LETTER OF APPROVAL WITH MODIFICATIONS
City of Locust
Attention: Cesar Correa
Post Office Box 190
Locust,North Carolina 28097
RE: Project Name: North Basin Sanitary Sewer Improvements
Project ID: STANL-2023-019
Acres Approved: 0.94
County: Stanly
City: Locust
Location: Not Provided
River Basin: Yadkin—Pee Dee
Stream Classification: Other
Submitted By: Chambers Engineering, PA
Date Received by LQS: April 20, 2023
Plan Type: Revised
Dear Mr. Correa;
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of
approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
Please direct questions about the eNOI form to the Stormwater Program staff the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at
the job site:
Q North Dme of E Quality I D of Energy, and D
'��� MooresvilleCarolina Regionalepart Officent 1610nvironmental East Center Avenueualit ,Suiteivision 301 1 MooresvilleMineral,North CarolinaLand 28115Resources
NORTH CAROLINA
oecaro�em of Enmronmemzl Qaluy 704.663.1699
Letter of Approval with Modifications
Name of Financially Responsible Party
Date of the Letter
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Is!George Adams
George D. Adams
Assistant Regional Engineer
Land Quality Section
GDA/cys
Enclosure: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Inspection Department
ec: Chambers Engineers, PA
Attention: Heather Reynolds, PE
heather@ce-pa.com
Letter of Approval with Modifications
Name of Financially Responsible Party
Date of the Letter
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: North Basin Sanitary Sewer Improvements
Project ID: STANL-2023-019
County: Stanly
Reviewed by: George D. Adams
1. Timber mats and/or an appropriate bridge system must be employed for all temporary stream crossings
when construction equipment needs to move from one side of any stream channel to the other.
2. All necessary easements and access agreements must be obtained and be current prior to starting work. All
potentially affected property owners must be notified prior to utility construction even though the activity is
covered under an easement or occurs within a right-of-way [G.S. 113A-54.1(al)].
3. I understand that the drawings have been revised to show a minimum 15-foot buffer when parallel to any
stream. Provide updated drawings to this office on or before May 22, 2023 showing this buffer and any
other changes discussed in correspondence from Chambers Engineering, PA on April 19, 2023 and May 4,
2023.
4. Additional measures may be required- The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]