Loading...
HomeMy WebLinkAbout820347_routine_20231011O Other /n� t�- Type of Visit: ompliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: G-Ifoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: J County: Farm Name: Zd— // L Owner Email: Owner Name: �/ Ti >�a/Ys Phone: Mailing Address: Physical Address: FacilityContact: r_ rVG�s1,CL, Title: Onsite Representative: Certified Operator: ��,� � H d`C5 Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Fee erto Finish arrow to Wean Farrow to Feeder Farrow to Finish Other Phone: Region: Integrator: 4,V-2-4T� Certification Number: Certification Number: Latitude: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes 2 o ❑ NA ❑ NE [—]Yes [—]No ❑ NA [:]NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Yes [jNo ❑ NA ❑ NE Page 1 of 3 511212020 Continued waste couecnon x treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes allo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E3'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [—]Yes Q o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [l'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E;Ko ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E]'No ❑ NA ❑ NE maintenance or improvement? Waste Aoolicatlon 10. Are there any required buffers, setbacks, or compliance alternatives that need [—]Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ mo ❑ NA ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents ❑ Yes [r] l o ❑ Yes E o ❑ Yes 0 o ❑ Yes EJ' o ❑ Yes [�J'l�o ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ®.➢io' ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 0-95 ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 0-No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑-No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Ei-No' ❑ NA ❑ NE Page 2 of 3 511212020 Continued L4. ura me racnrty, tau to canarate waste application equipment as required by the permit? Lj Yes =o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes B-No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a PDA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [-]Yes [D-No' ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �. ❑ NA ❑ NE [:]Yes Quo ❑ NA ❑ NE [—]Yes 0 M ❑ NA ❑ NE ❑ Yes Ej-&o ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Yes [ I No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question tt): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: '90 511212020