Loading...
HomeMy WebLinkAboutNCC233299_ESC Approval Submitted_20231103 ,.�i�jdh ROY COOPER ITT Governor ti _ iire.,,. ' ELIZABETH S.BISER Secretary ,*tgi Co ivP0* WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality October 30, 2023 LETTER OF APPROVAL SHJ Development, LLC Attn: Mr. Martie Murphy, Director of Entitlement 115 E. Main Street Thomaston, GA 30286 RE: Project Name: Tidal Wave Auto Spa - Goldsboro Project ID: Wayne-2024-014 County: Wayne City: Goldsboro Acres Approved: 1.13 Address: 1027 North Spence Avenue River Basin: Neuse Date Received by LQS: October 18, 2023 Submitted By: PM Engineering, Inc. Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. DE Q North Carolina Department of Environmental Quality 1 Division of Energy,Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 NORnH CAROUNA " 0.1.1.ent el Emironmentala.x\ I'l 252.946.6481 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please be advised that a rule to protect and maintain existing buffers along watercourses in the Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection and Maintenance Rule (15A NCAC 2B.0714) applies to the 50-foot wide zone directly adjacent to surface waters (intermittent streams, perennial streams, lakes, ponds, and estuaries) in the Neuse River Basin. For more information about this riparian area rule, please contact the Division of Water Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946-6481. Sincerely, QL 9 cc r Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: Martie Murphy; TWAS Properties, LLC (email) Michael Letson, PE; PM Engineering, Inc. (email) WaRO Division of Water Resources (email) �D E�i North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 moan,CAJ ALMA Dowd/n.1°1 EnvInmatenLNa...F" 252.946.6481 PROJECT INFORMATION SHEET APPROVAL DATE: October 30, 2023 RESPONSIBLE PARTY: SHJ Development, LLC PROJECT NAME: Tidal Wave Auto Spa - Goldsboro COUNTY: Wayne NO.: Wayne-2024-014 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@deq.nc.gov GP-CIE Q-- ) North caroling Department of Environmental Quality i Division of Energy,Mineral and Land Resources Washington Regional OfFlce 1943 Washington Square Mall I Washington,North Carolina 27889 Moan i cnirouran �v�*^�^^+E. a t\ /'' 252.946.6481 ,CERTIFICATE OF PLAN ANt_ VAL f �4yi�7-.A.,1--,, O,1 sA 0„t' ' - 4z-,7 i • f)o j Wd n.'/ I i {: 1 � `t 1 Loi, flE' •-; ! .,.„[ram:,,„ 4 1' o[r, vN i The costing of this certif c:. to certifies that an erosion im d sedinnes eit .rtio,o co itroi pi... 5 has been approved for this project by the North Carolin : Department if E, Niro, P. entail Quality is' accirdance with North Car li a Ge i,er,..,fl Statute 113A — 57 (4) . nd 113A — 54 (d) (4) and North Carilina Ad inistr;.;tive Code, Title i5A, Chapter 44 .0107 (c). This certificate must be posted at the primary entrance of the j I site before constr,.ctiiun begins and until establishment of permanent groun e covers as required by North Carolina Ai ininistrative Code, Title 15A, Chapter 4 .0127 (b)0 • V1SCS • I (awl NI • etu A . . ( %JP( 10; Ma) - efitd $Vem Project Name a Ail Loc .F do � a 10f a ) 2 3 S...."•t &durItI,,}� Date of Pi.a y Apprivar I cg onal Engineer Ec` �/ ji Certificate of Coverage Number VI A Wi - :24 . 0%y