Permittee: Sound Timber Management LLC DWR Project # 20221796
Project Name: Project Ocean — Eagle Crest Industrial Park County: Wake
The Division has received a Statement of Availability (SOA) from EBX-Neuse I. LLC and Environmental
Banc & Exchange, LLC from the EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation Bank, RES
Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank, RES Poplar Creek Buffer & Nutrient Offset
Umbrella Mitigation Bank, EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank, RES 2021 Neuse
Umbrella Mitigation Bank, or RES 2022 Phase II Umbrella Mitigation Bank. Specific bank sites that may
be debited are Shady Grove, Caraway Bluff II, Selma Mill, Bucher, Hannah Bridge, Stone Creek, Meadow
Spring, Uzzle, Poplar Creek, Polecat, Wolf King and Thunder Swamp Phase II Bank (Mitigation Provider)
to partially satisfy the mitigation requirements set forth in the Buffer Authorization with Exception
issued to Sound Timber Management LLC, dated June 30, 2023 as provided in the table below.
Compensatory Mitigation River and 8-digit HUC Number
Neuse Buffer 52,993 square feet (credits) Neuse / 03020201
The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then
sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the
Mitigation Provider has signed this form, it is the Permittee's responsibility to ensure that a signed copy
of this form and the mitigation transfer certificate is submitted to the Division before conducting any of
the authorized impacts.
The Mitigation Provider verifies that the mitigation requirements (credits) shown above, have been
released and are available at the identified bank site(s). By signing below, the Mitigation Provider is
accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no
more than 25 percent of the total mitigation required by Division can be met through preservation,
unless requested and approved by the Division Director (15A NCAC 02H. 0506(c)(7)).
Signature Authority Name (print): Ably Staley
Signature: Date: 11/8/2023
North Carolina Department of Environmental QualityI Division of Water Resources
v 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
NORTH CAROLINA
uepsamem or eommmmnw aeai� /� 919.707.9000
fires
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
November 9, 2023
Sound Timber Management LLC
Mr. Glenn Bagwell, Jr., Manager
333 Sherwee Drive
Raleigh, NC 27603
Shady Grove Bank Parcel ID: DWR Project # 2020-1091v2
Riparian Buffer Credits Purchased: 9,506.220 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Project Ocean - Eagle Crest Industrial Park, DWR Project #: 20221796
You have elected to fulfill your permitted buffer mitigation requirements for the Project Ocean - Eagle Crest Industrial
Park project by paying into the RES 2021 Neuse Umbrella Bank (Shady Grove Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts
occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project
#20221796 is 61,308.00 (ft2). The Thunder Swamp Phase II site is providing 10,528.613 (ft2), the Shady Grove site is
providing 9,506.220 (ft2), the Caraway Bluff site is providing 8,282.111 (ft2), the Poplar Creek site is providing 17,844.100
(ft2), and the Hannah Bridge site is providing 6,831.956 (ft2) for the partial amount of 52,993.00 (ft2). The remaining
credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this
activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not
transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or
astaley@res.us.
Thank you,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Stephanie Goss
Terracon — Jeff Harbour
res.us
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2021 NEUSE UMBREALLA MITIGATION BANK
Shady Grove Site, HUC 03020201 Buffer Preservation Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2020-1091v2
As -Built Credit Total: 1,980.400 square feet
Total Credits Released to Date: 990.20 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
6/20/23
Task 1: Credits Released (20%)
396.08
0.009
396.08
0.009
2
8/18/2023
Task 2: Credits Released (20%)
396.08
0.009
792.16
0.018
3
8/31/2023
Town of Kni htdale
Connector Road, Old Crews Rd to Old
Milburnie Rd. 20230420
03020201
396.080
0.0091
396.08
0.009
DWR
4
10/19/2023
Task 3: Credits Released (10%)
198.04
0.005
594.12
0.014
5
11/9/2023
Sound Timber Mana ement LLC
Project Ocean - Eagle Crest Industrial Park
20221796
03020201
594.120
0.014
0.00
0.000
DWR
990.201
990.200
0.00
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2021 NEUSE UMBREALLA MITIGATION BANK
Shady Grove Site, HUC 03020201 Buffer Restoration Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2020-1091v2
As -Built Credit Total: 29,707 square feet
Total Credits Released to Date: 14,853.500 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
6/20/23
Task 1: Credits Released (20%)
5,941.400
0.136
5,941.400
0.136
2
8/18/2023
Task 2: Credits Released (20%)
5,941.400
0.136
11,882.800
0.273
3
8/31/2023
Town of Kni htdale
Connector Road, Old Crews Rd to Old Milburnie
Rd. 20230420
03020201
5,941.400
0.136
5,941.400
0.136
DWR
4
10/19/2023
Task 3: Credits Released (10%)
2,970.700
0.068
8,912.100
0.205
5
11/9/2023
Sound Timber Mana ement LLC
Project Ocean - Eagle Crest Industrial Park
20221796
03020201
8,912.100
0.205
0.000
0.000
DWR
14,853.500
14,853.500
0.000
fires
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
November 9, 2023
Sound Timber Management LLC
Mr. Glenn Bagwell, Jr., Manager
333 Sherwee Drive
Raleigh, NC 27603
Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2
Riparian Buffer Credits Purchased: 10,528.613 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Project Ocean - Eagle Crest Industrial Park, DWR Project #: 20221796
You have elected to fulfill your permitted buffer mitigation requirements for the Project Ocean - Eagle Crest Industrial
Park project by paying into the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts
occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project
#20221796 is 61,308.00 (ft2). The Thunder Swamp Phase II site is providing 10,528.613 (ft2), the Shady Grove site is
providing 9,506.220 (ft2), the Caraway Bluff site is providing 8,282.111 (ft2), the Poplar Creek site is providing 17,844.100
(ft2), and the Hannah Bridge site is providing 6,831.956 (ft2) for the partial amount of 52,993.00 (ft2). The remaining
credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this
activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not
transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or
astaley@res.us.
Thank you,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Stephanie Goss
Terracon — Jeff Harbour
res.us
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Thunder Swamp Phase II, HUC 03020201 Buffer Preservation Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2021-0306v2
Total Credits Released to Date: 15,810.472 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
5/19/22
Task 1: Credits Released (15%)
4,311.947
0.099
0.000
4,311.947
0.099
DWR
2
6/17/22
1258 North Main Development LLC
Richland Creek Out -fall Replacement and Short
Extension (20220223)
03020201
4,311.947
0.099
0.000
0.000
DWR
3
6/30/22
Task 2: Credits Released (20%)
5,749.263
0.132
5,749.263
0.132
DWR
4
7/26/22
Jeramie Kyle Hockman
1306 Wicklow Drive (20220677)
03020201
765.000
0.018
4,984.263
0.114
DWR
5
8/3/22
Duke Energy
PNG Line 142 Pipeline (20210364)
03020201
4,984.263
0.114
0.000
0.000
DWR
6
11/30/22
Task 3: Credits Released (10%)
2,874.631
0.066
2,874.631
0.066
DWR
7
12/13/22
Richard and Stacy Jones I Jones Backyard Bulkhead (20220131 V2)
03020201
1,221.000
0.028
1,653.631
0.038
DWR
8
5/15/23
Task 4: Credits Released (10%)
2,874.631
0.066
4,528.262
0.104
DWR
9
5/31/23
Novo Nordisk Pharmaceutical Industries LP
Novo Nordisk Site Capacity Expansion
(20150465 v2)
03020201
1,653.631
0.038
2,874.631
0.0661
DWR
101
11/9/23
1 Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
(20221796)
03020201
2,874.631
0.066
0.000
0.000
DWR
15,810.4721
15,810.472
0.000
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Thunder Swamp Phase II, HUC 03020201 Buffer Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2021-0306v2
Total Credits Released to Date: 192,263.400 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
5/19/22
Task 1: Credits Released (15%
52,435.473
1.204
0.000
52,435.473
1.204
DWR
2
6/3/22
DR Horton - Terramor LLC
Winston Pointe (20041488 v9)
03020201
10,856.000
0.249
41,579.473
0.955
DWR
3
6/7/22
Highfill Infastructure Engineering, P.C.
Big Branch Sewer (20200597 v2)
03020201
45.720
0.001
41,533.753
0.953
DWR
4
6/17/22
1258 North Main Development LLC
Richland Creek Outfall Replacement and Short
Extension (20220223)
03020201
113,484.753
0.310
28,049.000
0.644
DWR
5
6/30/22
Task 2: Credits Released (20%)
69,913.963
1.605
97,962.963
2.249
DWR
6
7/19/22
Lennar Carolinas, LLC
Cayden Cove (20210782)
03020201
23,025.000
0.529
74,937.963
1.720
DWR
7
8/3/22
Duke Energy
PNG Line 142 Pipeline (20210364)
03020201
69,913.368
1.605
5,024.595
0.115
DWR
8
8/17/22
Bonaventure Property Company, LLC
Angier Avenue (20211730)
03020201
5,024.000
0.115
0.595
0.000
DWR
9
11/30/22
Task 3: Credits Released (10%)
34,956.982
0.803
34,957.577
0.803
DWR
10
1/25/23
Pulte Group Saunders Farm (20220011)
03020201
606.000
0.014
34,351.577
0.789
DWR
11
5/15/23
Task 4: Credits Released (10%)
34,956.982
0.803
69,308.559
1.591
DWR
12
5/31/23
Novo Nordisk Pharmaceutical Industries LP
Novo Nordisk Site Capacity Expansion (20150465
v2)
03020201
34,351.577
0.789
34,956.982
0.803
DWR
13
8/8/23
John Mascho
Porto Fino Lots 88-91: Driveway Widening
(20201046 v 2)
03020201
1,815.800
0.042
33,141.182
0.761
DWR
14
8/31/23
Town of Knightdale
Connector Road, Old Crews Rd to Old Milburnie
Rd. (20230420)
03020201
25,487.200
0.585
7,653.982
0.176
DWR
15
11/9/23
Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
(20221796)
03020201
7,653.982
0.176
0.000
0.000
DWR
192,263.400
192,263.400
0.000
fires
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
November 9, 2023
Sound Timber Management LLC
Mr. Glenn Bagwell, Jr., Manager
333 Sherwee Drive
Raleigh, NC 27603
Caraway Bluff Phase II Bank Parcel ID: DWR Project # 2014-0820v6
Riparian Buffer Credits Purchased: 8,282.111 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Project Ocean - Eagle Crest Industrial Park, DWR Project #: 20221796
You have elected to fulfill your permitted buffer mitigation requirements for the Project Ocean - Eagle Crest Industrial
Park project by paying into the RES 2022 Phase II Umbrella Mitigation Bank (Caraway Bluff Phase II Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts
occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project
#20221796 is 61,308.00 (ft2). The Thunder Swamp Phase II site is providing 10,528.613 (ft2), the Shady Grove site is
providing 9,506.220 (ft2), the Caraway Bluff site is providing 8,282.111 (ft2), the Poplar Creek site is providing 17,844.100
(ft2), and the Hannah Bridge site is providing 6,831.956 (ft2) for the partial amount of 52,993.00 (ft2). The remaining
credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this
activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not
transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or
astaley@res.us.
Thank you,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Stephanie Goss
Terracon — Jeff Harbour
res.us
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Caraway Bluff Phase II, HUC 03020201 Buffer Preservation Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2014-0820v6
Total Credits Released to Date: 2181.119 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
4/28/23
Task 1: Credits Released (15%)
934.765
0.021
0.000
934.765
0.021
DWR
2
7/13/23
Task 2: Credits Released (20%)
1,246.354
0.029
0.000
2,181.119
0.050
DWR
3
7/27/23
Susan S Petretich and John A Petretich
2519 Kenmore Drive (20230905)
03020201
40.000
0.001
2,141.119
0.049
DWR
4
8/28/23
LIV Development / Piney Plains Residences, LLC
The Livano Cary (20230756)
03020201
1,206.354
0.028
934.765
0.021
DWR
51
11/9/23
1 Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
(20221796)
03020201
934.7651
0.021
0.000
0.000
DWR
2,181.1191
2,181.119
0.000
ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK
Caraway Bluff Phase II, HUC 03020201 Buffer Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2014-0820v6
Total Credits Released to Date: 89,897.864 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Sale/ Release
Date
Purchaser or % Credit Release
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
4/28/23
Task 1: Credits Released (15%)
38,527.656
0.884
0.000
38,527.656
0.884
DWR
2
6/16/23
Stanley Martin Companies, LLC Haddonstone (20230573)
03020201
33,767.110
0.775
4,760.546
0.109
DWR
3
7/13/23
Task 2: Credits Released (20%)
51,370.208
1.179
0.000
56,130.754
1.289
DWR
4
8/8/23
John Mascho
Porto Fino Lots 88-91: Driveway Widening
(20201046 v 2)
03020201
98.200
0.002
56,032.554
1.286
DWR
5
8/28/23
Rick Hester and Johnston County
4 MGD WWTF Upgrade, Force Mail, and
Discharge Project (20201434 V2)
03020201
1,722.000
0.040
54,310.554
1.247
DWR
6
8/28/23
Piney Plains Residences, LLC (LIV Development)
The Livano Cary (20230756)
03020201
36,305.888
0.833
18,004.666
0.413
DWR
7
8/31/23
Town of Knightdale
Connector Road, Old Crews Rd to Old Milburnie
Rd. (20230420)
03020201
6,055.320
0.139
11,949.346
0.274
DWR
8
8/31/23
Morris Wake Forest, LLC / Blue Heel Development,
LLC
Morris Subdivision (20230826)
03020201
4,602.000
0.106
7,347.346
0.169
DWR
9
11/9/23
Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
(20221796)
03020201
7,347.346
0.169
0.000
0.000
DWR
89,897.8641
89,897.864
0.000
fires
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
EBX-Neuse 1, LLC
November 9, 2023
Sound Timber Management LLC
Mr. Glenn Bagwell, Jr., Manager
333 Sherwee Drive
Raleigh, NC 27603
Poplar Creek Bank Parcel ID: DWR Project # 2016-0979v2
Riparian Buffer Credits Purchased: 17,844.100 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Project Ocean - Eagle Crest Industrial Park, DWR Project #: 20221796
You have elected to fulfill your permitted buffer mitigation requirements for the Project Ocean - Eagle Crest Industrial
Park project by paying into the RES Poplar Creek Buffer & Nutrient Offset Umbrella Mitigation Bank (Poplar Creek
Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts
occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project
#20221796 is 61,308.00 (ft2). The Thunder Swamp Phase II site is providing 10,528.613 (ft2), the Shady Grove site is
providing 9,506.220 (ft2), the Caraway Bluff site is providing 8,282.111 (ft2), the Poplar Creek site is providing 17,844.100
(ft2), and the Hannah Bridge site is providing 6,831.956 (ft2) for the partial amount of 52,993.00 (ft2). The remaining
credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this
activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not
transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or
astaley@res.us.
Thank you,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Stephanie Goss
Terracon — Jeff Harbour
res.us
EBX-NEUSE I, LLC - RES POPLAR CREEK BUFFER AND NUTRIENT OFFSET UMBRELLA MITIGATION BANK
Poplar Creek Site, HUC 03020201 Buffer Preservation and Enhancement Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2016.0979v2
As -Built Credit Total: 85,761.76 square feet
Total Credits Released to Date: 71,973.76 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
6/25/2019
Tasks 1 and 7 Credits Released (25%)
21,440.44
0.49
-
21,440.44
0.49
DWR
2
4/7/2020
Cambrid e-FV, LLC I Royal Creek
03020201
3,315.00
0.08
18,125.44
0.42
DWR
3
4/8/2020
Tasks 2 Credits Released (20%)
17,152.35
0.39
35,277.79
0.81
DWR
4
6/5/2020
Tasks 3 Credits Released (10%)
7,978.47
0.18
43,256.26
0.99
DWR
5
8/31/2020
HR Northlake LLC
Holding Village North Lake
03020201
32,535.00
0.75
10,721.26
0.25
DWR
6
1/13/2021
Marlowe & Moe LLC
Hilburn Drive Duplex Lots - 20-0357
03020201
4,791.00
0.11
5,930.26
0.14
DWR
7
1/14/20211
Brasfield & Gorrie, L.L.C.
I Project Walter - 20201217
03020201
3,919.88
0.09
2,010.38
0.05
DWR
8
3/23/2021
Tasks 4 Credits Released (10%)
8,467.50
0.19
10,477.88
0.24
DWR
9
10/4/2021
Mun o Homes
Georgia's Landing Subdivision and Offsite
I Sewer Force Main - 20201613 v2
03020201
10,477.88
0.24
0.00
DWR
10
12/15/2021
Tasks 5 Credits Released (10%)
8,467.50
0.19
8,467.50
0.19
DWR
11
4/12/2022
Lennar Carolinas, LLC
Austin Creek Phase 6 & 7 20211608
03020201
945.00
0.02
7,522.50
0.17
DW R
12
4/14/2022
Comet Builders LLC
Comet Raleigh Apartments 20220060
03020201
3,107.53
0.07
4,414.97
0.10
DWR
13
7/19/2022
Lennar Carolinas, LLC
Ca den Cove 20210782
03020201
4,414.97
0.10
0.00
DWR
14
3/24/2023
Tasks 6 Credits Released (10%)
8,467.50
0.19
8,467.50
0.19
DWR
15
11/9/2023
Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
20221796
03020201
8,467.50
0.19
0.00
DWR
71,973.76
71,973.76
-
EBX-NEUSE I, LLC - RES POPLAR CREEK BUFFER AND NUTRIENT OFFSET UMBRELLA MITIGATION BANK
Poplar Creek Site, HUC 03020201 Buffer Restoration Credit Ledger
11/9/2023
DWR Bank Parcel Project Number: 2016-0979v2
As -Built Credit Total: 9,435.70 square feet
Total Credits Released to Date: 79,701.15 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
6/25/2019
Tasks 1 and 7 Credits Released (25%)
2,358.93
0.05
-
2,358.93
0.05
DWR
2
4/8/2020
Tasks 2 Credits Released (20%)
1,887.14
0.04
4,246.07
0.10
DWR
3
6/8/2020
Tasks 3 Credits Released (10%)
47,325.28
1.09
51,571.35
1.18
DWR
4
1/15/2021
City of Raleigh -Public Utilities De artment
Harris Creek Interceptor - 20-0205
03020201
18,276.50
0.42
33,294.85
0.76
DWR
5
2/9/2021
Wake Count Finance De artment
WCPSS-Fuller Elementary School - 20-0783
03020201
32,605.50
0.75
689.35
0.02
DWR
6
3/23/2021
Tasks 4 Credits Released (10%)
9,376.60
0.22
10,065.95
0.23
DWR
7
10/4/2021
Mun o Homes
Georgia's Landing Subdivision and Offsite
I Sewer Force Main - 20201613 v2
03020201
10,065.95
0.23
0.00
DWR
8
12/15/2021
Tasks 5 Credits Released (10%)
9,376.60
0.22
9,376.60
0.22
DWR
9
4/12/2022
Lennar Carolinas, LLC Austin Creek Phase 6 & 7 20211608
03020201
9,376.60
0.22
0.00
DWR
10
3/24/2023
Tasks 6 Credits Released (10%)
9,376.60
0.22
9,376.60
0.22
DWR
11
11/9/2023
Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
20221796
03020201
9,376.60
0.22
0.00
DWR
79,701.15
79,701.15
fires
3600 Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
EBX-Neuse 1, LLC
November 9, 2023
Sound Timber Management LLC
Mr. Glenn Bagwell, Jr., Manager
333 Sherwee Drive
Raleigh, NC 27603
Hannah Bridge Bank Parcel ID: DWR Project # 2017-0537v2
Riparian Buffer Credits Purchased: 6,831.956 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Project Ocean - Eagle Crest Industrial Park, DWR Project #: 20221796
You have elected to fulfill your permitted buffer mitigation requirements for the Project Ocean - Eagle Crest Industrial
Park project by paying into the RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank (Hannah Bridge Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts
occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project
#20221796 is 61,308.00 (ft2). The Thunder Swamp Phase II site is providing 10,528.613 (ft2), the Shady Grove site is
providing 9,506.220 (ft2), the Caraway Bluff site is providing 8,282.111 (ft2), the Poplar Creek site is providing 17,844.100
(ft2), and the Hannah Bridge site is providing 6,831.956 (ft2) for the partial amount of 52,993.00 (ft2). The remaining
credits will be purchased elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this
activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not
transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or
astaley@res.us.
Thank you,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Stephanie Goss
Terracon — Jeff Harbour
res.us
EBX-NEUSE I, LLC - RES NEUSE BUFFER AND NUTRIENT OFFSET UMBRELLA MITIGATION BANK
Hannah Bridge Site, HUC 03020201 Buffer Restoration Credit Ledger
111912023
DWR Bank Parcel Project Number: 2017-0537v2
As -Built Credit Total: 196,238.00 square feet
Total Credits Released to Date: 179,752.12 square feet
Credits Released/Available to
Bank
Credits Debited/Sold from Bank
Buffer Credit Balance
Transaction
Number
Date
Purchaser Name or UMBI Task Completed
Project Name
HUC of Project
Square Feet
Acres
Square Feet
Acres
Square Feet
Acres
Local Gov't
Requiring
1
10/29/2018
Tasks 1 and 7 Credits Released (25%)
49,059.50
1.13
-
49,059.50
1.13
DWR
2
12/5/2018
NCDEQ -DMS DEQ -DMS Contract #16-032618-24
03020201
49,059.50
1.13
0.00
DMS
3
6/3/2019
Tasks 2 Credits Released (20%)
39,247.60
0.90
39,247.60
0.90
DWR
4
8/15/2019
DWR approved transfer to Hannah Bridge nutrient offset ledger 8/15/19
39,247.60
0.90
-
0.00
DWR
5
12/10/2019
Tasks 3 Credits Released (10%)
21,541.41
0.49
21,541.41
0.49
DWR
61
12/31/2019
NCDEQ - DMS F DEQ - DMS Contract #16-031819-25
03020201
1
21,541.41
0.49
0.00
DMS
7
1/27/2020
Tasks 4 Credits Released (10%)
19,972.46
0.46
19,972.46
0.46
DWR
8
7/28/2020
Cassa Kni htdale, LLC Silverstone
03020201
15,104.50
0.35
4,867.96
0.11
DWR
9
12/29/2020
Tasks 5 Credits Released (10%)
19,972.46
0.46
24,840.42
0.57
DWR
10
1/19/2021
Merita a Homes of the Carolinas Inc
Preserve at Louisbu - 20201261
03020201
1,570.00
0.04
23,270.42
0.53
DWR
11
1/5/2022
City of Raleigh
SR 1670
03020201
6,146.50
0.14
17,123.92
0.39
DWR
12
1/28/2022
Tasks 6 Credits Released (10%)
19,972.46
0.46
37,096.38
0.85
DWR
13
3/10/2022
Town of Holl S rin s
Holl Springs Road Widening - Phase 2 20201018
03020201
17,123.92
0.39
19,972.46
0.46
DWR
14
3/28/2022
Abode Communities, LLC
Friendship Chapel Road Extension 20-0981
03020201
19,972.46
0.46
0.00
DWR
15
4/12/2023
Tasks 8 Credits
Released (5%)
9,986.23
0.23
9,986.23
0.23
DWR
11
4/20/2023
Smithers Equity Group, LLC
3907 Sherman Avenue Duplex 20230384
03020201
1,452.00
0.03
8,534.23
0.20
DWR
12
10/12/2023
Mark Delaney and Anna Preseren
Porch Addition - 313 Gary St., Raleigh 20230563
03020201
504.00
0.01
8,030.23
0.18
DWR
13
11/9/2023
Sound Timber Management LLC
Project Ocean - Eagle Crest Industrial Park
20221796
03020201
6,831.956
0.16
1,198.27
0.03
DWR
179,752.12
178,553.846
1,198.274