HomeMy WebLinkAboutGW1--07067_Well Construction - GW1_20231103 •
WELL CONSTRUCTION RECORD(GW-1)
i 11' • . I,, . i 1, For Internal Use Only
1g."Well Contractor Information: ,i
' 14.WATER ZONES I
Well Contractor Name ' FROM TO I DESCRIPTION
3 t 76,„ac/tl ft ft. I
NC Well Contractor Certification Number ! ft. ft.
• 15.OUTER CASING(for multi-cased wells)OR LiNER(if ap licable)
CC cH,:ei e. bdr-0 I//,Vry • FROM TO I DIAMETER THICKNESS MATERIAL
Company Namcl f ' ;i 1 Ii I
R, I in.
16.INNER CASING OR TUBING(geothermal closed-loop)
2.Well Construction Permit#:yA.eEne L A Pit FROM TO 'DIAMETER THICKNESS MATERIAL
List all applicable'n�e/i construction penne.s(Le.'U1C.County,State,Variance,etc.) ft, ft. I. In.
3.Well Use(cheek use): er int/A-19 Iti�"°rede
•
ft. ft. In.
Water Supply Well: 17.SCREEN I •
°A(picultlrral FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL
OMlmicipal/Public ft. ft, in.
°Geothermal(Heating/Cooling Supply) °Residential Water Supply(single) -
❑lndustnal/Commercial ft. ft, • I"
°Residential Water Supply(shared)
°Irrigation • 18.GROUT
O Wells>100,000 GPD FROM TO ' MATERIAL'') EMPLACEMENT METHOD&AMOUNT
Non-Water Supply Well: .. • ft. R.
°Monitoring ' °Recovery
Injection Well: • ft• fa ; .
°Aquifer Recharge, IIDtirourulwater Remediation tt. R. '
°Aquifer Storage and Recovery °Salinity Barrier • 19.SAND/GRAVEL PACK(If:applicable) •
FROM TO MATERIAL EMPLACEMENT METHOD
°Aquifer Test OStornwater Drainage • . It. • ft:
❑Experimental Technology °Subsidence Control • ft. ft. I'
°Geothermal(Closed Loop) °Tracer I
• 20.DRILLING LOG(attach additional sheets if necessary) • '
°Geothermal(Heating/Cooling Return) Cher(explain under#21 Remarks) FROM TO DESCRIPTION lsnior,hardness soNroek type,grain size,eic.j
I f ft' 2.5 fL
4.Date Well(s)Completed:/ ,O', 1- Well ID# f7 -3 2 s ft. R, )�p ,(Wei������A''�tire�Q'
• - lt�. .4 u wa- s~al./io zi
5a.Well Location: n, ft. 1
Dive 1 ou r C pert-5 , -
Facility/OanerName • Facility iO0(if applicable) ft. ft. ,.``"' .::.,i.' 1
1 .
•
2127 ZlievAre/3/✓4 2 8' y' ft. ft. N� eti
-�.
2
if
(]��
Physical Address,City,and Zip -p ft. • ft. 2 J
ON-5/0(.0 4/3�I/3D'// t91® 21.REMARKS
County Parcel Identification No.(PiN) / er- (�a4' .��.5•f- 1'- ,1g 'I r'2>%t;i
Sb.Latitude and longitude indegrees/minutes/seconds or decimal degrees: Seen,t1-64 Gis'eh dzi-i.a�o r C o. .xtr•ca:fi tI aw ei ett,i L$
(if well field,one tat/long is sufficient) 22.Certification:
ntanent or °Temporary aturo ofCcnificd Well Contmcttir Date
6.Is(are)the well(s): er
Bysigninglldsform,I hereby cerli/j hatthe ne//(s)was(were)constructed in accordance with
7.Is this a repair to an existing well: ! Dyes or &'!Vo • ISANCAC 02C.0100 or 15A NCACO2C.0200►Ve/1 Construction Standards and that a copy
Olds is a repafr,•/Ai out known well construction it formation and explain the nature of/he of this record has been provided to th'a e/l owner,
repair tinder 021 remarks section or on the back ofthis form. '
23.Site diagram or additional well details:
S.For Geoprobe/DPT or Closed-Loop.Geothermal Wells having the same You may use the back of this page to provide additional well construction info
construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells •(add'See Over'in Remarks Box).You may also attach additional pages if necessary.
drilled:
. j r 24.SUBMITTAL INSTRUCTIONS
9.Total_well depth halo*land surface: ' ! • r
For multiple wells list all depdrs ifd�erent(eiantple-!3@200'and 22@@1oo') (ft.)
Submit this GW-1 within 30 days f well completion per the following:
10.Static water level below top of casing: ®p 1(ft) -24a. For All Wells: Original form to Division of Water Resources (DWR),
Ovate,.level is above casing,use '+^ 1 information Processing Unit,1617 MSC,Raleigh,NC 27699-1617
11.Borehole diameter: 6 (in.) 1 • ,; 24b.For Infection Wells:Copy to l:DWR,Underground Injection Control(IUC)
Program, 1636 MSC,Raleigh,NC127699-1636
12.Well construction method: eC) f al J ea'� •' 24c,For Water Supply and Open-Loop Geothermal Return Wells:Copy to the
(i.e•auger,rotary,icflble,direct push,etc.) I ';I county environmental health department of the county where installed
FOR WATER SUPPLY WELLS ONLY: ''
' 't I •i 24d.For Water Wells producing I over 100,000 GPD:Copy to DWR,CCPCIJA
j ,,, Permit Program,1611 MSC,Raleigh NC 27699-1611
13a.Yield(gpm) ;Method of test:
• ��
13b.Disinfection type: Aniount: •- I
li
Form GW-I North Carolina Department of Environmental Quality-Division of Water Resmrmes
•
lat ' ISTD Heater Boring Construction Detail i Revision#: 0
TERRATHERM
a caraan cam"; Release date: 5/12/23
Approved by: SL
1
Well.ID Ha Date 7 la, —
• Job# R23-104
' Oversight ' �. ��;/f��' ,
Driller /�/®/�S'r: G(/r�/M 6lrly q
, ( Constructed
. I (fill out if
Design different) Notes
—Stick Up Height
1/2"Thermocouple pipe? P,;.,.��w?r''r., ' 24'J
Thermocouple Length f` 67'
I'
Ground Surface.'_0.0'
Heater Can Conductive HT Grout—I• ! ::Angle from Horizontal 90°
Schedule 40 d
•. , „Borehole Diameter 6"
I:• • i 1
— C
I i
Heater Can Length AO ft. 1 ili • 5 Gal Buckets of Graphite 125 I,
I ;.1
• •;Bags of Silica' 1I75
Heater Can Diameter 3 in i •Bags of Cementcr.)i
Installation Method ..
iPush 1,
• Sonic I „ i'• .
Hollow Stem Auger • I j
Mud Rotary ' ' • i
Other' I 1
Bottom of Heater Can 26'
e ., , I I z••', I
I }.. __, Bottom of Borehole 6'
1, V i.
Post-Installation;QC(to be performed 24hrs after Installation) ND Log:Make/Model: 1;
1)Confirm well Is free of grout,' 'I Design ' '' ' Constructed Time: IQ:QQ i Reading: a s Q PPM
Depth to bottom of well[ft bTOC 711' ,, Time: i,(!;O 5 1 Reading: 0,,0 PPM
if greater:thun'or`equal to'1ft less than designed alert the office Time: 1 Reading: PPM
2)Confirm grout'plug reaches ground surface Time: 1 Reading: PPM
repeat`daily,until depth to grout is Oft. I Time: I Reading: PPM
Date ,: Depth to Grout[ft bgs] Notes: I •
,. II
' ,1 I
I•
'
lI •� 1
,,1 , 1 , I, I,