HomeMy WebLinkAboutNCC230446_NOT Closeout Documents_20231106 FINAL INSPECTION REPORT
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# NCC230446
Project Name Birkdale GC West Pond Renovation
Financially Responsible Owner(FRO) Lake Norman Real Estate Investors, LLC
FRO Address 5960 Fairview Rd.STE 327 Charlotte NC 28210:tgustafson@gpartnerscre.com
Project Location 16500 Birkdale Commons Parkway
River Basin/Watershed McDowell- Mtn Island Lake
EC Final Inspection Date 11/1/2023 Start Time 11:00 AM Time 12:30 PM
Inspector Name Anne Loftin/Veronika Galitsky
Others Present Trent Gustafson (FRO),William Morris(Land Design),Justin Call (Keach Const)
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made Yes Name see above
Title/Company
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes ongoing maintenance required.
As-Built BMP Project# wet pond 453311 apprved 9/5/2023
const.docs 402213 w/RTAP 433768
FINAL INSPECTION COMMENTS
Project is completed,stable and the erosion measures removed.Joint BMP inspection w/H. Davis(Meck.Co.). Construction is complete,
wet pond should continue maintenance to resolve low water elevation and ensure plantings establish per plan and the Declaration and
Covenants(PC019). Ongoing compliance is with the Mecklenburg County SWS inspection staff.
DISPATCH LIST
tgustafson@gpartnerscre.com; William Morris<wmorris@landdesign.com>; Kevin Vogel <kvogel@landdesign.com>; Davis,
Heather<Heather.Davis@mecklenburgcountync.gov>;Greg Keach <greg@keachconstruction.com>; Ed Reid
<ed@keachconstruction.com>;Justin Call <justin@keachconstruction.com>; Brian Alvord <brian@keachconstruction.com>;
dave@richardsongrading.com; David Goff<dgoff@richardsongrading.com>; Wilson Richardson
<wil@richardsongrading.com>
1 of 1
Report Date: 11/3/2023