Loading...
HomeMy WebLinkAboutNCC233425_Site Plan or Location Map_20231116 • �P� �� � /rn� GAD „�_t�� GROUND STABILIZATION MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION 301 // "ay., °Qyc �"' "Net+ a SITE AREA STABILIZATION pP 0 �i EXCEPTIONS �b DESCRIPTION TIME N w • DESC 0 FRAME c o� • General-AII measures will be inspected and corrections made after runoff producingrainfalls, any or at least once per week minimum.The builder will insure that the construction activities on particular lot do not adverselyaffect an of the installed erosion control measures.If lot construction dictates,measures will be $ PERIMETER DIKES, 7 DAYS NONE relocated on the lot to insu a that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. i, "Yaopo SWALES, DITCHES �� // 3 seta sa`s'g &SLOPES Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all �o I HIGH QUALITY 7 DAYS NONE objectionable materials spilled,washed,or tracked onto public roadways. $7 .1 WATER ZONES r- (HOW) Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure 4pO oQ S ITE SLOPES STEEPER 7 DAYS IF SLOPES ARE that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. allTHAN 3:1 10'OR LESS IN General Erosion Control Notes LENGTH AND ARE Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth S9fod, 1.Only the areas shown shall be disturbed. and stabilization of the root bed.The sod should be limed and fertilized as per soiltype recommendations and type of grass recommendations when and if possible. ,pR NOT STEEPER 2. All disturbed areas shall be grassed and p YP 9 4G THAN2:1, 14 I �L•o mulched as s as possible net maintained g an g- grassing an g s properly ryas an initial pin sot prepare grassing p germinating prope y. y q> s4ry0E DAYS ARE until pemonent cover tablished. Grassing d Mulchin The area to receive d mulching should be ri fertilized and limed as necessary tier ate I Lion. Once the has been laced,the area should be maintained as needed to insure that all areas are tin d M bare areas should be �• sire ao ALLOWED repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. RO V'-' ao - SLOPES 3:1 OR 14 DAYS 7 DAYS FOR V FLATTER SLOPES GREATER Wattles-Wattles shall be inspected after signifcant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed Hucnw5n B�ROAD oe° THAN 50'IN sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. LENGTH Nca1RO PUCE s`'8 a B - ALL OTHER AREAS 14 DAYS NONE(EXCEPT Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all J. IHUM SR aes a'q - WITH SLOPES FOR PERIMETERS fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. FLATTER THAN 4:1 AND HOW ZONES) ICINITY MA-Mk ( (N.T.S.) —�, ,l am. "� . -- . --1 r---., f'/,` J r ) J / �: 1,•.• ./... CONSTRUCTION SCHEDULE —�ar_,,��--,. - r / f, {- L-mot I.Obtain all necessary permits and p.approvals.Erosion and Sediment Control(EreSq permit and a Certificate of Coverage i 2,�-Y` Y� // / 1 a (COC)must be obtained before any land disturbing activities occur.A copy of the EreSC permit,the COC and a hard copy of the _— \ — �' p` ~,4 a I / { a,\ i , + ar planmust be keptonsite,preferably ' box,andaccessibledurm F F pre permits g Inspection. _ ` 2.mnwll gravel construction entrances first,then cut faces,reinforced silt fence C I nnera and wanlea. \ I /* vo, gttt . ` J "-`� / ta_r a ty r1 3.Finish clearing and grubbing any necessary areas on the lots as they are started. ---—-- \ 1130 - - - ) \ \• \( -1 A 1.r-,1� r 4.Begin rut grading and excavation activities .. ^\ tI / i 5.Begin or cominue with house cnnatm<tion activities. / / \ 1 fa \"\�., \ .� �J 1 p, 6,Finish all rough grading and house construction. J �� `VT.Intl driveways,walks and patios. / / \ } ,...„. -,1--...11 \y r�Th S.Begin fine grading of lot areas l , N ` \ .` 9.Final g.sing,mulching and stabilizing of lac In most cases this will involve the installation of sod on the lot.The silt fence will wets I`.` ` `r /I ...\! l� remain in place until the lm is sodded or grassing is stabilized and takes hold. / �/ I I /, ; \ < \ �� a }, 1 Ion':,. `J 10.The contractor shall conduct self-inspection of the erosion and sedimentation control measures and complete Me foliowing / I - - - \ 1 t w I ,,pJ JJ combined self-inspection form found on the DEMLR website / _ _ _ .y`` e _ _ _ _ _ _4�_ _ _ \L,.r` /. - tl' hrrys tfivmudeunc govlabouVdivisionsrenergy-mineral-and-land-resourcestsmmmater/stommater-program/npdesKonswction-program. / / / I / ,/ _ \ ,✓/ �.-— f `- !• F Twelve months of-complete inspection forms shall be kept an site and available for inspection at all times.It is recommended / / / l c'� / \ ia/ +1 `< I/ ( sflfi copy be kept in permits box.Ref:G.S.111A-54.1 through GE.113A-57 Sections 15A NCAC 04,0101 though 1SA / / l / / ' ;�� /' \ / ,II 1 / ,P+^ NCAC 04E0504 General Permit NCG 010000 NPDES for Cons.reion Activities. / r •`. �. / /.-/ !. j fP u.Self-inspections for erosion and sedimentation control measures are to he performed at least once evert seven calendar days and / / / \132 \ _ within 24 hours of very rain event of greater than l inch.Any needed repairs shall be made immediately to maintain measures as l\ / / `• • - • - - - - - - - - - - - - - \� ��,,,/ designed.All ESC measures shall be maintained as specified in the concoction details on this Plan.A min gauge shall be installed \ et the project site for monitoring. T�('�T�T �[J'/- r 12.hapectlon and final acceptance letters.When the project Is complete,the pe.i.es shall contact DEMLR to close out the Egad �// , / / I / .L L/1`I��- -�ry!V� -� /., ......... ................... (I \� `� l -- -y / 1--- Plan.After DEMLR informs the perminee of the project closeout,via inspection report,the pe.ittee shall visit I / - �r. ay -���--' _ "- 'd<9nugovvT electronic Notice of-termination(e-NOT).A$100 annual general permit fee will be charged / / I / `tea .�•/\ �- 1 `L"--'---".... - , a 'a y until the o-NNOT has been filled out t ,�(J„ G01't submit ant. _ _ _ _ _ / `mow WEMN \/ �' \ // / / �__ / _ � J.. / pvoo` N —�„-,_� wf-1 / --J A'SELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIREDB BY \ / / / / _ `.ram.-,Ko - - - - - - • - - • - • -s j - - - - - - ��\'. . - / - - -.o%iN`. e`- NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED Y HAND OR / / / k„,. /' - / \_ COMPLETED AS AN EXCEL SPREADSHEET. / / / . . - .r,Ly/� /. . . {- —_ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED w/ / oo� •W. Vona u o -.l. it.: ✓ EROSION AND / / / \ - - - -N Np\ - - - - - - - - - - - - - / - �- - - - �� - - \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A // 15 uT / \\ \ ` - - - ,� t NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY '\_ i / E�'/ / _ �. ` INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE // _, �/ ram/ / \\ . -�-- -� - - �'.'.'.'� -- - - APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, J ( jrimiii;im DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, L t' / / 16 \_ v _ _ _ _ \. PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION / / ——q- ---- �.�7-w'-. .\ • / �/�_ CONTROL PLAN." \ \...off . . . . . . . - : .l- \' rly\ !'-� • �' �/ �� 1a/ / /_/ \ \� -- —————was \�\ �i�ruNos .-.. . "'�ok ——�� �,.�'----`�.r\ ,\ ``„__r`,, / / g I 7 \. . . \ KF . . . . . .. 5"` - ^�/^l1 3 J' • SODDING "A---- \ / 12 / I A \ CA, n�. a id^ .'�-. l�4- 1I - 'a ... LAPSED IN A STAGGERED PEROT LEAVE SPACES ME DO / �/ / � \ � ET - lr r ti PATTERN.BUTT THE STRIPS NOT OVERLAP.A SHARPENED �' / &ei (.)0 / / 18 \ \ �' . .=- - /1 (Id' .�, redo:.NOTna,M NCProEa. / z/ roC .L \'� $ ' 1 'tear 1 t� ` B / \\ -0— MITE SOO CURER MUST BE / • / J / \ \ `26 27 28 29 . . t 2 ///� // t a III u.,eHEoem�m... 9 s re L �n<°R r / EONLI / «� � / �� l tOh Lg 1\ 20 25 \\/46 \ // /) \ • 30 ~ Jfj • / \ E tare; 112e5aEr� .l 1 � YY77 li. I�IiNNSVi M', a ..L.1 s 1 con /// / \\ 23 �� / I ',.� / litwpm "`TEl ll ) / v / Mahon Co .. / p_oww f✓,J mIL ANCE TNEanna IS M0 /,./ / �� _ -Es�sEMEM f ` f/ APPEARANCE OF GOOD SOD sj / �5'ORgINP9E PN0 j 8 ' / \ \ „`\ / �/ TILBYEABEMEN - ` i �_ / ♦ /z % \ \\ 34 / 33/ 32 / r3'y' • I o v rtn„e•t era nnan G I \ 7 0 A ....7111 / 31 S � �1 III naoM amaaa�.nr it \ •\\ �/\ 37/ l (•rag r J/ %H �:/ — ° — /�v C $,RUCTION \ \\ I ,��136 // -� �ro \ \5`� iEVANCE \ \aa LIMITS - rr/\CONSTRUCTION \ 111111 /. or \ 1 4 r \ T / ' Lot Plan / •/' -•I 39 nMn3 y� l TRACTB TRACT E ; = --' !:.�` /0 �� PAGE 1 of 2 Rictied( �' -�` I� ' \ 1TOTAL DISTURBED ACREAGE: 0.99 ACRES \ MITS FUTURE ! r''l,_-r LOT EROSION CONTROL PLAN AT n I I is�IxATNAGE EgsEMErvr— �corvsraucnon� DEVELOPMENT / t_ -�..- J ' \� l o, j l J f �� •'.'/ r�' �.-''-� ( V LOT 4 / / ` \� / N A 40 / TRACT,C /.!- \ N / \� �� 0'�' /�' DEVELP�PMENT /''�• a /-. \ WILLIFORD COVE i .... \ -- / / N L— �) ! ''- FOR II 42 .--'r. DREAM FINDERS HOMES, LLC \ �'- —�`\ 7 I 49/ t!'-- \ EASTOVER TOWNSHIP CUMBERLAND COUNTY v A� ��( 1 I S,.N,O; ice'' SCALE: 1"=120' OCTOBER2023 �`_ I I R°aa.—,g32 — / GRAPHIC SCALE p 1zD 0 �a zoo 480 \ 'r3EV" ( (IN FEET) 11 I I "' \ 1 Inch = L20 [L MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 I t PHONE(910)484-5191 FAX(910)484-0388 LICENSE HF-0106 LAST MEM:10/24/2023 2:11 PM LAST PLOTTED:10/24/2023 2:30 PM PLO7TED BE Dennis Gilbert FILENAME:G\CURRENT JOBS\H Ec H CONSTRUCTORS\23-130-04 WILLIFORD COVE-EC\PLANS\VAWFORD COVE EC-LOT WOW°