Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20230422 Ver 1_R5808_Wetland_Impact_Summary_Form_rev10.30.2023_20231030
Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 24+45 / 24+74 2@14'x7' RCBC (Buried 1') 0.04 23 -L- 24+45 / 24+74 BANK STABILIZATION 0.03 0.02 41 16 -L- 21+88 / 26+97 WETLAND WA 0.25 < 0.01 0.15 2 -L- 44+47 / 151+51 WETLAND WB 4.93 2.42 3 -L- 167+42 / 186+61 (RT) WETLAND WC 1.07 0.43 4 -L- 218+17 / 234+00 (RT) WETLAND WD 0.40 0.35 5 -L- 65+17 / 130+26 (LT) WETLAND WG 0.37 6 -L- 130+26 / 222+43 (LT) NEWLAND DRAINAGE CANAL 0.25 0.36 TOTALS*: 7.02 < 0.01 3.35 0.32 0.38 64 16 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 54 OF 54 WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS GATES COUNTY R-5808 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 10/30/2023