Loading...
HomeMy WebLinkAbout20230422 Ver 1_R5808_Wetland_Impact_Summary_Form_rev10.30.2023_20231030Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 24+45 / 24+74 2@14'x7' RCBC (Buried 1') 0.04 23 -L- 24+45 / 24+74 BANK STABILIZATION 0.03 0.02 41 16 -L- 21+88 / 26+97 WETLAND WA 0.25 < 0.01 0.15 2 -L- 44+47 / 151+51 WETLAND WB 4.93 2.42 3 -L- 167+42 / 186+61 (RT) WETLAND WC 1.07 0.43 4 -L- 218+17 / 234+00 (RT) WETLAND WD 0.40 0.35 5 -L- 65+17 / 130+26 (LT) WETLAND WG 0.37 6 -L- 130+26 / 222+43 (LT) NEWLAND DRAINAGE CANAL 0.25 0.36 TOTALS*: 7.02 < 0.01 3.35 0.32 0.38 64 16 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 54 OF 54 WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS GATES COUNTY R-5808 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 10/30/2023