Loading...
HomeMy WebLinkAboutNCC211962_MODIFICATION Supporting Documents_20231030 Jeremy McCall From: Kent Wall <kentw@cityofws.org> Sent: Monday, October 30, 2023 11:53 AM To: Jeremy McCall Cc: Mike Adams;Vince Townsend Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon Jeremy, please use approval email below: City of di WINSTON-SALEM NORTH CAROLINA Application Type: 04.02) Grading/Erosion Control Permit Workflow: 04.02) Grading & Erosion Control Project: Brooke Hill Subdivision A/P #: EN2100036 Acreage to be Disturbed: 43.56 https://wnston-salem.idtplans.com/secure/project/?projectid=506138 Hello RS Parker, Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design is adequate to meet the ordinance standards and the plans have been approved. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO)form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document. If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCG01 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is obtained, please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCG01 is provided. ***This approval email serves as the "Approval Letter" that must be uploaded when filing the e-NOI application to obtain the NCG01 Certificate of Coverage. *** As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance. Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462- 7480 or matthewo@cityofws.orq. i Winston-Salem North Carolina and Forsyth County City Link 311 311 or(336)727-8000 citylink@,cityofws.org 100 E.First Street Winston-Salem,NC 27101 City Directory From:Jeremy McCall <jeremy@greenmountainengineers.com> Sent: Monday, October 30, 2023 10:05 AM To: Kent Wall <kentw@cityofws.org> Cc: Mike Adams<madams@rsparkerhomes.com>; Vince Townsend <vince@greenmountainengineers.com> Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon CAU AL SE *** . EVAL . ere Does the content make sense? Can you verify the sender? If the email is suspicious: o no cis in Mlettachmen Kent, I finally received a response form the state.They said that I never submitted the approval form the City. Looking back, I cannot locate an approval form the City for the Revisions to the existing permit to include Phase II. We do have approved stamped plans. Can you forward me the approval email so I can take care of this today? Thank You, Jeremy L. McCall,CFM, PE Green Mountain Engineering, PLLC 1A Wendy Court Greensboro, NC 27409 www.greenmountainengineers.com Office 336.594-0643 Cell 336.870.0940 From: Kent Wall <kentw@cityofws.org> Sent:Thursday, October 12, 2023 3:33 PM To: Mike Adams<madams@rsparkerhomes.com> Cc: craig sparks<sparkscontracting@att.net>;Jeremy McCall <jeremy@greenmountainengineers.com>; Stephen Parker <stephen@rsparkerhomes.com>;Josh A. Montazeri <josh@greenmountainengineers.com> Subject: RE: [EXTERNAL] Brooke Hill phase 2 precon Hey Mike, I looked that project up in our system and it looks like we are still waiting for the NCG01 permit modification. Do you know if that has been obtain yet? Thanks, Kent Wall Erosion Control Inspector 336-462-7481 2 From: Mike Adams<madams@rsparkerhomes.com> Sent:Tuesday, October 10, 2023 11:21 AM To: Kent Wall <kentw@cityofws.org> Cc: craig sparks<sparkscontracting@att.net>;Jeremy McCall <ieremy@greenmountainengineers.com>; Stephen Parker <stephen@rsparkerhomes.com>; Green Mountain <josh@greenmountainengineers.com> Subject: [EXTERNAL] Brooke Hill phase 2 precon Does the content make sense? Can you verify the sen ope ink. Click the liMilliOiOutlook to notify I Kent, Hope you're doing well. I wanted to touch base for scheduling a precon, Sparks will be doing the erosion Control and grading, I believe he's a couple weeks out from starting. Thanks Mike Adams RS Parker Homes 843-780-1128 Disclaimer The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website. 3