Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWA000208_Design Calculations_20231106
ISAACS ,-)23 CIVIL ENGINEERING DESIGN & LAND SURVEYING 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 The Plant Guys Independence Commerce Drive (Stallings Commerce Drive) Matthews, North Carolina (Union County, North Carolina) / t� '`.� �i y�1 ie�e11111111f/� .,-. C/1?©V. "A,0 H CA 0 ge's q► ...,.s., f 1/4 ......... la, •. e 2�Pam[ 1 ; : THE ISAACS ••• L• SEAL : e GROUP,P.C. s S a 0 t ENGINEERING& :z 025926 : LAND SURVEYING 7 n i ',Ai. S. : :ck: NO.C-1069 i lam'46 I C7 /0 25 NO. BY DATE REVISION 1 CMJ 10/10/23 PER REVIEW COMMENTS The Plant Guys-22040 Swale (Liner) Calculations The Plant Guys-22040 OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: "TD-I" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 1.04 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA(Q=c*I*A): 4.68 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 228.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.68 cfs 0.77' 2.18 sq. ft. 0.40 ft 2.15 fps 0.48 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: "TD-2" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.01 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.05 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 20.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(C125) MANNING'S n-VALUE: 0.022 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.05 cfs 0.07' 0.05 sq. ft. 0.05 ft 0.94 fps 0.04 psf 2.25 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S1" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.09 ac RUNOFF COEFFICIENT("c"): 0.50 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.34 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 86.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.023 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.34 cfs 0.22' 0.26 sq. ft. 0.14 ft 1.32 fps 0.32 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S2" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.10 ac RUNOFF COEFFICIENT("c"): 0.70 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.53 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 235.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.009 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.53 cfs 0.21' 0.55 sq. ft. 0.17 ft 0.95 fps 0.12 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S3" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.16 ac RUNOFF COEFFICIENT("c"): 0.80 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.96 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 380.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.013 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.96 cfs 0.27' 0.74 sq. ft. 0.20 ft 1.30 fps 0.22 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S4" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.26 ac RUNOFF COEFFICIENT("c"): 0.70 FLOW FROM DRAINAGE AREA(Q=c*I*A): 1.37 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 1.37 cfs 0.20' 0.52 sq. ft. 0.16 ft 2.65 fps 0.93 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S5" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): RUNOFF COEFFICIENT("C"): FLOW FROM DRAINAGE AREA(Q=C*I*A): ADDITIONAL FLOW(or user-defined flow): 0.52 cfs (See Hydraflow Hydrographs:"Bypass2") CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.52 cfs 0.11' 0.27 sq. ft. 0.10 ft 1.94 fps 0.54 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S6" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.75 ac RUNOFF COEFFICIENT("c"): 0.95 FLOW FROM DRAINAGE AREA(Q=c*I*A): 5.34 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 132.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Gravel (D50=2") MANNING'S n-VALUE: 0.042 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 5.34 cfs 0.78' 2.23 sq. ft. 0.41 ft 2.39 fps 0.73 psf 0.80 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S7" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.68 ac RUNOFF COEFFICIENT("c"): 0.80 FLOW FROM DRAINAGE AREA(Q=c*I*A): 4.08 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.035 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.08 cfs 0.48' 1.65 sq. ft. 0.33 ft 2.47 fps 0.45 psf 1.13 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S8" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.08 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.36 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") *(BUNCH GROWTH; POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.36 cfs 0.15' 0.36 sq. ft. 0.12 ft 1.00 fps 0.14 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S1" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.09 ac RUNOFF COEFFICIENT("c"): 0.50 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.34 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 86.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.023 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.34 cfs 0.24' 0.29 sq. ft. 0.15 ft 1.15 fps 0.34 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S2" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.10 ac RUNOFF COEFFICIENT("c"): 0.70 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.53 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 235.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.009 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.53 cfs 0.24' 0.64 sq. ft. 0.18 ft 0.83 fps 0.13 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S3" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.16 ac RUNOFF COEFFICIENT("c"): 0.80 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.96 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 380.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.013 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.96 cfs 0.30' 0.85 sq. ft. 0.22 ft 1.12 fps 0.24 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S4" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.26 ac RUNOFF COEFFICIENT("c"): 0.70 FLOW FROM DRAINAGE AREA(Q=c*I*A): 1.37 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 1.37 cfs 0.22' 0.59 sq. ft. 0.17 ft 2.30 fps 1.04 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S5" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): RUNOFF COEFFICIENT("C"): FLOW FROM DRAINAGE AREA(Q=C*I*A): ADDITIONAL FLOW(or user-defined flow): 0.52 cfs (See Hydraflow Hydrographs:"Bypass2") CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.52 cfs 0.13' 0.31 sq. ft. 0.11 ft 1.69 fps 0.60 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S6" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.75 ac RUNOFF COEFFICIENT("c"): 0.95 FLOW FROM DRAINAGE AREA(Q=c*I*A): 5.34 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 132.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 5.34 cfs 0.75' 2.06 sq. ft. 0.39 ft 2.59 fps 0.70 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S7" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.68 ac RUNOFF COEFFICIENT("c"): 0.80 FLOW FROM DRAINAGE AREA(Q=c*I*A): 4.08 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.08 cfs 0.50' 1.75 sq. ft. 0.34 ft 2.33 fps 0.47 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S8" FACTORS USED: TIME OF CONCENTRATION (Tc): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.08 ac RUNOFF COEFFICIENT("c"): 0.60 FLOW FROM DRAINAGE AREA(Q=c*I*A): 0.36 cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Unvegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Calculated Allowable Velocity Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.36 cfs 0.17' 0.41 sq. ft. 0.14 ft 0.87 fps 0.15 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No.15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute Skimmer Basin Calculations The Plant Guys-22040 "SKIMMER" BASIN WORKSHEET DESCRIPTION: THE PLANT GUYS Drainage Area to Basin (A) = 1.75 ac. Disturbed Area to Basin (Ad) = 1.70 ac. Weighted Runoff Coefficient (c) = 0.65 Required Basin Volume = 3060.00 ft3 =Ad x 1,800 Provided Volume (at 713.00)ft= 5305.00 ft3 (see table, below) ELEVATION AREA INC. VOLUME ACC. VOLUME 711 1988 ft2 0.00 ft3 0.00 sq. ft. 712 2638 ft2 2313.00 ft3 2313.00 sq. ft. 713 3346 ft2 2992.00 ft3 5305.00 sq. ft. 714 4109 ft2 3727.50 ft3 9032.50 sq. ft. 715 4930 ft2 4519.50 ft3 13552.00 sq. ft. SPILLWAY ANALYSIS 10-yr Flow Into Basin (Q10) = 7.77 cfs = (c*I*A); Where"I"=6.86 in/hr Proposed Spillway Elevation = 713.00 ft Proposed Spillway Width (W) = 15.00 ft Flow Height Over Spillway(h) = 0.31 ft = [Q10/ (3 *W)]213 TRAPPING EFFICIENCY (75% Trapping Efficiency Per the Barfield and Clar Equation) Surface Area Required at Design Flow= 325 * Q10= 2524.91 ft2 Surface Area Provided at Design Flow (see table) = 3346.00 ft2 SKIMMER SIZING _ Volume = 5305.00 ft3 (Released Over 5.0 days) Table 6.64a(NCDENR) Flow(Qd) = (5305.00 ft3/ 5 days) = 1061 ft3/day Skimmer Size Head Chosen Skimmer Size = 2.00 in Thus, Head (H) = 0.167 ft 1.5 in 0.125 ft Desired Orifice Diameter = [Qd/(2300 * (H)12)]12 = 1.06 in 2 in 0.167ft Therefore, Use 1.0 in. Orifice 2.5 in 0.208 ft 3 in 0.250 ft 4 in 0.292 ft 5 in 0.333 ft 6 in 0.417 ft 8 in 0.500 ft Storm Drain (Pipe) Calculations The Plant Guys-22040 GRAVITY PIPE FLOW ANALYSIS BASED UPON MANNING'S&THE ENERGY EQUATION PROJECT:THE PLANT GUYS PIPE FLOW CALCULATIONS FOR A 10-YEAR STORM EVENT Stallings October 10,2023-05:46 PM down- down- Pipe Pipe Pipe Manning's Drainage Runoff Time of Rainfall Surface User-Defined Lateral Total Capacity of Depth of Wetted Wetted Hydraulic Discharge Structure Pipe Tailwater Water Elev. Structure Rim Invert stream stream Length Slope Diameter Pipe roughness Area Coeff. Concentration Intensity Runoff Flow Flow Flow Pipe Flow Flow Area Perimeter Radius Velocity Headlosses Headloss Elevation at Inlet Name Elevation Out structure Invert (L) (S) (D) Material (n) (Ad) (c) (Tc) (I) (Qsrf) (Quser) (Qiat) (Qror) (Qcap) (d) (Aw) (Pw) (Rh) (V) (He Hj Hb) (Hr) (Tw) (HGL) A4 716.00' 707.50' A3 707.25' 52.97 ft 0.0047 12 in HDPE 0.012 7.50 in/hr 2.60 cfs 2.60 cfs 2.85 cfs 0.80 ft 0.6736 ft' 2.2143 ft 0.3042 ft 3.85 fps 0.34 ft. 0.19 ft. 707.26 ft. 707.79 ft. A3 718.51' 707.14' A2 705.95' 244.42 ft 0.0049 12 in HDPE 0.012 7.50 in/hr 2.60 cfs 2.90 cfs 0.79 ft 0.6655 ft' 2.1895 ft 0.3040 ft 3.91 fps 0.06 ft. 0.85 ft. 706.35 ft. 707.26 ft. A2 711.79' 705.85' END 705.77' 21.67 ft 0.0037 15 in RCP 0.013 7.50 in/hr 0.90 cfs 3.50 cfs 4.22 cfs 0.91 ft 0.9598 ft' 2.5610 ft 0.3744 ft 3.61 fps 0.03 ft. 0.05 ft. 706.27 ft. 706.35 ft. B4 716.50' 714.20' B3 713.55' 78.72 ft 0.0083 12 in HDPE 0.012 0.52 ac 0.75 7.50 in/hr 2.93 cfs 2.93 cfs 3.77 cfs 0.69 ft 0.5780 ft' 1.9606 ft 0.2950 ft 4.99 fps 0.48 ft. 0.36 ft. 713.45 ft. 714.30 ft. B3 718.80' 713.45' B2 712.45' 121.94 ft 0.0082 15 in HDPE 0.012 0.05 ac 0.95 7.50 in/hr 0.36 cfs 0.47 cfs 3.75 cfs 6.82 cfs 0.69 ft 0.6916 ft' 2.0888 ft 0.3311 ft 5.37 fps 0.15 ft. 0.32 ft. 712.88 ft. 713.45 ft. B2 715.50' 712.35' END 712.00' 42.93 ft 0.0082 18 in HDPE 0.012 0.75 ac 0.95 7.50 in/hr 5.34 cfs 9.10 cfs 11.06 cfs 1.10 ft 1.3822 ft' 3.0732 ft 0.4493 ft 6.56 fps 0.17 ft. 0.22 ft. 712.50 ft. 712.88 ft. C2 720.50' 715.75' Cl 714.45' 85.19 ft 0.0153 12 in HDPE 0.012 0.09 ac 0.50 7.50 in/hr 0.34 cfs 0.34 cfs 5.13 cfs 0.18 ft 0.0961 ft' 0.8763 ft 0.1097 ft 3.51 fps 0.24 ft. 0.02 ft. 712.96 ft. 715.75 ft. C1 719.90' 714.35' B3 713.55' 54.25 ft 0.0147 12 in HDPE 0.012 0.02 ac 0.90 7.50 in/hr 0.14 cfs 0.47 cfs 5.04 cfs 0.21 ft 0.1199 ft' 0.9521 ft 0.1259 ft 3.78 fps 0.06 ft. 0.02 ft. 712.88 ft. 712.96 ft. D1 715.25' 714.00' END 712.00' 33.10 ft 0.0604 15 in HDPE 0.012 0.80 ac 0.80 7.50 in/hr 4.80 cfs 4.80 cfs 18.51 cfs 0.45 ft 0.3978 ft' 1.6088 ft 0.2473 ft 11.99 fps 2.79 ft. 0.21 ft. 712.50 ft. 715.50 ft. E2 707.88' 706.90' El 706.30' 96.01 ft 0.0062 8 in HDPE 0.012 0.06 ac 0.60 7.50 in/hr 0.27 cfs 0.27 cfs 1.11 cfs 0.23 ft 0.1047 ft' 0.8301 ft 0.1261 ft 2.46 fps 0.12 ft. 0.06 ft. 706.42 ft. 706.90 ft. El 707.96' 706.20' A2 706.05' 30.96 ft 0.0048 8 in HDPE 0.012 0.14 ac 0.60 7.50 in/hr 0.63 cfs 0.90 cfs 0.98 cfs 0.53 ft 0.2994 ft' 1.4762 ft 0.2028 ft 2.98 fps 0.03 ft. 0.11 ft. 706.27 ft. 706.42 ft. PIPES 1 Energy Dissipater Calculations The Plant Guys-22040 PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Do= 3.75' L = APRON LENGTH, (FEET) Do = OUTLET PIPE DIAMETER, (INCHES) d50= MEDIAN STONE SIZE, (FEET) I I I T W = Do + La = 11.75' 90__ OUTLET 2 MIN 1 corn PIPE 1 a'/ DIAMETER, Do= 1.25' La �� 80 1 la'�o ' 1 Ii�.O 70 aii _ .TAILWATER < 0.5 Do �O�' "�, 1 �Oc/ I %� �� ''°=='''='==•'=--�' PERMANENT GEOTEXTILE FABRIC PQ D = 1.5 TIMES THE MAXIMUM 0 60 a/ A a4_k THANSTONE6D1AMETER NCHES BUT NOT LESS ���C9 50 liii 1 a/� I a�b I I �� I I I II II I ,�� � r I // � I �`\'\40 1 I I I Ili 1111 �.,AIr A '��I�� I II 30 IIIIII i liI I I IN � MIN IIIPITI 4 I III I I I II I I 1 I d' /�',, I III I I I I I 1 1�I- /'�i� l 1 1 1 20 a d,1I I II WI I i.. au /La (MIN) FORA 10J41! L'*' �o- 15" PIPE = 8' / I 1I I I :ry .. N o N N I l i 4o 14 o� •� 32 I 2 cn h I I I I I I I 1 1 1 e raD i0 e 1 1 r a' O_ it tr �Co �t'k i• is I I I �` Et a''�� la i e a 1 I a.1� I 0 a*15 I I -o RECOMMENDED MIN I I d50 = 6-IN a%�2- 1 d50 (MIN) FOR A I 1 1 1 1 I I 15" PIPE = 0.50' I I I I I I I I 3 5 10 20 50 100 200 500 1000 (WHICH IS 6") DISCHARGE, FT3 / SEC PROPOSED Q10=4 cfs RIPRAP APRON H.W. "Al" Stormwater Management Calculations The Plant Guys-22040 SAND-FILTER DETENTION BASIN WORKSHEET THE PLANT GUYS - BASIN #1 October 10,2023 Total Drainage Area (AD) = 2.23 ac. Total Impervious Area (A;) = 1.34 ac. Impervious Fraction (IA) = 0.61 =Impervious Area(Ai) / Total Drainage Area(A) Runoff Coefficient (Rv) = 0.60 =0.05+0.9*IA [Per NCDENR DWQ BMP Manual] WATER QUALITY VOLUME (WQv)TO BE CONTROLLED Volume (V)to be controlled = (3630* RD* Rv*AD) Where: RD = Design Storm Depth = 1 inch AD= Watershed Area = 2.23 ac. Thus, Volume (WQv) = 4,856.94 ft3 *This volume is provided(above Sand Filter)at 715.06 ft (See the Stage-Storage table,below) RELEASE RATE The Water Quality Volume (WQv)shall be released over a time period of 24 hours SEDIMENT FOREBAY SIZING Req'd. Sediment Forebay Volume = 0.25 *WQv= = 1214.24 ft3 (Sediment Forebay Volume is provided at Elev. = 713.07 ft) (*Forebay Spillway will be at 713.10 ft) Using the Camp-Hazen Equation, the Forebay Minimum Surface Area (As) in "ft2" = 240 x R„x AD x RD Where: Rv=Runoff Coefficient(0.05 + 0.9*IA) = 0.60 AD = Watershed (or Drainage Area) = 2.23 ac. Rp = Design Storm (Runoff) Depth = 1 inch Thus, the Forebay Minimum Surface Area (As) = 321.12 ft2 The proposed Forebay surface area (at the forebay spillway elevation) = 1349.65 ft2 SEDIMENT FOREBAY STAGE-STORAGE ELEVATION FOREBAY AREA FOREBAY INCREMENTAL VOLUME FOREBAY CUMULATIVE VOLUME 712.00 ft 921 ft2 0 ft3 0 ft3 713.00 ft 1302 ft2 1112 ft3 1112 ft3 714.00 ft 1779 ft2 1540 ft3 2652 ft3 715.00 ft 2170 ft2 1974 ft3 4626 ft3 PRIMARY BASIN (ABOVE SAND FILTER) SIZING Req'd. Basin Treatment Volume = "Adjusted"WQv= 0.75 *WQv = 3,642.71 ft3 ("Adjusted"Water Quality Volume is provided at Elev. = 714.44 ft) (*Primary outlet will be at 714.50 ft) PRIMARY BASIN (ABOVE SAND FILTER) STAGE-STORAGE ELEVATION SURFACE AREA INCREMENTAL VOLUME BASIN CUMULATIVE VOLUME" 712.00 ft , 974 ft2 0 ft3 0 ft3 713.00 ft 1393 ft2 1184 ft3 1184 ft3 714.00 ft 1779 ft2 1586 ft3 2769 ft3 715.00 ft 2170 ft2 1974 ft3 4743 ft3 716.00 ft , 5178 ft2 3674 ft3 8417 ft3 *Proposed Basin"Top of Dam"=715.50 ft SAND FILTER SIZING Using Darcy's Equation, the Surface Area (in "ft2") = A,= (WQ,* df)/ [k* (hf+ df) *tf] Where: WQ,= Water Quality Volume (in ft3) =4856.94 ft3 df= Filter Bed Depth (in "feet") = 2.5 ft k = Coefficient of Permeabilty (for sand filter media) = 3.5 ft/day = 1.75 in/hr hf=Average Height of Water (above Sand Filter bed) = 1.53 ft tf= Filter Bed Drain Time (in "days") =24hrs=24hrs/day = 1.000 days Thus, Minimum A,= 861.11 ft2 Proposed A,= 862.00 ft2 (see Design Drawings) SAND FILTER STAGE-STORAGE & FILTRATION RATE STAGE(ELEVATION) AREA ACC. VOLUME ESTIMATED FILTRATION* 712.00 ft 862 ft2 0 ft3 0 ft3/day 0.00 cfs** 713.00 ft 862 ft2 _862 ft3 4224 ft3/day 0.049 cfs 714.00 ft 862 ft2 1724 ft3 5431 ft3/day 0.063 cfs 715.00 ft 862 ft2 2586 ft3 6637 ft3/day 0.077 cfs 716.00 ft 862 ft2 3448 ft3 7844 ft3/day 0.091 cfs *Estimated filtration rate(QE)is computed from the Darcy equation as follows:QE=V/tf=[Af*k*(hf+df)]/df **Discharge at the surface elevation of the filter media is neglected and assumed to be zero UNDERDRAIN PIPE AND PERFORATIONS The capacity of the underdrain (and its perforations) must be greater than the sand filter's media capacity or minimum drawdown rate, whichever is greater. As calculated above, the maximum drawdown rate (or"maximum release rate") = 0.056 cfs The sand filter media capacity is the filtration rate at the average water height above the sand filter surface. Water Quality Volume is provided at 715.06 ft (which is 3.06 ft above the sand filter surface) Thus, the avg. water height above the sand filter surface = 3.06 = 2 = 1.53 ft, or= Elevation 713.53 ft At 713.53 ft (or 1.53 ft above the sand filter), the filtration rate is= 0.056 cfs The underdrain pipe capacity (Qe) is computed using Manning's equation: Q. = (1.49/n)*Ay,* Rh2/3* S°5 Where: n = Gauckler-Manning Coefficient = 0.013 AN,= Wetted Area = 0.196 ft2 (for a 6-inch diameter pipe) Rh = Hydraulic Radius = (A /PW) = 0.125 ft PW= Wet Perimeter= 1.57 ft S = Slope of Pipe = 0.005 ft/ft (for a 0.50%slope) Thus, Q. = 0.40 cfs To account for clogging, Qp/2 = 0.20 cfs Therefore, the proposed underdrain pipe and perforations capacities are sufficient. The perforation capacity (Qpe) is computed using the orifice flow equation: Qpe = c *A* (2*g*h)0•5 Where: c = Orifice Coefficient = 0.6 g = Gravitational Constant = 32.2 ft/sec2 A =Area of Orifice Opening (in ft2) = 0.00077 ft2 (for 3/8"perforations) h = Height of Water Above Orifice = 2.03 ft* *The height of water above the orifice is the average height of water above the filter+the thickness of the Thus, Qpe = 0.005 cfs (per hole) filter+1/2 the thickness of the underdrain bed. The underdrain shall have 4 perforated rows with each hole being 3 inches on-center. Also, there will be at least 84 ft of underdrain piping. Thus, the total number of perforations = [84 = (3/12)] *4 = 1344 Thus, Qp,= 0.005 cfs per hole * 1344 holes = 7.070 cfs For clogging, Qp,/2 = 3.53 cfs Therefore, the proposed underdrain pipe and perforations capacities are sufficient. Storm Routing (Hydraflow Hydrographs) Report The Plant Guys-22040 Hydraflow Table of Contents Hydro-22040-Rational.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, Rational, X1-Pre 4 Hydrograph No. 2, Rational, DetainedArea 5 Hydrograph No. 3, Reservoir, SandFilter 6 Pond Report - SandFilter 7 Hydrograph No. 4, Rational, X1-Post 8 Hydrograph No. 5, Rational, Bypass 9 Hydrograph No. 6, Combine, X2-Post 10 Hydrograph No. 7, Rational, X2-Pre 11 TR-55 Tc Worksheet 12 10 - Year Summary Report 13 Hydrograph Reports 14 Hydrograph No. 1, Rational, X1-Pre 14 Hydrograph No. 2, Rational, DetainedArea 15 Hydrograph No. 3, Reservoir, SandFilter 16 Hydrograph No. 4, Rational, X1-Post 17 Hydrograph No. 5, Rational, Bypass 18 Hydrograph No. 6, Combine, X2-Post 19 Hydrograph No. 7, Rational, X2-Pre 20 25 - Year Summary Report 21 Hydrograph Reports 22 Hydrograph No. 1, Rational, X1-Pre 22 Hydrograph No. 2, Rational, DetainedArea 23 Hydrograph No. 3, Reservoir, SandFilter 24 Hydrograph No. 4, Rational, X1-Post 25 Hydrograph No. 5, Rational, Bypass 26 Hydrograph No. 6, Combine, X2-Post 27 Hydrograph No. 7, Rational, X2-Pre 28 100 - Year Summary Report 29 Hydrograph Reports 30 Hydrograph No. 1, Rational, X1-Pre 30 Hydrograph No. 2, Rational, DetainedArea 31 Hydrograph No. 3, Reservoir, SandFilter 32 Hydrograph No. 4, Rational, X1-Post 33 Hydrograph No. 5, Rational, Bypass 34 Hydrograph No. 6, Combine, X2-Post 35 Contents continued... Hydro-22040-Rational.gpw Hydrograph No. 7, Rational, X2-Pre 36 IDF Report 37 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 X1-Post DetainedArea L � X1-Pre SandFilter vi X2-Pre �ss p YX2-Post Legend Hvd• Oriain Description 1 Rational X1-Pre 2 Rational DetainedArea 3 Reservoir SandFilter 4 Rational X1-Post 5 Rational Bypass 6 Combine X2-Post 7 Rational X2-Pre Project: Hydro-22040-Rational.gpw Tuesday, 10/ 10/2023 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational 0.292 0.441 0.487 0.548 X1-Pre 2 Rational 7.298 11.03 12.17 13.69 DetainedArea 3 Reservoir 2 0.046 0.953 1.391 2.039 SandFilter 4 Rational 0.252 0.380 0.420 0.472 X1-Post 5 Rational 1.639 2.478 2.735 3.075 Bypass 6 Combine 3,5 1.663 2.513 2.773 3.119 X2-Post 7 Rational 2.065 3.234 3.595 4.083 X2-Pre Proj. file: Hydro-22040-Rational.gpw Tuesday, 10/ 10/2023 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 0.292 1 5 88 X1-Pre 2 Rational 7.298 1 5 2,189 DetainedArea 3 Reservoir 0.046 1 10 2,134 2 712.95 2,175 SandFilter 4 Rational 0.252 1 5 76 X1-Post 5 Rational 1.639 1 5 492 Bypass 6 Combine 1.663 1 5 2,626 3,5 X2-Post 7 Rational 2.065 1 16 1,982 X2-Pre Hydro-22040-Rational.gpw Return Period: 1 Year Tuesday, 10/ 10/2023 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.292 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 88 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 Xl-Pre Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 7.298 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,189 cuft Drainage area = 2.230 ac Runoff coeff. = 0.65* Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 "Composite(Area/C)=[(0.890 x 0.20)+(1.340 x 0.95)]/2.230 DetainedArea Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 0.046 cfs Storm frequency = 1 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,134 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 712.95 ft Reservoir name = SandFilter Max. Storage = 2,175 cuft Storage Indication method used. SandFilter 0 (cfs) Hyd. No. 3 -- 1 Year 0 (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 2,175 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Pond No. 1 - SandFilter Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=712.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 712.00 1,895 0 0 1.00 713.00 2,695 2,295 2,295 2.00 714.00 3,557 3,126 5,421 3.00 715.00 4,339 3,948 9,369 4.00 716.00 5,178 4,759 14,128 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 12.00 Inactive 0.00 0.00 Crest Len(ft) = 2.00 16.00 20.00 Inactive Span(in) = 12.00 0.00 0.00 0.00 Crest El.(ft) = 713.00 713.50 713.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.10 3.10 3.10 3.33 Invert El.(ft) = 707.50 0.00 0.00 0.00 Weir Type = Broad Broad Broad --- Length(ft) = 313.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 716.00 3.00 715.00 2.00 714.00 1.00 713.00 0.00 I 712.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 Total Q Discharge(cfs) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.252 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 76 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 5 Bypass Hydrograph type = Rational Peak discharge = 1.639 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 492 cuft Drainage area = 0.880 ac Runoff coeff. = 0.37* Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 "Composite(Area/C)=[(0.680 x 0.20)+(0.200 x 0.95)]/0.880 Bypass Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 6 X2-Post Hydrograph type = Combine Peak discharge = 1.663 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,626 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 0.880 ac X2-Post Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 2.00 2.00 1.00 j 1.00 0.00 0.00 0 60 120 180 240 300 360 420 480 540 600 660 720 780 840 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 5 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 7 X2-Pre Hydrograph type = Rational Peak discharge = 2.065 cfs Storm frequency = 1 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 1,982 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 3.277 in/hr Tc by TR55 = 16.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 3.00 3.00 2.00 ' 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 7 Time (min) 12 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. No. 7 X2-Pre Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.12 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 14.45 + 0.00 + 0.00 = 14.45 Shallow Concentrated Flow Flow length (ft) = 364.00 0.00 0.00 Watercourse slope (%) = 3.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.15 0.00 0.00 Travel Time (min) = 1.93 + 0.00 + 0.00 = 1.93 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc 16.00 min 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 0.441 1 5 132 X1-Pre 2 Rational 11.03 1 5 3,309 DetainedArea 3 Reservoir 0.953 1 10 3,246 2 713.27 3,153 SandFilter 4 Rational 0.380 1 5 114 X1-Post 5 Rational 2.478 1 5 743 Bypass 6 Combine 2.513 1 5 3,990 3,5 X2-Post 7 Rational 3.234 1 16 3,105 X2-Pre Hydro-22040-Rational.gpw Return Period: 10 Year Tuesday, 10/ 10/2023 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.441 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 132 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 7.610 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 11.03 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,309 cuft Drainage area = 2.230 ac Runoff coeff. = 0.65* Intensity = 7.610 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(0.890 x 0.20)+(1.340 x 0.95)]/2.230 DetainedArea Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 0.953 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,246 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 713.27 ft Reservoir name = SandFilter Max. Storage = 3,153 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 3,153 cuft 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.380 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 114 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 7.610 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 5 Bypass Hydrograph type = Rational Peak discharge = 2.478 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 743 cuft Drainage area = 0.880 ac Runoff coeff. = 0.37* Intensity = 7.610 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 "Composite(Area/C)=[(0.680 x 0.20)+(0.200 x 0.95)]/0.880 Bypass Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 6 X2-Post Hydrograph type = Combine Peak discharge = 2.513 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,990 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 0.880 ac X2-Post Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 J 0.00 0 60 120 180 240 300 360 420 480 540 600 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 5 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 7 X2-Pre Hydrograph type = Rational Peak discharge = 3.234 cfs Storm frequency = 10 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,105 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 5.133 in/hr Tc by TR55 = 16.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (cfs) Hyd. No. 7-- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 I 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 7 Time (min) 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) I 1 Rational 0.487 1 5 146 X1-Pre 2 Rational 12.17 1 5 3,652 DetainedArea 3 Reservoir 1.391 1 9 3,589 2 713.36 3,414 SandFilter 4 Rational 0.420 1 5 126 X1-Post 5 Rational 2.735 1 5 820 Bypass 6 Combine 2.773 1 5 4,409 3,5 X2-Post 7 Rational 3.595 1 16 3,452 X2-Pre Hydro-22040-Rational.gpw Return Period: 25 Year Tuesday, 10/ 10/2023 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.487 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 146 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 8.399 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 12.17 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,652 cuft Drainage area = 2.230 ac Runoff coeff. = 0.65* Intensity = 8.399 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(0.890 x 0.20)+(1.340 x 0.95)]/2.230 DetainedArea Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 1.391 cfs Storm frequency = 25 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 3,589 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 713.36 ft Reservoir name = SandFilter Max. Storage = 3,414 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3--25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 II 1 1 1 1 1 Total storage used = 3,414 cuft 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.420 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 126 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 8.399 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4--25 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 — 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 5 Bypass Hydrograph type = Rational Peak discharge = 2.735 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 820 cuft Drainage area = 0.880 ac Runoff coeff. = 0.37* Intensity = 8.399 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 "Composite(Area/C)=[(0.680 x 0.20)+(0.200 x 0.95)]/0.880 Bypass Q (cfs) Hyd. No. 5--25 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 6 X2-Post Hydrograph type = Combine Peak discharge = 2.773 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,409 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 0.880 ac X2-Post Q (cfs) Hyd. No. 6--25 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 60 120 180 240 300 360 420 480 540 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 5 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 7 X2-Pre Hydrograph type = Rational Peak discharge = 3.595 cfs Storm frequency = 25 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,452 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 5.707 in/hr Tc by TR55 = 16.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (cfs) Hyd. No. 7--25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 7 Time (min) 29 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 0.548 1 5 164 X1-Pre 2 Rational 13.69 1 5 4,107 DetainedArea 3 Reservoir 2.039 1 9 4,044 2 713.47 3,754 SandFilter 4 Rational 0.472 1 5 142 X1-Post 5 Rational 3.075 1 5 923 Bypass 6 Combine 3.119 1 5 4,966 3,5 X2-Post 7 Rational 4.083 1 16 3,920 X2-Pre Hydro-22040-Rational.gpw Return Period: 100 Year Tuesday, 10/ 10/2023 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.548 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 164 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 9.445 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 13.69 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,107 cuft Drainage area = 2.230 ac Runoff coeff. = 0.65* Intensity = 9.445 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 *Composite(Area/C)=[(0.890 x 0.20)+(1.340 x 0.95)]/2.230 DetainedArea Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 2.039 cfs Storm frequency = 100 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 4,044 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 713.47 ft Reservoir name = SandFilter Max. Storage = 3,754 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — 0.00 0 60 120 180 240 300 360 420 480 540 600 660 720 780 Time (min) Hyd No. 3 Hyd No. 2 1111111 Total storage used = 3,754 cuft 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.472 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 142 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 9.445 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 5 Bypass Hydrograph type = Rational Peak discharge = 3.075 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 923 cuft Drainage area = 0.880 ac Runoff coeff. = 0.37* Intensity = 9.445 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 "Composite(Area/C)=[(0.680 x 0.20)+(0.200 x 0.95)]/0.880 Bypass Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 6 X2-Post Hydrograph type = Combine Peak discharge = 3.119 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,966 cuft Inflow hyds. = 3, 5 Contrib. drain. area = 0.880 ac X2-Post Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 1 0.00 — 0.00 0 60 120 180 240 300 360 420 480 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 5 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Hyd. No. 7 X2-Pre Hydrograph type = Rational Peak discharge = 4.083 cfs Storm frequency = 100 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,920 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 6.482 in/hr Tc by TR55 = 16.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 7 Time (min) 37 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 10/10/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 66.8196 12.9000 0.8963 2 76.9232 13.1000 0.8842 3 76.1571 12.9000 0.8569 5 77.2081 12.9000 0.8371 10 75.5517 12.4000 0.8036 25 66.0145 11.1000 0.7420 50 59.2567 10.1000 0.6965 100 53.8843 9.2000 0.6563 File name:Monroe.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.03 4.04 3.38 2.92 2.57 2.30 2.08 1.91 1.76 1.63 1.52 1.43 2 5.94 4.79 4.03 3.49 3.08 2.76 2.50 2.30 2.12 1.97 1.84 1.73 3 6.43 5.21 4.40 3.82 3.38 3.04 2.77 2.54 2.35 2.19 2.05 1.93 5 6.90 5.61 4.76 4.15 3.68 3.32 3.03 2.79 2.58 2.41 2.26 2.13 10 7.61 6.21 5.28 4.62 4.11 3.72 3.40 3.14 2.92 2.73 2.56 2.42 25 8.40 6.87 5.87 5.15 4.61 4.19 3.85 3.56 3.33 3.12 2.95 2.79 50 8.94 7.33 6.28 5.53 4.97 4.53 4.17 3.88 3.63 3.42 3.23 3.07 100 9.44 7.75 6.66 5.88 5.30 4.85 4.48 4.18 3.92 3.70 3.51 3.34 Tc=time in minutes.Values may exceed 60. Precip.file name: Monroe.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.58 3.12 0.00 4.32 4.80 5.76 6.48 6.96 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00