Loading...
HomeMy WebLinkAbout030026_Compliance Evaluation Inspection_20221220 Division of Water Resources Facility Number - ❑ O Division of Soil and Water Conservation O Other Agency Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: aRoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: (' Departure Time: County: ►\ Region: Farm Name: `� � kk� ' � Owner Email: Owner Name: Phone: �l [ Mailing Address: {�I ( New ye I \ TJ[� ► v 0 �0�n Physical Address: 3 ( 1 v Facility Contact:r-w'Q� �� Title: Phone: Onsite Representative: Integrator: �1 Certified Operator: G6 6 Certification Number: Lai Jl Back-up Operator: Certification Number: Location of Farm: Latitude: D l U Longitude: ' l Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer �— _ Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Points Other Discharizes and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes o ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facilit Number: - Date of inspection: Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? Yes ❑ No ❑ NA ❑ NE a.If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 `Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity o any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a Yes ❑ No ❑ NA ❑ NE waste management or closure plan? '�9>;\'C� ' 1 6y�kk, �\ ip If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes CS�No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes NNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [:] No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes [:] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement2lf ycs,sh cP k the an�&wAe mw-bolo - ❑ Yes [] No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield El Monthly and 1" Rainfall Inspections E5-S� 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 1] NA ❑ NE Page 2 of 3 511212020 Continued Facilit Number: - Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No DNA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [:] No N NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ N E 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 0 No ❑ NA ❑ N E 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ N E. Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). a LEtS-� CCU i{�ra-h [� ea Y- V-1,2 t, ec�C3e� Y1�S 1(1U Y �aYr�S C>,von 0,Iol2 (yk r gNA Reviewer/Inspector Name: 2QLQ e.0 CC\' C.Q WAAt cy- Phone: ��{_ 910� Reviewer/Inspector Signature: Date: Page 3 of 3 511212020