Loading...
HomeMy WebLinkAboutNCC233273_Site Plan or Location Map_20231102 0\I 1111 11111/l,,/ PRELIMINARY MAJOR SITE PLAN .s.,;,,,,.., ..•p s.. - _ 6i SEAL =_ 27370 = 9j'F.NGINEE��:�PJ� SANDHILLS GATEWAY 09/27/2023 E 2321 GILLIS HILL ROAD, FAYETTEVILLE, NORTH CAROLINA 28304 = CUMBERLAND COUNTY ~ ',T,'3 _ LTC oW-Q O o O Z Z Sheet Number Sheet Title C7.10 NOTES AND DETAILS d u I LU LU z W..- n 0 0 CO.0 COVER SHEET L1.0 OVERALL LANDSCAPE PLAN L a_ U O O 3< x1 w UU EXISTING CONDITIONS&DEMO PLAN PRIOR TO NCDOT L1.1 LANDSCAPE PLAN-INSET 1 LL p C1.0 IMPROVEMENTS in 2 a O L,L,L1.2 LANDSCAPE PLAN-INSET 2 EXISTING CONDITIONS AFTER NCDOT TIP NO.44369.1.1 C1.1 IMPROVEMENTS L1.3 LANDSCAPE PLAN-INSET 3 ~ cs. j U U OWNER: DEVELOPER: CIVIL ENGINEER: SURVEYOR: C2�1 OVERALL PLAN ELL SITE PLAN OPEN SPACE L1.5 LANDSCAPE PLAN-INSET 4 LANDSCAPE PLAN-INSET 5 � Li r"e 1 ic i C2.1 SITE PLAN-INSET 1 L1.6 LANDSCAPE PLAN-INSET 6 DAN T. BARKER, JR. JEFF SURRENCY TIMMONS GROUP REGIONAL LAND C2.2 SITE PLAN-INSET2 L1.7 LANDSCAPE PLAN-INSET7 ui DTBARKER@BELLSOUTH.NET EXECUTIVE VICE-PRESIDENT OF 5410 TRINITY ROAD, SUITE 102 SURVEYORS, INC. C2.3 SITE PLAN-INSET3 L2.0 LANDSCAPE NOTES AND DETAILS o BARKER PARTNERS, LLC DEVELOPMENT RALEIGH, NC 27607 KIM R. LILLY, PLS C2.4 SITE PLAN-INSET4 WLS-18402A LIGHTING PLAN C2.5 SITE PLAN-INSET 5 R1.00 COVER SHEET p 30 LANDS END DRIVE JSURRENCY@THEMORGANCOS.COM 8624 WEST MARKET STREET C2.6 SITE PLAN-INSET6 R200 GENERAL NOTES,ALIGNMENT DATA&CONVENTIONAL F GREENSBORO, NC 27408 THE MORGAN COMPANIES PROJECT MANAGER: SUITE 100 SYMBOLS o MM C2.7 SITE PLAN-INSET 7 w o 0 R2.01 TYPICAL SECTIONS CELL: 336-314-1880 4521 SHARON ROAD PATRICK BARBEAU, PE GREENSBORO, NC 27409 C2.6 PAVING PLAN a R4.01 EXISTING CONDITIONS AND PLAN SHEET U p C3.0 OVERALL GRADING AND DRAINAGE PLAN z o 0 OFFICE: 336-275-7655 SUITE 275 PATRICK.BARBEAU@TIMMONS.COM 336-665-8155 ext. 103 c3.1 GRADING AND DRAINAGE PLAN-INSET1 R4.02 GRADING AND ROADWAY PROFILE o R5.01 EXISTING CONDITIONS AND PLAN SHEET 5 DATE PH: 919-995-1259 CHARLOTTE, NC 28211 PH: (919) 866-4512 C3.2 GRADING AND DRAINAGE PLAN-INSET 2 R5.02 GRADING AND ROADWAY PROFILE o D 08/22/2022 FAX: 336-275-2733 704-909-4502 C3.3 GRADING AND DRAINAGE PLAN-INSET 3 R6.01 EXISTING CONDITIONS AND PLAN SHEET DRAWN BY C3.4 GRADING AND DRAINAGE PLAN-INSET 4 R6.02 GRADING AND ROADWAY PROFILE 332 C3.5 GRADING AND DRAINAGE PLAN-INSET 5 R7.01 EXISTING CONDITIONS AND PLAN SHEET C3.6 GRADING AND DRAINAGE PLAN-INSET 6 DESIGNED BY R7.02 GRADING AND ROADWAY PROFILE C3.7 GRADING AND DRAINAGE PLAN-INSET 7 • P.BARBEAU R8.01 EXISTING CONDITIONS AND PLAN SHEET C3.8 STORM SEWER TABLES • CHECKED BY R8.02 GRADING AND ROADWAY PROFILE C3.9 SCM DETAILS R9.01 EXISTING CONDITIONS AND PLAN SHEET P.BARBEAU C3.10 SCM DETAILS • • R9.02 GRADING AND ROADWAY PROFILE SCALE SITE PLAN SUMMARY C4.0 OVERALL EROSION CONTROL PLAN-PHASE I R10.01 EXISTING CONDITIONS AND PLAN SHEET • AS SHOWN C4.1 EROSION CONTROL PLAN-PHASE I-INSET 1 PROJECT: SANDHILLS GATEWAY R10.02 GRADING AND ROADWAY PROFILE • C4.2 EROSION CONTROL PLAN-PHASE I-INSET 2 OWNERS: BARKER PARTNERS,LLC R11.01 EXISTING CONDITIONS AND PLAN SHEET • _ C4.3 EROSION CONTROL PLAN-PHASE I I.INSET 3 - R11.02 GRADING AND ROADWAY PROFILE PROJECT ADDRESS: �-� ✓��:�;,;�('1;������ ►,�, I C4.4 EROSION CONTROL PLAN-PHASE I-INSET 4II PIN#: 9486-34-9273 ' ��� �i� �:= R15.01 CROSS SECTION SHEET-US 401 EB DEED BOOK 8580,PAGES 254,257,260,263 IN CUMBERLAND , �; ��1, C4.5 EROSION CONTROL PLAN-PHASE I-INSET 5 DEED: "Wier_ ,I I C4.6 EROSION CONTROL PLAN-PHASE I I.INSET 6 R15.02 CROSS SECTION SHEET-US 401 EB COUNTY REGISTER OF DEEDS �� I �j� R15.03 CROSS SECTION SHEET-US 401 EB ZONING: CC-COMMUNITY COMMERCIAL 'I • _ _ -�.I�1�I,��•_ C4.7 EROSION CONTROL PLAN-PHASE I-INSET 7 OEXISTING USE: VACANT R15.04 CROSS SECTION SHEET-US 401 EB . 1111. C4.9 OVERALL EROSION CONTROL PLAN-PHASE II Tg PROPOSED USE: RETAIL SHOPPING CENTER \ 1,1i �� R15.05 CROSS SECTION SHEET-US 401 EB \ C4.10 EROSION CONTROL PLAN-PHASE II-INSET 1 NOT LOCATED IN FLOOD HAZARDS AREA PER FEMA MAP Aged ,, `1„� i '_- - R15.06 CROSS SECTION SHEET-US 401 WB FLOOD ZONE: - #3710948600J(EFFECTIVE 01/05/2007) , I Jr , C4.11 EROSION CONTROL PLAN-PHASE II-INSET 2 TOTAL TRAEXISTING4g.45 AC '�_ �•.� �'' S�pEF_RO�O lU5�p11 C4.12 EROSION CONTROL PLAN-PHASE II-INSET 3 R15.07 CROSS SECTION SHEET-US 401 WB R15.08 CROSS SECTION SHEET-US 401 WB �y PROPOSED TRACT �. •. e� C4.13 EROSION CONTROL PLAN-PHASE II-INSET 4 - 38.25 AC ' R15.09 CROSS SECTION SHEET-GILLIS HILL ROAD Q AREA: �,���/ ,. C4.14 EROSION CONTROL PLAN-PHASE II-INSET 5 O N Z 8 ��� ,` / I R15.10 CROSS SECTION SHEET-GILLIS HILL ROAD Lfl e DISTURBED AREA: 43.00 AC i�I ... (, 6C4.15 EROSION CONTROL PLAN-PHASE II-INSET 6 tp O /Y��' SITE R15.11 CROSS SECTION SHEET-GILLIS HILL ROAD Q d' EXISTING Cq- C4.16 EROSION CONTROL PLAN-PHASE II-INSET 7 - , U IMPERVIOUS 0.85 AC �e R15.12 CROSS SECTION SHEET-SITE ACCESS o SURFACE AREA: -- _____ , C5.0 OVERALL UTILITY PLAN - U _ ` MAX ALLOWED LOT /, \ -n . C5.1 UTILITY PLAN-INSET 1 R15.13 CROSS SECTION SHEET-SITE ACCESS 0 w & COVERAGE: 65%(24.86 AC) •• c ,`� a R15.14 CROSS SECTION SHEET-SITE ACCESS O A I Z C5.2 UTILITY PLAN-INSET 2 Z Z 1 OUTPARCEL#1:0.06 AC `,� 'ter m R15.15 CROSS SECTION SHEET-SITE ACCESS W w OUTPARCEL#2:0.05 AC C5.3 UTILITY PLAN-INSET 3t121 Z w a m I R15.16 CROSS SECTION SHEET-SITE ACCESS U) ° a OUTPARCEL#3:0.14 AC "" -' °' C5.4 UTILITY PLAN-INSET 4 Z PROPOSED LOT / ` COVERAGE OUTPARCEL#4:0.23 AC �_, I R15.17 CROSS SECTION SHEET-SITE ACCESS °i OUTPARCEL#5:0.28 AC C5.5 UTILITY PLAN-INSET 5 - W O (n & (BUILDING ONLY PER I ZA.01 TRC INLINE ELEVATIONS(7505-7541) U U _ OUTPARCEL#6:0.14 AC C5.6 UTILITY PLAN-INSET 6 ` FAYETTEVILLE UDO I __ --� - J O v OUTPARCEL#7:0.20 AC _-� ZA.02 TRC OUTPARCELS 3-5 ELEVATIONS(7581-7551) Z - JR BOX RETAIL:3.57 AC I / C5.7 UTILITY PLAN-INSET 7 Q J ZA.03 TRC OUTPARCELS 1-2 ELEVATIONS(7595-7585) z > C5.8 FIRE HOSE PULL PLAN 1 ° TOTAL LOT COVERAGE(BUILDING ONLY):4.67 AC(12%) III ZA.04 TRC SITE SECTIONS LinJ J m a C6.0 OVERALL DRY UTILITY PLAN - �1 U $ JR BOX RETAIL ZA.05 TRC SITE SECTIONS REFERENCES O ari VEHICLE PARKING 1 SPACE PER 350 SQ FT OF GROSS FLOOR AREA C6.1 DRY UTILITY PLAN-INSET 1 CC U " 155,583 SQ FT/350 SQ FT=445 SPACES REQUIRED VICINITY MAP a SUMMARY: 733 SPACES PROVIDED C6.2 DRY UTILITY PLAN-INSET 2 Q Q ' REQUIRED/PROVIDED U w ri > OUTPARCEL#1 " � 2,495 SF TOTAL 1 n = 1000I C6.3 DRY UTILITY PLAN-INSET 3 = Z �-" , E VEHICLE PARKING 1 SPACE PER 300 SF C6.4 DRY UTILITY PLAN-INSET 4 z w A SUMMARY: 9 SPACES REQUIRED a 8 m REQUIRED/PROVIDED 32 SPACES PROVIDED C6.5 DRY UTILITY PLAN-INSET 5 0 O V, /^ OUTPARCEL#2 2,400 SF TOTAL C6.6 DRY UTILITY PLAN-INSET 6 = w VEHICLE PARKING SUMMARY: 1 SPACE PER 300 SF PROPOSED IMPERVIOUS SUMMARY C6.7 DRY UTILITY PLAN-INSET 7 tL d 8 SPACES REQUIRED EXISTING E GENERAL NOTE REQUIRED/PROVIDED 23 SPACES PROVIDED IMPERVIOUS 0.85 AC C7.0 NOTES AND DETAILS 3 =s 9 OUTPARCEL#3 6,363 SF TOTAL SURFACE AREA: u 1. ALL CONTRACTORS SHALL VISIT THE PROJECT TO FAMILIARIZE THEMSELVES WITH SITE C7.1 NOTES AND DETAILS VEHICLE PARKING 1 SPACE PER 300 SF PROPOSED ONSITEX ° SUMMARY: 22 SPACES REQUIRED IMPERVIOUS 26.27 AC(INCLUDES 1.95 AC FUTURE IMPERVIOUS) CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION.BY SUBMITTING A BID,THE C7.2 NOTES AND DETAILS a 3 LL REQUIRED/PROVIDED 34 SPACES PROVIDED CONTRACTOR AND HIS SUBCONTRACTORS ARE CONFIRMING THAT THEY HAVE VISITED 1THE SITE AND HAVE INCLUDED IN THEIR BID ANY ADDITIONAL ITEMS OF CONSTRUCTION = SURFACE AREA: C7.3 NOTES AND DETAILS _1 OUTPARCEL#4 9,844 SF TOTAL PROPOSED OFFSITE THAT MAY BE REQUIRED DUE TO EXISTING SITE CONDITIONS. C7.4 NOTES AND DETAILS _ Ip VEHICLE PARKING 1 SPACE PER 300 SF IMPERVIOUS 3.37 AC 2.REVISIONS TO PLANS SHALL REQUIRE RESUBMISSION FOR REVIEW/APPROVAL. _ I SUMMARY: 33 SPACES REQUIRED SURFACE AREA 3. ANY FUTURE DEVELOPMENT SHALL BE SUBMITTED FOR REVIEW/APPROVAL. C7.5 NOTES AND DETAILS S REQUIRED/PROVIDED 46 SPACES PROVIDED OUTPARCEL#1:0.69 AC(INCL.0.06 AC FUTURE) 4.THE DEVELOPER SHALL BE AWARE THAT SUBSEQUENT APPLICATION FOR ZONING AND % OUTPARCEL#5 12,183 SF TOTAL OUTPARCEL#2:0.52 AC(INCL.0.05 AC FUTURE) BUILDING PERMITS CONSTITUTES THE DEVELOPERS UNDERSTANDING AND C7.6 NOTES AND DETAILS 8 VEHICLE PARKING 1 SPACE PER 300 SF OUTPARCEL#3:0.70 AC(INCL.0.06 AC FUTURE) ACCEPTANCE OF THESE COMMENTS. C7.7 NOTES AND DETAILS 0 " MAX IMPERVIOUS ( ) C7.8 NOTES AND DETAILS - SUMMARY: 41 SPACES REQUIRED OUTPARCEL#4:1.07 AC INCL.0.1 AC FUTURE �' E. REQUIRED/PROVIDED 58 SPACES PROVIDED ALLOWANCE PER OUTPARCEL#5:1.33 AC(INCL.0.12 AC FUTURE) A a ci OUTPARCEL#7 7,998 SF TOTAL PARCEL(BUILDING& OUTPARCEL#6:1.77 AC(0.16 AC FUTURE) C7.9 NOTES AND DETAILS °_ PARKING) JOB NO. VEHICLE PARKING 1 SPACE PER 300 SF OUTPARCEL#7:2.02 AC(0.18 AC FUTURE) 2` e SUMMARY: 27 SPACES REQUIRED OUTPARCEL#8:1.23 AC(ENTIRE BUILDABLE AREA) 41035.008=? M REQUIRED/PROVIDED 179 SPACES PROVIDED JR BOX RETAIL:16.94 AC(INCL.1.22 AC FUTURE) (PRELIMINARY-NOT RELEASED FOR CONSTRUCTION 5 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF FAYETTEVILLE, SHEET No. _P. 5' NCDEQ,AND NCDOT STANDARDS,SPECIFICATIONS,AND DETAILS CO.O F.E L