HomeMy WebLinkAbout20150864 Ver 1_Approval Letter_20150828Pat McCrory
Governor
�����
����
NCDENR
North Carolina Department of Environment and Natural Resources
Donald R. van der Vaart
Secretary
August 28, 2015
Columbus County
NCDWR Project No. I 5-0864
Bridge 342 on SR 1900
State Project No. 17BP.6.R.40
APPROVAL of 401 WATER QUALITY CERTIFICATION, with ADDITIONAL CONDITIONS
Mr. Greg Burns, P.E., Division Engineer
NCDOT, Division 6
PO Box 1 150
Fayetteville, NC 28302
Dear Mr. Burns:
You have.our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
Bridge No. 342 with a 25' 4" x 8'; 7" x 46 ft. aluminum box culvert on SR 1900 (Canal Drive) over Lake
Waccamaw Canal in Columbus County:
O en Water
Site Station
� � 2+04/ 12+30 —L-
Tota I
Canal) Impacts
Permanent Fill i
D en Waters ac
0.02
0.02
in the Lumber River Basin
n Temporary Fill in
O en Waters ac
< 0.01
< 0.01
Total Open Water Impact for Project: 0.02 acres.
Total Fill in Open
Waters (ac)
0.02
0.02
The project shall be constructed in accordance with your application dated received August 24, 2015. After
reviewing your application, we have decided that these impacts are covered by General Water Quality Certification
Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In
addition, you should acquire any other federal, state or local permits before you proceed with your project including
(but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This
approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the
conditions listed in the attached certification and any additional conditions listed below.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer
Condition(s) of Certification:
Project Specific Conditions
1. As a condition of this 401 Water Quality Certification, the bridge demolition and culvert construction must
be accomplished in strict compliance with the most recent version ofNCDOT's Best Management
Practices for Construction and Maintenance Activities. [l5A NCAC 02H .0507(d)(2) and 15A NCAC 02H
.0506(b)(5)]
2. The permittee shall use /Design Standards in Sensitive Watersheds/ (15A NCAC 4B.0124 [a]-[e]) in areas
draining to ORW waters. However, due to the size of the project, the NCDOT shall not be required to meet
15A NCAC 4B A124(a) regarding the maximum amount of uncovered acres. Temporary cover (wheat,
millet, or similar annual grain) or permanent herbaceous cover shall be planted on all bare soil within ] 5
business days of ground disturbing activities to provide erosion control. [ 15A NCAC 02B.0224 and 0225]
Tall fescue shall not be used in the establishment of temporary or permanent groundcover within riparian
areas. For the establishment of permanent herbaceous cover, erosion control matting shall be used in
conjunction with an appropriate native seed mix on disturbed soils within the riparian area and on disturbed
steep slopes with the following exception. Erosion control matting is not necessary if the area is contained
by perimeter erosion control devices such as silt fence, temporary sediment ditches, basins, etc. Matting
should be secured in place with staples, stakes, or wherever possible, live stakes of native trees. Erosion
control matting placed in riparian areas shall not contain a nylon mesh grid, which can impinge and entrap
small animals. For the establishment of temporary groundcover within riparian areas, hydroseeding along
with wood or cellulose based hydro mulch applied from a fertilizer- and limestone-free tank is allowable at
the appropriate rate in conjunction with the erosion control measures. Discharging hydroseed mixtures and
wood or cellulose mulch into surface waters in prohibited. Riparian areas are defined as a distance 25 feet
landward from top of stream bank. [15A NCAC 02B.0224 and 0225]
4. NCDOT shall be in compliance with the NCS00250 issued to the NCDOT, including the applicable
requirements of the NCGO1000. Please note the extra protections.far the sensitive watersheds. [15A
NCAC 02B.0224 and 0225]
General Conditions
Unless otherwise approved in this certification, placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter
greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48
inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other
structures including temporary erosion control measures shall not be conducted in a manner that may result in
dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above
structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested
in writing by NCDWR., If this condition is unable to be met due to bedrock or other limiting features
encountered during construction, please contact NCDWR for guidance on how to proceed and to determine
whether or not a permit modification will be required. [l5A NCAC 02H.0506(b)(2)]
6. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be
discharged to surface waters due, to the potential for elevated pH and possible aquatic life and fish kills.
[15A NCAC 02B.0200]
7. During the construction of the project, no staging of equipment of any kind is permitted in waters of the
U.S., or protected riparian buffers. [ 15A NCAC 02H.0506(b)(2)]
8. The dimension, patte� and profi:e of .h� stream above and below the crossing sl-�all not be rncd;fied.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
9. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life
passage. [15A NCAC 02H.0506(b)(2)]
10. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [ 15A NCAC 02H .0507(c) and I SA NCAC 02H .0506 (b)(2) and (c)(2)]
1 1. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures
from the most current version of NCDOT Construction and Maintenance Activities manual such as
sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in
flowing water. [i5A NCAC 02H.0506(b)(3) and (c)(3)]
12. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A
NCAC 02H.0506(b)(3)] _
14. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [15A NCAC 02H.0506(b)(3)]
l5. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited. [15A NCAC 02H.0506(b)(3)]
16. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water
Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State
or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR
may reevaluate and modify this certification. [15A NCAC 02B.0200]
17. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification. [15A NCAC 02H.0506(bl(2)J
18. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with
the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506
(b)(2) and (c)(2)]
19. The outside buffer; wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. [mpacts
to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC
02H.0501 and .0502]
20. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and
federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management
rules, soil erosion and sedimentation control requirements, etc.
21. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery. [ 15A NCAC 02B.0506(b)(2)]
22. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT
Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
23. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the
project by the end of the growing season following completion of construction.[15A NCAC 02H.056(b)(2)]
24. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with
this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or
borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct
impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
25. Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment and
Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of
the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or
leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance
with the requirements of the Sedimentation Pollution Control Act.
26. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable at site,
they shall be removed and the natural grade restored upon completion of the project. [15A NCAC
02H.0506(b)(3) and (c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. � You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the ofiice of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-431-3000, Facsimile: (919)-431-3100
A copy of the petition must also be served on DENR as follows:
Mr. Sam M. Hayes, General Counsel
Department of Enyironment and Natural Resources
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. [f you
have any questions, please contact Mason Herndon at (9l0) 308-4021 or mason.herndon@ncdenr.gov.
Sincerely,
�� C ���,�
S. Jay Zimmerman
Director, Division of Water Resources
Electronic copy only distribution:
Liz Hair, US Army Corps of Engineers, Wilmington Field Office
Jim Rerko, Division 6 Environmental Officer
Travis Wilson, NC Wildlife Resources Commission
NC Division of Water Resources Raleigh Central Office
File Copy
�������
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
Donald R. van der Vaart
Secretary
Certificate of Completion
Upon completion of all work approved within the 401 WaterQuality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 V�'ater Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Gate:
Agent's Certifeation
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials. ,
Signature:
Engineer's Certifieation
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617