Sincerely, The DEMLR Stormwater Program This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. 2