Loading...
HomeMy WebLinkAboutNC0086690_Permit Modification_20120208ALT,M� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary February 8, 2012 Mr. Thomas J. Roberts Aqua North Carolina, Inc. 202 MacKenan Ct Cary, N.C. 27511 Subject: Modification of NPDES Permit NC0086690 Stansted Subdivision Well #2 WTP Wake County Dear Mr. Roberts: The Division has reviewed the modification request you submitted on January 27, 2012. The Division has no objection to your request. This modification is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This modified permit includes the following changes from your current permit: ➢ The Flow limit has been deleted. ➢ Monitoring for Total Iron has been reduced to Quarterly. If any parts, measurement frequencies or sampling requirements contained in this modification are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. This permit is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division or permits required by the Division of Land Resources, the Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this matter, please contact Charles H. Weaver at (919) 807-6391 or via e-mail [charles.weaverpncdenr.gov]. S' cer y, hazles Waluld, P.E. cc: Central Files Raleigh Regional Office / Surface Water Protection NPDES Unit i 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 North Salisbury Street, Raleigh, North Carolina 27604 Phone: 919 807-6300 / FAX 919 807-6495 / Internet: www.ncwaterquality.org An Equal Opportunity/Atrirmative Action Employer —50% Recyded/l0% Post Consumer Paper No�rthCarolina Naturldy Permit NCO086690 A. (1) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning on February 1, 2012 and lasting until expiration, the Permittee is authorized to discharge from outfall 001. Such discharges shall be limited and monitored by the Permittee as specified below for each outfall: LJ11`5 IA Yrx �r *NTR)f,G >. UFEI�lENTS -PARAMETER .F Y Monthly xy :EPOS Code] Fl ow Monthly Estimate Effluent [50050 ] Total Suspended Solids (TSS) 30.0 mg/L 45.0 mg/L 2/Month Grab Effluent [00310] Total Iron (Ng/L) Quarterly Grab Effluent [01045] Total Residual Chlorine (TRC) 2 17 Ng/L 2/Month Grab Effluent [50060] pH > 6.0 and < 9.0 standard units 2/Month Grab Effluent [00400] — — Nitrate/Nitrite Nitrogen Monitor & Report (mg/L) Semi-annually Grab Effluent (NO2 - N + NO3- N) [00630] Total Kjeldahl Nitrogen (TKN) Monitor & Report (mg/L) Semi-annually Grab Effluent [00625] Total Nitrogen (TN) 3 Monitor & Report (mg/L) Semi-annually Calculated Effluent [00600] Total Phosphorus (TP) Monitor & Report (mg/L) Semi-annually Grab Effluent [00665] Footnotes: 1. Daily flow estimates are determined by the number and duration of backwash/rinse events. 2. Limit and monitoring requirements apply only if chlorine or a chlorine derivative is used for disinfection. The facility shall report all effluent TRC values reported by a NC certified laboratory including field certified. However, effluent values below 50 µg/ L will be treated as zero for compliance purposes. 3. For a given wastewater sample, TN = (NO2-N + NO3-N) + TKN, where TN is Total Nitrogen, (NO2-N + NO3-N) is Nitrite/ Nitrate Nitrogen, and TKN is Total Kjeldahl Nitrogen. All samples collected should be from a representative discharge event. There shall be no discharge of floating solids or visible foam in other than trace amounts. AO UA_ January 25, 2012 Mr. Tom Belnick Tom.belnick@ncdenr.gov NPDES Unit Supervisor NCDENR 1601 Mail Service Center Raleigh, NC 27699-1601 RE: NPDES Permit NCO086690 Stansted Subdivision Well #2 WTP Dear Mr. Belnick, Aqua North Carolina, Inc. Thomas J. Roberts 202 MacKenan Court President and Chief Operating Officer Cary, NC 27511 T: 919.653.5770 F: 919.460.1788 tiroberts@aquaamerica.com www.aq u a north ca rol i na.com - -- - - i- ----- JAN 2 7 2012 In accordance with the attached Changes to Water Treatment Plant Strategy (October 2009), Aqua North Carolina, Inc. (Aqua) requests the following permit modifications be made to NPDES Permit NCO086690: Remove flow limits as noted in Chances to Water Treatment Plant Strategy (October 2009), item I. When this permit was initially issued, there were no flow limits. However, when the permit was renewed in 2008 a flow limit of 0.0025 MGD was instituted. Due to changing raw water quality, requiring more frequent backwash requirements, Aqua North Carolina, Inc. respectfully requests that this flow limit be removed. • Change the total iron monitoring requirement from monthly to quarterly monitoring requirement as noted in Changes to Water Treatment Plant Strategy (October 2009), item III. Thank you very much for your consideration in this matter. If you need any further information from me, please don't hesitate to contact me. Si r y, Thomas J. R/COO President an !ms Attachments cc: Central Operations Supervisor Stansted WTP File An Aqua America Company