Loading...
HomeMy WebLinkAboutNCC221914_NOT Closeout Documents_20231027 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094 (910)433-3300 County: Sampson Project: Sampson Southeast Business Center River basin: Cape Fear Person financially responsible:Barnhill Contracting Company-James Project#: SAMPS-2022-014 Partington,IV,Vice President NCC221914 Address: PO Box 7948,Rocky Mount,NC 27804 1. Project Location: Industrial Drive,Clinton Pictures: No 2. Weather and soil conditions: Dry,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Lance Bullard Title: Project Manager Inspection report: Sent Report Date given/sent: October 27,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG010000)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Evangelyn Lowery-Jacobs Others present: Melissa Joyner Date of inspection: October 25,2023 Time arriving on site: 9:15 AM Time leaving site: 9:32 AM cc: Lance Bullard;Bruce Taylor;Willie Holmes