HomeMy WebLinkAboutWQ0003226_2022 Annual Report Review_20231030
North Carolina Department of Environmental Quality Division of Water Resources
Raleigh Regional Office 3800 Barrett Drive Raleigh, North Carolina 27609
919.791.4200
October 30, 2023
Hank Raper – Town Manager
Town of Siler City
P. O. Box 769
Siler City, NC 27344
Subject: Annual Report Review
Permit No. WQ0003226
Town of Siler City
Chatham County
Hank Raper,
The 2022 Residuals Annual Report for the Town of Siler City Class B Residuals Land
Application program was reviewed by WQROS staff on October 30, 2023. The report was
received on February 23, 2023. A signed certification form was submitted and indicated
compliance. The report was compiled and submitted by Synagro. Synagro hauls and applies
all the Wastewater Treatment Plant (WWTP) and Water Treatment Plant (WTP) residuals
generated under this permit.
In 2022, Synagro collected and distributed approximately 121.68 dry tons of
residuals sourced from facilities listed in Attachment A of the permit to 3 fields listed in
Attachment B of the permit comprising 102.20 acres.
Metals and Nutrients analyses were completed as required with no exceedances of
limits. TCLP analyses were completed as required by permit conditions. Pathogen and
Vector Attraction reduction was conducted as required by the permit.
The report was received on time and in the proper format. At the time of the report
review the facility appeared compliant with the annual report requirement.
Sincerely,
Vanessa E. Manuel
Assistant Regional Supervisor
Water Quality Regional Operations Raleigh Regional Office
cc: Laserfiche
DocuSign Envelope ID: 1289995D-D3C6-4FAE-8055-D376C5D20A47
Compliance Inspection Report
Permit:WQ0003226 Effective:02/18/22 Expiration:06/30/28 Owner :Town of Siler City
SOC:
Contact Person:
Region:
County:
Directions to Facility:
Chatham
Raleigh
Chris McCorquodale
Effective:Expiration:Facility:Town of Siler City Class B Residuals Program
370 Waste Treatment Plant Rd
Siler City NC 27344
Title:Phone:919-742-4732
Highway 64 west towards Siler City. Left on Wastewater Treatment Plant Rd, just before intersection with Highway 421.
Secondary ORC(s):
Phone:Certification:Primary ORC:
LA,System Classifications:
On-Site Representative(s):
Related Permits:
NC0026441 Town of Siler City - Siler City WWTP
Secondary Inspector(s):
Primary Inspector:
Inspection Date:Exit Time:Entry Time:
Phone:
10/30/2023 12:00PM 12:00PM
Chris Smith 919-791-4200
Facility Status:
Permit Inspection Type:
Reason for Inspection:Inspection Type:
Not CompliantCompliant
Routine
Land Application of Residual Solids (503)
Annual Report Review
Question Areas:
Miscellaneous Questions
(See attachment summary)
Page 1 of 3
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0003226
10/30/2023 Annual Report Review
Town of Siler City
Routine
Inspection Summary:
The 2022 Residuals Annual Report for the Town of Siler City Class B Residuals Land Application program was reviewed by
WQROS staff on October 30, 2023. The report was received on February 23, 2023. A signed certification form was submitted
and indicated compliance. The report was compiled and submitted by Synagro. Synagro hauls and applies all the
Wastewater Treatment Plant (WWTP) and Water Treatment Plant (WTP) residuals generated under this permit.
In 2022, Synagro collected and distributed approximately 121.68 dry tons of residuals sourced from facilities listed in
Attachment A of the permit to 3 fields listed in Attachment B of the permit comprising 102.20 acres.
Metals and Nutrients analyses were completed as required with no exceedances of limits. TCLP analyses were completed
as required by permit conditions. Pathogen and Vector Attraction reduction was conducted as required by the permit.
The report was received on time and in the proper format. At the time of the report review the facility appeared compliant with
the annual report requirement.
Page 2 of 3
Inspection Date:
Permit:
Inspection Type :
Owner - Facility:
Reason for Visit:
WQ0003226
10/30/2023 Annual Report Review
Town of Siler City
Routine
Page 3 of 3