Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0003433_Figure 12-8 Ecological CEM Cape Fear_20150902
Primary Source Secondary Sources Exposure Medium Exposure Route I Current and Hypothetical Future Ecological Receptors Existing Primary Release Mechanisms Ash Basin Former Primary Release Mechanism Former Discharge — — — — — — — — Incomplete Pathway — — — — — — — — Secondary Source Flow Exposure Medium Dermal Soil 0 Incidental Ingestion Ingestion of Prey or Plants Surface Water Sediment i •——————————————————————————————————— — — — — —— Groundwater jPotential Human Receptors ® Potentially Complete Exposure Pathway 49 Incomplete Exposure Pathway Dermal Purposeful Ingestion (Drinking) Incidental Ingestion Ingestion of Prey or Plants Dermal Incidental Ingestion Ingestion of Prey or Plants Incidental Ingestion Ingestion of Prey or Plants 167 synTerra 148 River Street, Suite 220 Greenville, SC 29601 Phone: (864)421-9999 � is" u v ' O � CU Figure 12-8 Ecological Conceptual Exposure Model Cape Fear Steam Electric Plant P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\1.11 CSA Repo rting\Figures\Figure 12-8 Ecological CEM Cape Fear.xlsx8/28/2015