Loading...
HomeMy WebLinkAboutWQCS00039_System Performance Annual Report 2022_20230131 WASTEWATER SYSTEM PERFORMANCE REPORT January 1, 2022 – December 31, 2022 Town of Waynesville Public Works Department 129 Legion Drive Waynesville, NC 28786 (828)456-3706 Description of Wastewater Treatment System The Town of Waynesville owns and operates a wastewater treatment system consisting of a wastewater collection system and one wastewater treatment plant. The wastewater collection system consists of the sewer lines, pump stations, and all the related appurtenances required to convey wastewater from the homes and businesses of customers to the wastewater treatment plant for treatment. All of the wastewater transported by the collection system is treated at the, located at 566 Walnut Trail Rd, Waynesville, NC 28785, prior to ultimate discharge into receiving Richland Creek. This report summarizes the performances of the collection system and Waynesville Collection Treatment Plant for the Calendar year 2021. Collection System General Information Facility/System Name: Town of Waynesville Wastewater Collection System Permit Number: WQCS00039 Operator in Responsible Charge (ORC): Jeffrey Stines (CS4-987994) Contact Information for ORC: (828)456-3706 jstines@waynesvillenc.gov Miles of Pipe Cleaned: 20.22 miles Number of Pump Stations: 0 Wastewater Conveyance and Sanitary Sewer Overflows (SSO) During the calendar year 2021, approximately millions of gallons of wastewater were conveyed to Waynesville Wastewater Treatment Plant. Sanitary sewer overflows (SSO) totaling 0 gallons were reported to the NC Department of Environmental Quality (DEQ). The SSO gallons per month were as follows: MONTH NUMBER OF SSOs TOTAL GALLONS GALLONS TO SURFACE WATER January 0 0 0 February 0 0 0 March 0 0 0 April 0 0 0 May 0 0 0 June 0 0 0 July 0 0 0 August 0 0 0 September 0 0 0 October 0 0 0 November 0 0 0 December 0 0 0