HomeMy WebLinkAboutNCC221914_NOT Closeout Documents_20231027 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094
(910)433-3300
County: Sampson Project: Sampson Southeast Business Center River basin: Cape Fear
Person financially responsible:Barnhill Contracting Company-James Project#: SAMPS-2022-014
Partington,IV,Vice President NCC221914
Address: PO Box 7948,Rocky Mount,NC 27804
1. Project Location: Industrial Drive,Clinton
Pictures: No
2. Weather and soil conditions: Dry,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Lance Bullard Title: Project Manager
Inspection report: Sent Report Date given/sent: October 27,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG010000)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Evangelyn Lowery-Jacobs Others present: Melissa Joyner
Date of inspection: October 25,2023 Time arriving on site: 9:15 AM Time leaving site: 9:32 AM
cc: Lance Bullard;Bruce Taylor;Willie Holmes