From:Wanucha, Dave
Sent:Thursday, August 20, 2015 4:31 PM
To:Euliss, Amy
Subject:RE: Permit Site 12
Ok, Next week.
Dave Wanucha
NCDENR Winston Salem
Regional Office
450 West Hanes Mill Rd.
Suite 300
Winston Salem, NC 27105
336-403-5655
Smartphone
-------- Original message --------
From: "Euliss, Amy"
Date:08/20/2015 3:58 PM (GMT-05:00)
To: "Wanucha, Dave"
Subject: RE: Permit Site 12
Can you send us an inspection report for our records including your recommendations on the violation area? Thanks.
From: Euliss, Amy
Sent: Wednesday, August 19, 2015 9:58 PM
To: Wanucha, Dave; Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil)
Cc: Guy, Jeremy M; Panek, Lindsey F; Suggs, Phillip H; Wyrick, Scott D; Archer Sr, Wright
Subject: Fw: Permit Site 12
We'll review this site tomorrow. The contractor removed the orange fence and silt fence and drove the track
hoe in the creek. DOT was not notified that crews were working in area, and discovered it late afternoon.
Below is an email with pictures from our lead inspector on the project. It's my understanding that there were no
permitted impacts at the location of the unauthorized activity; however I'll have to confirm that tomorrow.
I had them protect the area in case we had rains overnight.
Our Resident Engineer has shut all operations down, except erosion control repair, maintenance and
installations until further notice.
Amy
Sent using OWA for iPad
From: Wyrick, Scott D
Sent: Wednesday, August 19, 2015 7:06:33 PM
To: Guy, Jeremy M; Panek, Lindsey F
Cc: Euliss, Amy; Suggs, Phillip H; Archer Sr, Wright
Subject: Permit Site 12
1
At permit site 12 Dragados removed the orange fence that designated a permit area. Then Dragados removed the silt fence that ran
along the bank of the jurisdictional stream. Dragados then operated a trackhoe in the jurisdictional stream and cleared. At no time did
anyone inform the inspection crew of this work. If they had communicated the work plan for this area we could have been involved
and prevented this incident. We had the Dragados reinstall silt fence along the stream bank to prevent anymore sediment loss.
________________________________