HomeMy WebLinkAbout20230422 Ver 1_More Info Received_20231030Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID#* Version* 1
20230422
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and
Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel,
petroleum, or electricity?*
Yes No
Is this project a public transportation project?* Yes No
Is this a DOT Yes No
project? *
Reviewer List: * Garcy Ward:garcy.ward
Select Reviewing Office: * Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Pre -Filing Meeting Date Request was submitted on:
Is this supplemental information that needs to be sent to the Corps?*
Yes No
Project Contact Information
Name: Paul Williams
Who is submitting the information?
Email Address: pcwilliams2@ncdot.gov
Project Information
Existing ID #:
20230422
20170001(no dashes)
Existing Version:
1
1
Project Name: R-5808 - US 158 Improvements in Gates County
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
Is this project connected with ARPA funding?
Yes No
TIP#: WBS#:
R-5808 46972.1.1
(Applies to DOT projects only)
County (ies)
Gates
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
R5808_Wetland_lmpact_Summary_Form_rev10.3... 73.68KB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
The design firm for this R-5808 project had a discrepancy with the shoulder width in the vicinity of the double
barreled RCBC at Site 1 on the project. To make a consistent shoulder, the culvert needs to be lengthened a
couple of feet. This would result in the following impacts, all as shown on the attached revised impacts table.
Increase in culvert impacts (permanent loss of water) from 21 LF to 23 LF (negligible surface area changes)
Increase in bank stabilization impacts (permanent no -loss of water) from 39 LF to 41 LF (negligible surface
area changes)
- Decrease in temporary stream impacts from 23 LF to 16 LF (0.03 ac to 0.02 ac)
Sign and Submit
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
I intend to electronically sign and submit the online form.
Signature:
Submittal Date: 10/30/2023
Is filled in automatically.