HomeMy WebLinkAboutNCC223749_NOT Closeout Documents_20231107 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
The Preserve at Lake Upchurch,Phase
County: Cumberland Project: Two,Section Two-Lot 20 River basin: Cape Fear
Person financially responsible:H&H Constructors of Fayetteville,LLC-Leslie Project#: CUMBE-2023-068
Groves,VP of Sales NCC223749
Address: 3709 Raeford Road,Suite 200,Fayetteville,NC 28304
1. Project Location: Brian Davis Court,Rockfish Twp
Pictures: No
2. Weather and soil conditions: dry,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Chris Godfrey Title: Site Superintendent
Inspection report: Sent Report Date given/sent: August 02,2023
9. Corrective action needed:
10. Comments: Corrective actions have taken place since the previous inspection in regards to the installation
of the silt fence outlet and trenching in of the silt fence.
A groundcover issue was first noted during this inspection but since the homeowner now owns
the Lot the homeowner is responsible for the groundcover.Therefore the Developer is not
responsible for the groundcover issue. No additional self-monitoring or self-inspections are
required. Project is in compliance and released under the SPCA. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities must be requested
by the permittee via a Notice of Termination(NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence
must be uploaded as part of completing the Notice of Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: July 28,2023 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM
cc: