HomeMy WebLinkAboutNCC191689_NOT Closeout Documents_20231030 TOWN OF FUQUAY-VARINA SEDIMENT AND EROSION CONTROL INSPECTION REPORT FU QUAY-VAR INI Town of Fuquay-Varina Town Hall 134 North Main Street Fuquay-Varina, NC 27526 Project:Woodland Springs Lots EC Permit No: EC-2019-30 River basin: Cape Fear Disturbed Acreage: 3.88 Permit Issue Date: 8/21/2019 Permit Expiration Date: 8/21/2021 Covid 19 Expiration Date: TBD Person financially responsible: John Nance Phone: 919-880-2829 Email:jonance@carushomes.com Address: 206 High House Road, Suite 205 Cary, NC 27513 1. Pictures: No: ® Yes: ❑ Video: ❑ Digital: ❑ 2. Weather and soil conditions: Cloudy/Dry,Workable First inspection:Yes: ❑ No: ❑ 3. Is site currently under notice of violation? Yes: ❑ No: 4. Is the site in compliance with S.P.C.A.and rules? Yes: ❑ No: ® If no, check violations below: 5. Violations: ❑ a. No approved plan, G.S. 113A-57 (4)and 15A N.C.A.0 4B.0107(c) LDO§9-1407(a)(4)(D) ❑ b. Failure to follow approved plan, G.S. 113A-57(5)LDO§9-1407(b)(1)(H) ❑ c. Failure to submit revised plan, G.S. 113A-54.1(b)and 15A N.C.A.C.4B.0118(a) LDO§9-1407(c)(9) ❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3)and 15A N.C.A.C.4B.0107(b)or 15A N.C.A.C.46.0124(e) LDO§9-1407(b)(1)(G) ❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)LDO§9-1407 ❑f. Failure to take all reasonable measures, 15A N.C.A.C.4B.0105 LDO§9-1407 ❑ g. Inadequate buffer zone, G.S 113A-57(1) LDO§9-1407 (b)(1)(C) El h. Graded slopes and fills too steep G.S. 113A-57(2)or 15A N.C.A.C.4B.0124(e) LDO§9-1407(b)(1)(E) ❑ i. Unprotected exposed slopes, G.S. 113A-57(2) LDO§9-1407 (b)(1)(G) ❑j. Failure to install and maintain measures, 15A N.C.A.C. 4B.0113 LDO§9-1407 ❑ k. Failure to self-inspect G.S. 113A-54.1(e)and 15A N.C.A.C.4B.0131 LDO§9-1407 (e)(1) ❑ I. Potential NPDES violation. NCG 010000 and LDO§9-1407 (e)(1) 6. Has sedimentation damage occurred since last inspection or at 1st inspection? Yes: ❑ If yes,where? (check all that apply) No: Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑ Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑ moderate: ❑ severe: ❑ 7. Contact made with (name): Josh Nance Title: President Inspection report given:❑ or sent: ® to person financially responsible. Date given/sent: 5/16/2022 8. Comments: Inspector was on site to conduct a final SEC inspection on the following Lots all have permanent grass sod in place.All groundcover looks good enough to close out this permit. Last Updated July 2020 TOWN OF FUQUAY-VARINA SEDIMENT AND EROSION CONTROL INSPECTION REPORT FUQUAY-VARlNA Town of Fuquay-Varina Town Hall 134 North Main Street Fuquay-Varina, NC 27526 9. Corrective actions needed for S.P.C.A.and rules: ❑ a.Submit an approvable sedimentation and erosion control plan, including appropriate review fee, covering all areas disturbed or to be disturbed. ❑ b. Follow approved plan requirements in regard to sequencing, measure installation, maintenance requirements etc. 111c. Submit a revised sedimentation and erosion control plan. ❑ d. Provide adequate permanent ground cover on all areas where development has been completed for 90 days. Please note that merely planting grass seed does not satisfy the requirements of"vegetative cover"or of"ground cover sufficient to restrain erosion." These requirements are not satisfied until an adequate cover of grass or other ground cover(such as properly applied and secured, mulched seeding or appropriate rip-rap)is established which is, in fact, sufficient to restrain accelerated or man-made erosion. ❑ e. Provide additional erosion and sediment control measures required to sufficiently to retain sediment on the tract. Elf. Install and/or maintain measures to protect public and private property. ❑ g. Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25% of the buffer nearer the land disturbance using natural or artificial means. ❑ h. Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established. ❑ i. Provide temporary or permanent ground cover, devices, or structures sufficient to restrain erosion within up to 21 calendar days of completion of any phase of grading. ❑j. Install and/or maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. Elk. Perform inspections of the area covered by the plan after each phase has been completed and after establishment of temporary ground cover as required by land disturbance permit. 9.Additional Corrective Actions: 10. For Final Inspections Only: El Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self- inspections are required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated. This one would be for projects permitted prior to April 1, 2019. n Permanent ground cover sufficient to restrain erosion has been established. No additional self-inspection or monitoring is required and the project is released. If this project has a Certificate of Coverage(COC)under the NCGO1 permit,then complete the electronic Notice of Intent(eNOT)form at deq.nc.gov/NCG01. Deadline for Compliance is Report by: Howard Bishop Jr. Others present: Date of inspection: 5/13/2022 Estimated Time on site: 30 rains 2IPage Last Updated July 2020