Loading...
HomeMy WebLinkAboutGW1--07113_Well Construction - GW1_20231103 11 , , P WELL CONSTRUCTION RECORD(GW-1) ( For Internal Use Only': 1.Well Contractor Information: .I I I WWI-et-MI 9dtsllboer11 y ; 14.WATER ZONES I Well Contractor Name FROM TO I DESCRIPTION S ag 76 ,4 i ft. fr. I NC Well Contractor Certification Number ft• ft, j 1 15.OUTER CASING(for multi-cased wells)OR LINER(Bap neable) 4 0, c Cp,ei e. Dr;It,per FROM TO 'DIAMETER THICKNESS MATERIAL Company Name ft. I R. I 1 In, 1 2.Well Construction Permit#: Q� ��tAt►�„[A gilt FROM INNER CASING OR TUBING(geothermal closed-loop) FROM TO .DIAMETER THICKNESS MATERIAL List all applicable well construction pe n Is(i.e.WC. County,State,Variance,etc.) ft. fit in. 3.Well Use(check well use): el9"'�i e o y Id�-°r e ft. ft. In. Water Supply Well: 17.SCREEN • °Agticultlrral FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Mimicipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) . ❑Industrial/Commercial ft' e, to ❑ResideritialWaterSupply(shared) °}rrigation IS.GROUT °Wells>100,000 GPD FROM TO ' MATERIAL.'' EMPLACEMENT METHOD 3 AMOUNT Non-Water Supply Well: it. ft. ❑Monitoring ❑Recovery ' • • • Injection Well: ft, ft.°Aquifer Recharge • trdGroundwater Remediation .. tt. ft. • DAquifer Storage and Recovery OSalinity Barrier 19.SAND/GRAVEL PACK(if•applicable) .• FROM TO MATERIAL EMPLACEMENT METHOD °Aquifer Test °Stormwater Drainage • • • • ft. • ft. • DExperimental Technology ❑Subsidence Control ' ft. ft. ' • °Geothermal(Closed Loop) OTracer • 20.DRILLING LOG(attach additional sheets if necessary) - • °Geothermal(Heating/Cooling Return) keret.(explain under 1/21 Remarks) - FROM TO DESCRIPTIONZm1or,hardness,soli/rock type,grain size,etc.) -- 4.Date Well(s)Completed:/e)_�3,"'� /]t `b . R, 2.5 -, % �J ttJ A. t"LI Yeti,4r, ca-chi V4rellIDll 5a.Well Location: It. ft. � y��,�.r�Z -sra�.e� ave I/our Clig.t ect s°��et•R,,,,E i� e ,i( b 0 vie 'iev9ie ft. rt. Facility/Owner Name Facility iDS(if applicable) ft. ft' . `•6' 4 , - • 2 d Z7 l eu,A.e 13, iai,X:erso.i Ile) 2:.�"v( ft. ft. ; NO v 0 .... Physical Address,City,and Zip it. • ft. Istr„ L 206 ON-5/0 1083 21.REMARKS }..; / County ParcelldentificationNo.(PiN) / 'e4P:ter t��vt/, S g���W f Yi/1 i 5b,Latitude and longitude in degrees/minutes/seconds or decimal degrees: gee dt,�a,c'i el sch 'o-'�"t`c.►o r e oX.Strarg'C f a e av e)et.e p.s (if well field,one Int/long is sufficient) Y N B ®� 22.Certification: Ai N a 77. 36U1 00 6.h(are)the well(s): rmanent or ❑Temporary ignature /;(4':/j4b. of Certified Wcl Contractor Date Bj'signing thisform,I hereby certify that the ivellls)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or N9Yo 1SANCAC 02C.0100 or 1SA NCAC 02C.0200 Well Construction Standards and that a copy Ifl/tr is a repair,fill out kirown well construction information and explain the nature oftbe of this record has been provided to the well onmer. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this prise to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells •(add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: , 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 3 ©' (ft.)' Submit this GW l within 30 dais For multiple mils list all depths if different(example=3@200'and 2(aQ/005 ys of well completion per the following: 10.Static water level below top of casing: �,9 ft) '24a. For All Wells: Original form to Division of Water Resources (DWR), If water level is above casing,rise"+" ( Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 ; I1.Borehole diameter: (itt.) ' ;•1 24b.For Infection Wells:Copy to DWR,Underground Injection Control(IUC) l� .5�• U .I Program,1.636 MSC,Raleigh,N027699-1636 K2.Well construction method: go n- 1, .1 4 1 (i.e,auger,rotary,cable,direct push,ere.) 24e.For Water Supply and ODelnLoop Geothermal Return Wells:Copy to the county environmental health department-Of the county where installed FOR WATER SUPPLY WELLS ONLY: 1, 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a,Yield m Permit Program,.1611 MSC,RalcighJ NC 27699-1611 (gP ) Method of test: . 13b.Disinfection type: Amount: 1 , I i . • ••Form OW-I NorthCarolinaDepartmentofEnvironmentalQuality-DivisionofWaterResource� i • Revised 6-6-2018 i4510 s TERRATHERM ISTD Heater Boring Construction Detail j Revision#: 0 "u ,b,a�vry Release date: 5/12/23 ' • Approved by: SL Well ID H-35 Date 7-9?3 'e?3 _ Oversight d ,,�,fh-',/* ' ibIsi1t, R23-104 Driller P o aorS ��/M:eb rr/`- Constructed (fill out If Design different) Notes --Stick Up Height ;w,,,� 1/2"Thermocouple pipe? up i .-24 'f Thermocouple Length 37.67' • Ground Surface 0.0' t Heater Can Conductive HT Grout— [,,. , •'!Angle from Horizontal j 90° Schedule 40 Borehole Diameter 1,6" , I Heater Can Length 38 ft 'i. ' I t; Seal Buckets of Graphite 1.75 i, ,Bags of Silica .2.5 w' Heater Can Diameter 3 in : '1 I' Bags of Cement 8.25 �d Installation Method ' [ ect Push r ! }. I w Stem Auger s" i Mud Rotary I, .'.,a; .I } ;!.:i is Other: ' i ;:I Bottom of Heater Can 36• 'I I I II! , , .11 f ! ' ' Bottom of Borehole 6' Post-Installation QC(to be performed 24hrs after installation) PID Log:Make/Model: • 1)Confirm well is free of grout Design , ;Constructed Time: Er o !' Reading: e. 6 PPM Depth to bottom of well[ft bTOC: , 4R' I Time: f 1,,,E i Reading: D i PPM if greater than or equal to'1ft less than designed alert the office Time: i�'j,j 1' Reading: d,Ii PPM 2)Confirm'g•rout plug reaches ground surface Time: I' ,Reading: PPM repeat daily until depth to grout is Oft. Time: I ' Reading: , PPM Date Depth to Grout.[ft bgs] Notes: I • i +fl I I I ,