LETTER OF APPROVAL WITH MODIFICATIONS
SODUS GROUP HOLDINGS LLC
Attention: Christine Dzula, CEO
5805 Shallowford Road
Lewisville,NC 27023
RE: Project Name: Dixon St. Storage Units
Acres Approved: 5.61
Project ID: DAVID-2023-074
County: Davidson
City: Lexington
Address: Dixon Street
River Basin: Yadkin
Stream Classification: C
Submitted By: WK Environmental PLLC
Date Received by LQS: June 8, 2023
Plan Type: New
Dear Ms. Dzula:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be
kept on file at the job site:
North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776-9800
Letter of Approval with Modifications
SODUS GROUP HOLDINGS LLC
June 21, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Since ,
Nicole Chiles, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: WK Environmental PLLC
Attn: Wesley Kimbrell, PE
453 Shannon Brooke Drive
Lexington,NC 27295
Letter of Approval with Modifications
SODUS GROUP HOLDINGS LLC
June 21, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Dixon St. Storage Units
Project ID: DAVID-2023-074
County: Davidson
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
2. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
3. The NCG01 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a
closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
_�
rD
pCD O 7 � rD ` O "p.1 p '
TqCD
O�.
til
c • Pt
p C • O ' — p
eD w � � � n � y
O' n r' sz -
It
CD �,� n -
cz
""0 -. fD
� z �n
T
o "� C
1
�r n tom• Fr. 3 r `� ,L r iii 31 $°)1111.111 A:
F.I O CC) = O Aly it
= i /....• ".'•N = CD
,... O
n C
A� ii C.
CD CD C
< L "t
2
qCi
1.4 V Te -
(/� O 0. ,p =
c
y ` e ...4 4.• iy
� = =„ c. =
Fact Sheet on the New NCG01 Permit ,
April 2019
EQ�
The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably,there is a new
process in which construction sites will obtain official coverage under an NCG01 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919)707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCGO1 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; e-NOI: Notice of Intent,application form for the NCGO1 permit
• Is clearly organized by topic; and e-NOT: Notice of Termination, form for closing out the NCGO1 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
• Provides a list of items that must be
included in the SWPPP,such as the
construction sequence, plans,
calculations, etc. (p. 2-4);1
• Has updated language on bypasses and
upsets that is tailored to construction
activities(p. 10);
• Puts all timeframes for inspections,
record-keeping and reporting in The NCG01 Process
"calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1,2019.
consistency(p. 11-14);2
• Changes the inspection frequency Permittees will no longer receive a copy of the NCGO1 permit in the mail
(during business hours)to at least with their E&SC Plan approvals and be considered as covered under the
once per 7 calendar days and after permit. Federal rules require that DEMLR receive an NOI on each
everystorm > 1.0 inch construction project and issue each construction project its own COC.
(previously 0.5
inch);3 and Under the new NCGO1 process,construction sites will continue to
• Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCGO1 by
place (p. 23). completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
Initially, there will be no charge associated with applying for an NCGO1
by the DEMLR Sediment Program.
permit but on or around June 1, 2019, DEMLR will begin charging a $100
2 The number of calendar days was
selected to be as equivalent as annual general permit fee as required per§143-215.3D.
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at
DEMLR.