Loading...
HomeMy WebLinkAboutSW6231109_Supplement-EZ Form_20231127 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Barker Laydown Yard 2 Project Area(ac) _ 123.05 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 18.25 5 Is this project High or Low Density? _ Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 L- FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Zachary Eulo,Project Manager 28 Organization: Dewberry Engineers Inc. 29 Street address: 2610 Wycliff Rd Suite#410 30 City,State,Zip: Raleigh,NC 27607 31 Phone number(s): 919-425-7610 32 Email: zeulo@dewberry.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,stg 111l/g1, .4 t1 CAR .?4,31".0.*°S1N-1'..1 :Q SEAL L Signa esi 055132 •*4. IM��J�: • CHARY �•`' k 11 /2a/2 3 ., •"smSearsr`e Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so,number of drainage areas/SCMs _ 0 3 Does this project have low density areas? _ Yes 4 If so,number of low density drainage areas _ 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM 5 Total drainage area(sq ft) 4565088 4565088 6 Onsite drainage area(sq ft) 4565088 4565088 7 Offsite drainage area(sq ft) - 8 Total BUA in project(sq ft) 306663 sf 306663 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) -New BUA not on subdivided lots(subject to 10 permitting)(sf) 283140 sf 283140 sf 11 Offsite BUA(sq ft) 23523 sf 23523 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) --Sidewalk(sq ft) - - -Roof(sgft) --Roadway(sq ft) --Future(sq ft) --Other,please specify in the comment box below(sq ft) 283140 sf 283140 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) -New infiltrating permeable pavement not on 14 subdivided lots(sq ft) - - Existing BUA that will remain(not subject to 15 permitting)(sq ft) 23523 sf 23523 sf 16 Existing BUA that is already permitted(sq ft) - - 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 7% 7% 19 Design storm(inches) - - 20 Design volume of SCM(cu ft) - - 21 Calculation method for design volume - - ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): 4:283,140 sf of gravel will be used as a temporary laydown yard to store material and equipment for the construction of a linear utility project. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances(H:V) (3:1) 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 2.74 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s)(%) - 8 Bottom width of curb outlet swale(s)(feet) - 9 Maximum side slope of curb outlet swale(s)(H:V) - 10 Minimum length of curb outlet swale(s)(feet) 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule.1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Velocities are based off straw with net lining Drainage Pervious Swale BUA Q Slope Vallow Vans, Flow depth Area area (ac) (cfs) (%) (fps) (fps) (ft) (ac) (ac) 1 3.74 3.10 0.64 0.86 12.58 0.01 5.80 2.74 0.59 2 3.00 2.51 0.49 0.86 10.09 0.01 5.80 2.55 0.52 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2