Loading...
HomeMy WebLinkAboutWQCS00153_BIMS Report_20231103Compliance Inspection Report Permit: WQCS00153 Effective: 05/01/18 Expiration: 04/30/26 Owner: Town of Norwood SOC: Effective: Expiration: Facility: Norwood Collection System County: Stanly PO Box 697 Region: Mooresville Contact Person: Heather Adams Title: Consultant Phone: 252-235-4900 Directions to Facility: System Classifications: CS2, Primary ORC: Joshua Powers Secondary ORC(s): On -Site Representative(s): Certification: 1011097 Phone:704-775-6128 Related Permits: NC0021628 Town of Norwood - Norwood WWTP Inspection Date: 11/02/2023 Entry Time 10:OOAM Primary Inspector: Tony Parker Secondary Inspector(s): Exit Time: 01:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions General Sewer & FOG Ordinances Capital Improvement Plan Map Reporting Requirements Inspections Spill Response Plan Spills Lines Manholes Pump Stations (See attachment summary) Page 1 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: Page 2 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Yes No NA NE Is there a properly designated primary ORC and at least one back-up of proper grade? ❑ ❑ ❑ Are logs being reviewed by the system management or owner on a regular basis? ❑ ❑ ❑ # What is that frequency? daily # Are there any issues being addressed currently or any in the planning stages? 0 ❑ ❑ ❑ Is there a specific pump failure plan available for all pump stations? ❑ ❑ ❑ Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? ❑ ❑ ❑ Are new/significantly upgraded pump stations equipped with anti -corrosion materials? ❑ ❑ ❑ Does the permittee have a copy of their permit? ❑ ❑ ❑ # Is permit expiring within the next 6 months? ❑ ❑ ❑ If Yes, has the Permittee applied for renewal? ❑ ❑ 0 ❑ Comment: The current permit expires 4/30/2026. Sewer and FOG Ordinances Yes No NA NE Is Sewer Use Ordinance (SUO) or other Legal Authority available? 0 ❑ ❑ ❑ Does it appear that the Sewer Use Ordinance is enforced? 0 ❑ ❑ ❑ Is there a Grease Control Program that legally requires grease control devices? 0 ❑ ❑ ❑ What is the standard grease trap cleaning requirement in the FOG ordinance? Annual Is Grease Control Program enforced via periodic inspections/records review? 0 ❑ ❑ ❑ Is action taken against violators? ❑ ❑ ❑ # Have satellite systems adopted an equivalent or more stringent ordinance? ❑ ❑ 0 ❑ Is grease/sewer education program documented with req'd customer distribution? 0 ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? 0 ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) The Town sends FOG info out 2/year and posts info on website. Comment: Capital Improvement Plan Yes No NA NE Has a Capital (CIP) or System Improvement Plan been developed and adopted? ❑ ❑ ❑ Is it designated for wastewater only or does it have a dedicated section? ❑ ❑ ❑ Does CIP cover three to five year period of earmarked improvements? ❑ ❑ ❑ Does CIP include description of project area? ❑ ❑ ❑ Does CIP include description of existing facilities? ❑ ❑ ❑ Does CIP include known deficiencies? ❑ ❑ ❑ Does CIP include forecasted future needs? 0 ❑ ❑ ❑ Comment: The Towns CIP program appears to be adequate for future needs. Numerous upgrades and improvements have been completed and ongoing events are planned. Page 3 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Map Yes No NA NE Is there a overall sewer system map? 0 ❑ ❑ ❑ Does the map include: Pipe Type (GS/FM) 0 ❑ ❑ ❑ Pipe sizes 0 ❑ ❑ ❑ Pipe materials (PVC, DIP, etc) 0 ❑ ❑ ❑ Pipe location 0 ❑ ❑ ❑ Flow direction 0 ❑ ❑ ❑ Approximate pipe age 0 ❑ ❑ ❑ Pump station ID, location and capacity 0 ❑ ❑ ❑ # Force main air release valve location & type 0 ❑ ❑ ❑ # Location of satellite connections 0 ❑ ❑ ❑ Is the map being updated for changes/additions within 1 year of activation? M ❑ ❑ ❑ Comment: The Town uses digital and paper maps Reporting Requirements Yes No NA NE # Have there been any sewer spills in the past 3 years? ❑ ❑ ❑ If Yes, were they reported to the Division if meeting the reportable criteria? ❑ ❑ ❑ If applicable, is there documentation of press releases and public notices issued? ❑ ❑ ❑ Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑ Is the report being made available to all its sewer customers? ❑ ❑ ❑ # How is it being made available? on request Comment: Inspections Yes No NA NE Are adequate maintenance records maintained? 0 ❑ ❑ ❑ Are pump stations being inspected at the required frequency? 0 ❑ ❑ ❑ # Is at least one complete functionality test conducted weekly per pump station? 0 ❑ ❑ ❑ Is there a system or plan in place to observe the entire system annually? 0 ❑ ❑ ❑ Is the annual inspection documented? 0 ❑ ❑ ❑ # Does the system have any high -priority lines/locations? ❑ ❑ ❑ Are inspections of HPL documented at least every 6 months? ❑ ❑ ❑ Are new lines being added to the HPL list when found or created? ❑ ❑ ❑ Comment: All activities were well documented. Spill Response Action Plan Yes No NA NE Is a Spill Response Action Plan available? 0 ❑ ❑ ❑ Is a Spill Response Action Plan available for all personnel? 0 ❑ ❑ ❑ Page 4 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include: 24-hour contact numbers ❑ ❑ ❑ Response time ❑ ❑ ❑ Equipment list and spare parts inventory ❑ ❑ ❑ Access to cleaning equipment ❑ ❑ ❑ Access to construction crews, contractors, and/or engineers ❑ ❑ ❑ Source of emergency funds ❑ ❑ ❑ Site sanitation and cleanup materials ❑ ❑ ❑ Post-overflow/spill assessment ❑ ❑ ❑ Does the Permittee appear to respond within 2 hours of first knowledge of a spill? ❑ ❑ ❑ Comment: No SSO's or spills reported for the review period. $pills Yes No NA NE Is system free of known points of bypass? ❑ ❑ ❑ If No, describe type of bypass and location Are all spills or sewer related issues/complaints documented? ❑ ❑ ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ ❑ ❑ # If Yes, is there a corrective action plan? ❑ ❑ 0 ❑ Comment: Lines/Right-of-Ways/Aerial Lines Yes No NA NE Please list the Lines/Right of Ways/Aerial Lines Inspected: Parker Circle aerial and outfall right-of-way. No issues noted and outfall and R/W were mowed, cleared and maintained. Are right-of-ways/easements maintained for full width for access by staff/equipment? ❑ ❑ ❑ ❑ If No, give details on temporary access: Is maintenance documented? ❑ ❑ ❑ Are gravity sewer cleaning records available? ❑ ❑ ❑ Has at least 10% of lines older than 5 yrs been cleaned annually? ❑ ❑ ❑ Were all areas/lines inspected free of issues? 0 ❑ ❑ ❑ Comment: The Town had cleaned 10% of their lines as required and documented same. Manholes Yes No NA NE Please list the Manholes Inspected: Numerous manholes inspected and no issues noted. Are manholes accessible? ❑ ❑ ❑ # Are manhole covers/vents above grade? ❑ ❑ ❑ Are manholes free of visible signs of overflow? ❑ ❑ ❑ Are manholes free of sinkholes and depressions? ❑ ❑ ❑ Are manhole covers present? ❑ ❑ ❑ Page 5 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine # Are manholes properly seated? 0 ❑ ❑ ❑ # Are manholes in good condition? 0 ❑ ❑ ❑ # Are inverts in good condition? 0 ❑ ❑ ❑ Is flow unrestricted in manholes? 0 ❑ ❑ ❑ Are manholes free of excessive amounts of grease? 0 ❑ ❑ ❑ Are manholes free of excessive roots? 0 ❑ ❑ ❑ Are manholes free of excessive sand? 0 ❑ ❑ ❑ Are manhole vents screened? 0 ❑ ❑ ❑ Are vents free of submergence? 0 ❑ ❑ ❑ Are manholes free of bypass structures or pipes? 0 ❑ ❑ ❑ Comment: No issues with manholes. Pump Stations Yes No NA NE Please list the Pump Stations Inspected: P/S's #'s 1, 5, 7 & 8. No issues noted with P/S's. # Number of duplex or larger pump stations in system 15 # Number of vacuum stations in system 0 # Number of simplex pump stations in system 50 # Number of simplex pump stations in system serving more than one building 0 How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? 15 # A simple one-way telemetry/communication system (auto -dialer) installed? 0 For pump stations inspected: Are they secure with restricted access? 0 ❑ ❑ ❑ Were they free of by-pass structures/pipes? 0 ❑ ❑ ❑ Were wet wells free of excessive grease/debris? 0 ❑ ❑ ❑ # Do they all have telemetry installed? ❑ ❑ 0 ❑ Is the communication system functional? 0 ❑ ❑ ❑ Is a 24-hour notification sign posted ? 0 ❑ ❑ ❑ Does the sign include Owner Name? 0 ❑ ❑ ❑ Pump station identifier? 0 ❑ ❑ ❑ # Address? 0 ❑ ❑ ❑ Instructions for notification? 0 ❑ ❑ ❑ 24-hour emergency contact numbers? 0 ❑ ❑ ❑ Are audio and visual alarms present? 0 ❑ ❑ ❑ Are audio and visual alarms operable? 0 ❑ ❑ ❑ Page 6 of 7 Permit: WQCS00153 Owner - Facility: Town of Norwood Inspection Date: 11/02/2023 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine # Is there a backup generator or bypass pump connected? If tested during inspection, did it function properly? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? # Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? The Town relies on 11 on -site dedicated generators and 1 portable generator and 1 portable by-pass pump. # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? Inspecting and exercising all valves? Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? Comment: The pump stations inspected were well operated, maintained & documented. • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 7 of 7