HomeMy WebLinkAboutNCC211962_MODIFICATION Supporting Documents_20231030 Jeremy McCall
From: Kent Wall <kentw@cityofws.org>
Sent: Monday, October 30, 2023 11:53 AM
To: Jeremy McCall
Cc: Mike Adams;Vince Townsend
Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon
Jeremy, please use approval email below:
City of
di WINSTON-SALEM
NORTH CAROLINA
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Brooke Hill Subdivision
A/P #: EN2100036
Acreage to be Disturbed: 43.56
https://wnston-salem.idtplans.com/secure/project/?projectid=506138
Hello RS Parker,
Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been
completed. The design is adequate to meet the ordinance standards and the plans have been approved.
If you have not already done so, please provide an original signed and notarized Financial
Responsibility/Ownership (FRO)form as applicable. This document is required prior to the issuance of the
Grading/Erosion Control Permit. If this has already been provided, then please disregard this
statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to
use the HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the
Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the
NCG01 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the
permit at the following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is obtained,
please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion
Control Permit will not be issued until proof of coverage under NCG01 is provided. ***This approval email
serves as the "Approval Letter" that must be uploaded when filing the e-NOI application to obtain the
NCG01 Certificate of Coverage. ***
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of
Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically
inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the
approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized
representative, employee, or agent of the Erosion Control Division while that person is inspecting or
attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462-
7480 or matthewo@cityofws.orq.
i
Winston-Salem North Carolina and Forsyth County
City Link 311
311 or(336)727-8000
citylink@,cityofws.org
100 E.First Street
Winston-Salem,NC 27101
City Directory
From:Jeremy McCall <jeremy@greenmountainengineers.com>
Sent: Monday, October 30, 2023 10:05 AM
To: Kent Wall <kentw@cityofws.org>
Cc: Mike Adams<madams@rsparkerhomes.com>; Vince Townsend <vince@greenmountainengineers.com>
Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon
CAU AL SE *** . EVAL . ere
Does the content make sense? Can you verify the sender? If the email is suspicious: o no cis in
Mlettachmen
Kent,
I finally received a response form the state.They said that I never submitted the approval form the City. Looking back, I
cannot locate an approval form the City for the Revisions to the existing permit to include Phase II. We do have
approved stamped plans. Can you forward me the approval email so I can take care of this today?
Thank You,
Jeremy L. McCall,CFM, PE
Green Mountain Engineering, PLLC
1A Wendy Court
Greensboro, NC 27409
www.greenmountainengineers.com
Office 336.594-0643
Cell 336.870.0940
From: Kent Wall <kentw@cityofws.org>
Sent:Thursday, October 12, 2023 3:33 PM
To: Mike Adams<madams@rsparkerhomes.com>
Cc: craig sparks<sparkscontracting@att.net>;Jeremy McCall <jeremy@greenmountainengineers.com>; Stephen Parker
<stephen@rsparkerhomes.com>;Josh A. Montazeri <josh@greenmountainengineers.com>
Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon
Hey Mike, I looked that project up in our system and it looks like we are still waiting for the NCG01 permit
modification. Do you know if that has been obtain yet?
Thanks,
Kent Wall
Erosion Control Inspector
336-462-7481
2
From: Mike Adams<madams@rsparkerhomes.com>
Sent:Tuesday, October 10, 2023 11:21 AM
To: Kent Wall <kentw@cityofws.org>
Cc: craig sparks<sparkscontracting@att.net>;Jeremy McCall <ieremy@greenmountainengineers.com>; Stephen Parker
<stephen@rsparkerhomes.com>; Green Mountain <josh@greenmountainengineers.com>
Subject: [EXTERNAL] Brooke Hill phase 2 precon
Does the content make sense? Can you verify the sen
ope ink. Click the liMilliOiOutlook to notify I
Kent,
Hope you're doing well.
I wanted to touch base for scheduling a precon, Sparks will be doing the erosion Control and grading, I believe he's a
couple weeks out from starting.
Thanks
Mike Adams
RS Parker Homes
843-780-1128
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and
others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or
taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email
security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security,
compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human
error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website.
3